随着我国经济的快速发展,工程建设项目也在逐步增多,为了更好的提高我国工程建设项目的质量和效率,有效的工程建设项目管理是十分必要的。下面是我为大家整理的工程建设项目管理论文,供大家参考。
促进建设工程项目管理的 方法 探讨
工程建设项目管理论文摘要
摘要:大中型建设工程项目的成功建设和尽早投入使用的关键在于项目业主的项目管理水平和控制项目的能力。项目总控是加强项目业主方对项目管理和控制能力的有效途径。对项目总控的基本任务和特点进行了阐述,并进一步分析了项目总控的组织模式和项目总控的系统过程。
工程建设项目管理论文内容
关键词:建设工程 项目总控 信息技术
Abstract: large and medium-sized construction project the success of the project construction and put into use as early as possible is the key to the project owner's project management level and the ability to control project. Total project control is to strengthen the project owners for the effective way of project management and control ability. The basic task and the characteristics of the total project control, and further analyzes the organization mode of the total project control and project process of general control system.
Key words: construction project; The total project control; Information technology (it)
中图分类号:窗体顶端
中图分类号:TU71文献标识码:A 文章 编号:
窗体底端
1.引言
我国经济增长一直呈高速增长态势,而且,从国家整体经济发展状况来看,我国的工业生产、建筑、零售销售等基本面情况总体保持良好,这意味着中国经济未来几年继续快速增长的潜力很强。建筑业作为国民经济的支柱产业,也面临着极为广阔的发展前景。建筑施工企业建立现代企业制度的落脚点应该是不断创新和完善项目施工管理,而施工项目能否全面、顺利实施,解决好项目与企业的关系是关键,项目与企业间责任不明、关系模糊,激励不够,约束不严,不确定因素过多等严重影响着项目施工管理的正常实施,必须通过创新才能使项目施工管理适应现代企业制度建设的要求。
2.建设工程项目管理的发展
随着工程项目管理的发展,管理专家发现设计阶段对项目管理目标的实现影响巨大,这就是工程界已经形成的共识:工程设计费用一般只相当于工程造价的5%以下,但正是这少于5%的费用对工程造价的影响度却高达80%左右。因此,高质量的完成设计任务是项目成功的先决条件。
这是一个很大的进步,设计也成为项目管理的对象,并且将设计和施工阶段连成一个整体来进行管理。设计相对于施工而言,有更多的创造性活动,因此,管理设计需要更多的艺术和科学的成分,“效率”不再是唯一的追求。价值工程就是这一思想的反映。
作为一种结果,工程项目管理的范围包括设计,甚至在管理模式、方法上出现了,将设计—施工进行整合,例如,打破传统的设计—招标—建设模式,开始将部分施工图设计任务委托给承包商而不是设计者完成,早期的FIDIC合同版本,为这种整合提供了合同管理的条件。
当然,发展还在继续,工程前期的重要性表现在对项目经济效益的决定性。工程项目管理活动开始向设计的上游延伸,目的是确保设计合理、经济和实用性。这是一个更大的进步,项目的整合在扩大,在追求的效率的同时效率,强调对资源的有效的利用。工程项目管理的范围进一步扩大:前期—设计—施工,反映的仍然是整合管理。项目管理的手段有技术的、经济的、法律的,管理开始逐渐增加其科学的充分,而不仅仅是一种技术。
这是一个里程碑式的发展,根据项目中不同活动的特点将项目划分成不同的阶段,对不同的阶段采用有的放矢的管理方法,并在整体上将各个阶段加以整合,追求的是效率、资源有效的利用、客户至上。
直到19世纪中叶,工程活动造成越来越多社会矛盾等负价值,以及客户至上理念的发展,学者们发现原有的工程项目管理太多的关注生产效率、经济效益的问题,却忽视了工程活动所带来的社会、伦理、服务等新的问题。
时至今日,经济学家米尔顿?弗里德曼的古老公理,“商道之道乃商也”不再完全正确。社会和公众要求工程建设领域实现商业价值并承担更广泛意义的社会和道德责任,工程项目管理研究的焦点已从“效率”扩展到“社会”。
这是一个革命,工程项目管理范围的延伸和整合,使得项目管理以更高的视角、更多的参与者看待工程活动,最强的不仅仅是效率、经济性,还包括了可持续发展观和以人为本的理念。
从管理方法上看,今天的项目管理运用技术、经济、法律和社会科学知识进行管理。对于不同的参与者涉及的项目管理阶段,取决于具体的情况,例如,设计-建造合同,承包商涉及的项目管理就包括了设计、施工等阶段。又例如,对于BOT合同,承包商涉及的项目管理可能就包括设计、施工和使用等阶段。对于不同的合同,也可以包括概念阶段。
工程管理范围扩展的同时,项目管理专家越来越关注、重视两端的管理活动,特别是将概念阶段的管理称为创造性的管理工作,将施工管理称为程式化的管理工作,项目管理阶段延伸到使用阶段,体现服务至上、可持续观的理念。
工程项目管理的整合能够更好的达到以下三个目标:
(1)应用人类最先进的科学和技术成果,努力节约资源,不断地提高生产效率,获得更好的经济效益。
(2)实践以人为本的理念,生产舒适、健康、环保、安全的生产和生活场所。
(3)促进社会可持续发展,走低碳、绿色的发展之路;实现社会的公平、公正,保护生产者的健康和安全。
在中国,推动工程项目管理发展的动力还来自被称为“世界第一建筑市场”和城市化进程的内在要求。这是一个难得的实践课堂,它促进了项目管理从三十年前的热衷于引进,到近年来的关心于应用。今天,中国的项目管理专家已具备了进行管理理论、技术创新的外部条件,引领世界工程项目管理发展的领导地位指日可待。
比较而言,近二十年的工程项目管理具有更多的内涵、更高的层次,科学而不仅仅是技术的成分不断地增多,这对于管理科学服务社会,及其学科地位都有重要意义。
2. 建设工程项目总控理论及其应用
随着科学技术的发展,工程项目的规模越来越大,如何对大型项目、复杂项目、分散的项目实施有效的控制,确保项目计划顺利实施,项目目标有效实现。以信息技术为手段,结合企业控制论产生了项目总控。
项目总控是以现代信息技术为手段,对大型项目基层进行信息的收集、加工和传输,用经过处理的信息流指导和控制项目建设的物质流,支持项目决策者进行策划、协调和控制的管理组织模式。为大型、复杂、分散工程业主方的最高决策者提供战略性、宏观性和总体性咨询服务的。
联邦德国统一铁路改建和新建工程项目使用了项目总控,这个项目几乎符合总控运用的所有条件:规模大、空间范围分布广、复杂、工期要求紧。要确保项目目标的实现就需要有一个强有力的总控单位。
项目总控实施的关键是在预定的总体项目目标下进行Planning+Controlling。侧重于宏观的、整体的、方向性的策划、协调和控制,以保证工程项目整体的按目标完成。
2.1 项目总控的计划主要有以下工作:
项目总控的计划分解是根据项目总目标,先分解成里程碑计划,然后根据里程碑计划逐渐分级分解到执行层。计划的分解包括纵横两个方面的内容,即过程分解和任务分解,最后以合同的形式加以确定,这是项目控制的基础。计划分解是贯彻计划很重要的工作。在计划的基础上,该项目最后形成了几千个合同。
例如进度计划从里程碑到具体的任务层级进行分解,总公司关注的是宏观性的问题。
德国统一铁路项目组织管理形式是多级管理,从全国总公司、州级公司二级组织、项目管理三级组织到工地主任。这依赖于任务和过程的分解。
从德国统一铁路项目总控的组织中可以看出,总控单位有关项目信息的来源是自下而上的,而且信息量是逐渐减少的,这样就保证了只有最真实、最主要的信息能传达到总控单位,而总控有根据信息下达决策,而这时的决策路径是自上而下的,这符合“从实招来的实践中去”的原则。项目总控的组织包括业主项目总控和工程管理公司。
工程建设项目管理论文文献
[1] 蔡小飞.浅谈楼宇等民用建筑项目总控进度计划的编制与执行[J]. 江苏建筑. 2006(S1)
[2] 赵海金.浅谈大中型建设工程项目总控模式[J]. 山西建筑. 2007(02)
[3] 骆汉宾,姚军.轨道交通工程项目总控组织设计研究[J]. 武汉理工大学学报(信息与管理工程版). 2007(01)
[4] 贾广社,王广斌.大型建设工程项目总控模式的研究[J]. 土 木工 程学报. 2003(03)
[5] 周迎,丁烈云.武汉“数字轨道交通工程”项目总控支持系统研究[J]. 华中科技大学学报(城市科学版). 2004(02)
[6] 何广才,何清华.项目总控模式在大型工程建设管理中的应用[J]. 建设监理. 2005(01)
建设工程项目管理探讨
工程建设项目管理论文摘要
摘要:提高工程建设管理水平,保证工程质量和投资效益,规范建筑市场秩序的重要 措施 ,也是施工企业得以生存和发展的有效途径。本文阐述了建筑产品生产的特点,探讨了工程项目管理中注重加强管理的几个方面。
工程建设项目管理论文内容
关键词:建设工程项目管理
Abstract: improving project construction management level, and ensuring the quality of projects and investment returns, and regulate the important measures construction market order, and construction enterprise to the survival and development of the effective way. This paper expounds the characteristics of the building products production, discusses the project management in to reinforce the management aspects.
Key words: the construction project management
中图分类号:K826.16 文献标识码:A 文章编号
施工项目管理,既是一项科学的管理活动,也是一门复杂的管理学科。施工项目管理贯穿于工程项目实施的全过程、全方位,它涉及的工程质量、进度与费用是项目管理的关键内容。他们之间存在相互协调、相互制约、相互适应的有机关系。积极推行工程项目管理,是深化我国工程建设项目组织实施方式改革,提高工程建设管理水平,保证工程质量和投资效益,规范建筑市场秩序的重要措施,也是施工企业得以生存和发展的有效途径。
一、建筑产品生产的特点
1、建筑产品生产的流动性, 建筑产品地点的固定性决定了产品生产的流动性 。因此要编制周密的施工组织设计,使建筑产品的生产连续均衡地进行。
2、建筑产品生产的单件性, 建筑产品地点的固定性和类型的多样性决定了产品生产的单件性。
3、建筑产品生产的地区性, 由于建筑产品的固定性决定了同一使用功能的建筑产品因其建造地点不同,也会受到建设地区的自然 、技术、 经济和社会条件的约束, 从而使其建筑形式 、结构 、装饰设计、 材料和施工组织等均不一样。
4、建筑产品生产周期长, 建筑产品的固定性和体形庞大的特点决定了建筑产品生产周期长。
5、建筑产品生产的露天作业多, 建筑产品地点的固定性和体形庞大的特点,使建筑产品不可能在工厂里直接进行施工, 即使建筑产品生产达到了高度的工业化水平的时候, 仍然需要在施工现场内进行总装配后, 才能形成最终建筑产品。
6、建筑产品生产的高空作业多, 由于建筑产品体形庞大, 特别是随着城市现代化的进展,高层建筑物的施工任务日益增多, 建筑产品生产高空作业多的特点日益明显。
7、建筑产品生产协作单位多, 建筑产品生产涉及面广,在建筑企业内部, 要在不同时期有和不同建筑产品上组织多专业 、多工种的综合作业。
二、工程项目管理中注重加强以下几个方面的管理
1、成本管理
随着建筑工程项目管理体制改革的深入, 建筑业的生产方式和组织结构形式发生了深刻变化,工程项目管理水平的高低成为制约企业生存与发展的第一要素, 以工程项目管理为核心的企业生产运营管理机制已基本形成。
工程项目成本管理需要多方面努力, 主要应采取:优化施工方案, 改进工程项目管理手段。
(1)实行全过程的成本控制
加强成本管理、 控制费用的重要措施, 就是保证每个环节均能达到先算后做、 事先拟定费用的支出计划和成本开支范围以及可降低的成本比率, 把目标成本落实到每个最小的可控制单位, 甚至个人。 利用过程控制工具, 对项目成本进行过程控制 ,可以及时纠正项目建设过程中对最优计划的偏离 ,保证工程项目成本管理的效果。
(2)应从系统的角度, 通过平衡成本计划、 时间计划、 质量计划达到成本 、工期和质量之间的平衡 。企业效益取决于成本和收入两个方面 ,因此, 企业不仅从控制成本的角度来增加效益, 而且还要通过提高企业收入增加企业效益 ,工程质量的提高和工期缩短虽然可能增加一些经济成本 ,但这两方面都直接和间接地增加企业效益。 有助于企业打造核心竞争力, 塑造企业品牌。
(3)组织保障
组织是项目管理的载体, 是目标控制的依托 ,是控制力的源泉 。因此 ,在项目开工前, 要从组织项目部人员和协作部门上入手, 设置一个强有力的工程项目部和协作网络, 保证工程项目的各项管理措施得以顺利实施。
(4)建立合理的监督和激励机制
工程项目建设是一项复杂的系统工程, 工程参建单位众多, 如施工单位、 设计单位、 监理单位和材料设备供应商等 。在市场经济条件下, 各工程参建单位的行为都受到自身利益最大化动机的驱动, 其某些行为可能有损于工程项目目标的实现。为增强工程建设单位的道德风险意识 ,经济学家认为项目业主必须建立一种激励机制 ,诱导工程建设单位释放真实信息。对施工方案优化, 工程数量逐级控制 ,逐级价格预控等的激励措施, 以此达到各级组织追求工程项目成本降低的目的。
2、质量管理
在施工过程中,各个环节都存在着影响质量的因素,如施工时材料的质量差异、施工工艺的改变、天气环境的变化、施工设备的磨损等,都会产生质量变异,造成质量事故,并且公路工程质量比一般工业产品更难以控制。因此加强工程的质量管理,提高工程质量水平,就显得极其重要。
(1)明确工程质量目标
经理部要致力于满足业主要求的质量总目标而展开,制定相应的质量验收标准,而且要使质量验收标准不低于国家验收标准。
(2)建立质量保证体系
产品或服务质量的产生,归根结底是由作业技术过程直接形成的。因此,作业技术方法的正确选择和作业技术能力的充分发挥,是质量控制的致力点,包含了技术和管理两个方面。组织人员要具备相关的作业技术能力,只有通过科学的管理,对作业技术活动过程进行组织和协调,才能使作业技术能力得到充分发挥,为达到预期的质量目标。在施工工区、各班组建立自己的质量保证体系,配足专职质检员,项目实施过程中实行质量跟踪、监督、检查、控制。依照合同要求配备能满足工程需要的施工机械、检测设备、工具。建立工地中心试验室,配备试验人员,对施工质量进行跟踪检测。
(3)进行现场质量管理和控制
进行质量技术交底。在开工前,承包人要对设计图纸、工程数据进行复核,并对施工现场、定线数据进行复核、对含糊不清的问题进行汇总上报监理工程师和设计代表。 现场质量控制,做好“三检”即自检、互检、交接检。并建立质量奖惩制度。与各专业工程师、施工员、各施工队签订质量 责任书 。项目部试验室要对进场材料进行检验,不合格的严禁进场,已进场的不准使用并清理出料场,
对桥涵混凝土配合比要认真设计,确保各项指示符合设计要求。 施工现场采取动态跟踪,设立专业工程师,对路基及桥涵作技术指导,并设施工员进行全程跟踪施工指导。每道工序完工并自检合格后,申报监理人员验收。控制好每道工序的施工质量。
3、进度控制管理
工程进度涉及业主和承包人的重大利益, 是合同能否顺利执行的关键。在项目实施过程中, 监理工程师要制订出一套控制进度的措施和科学的计划管理方法 ,并根据合同赋予的职权监督承包人执行, 以保证工程在合同规定的限期内顺利完成。
(1)单项工程进度控制
在工程开工之后, 监理工程师应对整个工程进行专业分析, 建立工程分项的月、 旬进度控制图表 ,以便对分项施工的月、 旬进度进行监控。
(2)采用网络计划控制工程进度
用网络法制订施工计划和控制工程进度, 可以使工序安排紧凑便于抓住关键 ,保证施工机械 、人力、 财力、 时间均获得合理分配和利用 。因此, 承包人在制订工程进度计划时 ,采用网络法确定本工程关键线路是相当重要的。 监理工程师除要求承包人制订网络计划外, 监理机构内部也要求监理人员随时用网络计划检查工程进度。
(3)采用进度表控制工程进度
进度表是监理工程师要求承包人每月按实际完成的工程进度和现金流动情况向其提交的报表。 这种报表应由下列两项资料组成: 一是工程现金流动计划图 ,应附上已付款项曲线; 二是工程实施计划条形图, 应附上已完成工程条形图。 承包人提供上述进度表, 由监理工程师进行详细审查, 向业主 报告 。
(4)采用工程曲线控制工程进度
分项工程进度控制通常是在分项工程计划的条形图上画出每个工程项目的实际开工日期、 施工持续时间和竣工日期, 这种方法比较简单直观, 但就整个工程而言, 不能反映实际进度与计划进度的对比情况 ,采用工程曲线法进行工程进度的控制则比较全面。
总而言之,施工项目管理,既是一项科学的管理活动,也是一门复杂的管理学科。施工项目管理贯穿于工程项目实施的全过程、全方位,它涉及的工程质量、进度与费用是项目管理的关键内容。他们之间存在相互协调、相互制约、相互适应的有机关系。积极推行工程项目管理,是深化我国工程建设项目组织实施方式改革,提高工程建设管理水平,保证工程质量和投资效益,规范建筑市场秩序的重要措施,也是施工企业得以生存和发展的有效途径。
工程建设项目管理论文文献
[1] 赵俊光. 建筑工程管理浅析[J]. 科技风, 2010,(22)
[2] 吴尚华. 浅谈如何做好建筑施工管理[J]. 广东科技, 2011,(16)
[3] 孙长城, __刚. 浅论建筑工程项目管理[J]. 科技风, 2009,(19)
[4] 李大伟. 系统论视域下的建筑工程管理[J]. 黑龙江科技信息, 2011,(24)
有关工程建设项目管理论文推荐:
1. 浅谈建设工程项目管理论文
2. 浅谈工程项目管理论文
3. 工程项目管理论文参考范文
4. 有关于工程项目管理论文参考
5. 工程管理类论文 工程施工项目管理论文
6. 工程项目管理研究论文范文
工程监理论文参考文献
无论是在学习还是在工作中,大家都经常看到论文的身影吧,论文是讨论某种问题或研究某种问题的文章。那么问题来了,到底应如何写一篇优秀的论文呢?下面是我收集整理的工程监理论文参考文献,供大家参考借鉴,希望可以帮助到有需要的朋友。
1、李永华.分析建筑工程管理的现状及控制措施[J].赤峰学院学报(自然科学版),2016,05:75~76.
2、王永乐.建筑工程管理的现状分析及控制措施[J].江西建材,2016,06:282~283.
3、许家伟.建筑工程管理的现状分析及控制措施[J].门窗,2016,04:78+80.
4、王京双.建筑工程管理的现状分析及控制措施探讨[J].建材与装饰,2016,16:207~208.
5、李春艳.浅谈城市道路工程监理存在的问题及对策[J].现代国企研究,2016(20).
6、邹胜利.关于公路与桥梁工程监理存在的问题探讨[J].建材与装饰,2016(3).
7、李培仙,沈嘉钬,张福军.园林工程施工管理中存在的问题及对策[J].现代农业科技,2014
8、李孝济.园林工程施工要点及措施[J].北京农业,2015
9、谢国红.园林绿化管理对城市生态建设的重要性研究[J].北京农业,2014
10、郑治理.园林绿化工程质量控制及施工技术探讨[J].中国城市经济,2011
11、奚玉琦.浅谈园林绿化工程施工技术[J].农业与技术,2013
12、顾彩虹,蒋克.园林绿化施工中的质量控制问题探讨[J].中国科技投资,2013
13、文斌.浅谈房屋建筑工程质量监理的`方法[J].黑龙江科技信息,2010(12).
14、丽华.房屋建筑工程质量监理工作方法探索[J].城市建设,2011(10).
15、刘立明.公路工程监理企业的财务预算制管理探讨[J].交通财会报刊,2011,12(293).
16、孙爱香.对企业实施全面预算管理的探讨[J].当代经济,2010,11下.
17、张蕴杰.莘奉金高速公路机电工程监理重点和体会[J].上海公路,2002(S1):169-173.
18、苏钰.关于高速公路机电系统工程监理工作的要点分析[J].科技与企业,2014(8):58.
19、梁克胜.论山西省高速公路机电工程施工管理与施工要点[J].科技风,2013(5):138-139.
20、万荣军,郭路毅,王志兵,等.高速公路机电工程供配电系统施工要点研究[J].科技创新导报,2015(36):118-120.
21、赵淑娟.高速公路机电工程编制联合设计文件的几个要点[J].交通世界(工程技术),2015(3):92-93.
22、于立国.建筑工程监理、施工技术创新关系解析[J].四川建材,2013(06):269-270.
23、刘红春.建筑工程监理与施工技术的关系分析[J].江西建材,2014(23):283.
24、关锡强.建筑工程监理与施工技术创新关系研究[J].中外建筑,2015(05):138-140.
25、谢素莲.浅谈建筑工程监理与施工技术的相互促进[J].低碳世界,2015(31):123-124.
26、李乐仁.建筑工程施工技术与监理的关系分析[J].四川水泥,2016(11):194.
27、宋彦.工程监理公司向项目管理公司转变策略研究[D].中国石油大学,2010.
28、李仡.工程监理公司向项目管理公司转化策略研究[D].天津大学,2008.
29、范力勇.工程监理公司向项目管理公司转化策略研究[J].企业科技与发展,2010(06):47-48,54.
30、郝艳玲.如何充分发挥监理在机电安装工程中的作用[J].贵州水力发电,2012(23).
31、魏文昭.浅析水电站机电安装工程的监理注意事项[J].水利经济,2015(4).
32、张德军.刍议当前我国建筑工程中机电设备安装的常见问题[J].西北水电,2013,23(6):52~55.
33、陈燕.建筑幕墙工程监理的关键环节和技术要点[J].建筑监督检测与造价,2009,(4):20-23.
34、周建新.幕墙工程质量监理控制要点[J].建设监理,2012,(1):74-76.
35、阿瑛,郑治生.浅谈建筑幕墙工程施工的质量控制[A].土木建筑学术文库(第10卷)[C].2008:2.
[1]监理工程师在工程建设中对投资控制的探讨.于长生,20092009年全国水利工程建设监理论坛.
[2]监理工程师在水电工程建设造价控制中的作用.张家华.王俊杰,20092009年全国水利工程建设监理论坛.
[3]监理工程师应加强建筑给排水安装工程中的全过程质量管理.刘淑霞,20092009年七省市第九届建筑市场与招标投标联席会.
[4]监理工程师加强安全监理进行自我防范的思考.梁显钧.周兴,2008四川省土木建筑学会第33届学术年会.
[5]监理工程师对施工索赔的管理.郑立新,20082008年土木建筑教育改革理论与实践研讨会.
[6]监理工程师要学点“管理学”知识.葛俊民,2006北京市建设监理协会2006年会员大会.
[7]浅议监理工程师如何预防和减少索赔.李丹丹,2013全国城市公路学会第二十二次学术年会.
[8]监理工程师在施工阶段控制投资的作用.梁明,2007四川省土木建筑学会第32届学术年会.
[9]浅论监理工程师在施工质量控制中的作用.闫景侠,2006华东公路发展研讨会暨2006年华东公路科技情报网年会.
[10]浅谈监理工程师在风电建设中的作用.张凯莉.姜锐.李东,2007华北电力大学第五届研究生学术交流年会.
[1].工程建设安全管理中施工合同有关各方的职责.《土木工程学报》.被中信所《中国科技期刊引证报告》收录ISTIC.被EI收录EI.被北京大学《中文核心期刊要目总览》收录PKU.2004年5期.何伯森.张水波.查京民.
[3].利益相关者视角下监理工程师信用评价.《工业工程》.被中信所《中国科技期刊引证报告》收录ISTIC.被北京大学《中文核心期刊要目总览》收录PKU.2014年6期.赵丽丽.王雪青.陈杨杨.
[4].论工程项目施工中的安全管理.《建设监理》.2005年4期.何伯森.赵珊珊.程志鹏.
[5].浅谈监理工程师应具备的基本素质.《价值工程》.被中信所《中国科技期刊引证报告》收录ISTIC.2011年22期.徐良.
[6].对监理工程师一岗双责制度的几点思考.《水利水电技术》.被中信所《中国科技期刊引证报告》收录ISTIC.被北京大学《中文核心期刊要目总览》收录PKU.2013年4期.杨红.
[7].监理工程师如何做好建筑工程的监理工作.《黑龙江科技信息》.2011年9期.杜秀娟.
[8].施工阶段监理工程师如何做好质量控制.《山西建筑》.2010年5期.张桂林.
[9].试论业主与监理工程师的关系.《企业经济》.被北京大学《中文核心期刊要目总览》收录PKU.被南京大学《核心期刊目录》收录CSSCI.2006年1期.谢小妍.麦婵妹.闫健.
[10].监理工程师如何进行施工阶段的质量监理.《工业建筑》.被中信所《中国科技期刊引证报告》收录ISTIC.被北京大学《中文核心期刊要目总览》收录PKU.2005年z1期.
[1].目录.监理工程师施工项目质量控制研究.被引次数:22作者:臧伶.项目管理天津大学2009(学位年度).
[2].目录.基于治理的监理工程师信用改善研究.被引次数:6作者:范志清.管理科学工程;工程管理天津大学2010(学位年度).
[3].目录.论监理工程师专家责任.被引次数:6作者:戚福平.法律·民商法学华东政法学院华东政法大学2007(学位年度).
[4].我国建设监理工程师的权力与责任研究.作者:尚晓东.项目管理天津大学2013(学位年度).
[5].目录.监理工程师胜任力研究.被引次数:1作者:罗永锋.企业管理西安工业大学2008(学位年度).
[6].目录.关于完善建设工程监理制度若干问题的研究.被引次数:26作者:朱玉华.建筑与土木工程重庆大学2004(学位年度).
[7].目录.监理工程师在项目投资中的作用.作者:邹立国.项目管理大连理工大学2007(学位年度).
[8].我国工程监理职业责任保险费率厘定研究.作者:郭青澍.工程管理大连理工大学2014(学位年度).
[9].目录.建设监理工程师的专业培训模式研究.被引次数:1作者:杨莉琼.管理科学与工程重庆大学2005(学位年度).
[10].目录.监理工程师索赔管理的研究与实践.作者:龚瑜.管理科学与工程同济大学2004(学位年度).
谈工程项目施工成本管理参考文献 参考文献:[1 ] 敖丽莉. 浅谈工程项目施工成本管理[J ] . 化学工业与工程技术,2007 (28) :2322234. [2 ] 张国珍. 工程项目管理[M] . 北京:中国水利水电出版社,2008. [3 ] 王清样. 建设工程投资控制[M] . 北京:中国电力出版社,2009. [4 ] 张学芹,金兴举. 工程项目的成本管理[J ] . 天津建设科技,2007 (2) :50252. [5 ] 刘志禄. 浅谈工程项目变更索赔管理[J ] . 兰州工业高等专科学校学报,2006 ,13 (3) :55258.请继续阅读相关推荐: 毕业论文 应届生求职 毕业论文范文查看下载 查看的'论文开题报告 查阅参考论文提纲 查 阅更多的毕业论文致谢
[摘要]本文根据作者多年从事工程建设经验总结,对工程投资项目管理控制,谈谈自己的看法。[关键词]建筑工程;论文、综述;工程投资控制 工程投资项目的管理即为工程项目造价的管理,工程项目的造价管理将有机地贯穿于以上各个阶段之中。从而影响决策、设计、施工等各个阶段,但是目前许多工程仍出现投资失控,如:概算超估算、预算超概算、结算超预算等现象。究其原因,主要应控制以下几个方面:1、重视源头,加强项目工程设计环节的控制项目投资控制的关键是在施工前的投资决策和设计阶段,长期以来,我国普遍忽视工程建设项目前期工作阶段的造价控制,而往往把控制工程造价的主要精力放在施工阶段,这样做尽管也有效果,但毕竟是“亡羊补牢”事倍功半。要有效地控制工程造价,就要坚决把重点转到前期阶段上来,当前尤其是抓住设计这个关键,未雨绸缪,以取得事半功倍的结果。因此,建设单位的工程造价控制要以设计阶段为重点,这是有效控制建设项目投资的根本所在。设计阶段的投资管理对整个工程的造价管理是何等的重要。例如:洛阳新区某住宅小区,建筑面积82912平方米,由两栋18层,两栋16层及6栋多层组成的花园式小区,工程总造价控制在1.4亿元以下,在投资控制中,造价人员召开专家研讨评议及周密计算,改变了地基处理方式、调整了部分结构尺寸,优化给排水系统,不仅提高了使用功能,还节约了几百万元的资金。2、工程招投标是有效控制工程造价的核心通过招投标是引进竞争机制,降低工程成本的主要手段。施工队伍的优劣关系到建设单位工程造价控制的成败和业主入住时对开发企业产品的满意度。因此,要求施工企业具有足够的技术实力,它不仅使企业自身的生产、经营实现高效、优质、低耗,也使施工企业能有实力在工程造价上给建设单位合理的优惠。同时要严格掌握工程招标条件,认真编制工程标底和标书,做好评标定标工作。以中标价为基础通过谈判、协商确定合同及工期。工程招标应采取公开招标或邀请招标。招标书条款应严谨、准确和全面,工程造价及相关费用应尽量包死,少留或不留活口。中标后合同条款的签订应严谨、细致,工期应合理,尽量减少甲乙双方责任不清日后扯皮的现象。3、加强合同管理,保证工程投资的有效控制造价工程师或咨询公司作为建设单位在合同和造价方面的专业代理,在对合同条件的拟定、招标方式的选择,承包金额的协商过程中,应根据相应的法律法规,充分发挥自身的专业特长,切实控制投资,保证取得合理的最佳成本效益。在与承包商协议整个合同和商谈工程承包价时,除根据市场价格基础对承包商的总体报价的合理性作出评估外,尤须注意利用资金的时间价值,对承包商报价的平衡性作出评估。与此同时,造价工程师或咨询公司也应格守公正的职业道德,防止片面依从业主意愿,故意压低承包商价格。就建设单位而言,一般希望工程成本低一些好,但从建筑业的合同管理可以看出,表面的低价,往往导致偷工减料或频繁的索赔,甚至导致拖延、停工等严重事件的发生。所以合理地制定标底和评标是保证投资得以控制的重要手段。这既保证了承包商的合理利益,有益于工程的顺利进行,实际上也间接地维护了业主的利益。4、加强项目施工环节的工程造价有效控制。在施工阶段主要是以施工图预算为目标,控制建安工程造价。在这一阶段节约的余地已经很小,但浪费的可能性却很大,因而要对工程造价的控制给予足够的重视。4.1加强对施工方案的技术经济比较。合理的施工方案,可以缩短工期,保证工程质量,提高经济效益。对施工方案从技术上和经济上进行对比评价,通过定性分析和定量分析,对质量、工期、造价三项技术经济指标比较,可以合理有效地利用人力、物力、财力资源,取得较好的经济效益,把好施工管理关,是全面造价管理的重要途径。4.2健全设计变更审批制度。设计如有变更,一是要尽量提前变更,因为变更越早,损失越小;二是在每一变更设计之前,必须进行工程量及造价增减分析,并经设计单位同意。如果变更后工程造价突破总概算,必须经有关部门审查,要切实防止通过变更设计增加设计内容、提高设计标准、提高工程造价的情况发生。4.3对工程现场签证手续严格把关。通过建设工程监理制度,建立专门部门,利用专业人员对工程实行专业化管理,避免出现工程管理人员只管签证,不算经济帐的现象,造成投资失控的严重后果。为了严肃变更签证手续,应采取建设方、监理方、施工方代表现场联签的方式,保证变更、签证的真实性、合理性、经济性,避免弄虚作假现象及由此产生的经济纠纷。4.4对材料采购严格把关。材料控制上造价工程师应着重把好价格关和数量关,实行材料台账管理。材料采购要尽量减少中间环节或直接从厂家进货,拉大与预算价的降幅,争取更大的利润空间,紧紧围绕以实现工程项目的低成本目标控制;材料采购数量原则上不得超过预算数,对于实耗数与预算数有差异时,应认真进行分析。对于施工机械费的控制,施工企业要切实加强设备的维护与保养,提高设备的利用率和完好率。对确需租用外部机械的,要做好工序的衔接,提高利用率,促使其满负荷运转,对于按完成工作量结算的外部设备,要做好原始记录,计量准确。同时,造价工程师还要按月做好成本原始资料的收集和整理工作,正确计算月度工程成本,同时要按照目标责任预算考核要求按分部分项工程分析实际成本与预算成本的差异,并对其进行分析,同时采取积极的防范措施纠正偏差,以防止对后续施工造成的不利影响及成本失控;对盈亏比例异常的现象,要特别引起重视,及时准确查清原因,使成本管理朝好的方向发展。在项目总成本上,造价工程师负责各工种直接费的审核和汇总,进行控制。5、认真做好竣工结算价的审核工作工程竣工结算是指施工企业按照合同规定的内部全部完成所承包的工程,经验收质量合格,并符合合同要求之后,向建设单位进行的最终工程价款结算。经审核的工程竣工结算是核定建设工程造价的依据。因此,竣工结算的审核是一项非常重要的工作,应着重做好以下几个方面的工作:5.1审核工程量的准确性。工程量的审核是竣工结算审核过程中最重要、最繁琐、最细致的一项工作,必须以工程竣工图、设计变更及施工现场为依据,严格按照定额规定的工程量计算规则逐项进行审核,以防止施工单位在工程竣工结算上虚增工程量来增加工程造价。5.2审查定额套用是否正确。审查所列分项工程的单价是否与定额单价相符,其名称、规格、计量单位和所包含的内容是否与单位估价表一致;对于换算的单价,首先审查单价的换算是否是定额允许的,其次审查单价换算是否正确。5.3审查各项取费标准是否符合费用定额和施工期间有关工程造价政策规定。6、结束语 从以上几个方面可以发现,降低工程成本事在人为。随着土地成本的增高,开发建设企业自身资金的筹措,加强投资控制,降低工程成本是开发企业的当务之急。所以,做好工程造价的有效控制,才能使企业立足于竞争市场,取得更好的效益,得到更高的赞誉。【参考文献】[1]谭德精,杜晓玲,吴宇经主编.工程造价计价与控制[M].重庆:重庆大学出版社,2006.[2]吴现立,冯占红.工程造价控制与管理[M].武汉:武汉理工大学出版社,2005. 还有很多相关的论文你可以到: 去看下 自己整合下就可以了
项目管理是对整个工程的计划、执行和完工考评等整个过程的管理,下面是我为您收集整理的工程项目管理类论文的内容,有需要的朋友们可以看看,想了解更多请锁定网。
一、项目管理
1.××工程施工组织设计
2.项目融资TOT模式的现状及对策研究
3.PPP项目风险分担方式探析
4.工程项目施工安全管理研究
5.××工程施工安全管理分析
6.工程项目施工现场管理研究
7.××工程项目施工现场管理分析
8.施工企业 人力资源 管理模式分析
9.工程项目材料管理研究
10.工程项目集成管理研究
11.工程质量保修制度存在的问题及其对策
12.我国政府投资工程管理模式分析
13.现阶段工程项目管理新模式的研究
14.论优化设计与工程建设投资控制
15.建筑工程项目分承包方式的探讨
16.工程垫资施工的利弊分析
17.高校基建工程项目管理模式研究
18.BOT模式在高校基建工程项目中的应用
19.高校基建工程项目代建制研究
20.高校基建工程项目造价管理与控制
21.高校基建工程项目招投标管理与控制
22.高校基建工程项目质量管理与控制
23.高校基建工程项目材料设备的采购与管理
24.工程项目管理“代建制”管理模式风险及其对策探析
25.工程项目管理“代建制”激励约束机制研究
26.关于我国建设项目总承包发包模式的研究
27.施工企业的组织机构设计对施工企业的影响研究(以XX企业为例)
28.房地产企业的组织机构设计对房地产企业的影响研究(以XX企业为例)
29.项目经理部的组织机构设计对施工项目的影响研究(以XX项目为例)
30.建设工程项目成本控制系统的分析与设计(以XX项目为例)
31.施工企业组织机构设计的优化(以XX企业为例)
32.房地产企业组织机构设计的优化(以XX企业为例)
33.项目经理部组织机构设计的优化(以XX项目为例)
34.建设项目的分包与总包研究(以XX项目为例)
35.建设项目总承包发包模式的研究(以XX项目为例)
36.大型建筑工程项目风险管理和工程保险的研究
37.建设项目风险预警系统的研究
38.城市土地成片开发项目前期策划及研究
39.开发商合同中的风险转嫁研究
40.承包商对开发商合同中的风险转嫁对策
41.建设工程安全预控管理信息系统研究
42.浅谈如何加强建设工程施工机械设备安全管理
43.关于建设工程现代安全管理体系建立的思考
44.建设工程安全管理体系化与信息化的应用研究
45.建设工程施工安全管理现状分析与建议
46.建设工程项目施工现场的消防安全管理探讨
47.BT项目施工管理特点及控制方法研究
48.大型运动会(例北京奥运会)项目风险管理研究
49.北京奥运工程项目管理研究
50.北京奥运工程信息管理分析
51.北京奥运工程承包模式分析
52.北京奥运工程人力资源管理初探
53.如何创建学习型组织团队
54.项目管理过程中语言方式及管理原则、沟通技巧探析(可以以业主、监理、施工等不同岗位角色中选择某一角度进行分析)
55.项目管理软件的应用与普及推广研究(现状、发展方向、推广方式)
56.绿色施工模式的实施策略研究
57.全面绿色施工管理研究
58.高层建筑绿色施工的成本分析及控制研究
59.某工程绿色施工组织设计
60.绿色建筑及绿色施工评价体系的研究与实践
61.多高层住宅的施工技术难点与管理模式探讨
62.建筑施工企业青年员工激励因素研究
63.建筑施工企业安全管理问题与对策研究
64.超高层建筑施工费用影响因素及控制措施研究
65.建筑施工企业管理标准化研究
66.建筑施工承包市场现状分析与对策探讨
67.建筑施工企业挂靠现象的风险识别与危害防治研究
68.建筑施工企业“挂靠经营”现象分析及对策
69.建筑施工企业空壳化现象研究
二、工程计价管理与控制
1.××工程的工程造价测算
2.××工程施工图预算书的编制
3.××工程工程量清单报价分析
4.工程造价的影响因素及控制措施--以XX工程为例
5.对我国工程价格实行“量价分离”的探讨
6.全寿命周期成本分析在工程项目中的应用研究
7.项目决策对工程造价的影响研究
8.建设项目设计阶段工程造价的计价与控制研究
9.工程量清单计价下施工过程中风险分担研究
10.浅谈用价值工程原理控制工程成本
11.工程量清单计价与传统报价模式比较分析
12. 工程设计对工程造价的影响研究
13.试论土建施工图预算的审核方法
14.关于在项目采购管理中成本降低的思考
15.工程造价咨询机构实施项目管理探讨
16.新型材料的出现对建筑工程造价管理的影响
17.论价值工程与建筑工程造价控制的关系
18.施工阶段全过程造价控制的范围及实施
19.工程造价计价现行体制的缺陷与对策研究
20.××钢筋工程量的计量方法分析
21.清单计价模式下施工项目造价控制
22.清单计价模式下项目风险管理研究
23.建设项目前期工程造价管理
24.工程总承包模式下的造价控制
25.工程量变化导致的业主风险分析与防范
26.建筑安装工程招投标过程中工程造价管理
27.工程实施阶段的造价管理与控制
28.政府投资项目工程造价管理研究
三、合同管理与招投标
1.无标低招标体系下业主面临的风险与防范
2.××建筑工程项目投标报价案例分析
3.建设工程中围标陪标问题研究
4.房地产工程现场签证与合同管理
5.工程建设合同担保制度研究
6.工程项目分包合同风险的规避和对策探讨
7.某工程项目合同索赔案例的解析与探讨
8.建设工程施工(监理、设计、勘察)合同常见纠纷及解决方法
9.监理工程师在施工工程合同管理中的作用
10.目标成本合同在工程项目中的应用研究
11.浅谈固定总价和固定单价施工合同的比较和选择
12.工程合同审计案例研究
13.建设工程施工合同的订立及其对合同效力的影响
14.建设工程违规合同的分析与探讨
15.建设工程“黑白合同”的效力及认定
16.完善我国建设工程施工合同违约救济的思考
17.在工程决算审计中如何回避合同风险
18.承包商工程合同索赔的方法与技巧
19.对施工合同承包人占有已竣工工程的探讨
20.建设工程合同变更及管理之我见
21.建设工程施工合同履约监管初探
22.情势变更原则在建设工程施工合同管理中的运用
23.建设工程合同的谈判技巧
24.招投标中的不平衡报价及识别方法
25.浅谈建筑工程项目招投标中的问题及对策
26.浅谈建设工程项目招投标中废标的认定
27.建设工程综合单价的市场组价在招投标中的应用
28.建设工程招投标中不平等问题探讨
29.建筑市场劳务分包现状分析及对策
30.无标低招标体系下业主面临的风险与防范
31.工程施工中对工程分包的管理
32.探讨合理低价中标在建筑工程中的应用
33.工程进度款的支付研究
34.建设工程招标投标的发展趋势
35.试论建筑市场的价格竞争
36.工程量清单模式下企业投标报价问题的研究
37.工程拖欠款现象探究
38.建筑工程最低价格密封招标与投标的风险控制
39.工程量清单计价模式下的报价策略与赢利措施探讨
40.工程量清单计价模式下施工合同管理研究
41.关于工程项目合同担保制度的研究
42.工程项目不同形式的担保比较研究
43.工程保险制度浅析
四、工程经济及项目可研
1.××工程项目的(建设、运营、安全等)风险评估
2.××工程项目节能评估研究
3.××工程项目环境影响评估研究
4.××工程项目的财务评价分析
5.××工程项目的国民经济评价分析
6.××房地产项目的可行性分析研究
7.房地产项目投资可行性分析的存在问题及对策
8.建设项目绿色经济评价方法研究
9.节能建筑的经济评价方法研究
10.某工程××和××两种工艺的技术经济分析及比较
11.论工程项目的不可行性研究
12.论可行性研究在房地产开发中的作用
13.考虑资金时间价值的工程经济决策树方法
14.建筑工程节能措施和经济效益分析
15.建设项目工程咨询发展实践与探索
16.价值工程在项目投资决策中的应用
17.建设工程项目后评价方法研究
18.××方法(如层次分析法)在××工程项目后评价中的应用
五、施工技术
1.××工程土方工程施工方案分析
2.××工程降水施工方案分析
3.钻孔灌注桩及人工挖孔桩施工技术的研究及应用
4.CFG桩基础工程施工要点及质量控制措施分析
5.××工程×××桩基础施工方案与质量控制措施(可以任选一种桩型)
6.××工程泵送混凝土施工方案分析
7.高强度混凝土施工及质量控制措施分析
8.高强预应力混凝土管桩液压法的施工
9.泡沫混凝土在建筑工程中的应用
10.复合土钉墙在软土地基中应用
11.软土地基桩基础类型选择与施工措施
12.建筑外墙保温施工技术与施工措施分析
13.落实安全文明施工措施费的监管措施浅析
14.建筑施工企业安全防护、文明施工措施费的提取、使用和管理分析
15.高层建筑深基坑支护工程结构设计与施工措施
16.如何在工程项目全过程管理中控制施工措施费
17.严寒地区混凝土冬季施工措施分析
18.××工程安全文明施工方案
19.××工程节能施工方案
六、房地产开发与经营
1.××房地产开发项目市场定位分析
2.××房地产估价案例及分析
3.××房地产项目 营销 策划方案研究
4.××房地产企业营销体系的分析与再造
抛开抄袭。你至少切实参与实践几次招投标活动,再查些资料仔细分析分析。建议毕业论文不要写这样的题目,没有实践,写不好的。招标和投标也不一样,而且这两个问题有点大。你可以选择其中某一点展开观点分析。比如招标活动中,招标代理设置的专用条款,通用条款,在实际投标中的应用问题;或者投标中报价的确定问题,方案的优化问题,等等。选择一点就够写一大堆了。
1、着眼实际,查漏补缺,抓紧修订完善招投标法规的配套制度。要对现行法规进行一次全面梳理,滞后于现实的抓紧修订,有明显漏洞的及时完善补充,过于原则、不便操作的尽快制定实施细则,需要配套的抓紧制定配套措施。实行监管部门与实施部门职权分离,堵住招投标过程中暗箱操作、少数人决定重大事项等漏洞。尽快研究制定新制度,修订完善老办法。2、创新机制,强化责任,加大对招投标工作的全程监管。立足现有体制,按照“管办分离、统一监管”的原则,重新界定招投标管理委员会、招标办和招投标中心的职责并监督其严格履行,构建职责明晰、适应招投标市场发展要求的领导、监管和操作机构管理体制。以招标方式的选择、资格审查和评标为切入点,以关系国家利益、公共利益和公众安全的项目为重点,加强全程监督,明确财政、审计等部门的责任,把单纯监督执法拓展到立项、履约、验收、审计等各个阶段。强化信息公开力度,把招投标活动的公告发布、投标报名、资格预审、开标、评标等各个环节置于公开透明的环境下,便于社会监督。 3、发展问题,果断处置,建立招投标举报投诉和快速干预机制。相关案件在招投标期间未引起重视或被举报,工程竣工后很难获取直接线索。要健全举报投诉机构,向社会公布举报投诉电话、电子邮箱等,构建部门监督、群众监督、社会舆论监督的立体监督体系;对实名举报的有价值线索,及时受理,认真调查。
工程建设项目招投标中存在的问题及对策郭强 吴耀星 工程建设项目实行招投标制度以来,通过规范、有效的市场竞争,较好地实现了社会资源的 优化配置,通过公平、透明的操作程序,一定程度上防止了腐败现象的发生。然而,我们在对工 程建设项目招投标审计中仍然发现部分项目存在一些违法违规问题。本文就此类问题及审计的做 法谈几点体会。 一、招标投标中存在的主要问题 1.评标人人为操纵中标结果。一是评标人以优惠报价的形式,调整投标报价。如某工程采取 最低评估价中标方式。项目公证开标后,评标人发函询问投标人是否愿意对投标,报价再作优惠, 并限期答复。以最低报价的投标人认为已是最低不再下调报价,而报价次低或较低的投标人及时 回函下调报价,成为最低报价人而获得中标。如此做法实际上是招标人与投标人相互勾结,改变 了投标文件的实质性内容以实现“意中人”中标。二是评标人以澄清含义不明确内容的形式,调 控中标结果。 如在某次评标中, 某投标人最有可能胜出。 评标人要求该投标人对投标文件中以 “拟 投人到该标的流动资金”这一内容作澄清,在相互沟通时暗示其若放弃该标而有机会中其他标。 该投标人心领神会,回函声明“由于我公司流动资金紧张,无足够资金投入到该标”而放弃该标 中标机会。评标人以流动资金不足为由,否定了该最低报价投标人,使得报价高的投标人中标, 相对抬高了中标价格,损害了国家利益。三是评标人对投标人实行歧视待遇,故意排斥投标人。 如某省水利系统外部投标人在其投标文件中明确承诺“我方所承担的工程,未经业主同意,绝不 向外分包、转包,全部工程自行完成” ,而由该系统内部专家组成的评标人出于对内部企业保护 的目的,无依据认定该投标人“以实质上超出所允许的金额和方式进行分包” ,以不合理的理由 将该投标人拒之门外,使得报价较高的系统内部投标人得以中标。 2.投标人弄虚作假,扰乱正常招标。一是投标人夸大经济实力,取中标。如某项目要求, “投标人用于本合同的流动,资金或信贷额度应不少于 550 万元” 。投标人如不达到此项要求, 其投标将被拒绝。为此。某些投标人利用关系,让银行为其出具虚假资信证明。证实其具备较高 资信、具有较大信贷额度,能够满足资金方面的要求。更有甚者投标前四处举债,待取中标之 后再作“完璧归赵” 。二是投标人夸大技术实力,取中标。为满足投标要求,某投标人将承包 过部分附属工程的整体工程悉数列为名下,以“壮大”自身实力。有的投标人在标书制作过程中 大肆造假,制作假文凭、假证书,一些低学历、无技术的临时聘用人员也滥竽充数,妄想蒙混过 关。还有的投标单位自身资质未达招标要求,外借其他单位资质参与投标。中标后向提供资质的 单位支付一笔费用。三是投标人相互围标、陪标,以高价中标。由一家投标人暗中邀请符合招标 条件、具有相应资质条件的另外几家企业报名投标,之后便一路“过五关斩六将” ,中标如同囊 中取物。有时候是由陪标单位制作标书,中标人中标后支付一定报酬,这种方式比较隐蔽,成本 较高。还有时候干脆由中标人统一制作标书。提高了陪标的效率,也降低了陪标的成本,形成今 天你陪我、明天我陪你的局面。陪标、围标目的是抬标,让招标人承担远高于市场的价格,真正 受损害的还是招标人。 3.招标人与投标人串通舞弊,共谋利益。在目前招标投标活动中,存在着种种招标人与投标 人串通舞弊、操纵中标结果的行为。这些不正当竞争行为,是以牺牲国家利益、社会公共利益或 者损害他人合法权益为代价的,其手段常常是综合运用上述种种做法。 二、招投标审计的几点做法认真审阅资料,对比分析。如某投标人同时投向两个标,而审计人员比较发现,两标工程 内容相同、对投标人要求也相同,但评标人却在对投标人资格审查时,认定该投标人“近三年类 似工程业绩”资格在其中一标合格、而在另一标不合格。审计人员由此推断评标中存在人为排斥 投标人行为。 2.深入延伸调查,实地落实。陪标、围标手段隐蔽。从招标人到投标人再到评标人都心照不 宣,如同“铁桶阵” ,审计人员在对某一投标单位延伸调查时才找出违规操作的确凿证据,那是 另外几家投标单位在该单位报销购买标书费用的发票。原来是该单位中标后,为其陪标的投标单 位凭单据前来报销购买标书的费用。审计人员以此为据,该单位不得不承认投标过程中存在陪标 行为。有的投标人行贿后,使用“招待费”“业务费”发票或虚假发票进行报账。在对某投标人 、 延伸审计时, 审计人员发现一张注明为招待某某业主费用的发票, 该投标人行贿行为 “跃然纸上” 。 3.多方获取信息,顺藤摸瓜。如在某次审计中,审计人员接到举报,反映某中标单位在投标 之前存在转包分包行为,且受过严重处分,而评标人认定该单位无转包分包行为。对此,审计人 员依据举报线索, 调查认定情况属实, 推断中标人与评标人有串通赚疑, “拔出萝卜带出泥” 最终 。【中文摘要】 : 工程招投标的实施促进了我国建筑市场的繁荣和经济的发展,节约了工程 投资,提高建设工程质量。随着我国社会主义市场经济的不断发展和完善,以 及与国际惯例接轨的迫切要求, 工程项目招投标将越来越规范化、 制度化。 2000 年 1 月 1 日,国家颁布了《中华人民共和国招标投标法》 ,并陆续制定一系列 政策法规, 规范相关规章制度, 逐步形成建设工程招投标法规体系的基本框架, 有效遏制了工程建设领域的腐败行为,对规范工程建设项目招投标工作,惩治 招投标活动中的违规行为起到了重要作用, 然而我国实行工程招投标的时间还 不长,工程招投标中规范化的操作还远远不够,还存在很多腐败的现象,工程 招投标的管理亟待加强。究其原因,除了我国的市场环境有待成熟,市场机制 尚需完善之外。还要加大严格执行依法招标制度;切实加强有形建筑市场的制 度建设,规范评标机构和评标活动,保证评标活动的公正性;加强建筑企业内 部造价管理,提高管理水平;强化工程招投标监督执法,依法实施行政监督。 【英文摘要】 : The implementation of project bidding promoted China's construction market prosperity and economic development, save the project investment, improve the construction quality. Along with our country socialist market economy continues to develop and perfect, and with international practice, the urgent requirement of project bidding will more and more standardized and institutionalized. On January 1, 2000, the government issued the bidding law of the People's Republic of China, and gradually establish a series of policies and regulations, regulate related rules and regulations, gradually formed bidding for construction project regulations system framework, effectively the construction field to regulate the corruption, project bidding, punish violations of the bidding activities play an important role, but our country executes project biding time is not long, project bidding process normalized operation is still far from enough, there are still many corruption phenomenon, the management of project bidding to be strengthened. Investigate its reason, besides our market environment, market mechanisms to mature beyond need to be perfected. Should strengthen strict execution to tender according to law system; Strengthen the construction of system in the construction market of a tangible, standardize the bid evaluation institutions and the bid evaluation activities, to guarantee the fairness of the bid evaluation activities; Strengthen building enterprise internal cost management, improve the level of management; Strengthening project bidding according to law supervision enforcement implement administrative supervision. 【关键词】 : 腐原创性声明 兹呈交的工程项目管理论文, 是本人在导师指导下独立完成的研 究成果。除文中已经明确标明引用或参考的内容外,本论文不包含任 何其他个人或集体已经发表或撰写过的研究成果。 本人依法享有和承 担由此论文而产生的权利和责任。 声明人: (签名:_________) 日期:2010 年 6 月 26 日 工程项目招投标中存在的问题及对策【中文摘要】工程项目招投标,其意图就是将社会资源进行合理有序的分配。通 中文摘要】 过招投标这样一个活动,企业优胜劣汰,最终将资源分配给管理体质和技术能力 都较强的一方,充分发挥竞争机制的作用。同时,企业为了多中标、中好标,就 必须提高自身水平,加强企业管理,不断提升技术水平,加强竞争能力。这本身 是一件无可厚非、利人利己的好事。然而,在现实情况中,由于招投标本身存在 着极大的利益驱动,使得许多以权谋私、钱权交易、中饱私囊等腐败现象不断发 生,产生了极其不良的社会影响。本文旨在指出当前工程项目招投标活动中广泛 存在的各种问题,并针对这些问题提出相应的对策,为今后的更好的开展各项招 投标工作提供参考与借鉴。 【关键词】项目工程 招投标 存在问题 危害 对策 关键词】 【英文摘要】Inviting bidding and tender of construction project aims at finding 英文摘要】 out a reasonable and ordered way to deal with the social resources. By the action of inviting bidding and tender, enterprises compete and the battle is to the strong. The one who are more outstanding in management and technology finally get the resources, which brings the role of competition mechanism into full play. At the same time, in order to win the bid more times and in high quality, enterprises must raise their own standard in management and technology and become more competitive. It seems to be a good thing to both sides. However, in reality, the benefits of inviting bidding and tender drive some corruptions occur, which leads bad effects on society. The text points out existing problems lies in inviting bidding and tender, and presents countermeasures and suggestions to improve the bidding work. 【英文关键词】project bidding & tender problems 英文关键词】 【正文】 正文】 damage suggestions 一.引言 招投标制度自上个世纪八十年代初期在工程建设领域开始推行 以来,至今已经成为了我国建设市场主要交易方式。长久以来,招标 投标活动一直遵循着“公开、公平、公正”的原则,先由各设计、施 工和材料供应等单位自主报价投标,相互竞争,最后由发包方择优选 定承包方。可以说,招标投标制度的推行和不断完善,在很大程度上 确保了建设工程的质量,加快了工程建设进度,使建筑主体各方取得 较好的经济效益。将近三十年的实践证明,招标投标制度是比较成熟 而且科学合理的工程承包发包方式,也是保证建设工程质量,加快工 程建设进度,取得理想经济效益的最佳途径。但与此同时,我国目前 的建筑市场发育还不够规范,监督约束机制并不完善,管理体制也不 够健全,加之经验的不足,招投标制度在实际的操作中仍然存在着一 些不规范、不合理的薄弱环节。 二.从实际运作中看招投标过程存在的问题及危害 1.规避招标 案例一:赣查处规避招标分包转包的违规招投标案件 江西省人大财经委近日公布的全省建设项目实施招标投标情况 的检查报告称,近年建设部门查处一批规避招标、分包转包的违规招 投标案件,一些情节严重的施工企业被清除出建设市场,有效遏制了 招标投标违法违规行为。 据江西省人大财经委介绍,2004年至2006年上半年,江 西共有6964个房屋建筑和市政基础设施工程项目实行招标, 标底 总造价384.44亿元,节约资金14.25亿元。检查报告披露说, 江西省机械职工大学在开建新校区工程时规避 招标、肢解发包;贵溪市国土局在开建综合楼交易综合业务用房工程 时要求投标人垫资100万元,并要求其将中标价下浮10%。对上 述案件,建设部门已对责任单位和责任人予以严肃处理和公开曝光。 从2004年至2006年6月, 江西省水利厅先后对14家施 工企业、1家监理单位和1家招标代理机构进行了处罚,取消了11 家水利施工企业参与省内水利工程的投标资格。 江西省重点办会同有关部门受理招标投诉60余起,对情节严重 的违法违规投标人,坚决取消其投标或中标资格。如昌泰高速公里、 乐温高速公路3家中标企业在建设过程中违法分包转包工程, 江西省 重点办对此进行了重点查处,并将其清退出场。 分析: 在分析上述案例之前,先谈谈规避招标。所谓规避招标,就是招 标人以各种手段和方法,达到逃避招标的目的。 《招标投标法》第四 条规定: 任何单位和个人不得将依法必须进行招标的项目化整为零或 者以其他任何方式规避招标。 规避招标行为一般有以下三类情况: 一是通过肢解工程来规避招标。 建设单位将造价大的单项工程化 整为零,肢解为若干个小的子项工程,这些小工程的造价低于招标限 额,从而规避招标。例如在审计过程中就发现某单位将办公楼装修工 程肢解为楼地面装修、吊顶等项目对外单独发包。 二是压低预算价。想方设法将工程造价降低到招标限额以下,确 定施工单位后,再进行项目调整,最后按实结算,最后工程结算造价 往往大大超过招标价格。 三是中标后改变工程量。 比如说有的单位先将主楼工程拿出来招 标,确定施工单位后,再明确工作内容不仅仅是主楼,同时还增加一 些附属建筑,规避了附属建筑的招标。 从江西省的这一案例我们不难看出, 规避招标在当前的社会中并 不少见,如果不是有关部门即使发现并制止查办,这样的现象必定会 导致整个省级工程项目招投标更加严重的腐败与猫腻, 甚至会扰乱正 常的建设市场的秩序。 建筑市场工程承发包从政府建设行政主管部门 指令性计划分配任务,到施工企业自己上市场揽业务,再发展到今天 在有形建筑市场(政府投资项目)参加竞标。政府建立招标投标制度 就是为了建立正常的市场秩序, 但是部分施工企业或其代理人不通过 公开招标而承揽到工程项目,从而扰乱了正常的市场秩序。 同时,这种不良环境下产生的工程,质量得不到保证。投标中的 违法行为,大都是为了给个人或小集体捞取利益,这样,业主与施工 单位之间相互制约的关系,就被一种特殊的利益关系所取代。这使得 双方对工程质量与效益的责任约束降到最低,容易发生偷工减料、不 执行工程建设强制性标准等行为, 甚至出现了业主单位与施工方串通 一气,掩盖质量问题的情况。 第三, 容易诱发腐败。 正常招标的项目都是在 “阳光” 下进行的, 而所谓的议标项目往往是单位几个人进行的所谓评标, 在工程承揽过 程中关键人物就成了施工单位攻关的对象,容易导致钱权交易,产生腐败。 2.招投标信息公告发布不规范 《招投标法》规定对招投标信息的发布作了明确的规定,但在实 际操作过程中,人有些人不按照规定发布信息,这主要表现在两个方 面:一是一些人常借口工期紧任务重、提高工作效率随意缩短信息发 布时间, 有的只发布一两个星期就匆匆开标; 二是限制信息发布范围, 不按要求在规定的媒体上发布信息, 而只将公告发布在了某一发行量 不大的不知名的地方报纸上,有的甚至只将公告张贴在单位门口。这 两何种做法在客观上都造成了潜在投标对象获知信息的不平等, 违背 了招投标活动所应该遵循的原则。 3.串标、围标现象严重 案例: “格力事件” 广州市政府采购网显示,2008 年 11 月 4 日,广州市番禺中心医 院筹建办公室委托广州市政府采购中心组织空调项目采购, 广州格力 空调销售有限公司同广州市水电设备安装有限公司、 广东省石油化工 建设集团公司、中建三局二建、广州市美术公司、广东省华侨建筑装 饰公司共同竞标。 广州市政府采购中心在其网站上发布 的番禺中心医院“子包二” 项目说明显示, “门诊楼变频多联空调器设备采购及安装” ,包括室外 机 314 台,室内机 1198 台,预算 2220 万元。 格力起诉书称,11 月 5 日,广州格力空调销售有限公司收到了来自广州市政府采购中心的 《关于提交有关投标资料的原件予采购人 核对的函》 ,被告知在 11 月 4 日的评标会上成为“子包二”的第一中 标候选人。 据格力的起诉书,11 月 10 日,格力方面收到了广州市政府采购 中心转来的采购单位番禺区中心医院筹建办的情况说明函。说明函 称,评审中其委托的评标专家认为中标候选人的投标文件有许多问 题, “现场反映,未被重视” ,之后再次认真核查《投标文件》 ,认为 格力空调投标设备实质上不能满足招标文件打星号条款。 11 月 13 日,广州市政府采购中心将格力空调的“情况说明”函 发给番禺中心医院和番禺区财政局政府采购管理办公室。 但番禺中心 医院仍然认为格力空调招标设备不能满足招标文件的要求, 拒不确认 该结果。 格力起诉书显示,11 月 14 日,番禺区政府采购办致函广州市政 府采购中心提出按照有关规定对项目进行复审。11 月 18 日复审后, 格力空调被彻底“废标” ,广东省石油化工建设集团公司成为中标供 应商,该公司的报价为 2151 万元,比格力报价 1707 万元多了 400 多 万元。 这使得格力非常不满。 串标围标的情况, “ 我们觉得是很明显的。 ” 广州格力法务部经理陈勇对时代周报记者表示, 他们认为投标的条件 是为某些人量身定做。 分析: 从格力事件中我们不难发现, 一些项目特别是在一些工程建设项目中,投标单位之间或投标单位与招标单位相互串通取中标。一些 承建商为承揽工程,以非法的手段参与投标竞争的现象很普遍。如一 家施工单位挂靠数家施工企业参加投标, 通过编制不同的投标方案进 行串标、围标,从而将其他投标人排挤出局。它严重扰乱了招投标市 场秩序,损害了国家和他人的合法权益,引发了腐败。 三.对策及建议 1.提高监管、监督工作力度 首先要完善监管机构,发挥其管理职能,真正做到依法查处、严 格把关,对于招投标活动中出现的不正当违法行为绝不手软。要强化 招标投标备案制度,招 投标管理办公室要充实力量,认真履行职能,针对招投标管理过程中的薄弱环节,加强监管,堵塞漏洞。 其次要建立责任感,加强监管。深入明确招投标办与管理部门的 责任,做到招投标市场与管理市场协调运作,严防在工程项目中出现 转包、违法分包、违规变更设计等违法违规问题。 除此之外还要加强执法检查,严惩违规行为。对有串标、挂靠行 为的投标作废标处理, 根据情况停止投标人一年至二年内在本县建设 市场的交易活动。对招投标各个环节存在的问题,依纪依法追究当事 人的纪律法律责任。以有力的执法监察保证招投标活动的规范运作。 2.加强招投标中心建设,规范招投标运作。 将招投标中心与招投标办脱钩,使操作与监管分离,保证监督到位。同时加强对招投标中心工作人员的法纪教育。注重利用反面典型 开展警示教育活动,增强其廉洁自律的意识和依法行政的意识。另外 也要加强对招标代理单位机构的约束。 有关部门要加强对招标代理机 构单位工作人员的法制教育和执业道德教育,促进其规范从业。 四 是加强招投标中心的硬件设施建设和内部管理, 修定完善内部规章制 度,严格内部人员管理,调整充实专家评委库,改进评标定标办法, 严格场内交易活动的程序,使中心成为招标投标活动的有效载体。 3.完善规章制度,净化招投标市场 建立对业主行为的监督制度。对必须招标而未招标、将工程肢 解发包等行为要严肃查处,视情节轻重,不予颁发施工许可证或不准 开发新项目。同时立信用档案,完善廉政准入制度。此外建立市场准 入和清出制度。 通过加强企业年检和专业技术人员执业资格注册等管 理手段, 对达不到规定要求以及有违法违规行为的企业和专业技术人 员,坚决依法予以降级或清出建筑市场。最后完善有形建筑市场,促 进公平竞争、打破地域、行业保护。有形市场的完善必将进一步打破 行业的垄断和地方的壁垒,实现真正的公平、公正、公开原则。【参考文献】 考文献】吴素萍《刍议工程项目招投标中存在的问题及对策》江西水利科技 2006 年 4 期 刘路 邓娟《关于工程招投标中的不正当竞争行为》 李春玲《工程项目招投标存在的问题及对策研究》科技创业月刊 2006 第 7 期
6、夜间施工照明光线要充足。
7、施工现场严禁吸烟。
8、现场按规定堆放易燃物。
9、现场氧气、乙炔气按规定堆放。
10、材料仓库有专人看管,严禁烟火,配备消防工具。
11、建立安全责任制,各级负责人员均为相应的安全工作责任人。
五、施工进度计划及保证措施
1、 工期的承诺
本公司根据对该工程的理解和业主对该工程的工期要求,结合公司的实际施工能力,本公司郑重承诺满足业主对该工程的工期要求:
要求工期:30个日历天。
2、 保证施工进度的措施
(1)施工进度的保证措施 A、施工进度管理
① 制定严密的总体形象进度书,其中包括总体和分部进度计划及季度计划、月计划、周计划和复式滚动,做到计划合理、科学安排,严格落实跟进督导,整体协调,进度统一。
② 编制程序化叠复式施工方案,分割单位占用工期和复式占用工期部分,不占用工期之安排,安排落实到人到位,使之不影响正常施工的进行,实行交错作业措施,上道工序和下道工序合理协调,在不发生矛盾的前提下工种间和工序间协调配合施工。
③ 各部位和各单位施工,只可按计划提前,不能占用其它工期以致拖延,禁止工序间的相互影响工期,绝对不允许影响到下道工序和整体工程的进度。
④ 管理人员对已制定计划根据现场情况进行调整,并落实监督计划进度的进展情况。
⑤ 加强与甲方和监理部门的联络,积极接收其对进度管理的指导性建议。
B 、工期保证措施 工期保证手段循环图
① 严格按照施工程序和进度计划进行施工,做到材料供应及时,合理安排交叉施工,合理调配施工人员工作时间和休息时间,节假日必须照常施工,必要时增加人员或适当延长工作时间,做到歇工不歇场地。
② 将每天的工作情况对照施工进度表,看是否按计划进行,工作只能比计划提前,否则就要查找原因,提出补救措施,确保按时完工。
③ 技术、质量管理工作做细,提前消化图纸内容,尽量做到有问题事前发现并解决,杜绝返工现象的发生,做好各工种之间、工序之间的衔接工作,避免产生不必要的停工。
④ 加强材料供应的管理,材料供应要及时,做到材料等人,不允许出现人等材料的现象。
⑤ 制定必要的奖罚制度,对于按计划完成工作的施工人员进行必要的奖励,对未按计划完成的施工人员作出相应的经济处罚,甚至开除。
3、 工期检查保证措施
施工进度的检查是计划执行信息的主要来源,也是计划调整和分析总结的依据。施工进度的跟踪检查,及时反馈进度计划的实施情况是进度循环控制之中不可缺少的部分反馈系统。故在施工组织中应尤为重视。
1、日检查工作制
专业施工员是施工技术、进度、质量的主要负责人,建立以专业施工点为主的计划执行系与施工员为主的计划检查系这一对立统一的工作关系,是保证项目进度计划的重要方法。施工员每日进行现场检查,并将检查的结果每日以书面的形式汇报项目经理,以便及时了解施工动态,监督和督促各施工班组按计划完成工作,及时进行必要的调整。
2、周汇报工作制
配合三周滚动计划的实施,建立每周进度汇报分析制。汇报分析会由项目经理主持,项目经理参加检查、落实一周工作情况,并将检查分析的结果书面汇报监理单位、业主及存档。并提出建议及要求,在每周由业主或监理主持的协调会上解决。
3、旬分析调整制度
项目部按旬进行分析、总结,并对进度的个别节点调整。进行必要的生产要素调动。由项目经理主持,公司项目部门及有关人员参加,并将检查分析的结果书面汇报业主、监理单位并存档。
4、施工日志
施工日志是项目施工中每一天所发生有关事宜的真实记录,也是项目日常管理的工作要点。由专业施工员对每日发生的事宜及有关工程的情况按施工日志的要求真实填写汇总,书面报送项目经理及资料存档。
如前所述,在建立各级检查制度的基础上有效的控制施工进度,这是目的所在。所以在了解了施工现状和实际进度后,如何进行进度控制是保证进度计划的关键,是项目管理的中心任务。
5、调整进度计划
由于外部因素影响造成进度无法实施或是计划与现场状况不符,就应及时调整进度计划,同时也要及时积极的进行施工协调,此项计划一般在分析会上做出。
6、质量跟踪检查
项目部质量检查员每日对施工班组所施工的内容进行检查,发现质量问题及时签发整改单,并每日将检查结果汇报项目工程师,把质量问题消除在过程中,决不因质量问题造成返工,从而影响工程进度计划。
7、利用现代科学手段,采用计算机项目管理系统对工程进行动态管理。
4、 施工进度表
经反复核算工作量结合图纸工艺要求,合理编制施工进度计划,详见附表
六、成本资金的管理
1.企业内部要制定劳动定额,根据工程量套用公司内部劳动定额,计算出人工总量。控制好人工总量,就能控制好人工费用,从而达到控制工程成本。
2.加强材料管理,建立限额领料制度,严格材料出入库管理,对施工现场耗用较大的辅材实行包干。
3.提高机械设备和周转材料的利用率。定期对施工机械检查、 维修 、保养,租赁的设备或周转材料用完以后立即归还租赁公司,既加快施工工期,又减少租赁费用。
4.为达到缩短工期、提高质量、降低成本的目的,正确选择施工方案是关键,在施工过程中努力寻找各种降低成本、提高工效的新工艺、新技术、新材料。
5.在施工中严格做到:按图施工,按规范施工,严把质量关,确保工程质量,减少返工造成人工和材料的浪费。
6.精简管理机构,减少管理层次,节约施工管理费。
随着我国经济的快速发展,工程建设项目也在逐步增多,为了更好的提高我国工程建设项目的质量和效率,有效的工程建设项目管理是十分必要的。下面是我为大家整理的工程建设项目管理论文,供大家参考。
促进建设工程项目管理的 方法 探讨
工程建设项目管理论文摘要
摘要:大中型建设工程项目的成功建设和尽早投入使用的关键在于项目业主的项目管理水平和控制项目的能力。项目总控是加强项目业主方对项目管理和控制能力的有效途径。对项目总控的基本任务和特点进行了阐述,并进一步分析了项目总控的组织模式和项目总控的系统过程。
工程建设项目管理论文内容
关键词:建设工程 项目总控 信息技术
Abstract: large and medium-sized construction project the success of the project construction and put into use as early as possible is the key to the project owner's project management level and the ability to control project. Total project control is to strengthen the project owners for the effective way of project management and control ability. The basic task and the characteristics of the total project control, and further analyzes the organization mode of the total project control and project process of general control system.
Key words: construction project; The total project control; Information technology (it)
中图分类号:窗体顶端
中图分类号:TU71文献标识码:A 文章 编号:
窗体底端
1.引言
我国经济增长一直呈高速增长态势,而且,从国家整体经济发展状况来看,我国的工业生产、建筑、零售销售等基本面情况总体保持良好,这意味着中国经济未来几年继续快速增长的潜力很强。建筑业作为国民经济的支柱产业,也面临着极为广阔的发展前景。建筑施工企业建立现代企业制度的落脚点应该是不断创新和完善项目施工管理,而施工项目能否全面、顺利实施,解决好项目与企业的关系是关键,项目与企业间责任不明、关系模糊,激励不够,约束不严,不确定因素过多等严重影响着项目施工管理的正常实施,必须通过创新才能使项目施工管理适应现代企业制度建设的要求。
2.建设工程项目管理的发展
随着工程项目管理的发展,管理专家发现设计阶段对项目管理目标的实现影响巨大,这就是工程界已经形成的共识:工程设计费用一般只相当于工程造价的5%以下,但正是这少于5%的费用对工程造价的影响度却高达80%左右。因此,高质量的完成设计任务是项目成功的先决条件。
这是一个很大的进步,设计也成为项目管理的对象,并且将设计和施工阶段连成一个整体来进行管理。设计相对于施工而言,有更多的创造性活动,因此,管理设计需要更多的艺术和科学的成分,“效率”不再是唯一的追求。价值工程就是这一思想的反映。
作为一种结果,工程项目管理的范围包括设计,甚至在管理模式、方法上出现了,将设计—施工进行整合,例如,打破传统的设计—招标—建设模式,开始将部分施工图设计任务委托给承包商而不是设计者完成,早期的FIDIC合同版本,为这种整合提供了合同管理的条件。
当然,发展还在继续,工程前期的重要性表现在对项目经济效益的决定性。工程项目管理活动开始向设计的上游延伸,目的是确保设计合理、经济和实用性。这是一个更大的进步,项目的整合在扩大,在追求的效率的同时效率,强调对资源的有效的利用。工程项目管理的范围进一步扩大:前期—设计—施工,反映的仍然是整合管理。项目管理的手段有技术的、经济的、法律的,管理开始逐渐增加其科学的充分,而不仅仅是一种技术。
这是一个里程碑式的发展,根据项目中不同活动的特点将项目划分成不同的阶段,对不同的阶段采用有的放矢的管理方法,并在整体上将各个阶段加以整合,追求的是效率、资源有效的利用、客户至上。
直到19世纪中叶,工程活动造成越来越多社会矛盾等负价值,以及客户至上理念的发展,学者们发现原有的工程项目管理太多的关注生产效率、经济效益的问题,却忽视了工程活动所带来的社会、伦理、服务等新的问题。
时至今日,经济学家米尔顿?弗里德曼的古老公理,“商道之道乃商也”不再完全正确。社会和公众要求工程建设领域实现商业价值并承担更广泛意义的社会和道德责任,工程项目管理研究的焦点已从“效率”扩展到“社会”。
这是一个革命,工程项目管理范围的延伸和整合,使得项目管理以更高的视角、更多的参与者看待工程活动,最强的不仅仅是效率、经济性,还包括了可持续发展观和以人为本的理念。
从管理方法上看,今天的项目管理运用技术、经济、法律和社会科学知识进行管理。对于不同的参与者涉及的项目管理阶段,取决于具体的情况,例如,设计-建造合同,承包商涉及的项目管理就包括了设计、施工等阶段。又例如,对于BOT合同,承包商涉及的项目管理可能就包括设计、施工和使用等阶段。对于不同的合同,也可以包括概念阶段。
工程管理范围扩展的同时,项目管理专家越来越关注、重视两端的管理活动,特别是将概念阶段的管理称为创造性的管理工作,将施工管理称为程式化的管理工作,项目管理阶段延伸到使用阶段,体现服务至上、可持续观的理念。
工程项目管理的整合能够更好的达到以下三个目标:
(1)应用人类最先进的科学和技术成果,努力节约资源,不断地提高生产效率,获得更好的经济效益。
(2)实践以人为本的理念,生产舒适、健康、环保、安全的生产和生活场所。
(3)促进社会可持续发展,走低碳、绿色的发展之路;实现社会的公平、公正,保护生产者的健康和安全。
在中国,推动工程项目管理发展的动力还来自被称为“世界第一建筑市场”和城市化进程的内在要求。这是一个难得的实践课堂,它促进了项目管理从三十年前的热衷于引进,到近年来的关心于应用。今天,中国的项目管理专家已具备了进行管理理论、技术创新的外部条件,引领世界工程项目管理发展的领导地位指日可待。
比较而言,近二十年的工程项目管理具有更多的内涵、更高的层次,科学而不仅仅是技术的成分不断地增多,这对于管理科学服务社会,及其学科地位都有重要意义。
2. 建设工程项目总控理论及其应用
随着科学技术的发展,工程项目的规模越来越大,如何对大型项目、复杂项目、分散的项目实施有效的控制,确保项目计划顺利实施,项目目标有效实现。以信息技术为手段,结合企业控制论产生了项目总控。
项目总控是以现代信息技术为手段,对大型项目基层进行信息的收集、加工和传输,用经过处理的信息流指导和控制项目建设的物质流,支持项目决策者进行策划、协调和控制的管理组织模式。为大型、复杂、分散工程业主方的最高决策者提供战略性、宏观性和总体性咨询服务的。
联邦德国统一铁路改建和新建工程项目使用了项目总控,这个项目几乎符合总控运用的所有条件:规模大、空间范围分布广、复杂、工期要求紧。要确保项目目标的实现就需要有一个强有力的总控单位。
项目总控实施的关键是在预定的总体项目目标下进行Planning+Controlling。侧重于宏观的、整体的、方向性的策划、协调和控制,以保证工程项目整体的按目标完成。
2.1 项目总控的计划主要有以下工作:
项目总控的计划分解是根据项目总目标,先分解成里程碑计划,然后根据里程碑计划逐渐分级分解到执行层。计划的分解包括纵横两个方面的内容,即过程分解和任务分解,最后以合同的形式加以确定,这是项目控制的基础。计划分解是贯彻计划很重要的工作。在计划的基础上,该项目最后形成了几千个合同。
例如进度计划从里程碑到具体的任务层级进行分解,总公司关注的是宏观性的问题。
德国统一铁路项目组织管理形式是多级管理,从全国总公司、州级公司二级组织、项目管理三级组织到工地主任。这依赖于任务和过程的分解。
从德国统一铁路项目总控的组织中可以看出,总控单位有关项目信息的来源是自下而上的,而且信息量是逐渐减少的,这样就保证了只有最真实、最主要的信息能传达到总控单位,而总控有根据信息下达决策,而这时的决策路径是自上而下的,这符合“从实招来的实践中去”的原则。项目总控的组织包括业主项目总控和工程管理公司。
工程建设项目管理论文文献
[1] 蔡小飞.浅谈楼宇等民用建筑项目总控进度计划的编制与执行[J]. 江苏建筑. 2006(S1)
[2] 赵海金.浅谈大中型建设工程项目总控模式[J]. 山西建筑. 2007(02)
[3] 骆汉宾,姚军.轨道交通工程项目总控组织设计研究[J]. 武汉理工大学学报(信息与管理工程版). 2007(01)
[4] 贾广社,王广斌.大型建设工程项目总控模式的研究[J]. 土 木工 程学报. 2003(03)
[5] 周迎,丁烈云.武汉“数字轨道交通工程”项目总控支持系统研究[J]. 华中科技大学学报(城市科学版). 2004(02)
[6] 何广才,何清华.项目总控模式在大型工程建设管理中的应用[J]. 建设监理. 2005(01)
建设工程项目管理探讨
工程建设项目管理论文摘要
摘要:提高工程建设管理水平,保证工程质量和投资效益,规范建筑市场秩序的重要 措施 ,也是施工企业得以生存和发展的有效途径。本文阐述了建筑产品生产的特点,探讨了工程项目管理中注重加强管理的几个方面。
工程建设项目管理论文内容
关键词:建设工程项目管理
Abstract: improving project construction management level, and ensuring the quality of projects and investment returns, and regulate the important measures construction market order, and construction enterprise to the survival and development of the effective way. This paper expounds the characteristics of the building products production, discusses the project management in to reinforce the management aspects.
Key words: the construction project management
中图分类号:K826.16 文献标识码:A 文章编号
施工项目管理,既是一项科学的管理活动,也是一门复杂的管理学科。施工项目管理贯穿于工程项目实施的全过程、全方位,它涉及的工程质量、进度与费用是项目管理的关键内容。他们之间存在相互协调、相互制约、相互适应的有机关系。积极推行工程项目管理,是深化我国工程建设项目组织实施方式改革,提高工程建设管理水平,保证工程质量和投资效益,规范建筑市场秩序的重要措施,也是施工企业得以生存和发展的有效途径。
一、建筑产品生产的特点
1、建筑产品生产的流动性, 建筑产品地点的固定性决定了产品生产的流动性 。因此要编制周密的施工组织设计,使建筑产品的生产连续均衡地进行。
2、建筑产品生产的单件性, 建筑产品地点的固定性和类型的多样性决定了产品生产的单件性。
3、建筑产品生产的地区性, 由于建筑产品的固定性决定了同一使用功能的建筑产品因其建造地点不同,也会受到建设地区的自然 、技术、 经济和社会条件的约束, 从而使其建筑形式 、结构 、装饰设计、 材料和施工组织等均不一样。
4、建筑产品生产周期长, 建筑产品的固定性和体形庞大的特点决定了建筑产品生产周期长。
5、建筑产品生产的露天作业多, 建筑产品地点的固定性和体形庞大的特点,使建筑产品不可能在工厂里直接进行施工, 即使建筑产品生产达到了高度的工业化水平的时候, 仍然需要在施工现场内进行总装配后, 才能形成最终建筑产品。
6、建筑产品生产的高空作业多, 由于建筑产品体形庞大, 特别是随着城市现代化的进展,高层建筑物的施工任务日益增多, 建筑产品生产高空作业多的特点日益明显。
7、建筑产品生产协作单位多, 建筑产品生产涉及面广,在建筑企业内部, 要在不同时期有和不同建筑产品上组织多专业 、多工种的综合作业。
二、工程项目管理中注重加强以下几个方面的管理
1、成本管理
随着建筑工程项目管理体制改革的深入, 建筑业的生产方式和组织结构形式发生了深刻变化,工程项目管理水平的高低成为制约企业生存与发展的第一要素, 以工程项目管理为核心的企业生产运营管理机制已基本形成。
工程项目成本管理需要多方面努力, 主要应采取:优化施工方案, 改进工程项目管理手段。
(1)实行全过程的成本控制
加强成本管理、 控制费用的重要措施, 就是保证每个环节均能达到先算后做、 事先拟定费用的支出计划和成本开支范围以及可降低的成本比率, 把目标成本落实到每个最小的可控制单位, 甚至个人。 利用过程控制工具, 对项目成本进行过程控制 ,可以及时纠正项目建设过程中对最优计划的偏离 ,保证工程项目成本管理的效果。
(2)应从系统的角度, 通过平衡成本计划、 时间计划、 质量计划达到成本 、工期和质量之间的平衡 。企业效益取决于成本和收入两个方面 ,因此, 企业不仅从控制成本的角度来增加效益, 而且还要通过提高企业收入增加企业效益 ,工程质量的提高和工期缩短虽然可能增加一些经济成本 ,但这两方面都直接和间接地增加企业效益。 有助于企业打造核心竞争力, 塑造企业品牌。
(3)组织保障
组织是项目管理的载体, 是目标控制的依托 ,是控制力的源泉 。因此 ,在项目开工前, 要从组织项目部人员和协作部门上入手, 设置一个强有力的工程项目部和协作网络, 保证工程项目的各项管理措施得以顺利实施。
(4)建立合理的监督和激励机制
工程项目建设是一项复杂的系统工程, 工程参建单位众多, 如施工单位、 设计单位、 监理单位和材料设备供应商等 。在市场经济条件下, 各工程参建单位的行为都受到自身利益最大化动机的驱动, 其某些行为可能有损于工程项目目标的实现。为增强工程建设单位的道德风险意识 ,经济学家认为项目业主必须建立一种激励机制 ,诱导工程建设单位释放真实信息。对施工方案优化, 工程数量逐级控制 ,逐级价格预控等的激励措施, 以此达到各级组织追求工程项目成本降低的目的。
2、质量管理
在施工过程中,各个环节都存在着影响质量的因素,如施工时材料的质量差异、施工工艺的改变、天气环境的变化、施工设备的磨损等,都会产生质量变异,造成质量事故,并且公路工程质量比一般工业产品更难以控制。因此加强工程的质量管理,提高工程质量水平,就显得极其重要。
(1)明确工程质量目标
经理部要致力于满足业主要求的质量总目标而展开,制定相应的质量验收标准,而且要使质量验收标准不低于国家验收标准。
(2)建立质量保证体系
产品或服务质量的产生,归根结底是由作业技术过程直接形成的。因此,作业技术方法的正确选择和作业技术能力的充分发挥,是质量控制的致力点,包含了技术和管理两个方面。组织人员要具备相关的作业技术能力,只有通过科学的管理,对作业技术活动过程进行组织和协调,才能使作业技术能力得到充分发挥,为达到预期的质量目标。在施工工区、各班组建立自己的质量保证体系,配足专职质检员,项目实施过程中实行质量跟踪、监督、检查、控制。依照合同要求配备能满足工程需要的施工机械、检测设备、工具。建立工地中心试验室,配备试验人员,对施工质量进行跟踪检测。
(3)进行现场质量管理和控制
进行质量技术交底。在开工前,承包人要对设计图纸、工程数据进行复核,并对施工现场、定线数据进行复核、对含糊不清的问题进行汇总上报监理工程师和设计代表。 现场质量控制,做好“三检”即自检、互检、交接检。并建立质量奖惩制度。与各专业工程师、施工员、各施工队签订质量 责任书 。项目部试验室要对进场材料进行检验,不合格的严禁进场,已进场的不准使用并清理出料场,
对桥涵混凝土配合比要认真设计,确保各项指示符合设计要求。 施工现场采取动态跟踪,设立专业工程师,对路基及桥涵作技术指导,并设施工员进行全程跟踪施工指导。每道工序完工并自检合格后,申报监理人员验收。控制好每道工序的施工质量。
3、进度控制管理
工程进度涉及业主和承包人的重大利益, 是合同能否顺利执行的关键。在项目实施过程中, 监理工程师要制订出一套控制进度的措施和科学的计划管理方法 ,并根据合同赋予的职权监督承包人执行, 以保证工程在合同规定的限期内顺利完成。
(1)单项工程进度控制
在工程开工之后, 监理工程师应对整个工程进行专业分析, 建立工程分项的月、 旬进度控制图表 ,以便对分项施工的月、 旬进度进行监控。
(2)采用网络计划控制工程进度
用网络法制订施工计划和控制工程进度, 可以使工序安排紧凑便于抓住关键 ,保证施工机械 、人力、 财力、 时间均获得合理分配和利用 。因此, 承包人在制订工程进度计划时 ,采用网络法确定本工程关键线路是相当重要的。 监理工程师除要求承包人制订网络计划外, 监理机构内部也要求监理人员随时用网络计划检查工程进度。
(3)采用进度表控制工程进度
进度表是监理工程师要求承包人每月按实际完成的工程进度和现金流动情况向其提交的报表。 这种报表应由下列两项资料组成: 一是工程现金流动计划图 ,应附上已付款项曲线; 二是工程实施计划条形图, 应附上已完成工程条形图。 承包人提供上述进度表, 由监理工程师进行详细审查, 向业主 报告 。
(4)采用工程曲线控制工程进度
分项工程进度控制通常是在分项工程计划的条形图上画出每个工程项目的实际开工日期、 施工持续时间和竣工日期, 这种方法比较简单直观, 但就整个工程而言, 不能反映实际进度与计划进度的对比情况 ,采用工程曲线法进行工程进度的控制则比较全面。
总而言之,施工项目管理,既是一项科学的管理活动,也是一门复杂的管理学科。施工项目管理贯穿于工程项目实施的全过程、全方位,它涉及的工程质量、进度与费用是项目管理的关键内容。他们之间存在相互协调、相互制约、相互适应的有机关系。积极推行工程项目管理,是深化我国工程建设项目组织实施方式改革,提高工程建设管理水平,保证工程质量和投资效益,规范建筑市场秩序的重要措施,也是施工企业得以生存和发展的有效途径。
工程建设项目管理论文文献
[1] 赵俊光. 建筑工程管理浅析[J]. 科技风, 2010,(22)
[2] 吴尚华. 浅谈如何做好建筑施工管理[J]. 广东科技, 2011,(16)
[3] 孙长城, __刚. 浅论建筑工程项目管理[J]. 科技风, 2009,(19)
[4] 李大伟. 系统论视域下的建筑工程管理[J]. 黑龙江科技信息, 2011,(24)
有关工程建设项目管理论文推荐:
1. 浅谈建设工程项目管理论文
2. 浅谈工程项目管理论文
3. 工程项目管理论文参考范文
4. 有关于工程项目管理论文参考
5. 工程管理类论文 工程施工项目管理论文
6. 工程项目管理研究论文范文
关于项目管理论文的参考文献汇总
在平时的学习、工作中,大家肯定对论文都不陌生吧,借助论文可以有效训练我们运用理论和技能解决实际问题的的能力。你知道论文怎样才能写的好吗?下面是我为大家整理的关于项目管理论文的参考文献汇总,欢迎阅读,希望大家能够喜欢。
项目管理论文参考文献1
[1]建设项目管理,石振武主编,一北京:科学出版社,200.5
[2]全国高校建筑与房地产管理学科专业指导委员会主编,房地产经济与管理,北京:中国人民大学出版社,1997年10月
[3]赵铁生,工程项目管理,天津:天津大学出版社,1992年10月
[4]张月娴、田以堂,建设项目业主管理手册,1998年4月
[5]王英军,工程项目管理,北京:中国石化出版社,19%年
[6]丛培经,建筑施工项目管理,1996年1月
[7]申立银、曾赛星、王锋等,房地产经营与管理,北京:中国计划出版社,1999年12月
[8]李志鼎、齐伟峰、谢留广,工程项目成本管理中存在的.问题与对策分析,华鼎管理咨询网,2003年5月
[9]谭术魁,房地产项目管理,北京:机械工业出版社,2003年H月
[10]丁晓欣、聂风德,建设项目规范高效操作规程,北京:中国时代经济出版社,2004年l月
[11]吴之明、卢有杰,项目管理引论,清华大学出版社,2000年
[12]潘蜀健,房地产经营学,中国建筑工业出版社,1996年
[13]全国监理工程师培训教材编写委员会,工程建设合同管理、投资管理、进度管理、质量管理,中国建筑工业出版社,2003年
[14]刘荔娟,项目管理概论,上海人民出版社,1990年
[15]顾祖惠、施佳燕,工程项目经理管理实务与技巧,上海科学普及出版社,1992年
[16]刘洪玉,房地产开发经营与管理,中国物价出版社,2001年
[17]林知炎、陈建国等,工程项目管理,中国建筑工业出版社,1998年
[18]马士华、林鸣,工程项目管理实务,电子工业出版社,2003年
[19]邱龙华,项目管理学,科学出版社,2001年
[20]中华人民共和国建设部,建设工程项目管理规范,中国建筑工业出版社,2002年
项目管理论文参考文献2
[1]建设项目管理,石振武主编,一北京:科学出版社,200.5
[2]中国企业的十大管理模式,祝晓东,周海涛编著一北京:经济管理出版社,2006一5一6
[3]企业管理:使命、流程、工具,骆守俭等编著,一上海:立信会计出版社
[4]流程制胜,李国良编著,一北京:中国发展出版社,2005.12
[5]工程项目管理,(美)古尔德,乔伊斯著:孟宪海译,一北京:清华大学 出版社
[6]建筑工程施工项目管理,(美)肖费勒伯格,霍尔姆编著;周爱军译,一北京:机械工业出版社,2005.10
[7]中国建设网
[8]工程造价管理相关知识中国计划出版社2000年3月
[9]建设工程项目管理的方法论研究
[10]五大趋势
[11]建设工程投资控制,中国建设监理协会,知识产权出版社,2005.1
[12]丁斌,吴剑琳编著,项目管理教程,合肥,安徽科学技术出版社,2005一02,121一122
[13]张青林.项目管理与建筑业[M].北京:中国建筑工业出版社,2006.3~44
[14]乌云娜.项目管理策划[M].北京:电子工业出版社,2006.
[15]李涛,张莉.项目管理[M].北京:中国人民大学出版社,2005.110~110.
[16]宁云才.项目管理[M〕.徐州:中国矿业大学出版社,2006,2
[17]王志平.管理学概论[M].上海:复旦大学出版社,2006,8
项目管理论文参考文献3
[1]戚安邦著,《现代项目管理》,对外经济贸易大学出版社,2001,1。
[2] Dennis Lock主编,李金海等译,《项目管理》(第8版),南开大学出版社,2005,1。
[3]吴守荣主编,刘长滨主审,《项目采购管理》,机械工业出版社,2004,9。
[4]汪小金著,《理想的实现―项目管理方法与理念》,人民出版社,2003,10。
[5]王忠宗著,《采购管理实物》,广东经济出版社,2001,8。
[6]张月娴,田以堂主编,《建设项目业主管理手册》,中国水利水电出版社,1998,4。
[7]何伯森编著,《工程招标承包与监理》,人民交通出版社,1999,10项目管理论文参考文献汇总项目管理论文参考文献汇总。 [8] J. Rodney Turner主编,戚安邦,耿岚岚,于玲译,《项目中的合同管理》,南开大学出版社,2005,2。
[9]李开运主编,李新军主审,《建设项目合同管理》(第二版),中国水利水电出版社,2001,8。
[10]谢勤龙,王成,崔伟.企业采购采购业务运作精要:基于EPR,SCM电子商务.北京:机械工业出版社,2002年9月。
[11]Project Management Institute. The PMI Project Management Fact Book (2nded .)[M].Upper Darby,PA,USA :Project Management Institute,2001.
[12] The view of inside the profession〔J. PM Network, September1997:31.
[13]Ward JL. Project Management Terms [M].Arlington,Virginia,USA :International,2000.
[14]Kashiwagi,Dean T. The construction delivery system of the information age . Automation in Construction,1999,8(8):111一114.
[15]石勇民.施工企业经营管理学.北京:人民交通出版社,2001年6月
[16] 陶敏,彭磊.采购战略与策略分析:从采购角色的转变谈起.现代管理科学,2003(2)。
[17]周克己.水利水电工程施工组织与管理.北京:中国水利水电出版社,1998年10月。
[18]冯子楹,何永春.项目采购管理.北京:清华大学出版社,2000年12月。
[19]王忠宗.采购管理手册.广州:广东经济出版社,2001年6月。
[20]龚晓海.工程建设企业质量管理:2000版工509000族标准在工程 建设企业的应用.北京:中国水利水电出版社,2002年4月
[21]王槐林.采购管理与库存控制.北京:中国物资出版社,2002年1月
[22]陈宝胜,孙静春.应用ABC/ABM方法优化企业采购过程.管理工程学报,2002(2)。
[23]魏红梅,魏红敏.战略成本下的采购成本控制.辽宁财税,2003(3)。
[24]常剑峰,孟强.价格信息库:采购控制的基础.内蒙古财经,2002(1)。
[25]李晓东,张忠臣.基于WEB的建设项目采购管理模式的研究.商业研究,2002(5)。
[摘要]本文根据作者多年从事工程建设经验总结,对工程投资项目管理控制,谈谈自己的看法。[关键词]建筑工程;论文、综述;工程投资控制 工程投资项目的管理即为工程项目造价的管理,工程项目的造价管理将有机地贯穿于以上各个阶段之中。从而影响决策、设计、施工等各个阶段,但是目前许多工程仍出现投资失控,如:概算超估算、预算超概算、结算超预算等现象。究其原因,主要应控制以下几个方面:1、重视源头,加强项目工程设计环节的控制项目投资控制的关键是在施工前的投资决策和设计阶段,长期以来,我国普遍忽视工程建设项目前期工作阶段的造价控制,而往往把控制工程造价的主要精力放在施工阶段,这样做尽管也有效果,但毕竟是“亡羊补牢”事倍功半。要有效地控制工程造价,就要坚决把重点转到前期阶段上来,当前尤其是抓住设计这个关键,未雨绸缪,以取得事半功倍的结果。因此,建设单位的工程造价控制要以设计阶段为重点,这是有效控制建设项目投资的根本所在。设计阶段的投资管理对整个工程的造价管理是何等的重要。例如:洛阳新区某住宅小区,建筑面积82912平方米,由两栋18层,两栋16层及6栋多层组成的花园式小区,工程总造价控制在1.4亿元以下,在投资控制中,造价人员召开专家研讨评议及周密计算,改变了地基处理方式、调整了部分结构尺寸,优化给排水系统,不仅提高了使用功能,还节约了几百万元的资金。2、工程招投标是有效控制工程造价的核心通过招投标是引进竞争机制,降低工程成本的主要手段。施工队伍的优劣关系到建设单位工程造价控制的成败和业主入住时对开发企业产品的满意度。因此,要求施工企业具有足够的技术实力,它不仅使企业自身的生产、经营实现高效、优质、低耗,也使施工企业能有实力在工程造价上给建设单位合理的优惠。同时要严格掌握工程招标条件,认真编制工程标底和标书,做好评标定标工作。以中标价为基础通过谈判、协商确定合同及工期。工程招标应采取公开招标或邀请招标。招标书条款应严谨、准确和全面,工程造价及相关费用应尽量包死,少留或不留活口。中标后合同条款的签订应严谨、细致,工期应合理,尽量减少甲乙双方责任不清日后扯皮的现象。3、加强合同管理,保证工程投资的有效控制造价工程师或咨询公司作为建设单位在合同和造价方面的专业代理,在对合同条件的拟定、招标方式的选择,承包金额的协商过程中,应根据相应的法律法规,充分发挥自身的专业特长,切实控制投资,保证取得合理的最佳成本效益。在与承包商协议整个合同和商谈工程承包价时,除根据市场价格基础对承包商的总体报价的合理性作出评估外,尤须注意利用资金的时间价值,对承包商报价的平衡性作出评估。与此同时,造价工程师或咨询公司也应格守公正的职业道德,防止片面依从业主意愿,故意压低承包商价格。就建设单位而言,一般希望工程成本低一些好,但从建筑业的合同管理可以看出,表面的低价,往往导致偷工减料或频繁的索赔,甚至导致拖延、停工等严重事件的发生。所以合理地制定标底和评标是保证投资得以控制的重要手段。这既保证了承包商的合理利益,有益于工程的顺利进行,实际上也间接地维护了业主的利益。4、加强项目施工环节的工程造价有效控制。在施工阶段主要是以施工图预算为目标,控制建安工程造价。在这一阶段节约的余地已经很小,但浪费的可能性却很大,因而要对工程造价的控制给予足够的重视。4.1加强对施工方案的技术经济比较。合理的施工方案,可以缩短工期,保证工程质量,提高经济效益。对施工方案从技术上和经济上进行对比评价,通过定性分析和定量分析,对质量、工期、造价三项技术经济指标比较,可以合理有效地利用人力、物力、财力资源,取得较好的经济效益,把好施工管理关,是全面造价管理的重要途径。4.2健全设计变更审批制度。设计如有变更,一是要尽量提前变更,因为变更越早,损失越小;二是在每一变更设计之前,必须进行工程量及造价增减分析,并经设计单位同意。如果变更后工程造价突破总概算,必须经有关部门审查,要切实防止通过变更设计增加设计内容、提高设计标准、提高工程造价的情况发生。4.3对工程现场签证手续严格把关。通过建设工程监理制度,建立专门部门,利用专业人员对工程实行专业化管理,避免出现工程管理人员只管签证,不算经济帐的现象,造成投资失控的严重后果。为了严肃变更签证手续,应采取建设方、监理方、施工方代表现场联签的方式,保证变更、签证的真实性、合理性、经济性,避免弄虚作假现象及由此产生的经济纠纷。4.4对材料采购严格把关。材料控制上造价工程师应着重把好价格关和数量关,实行材料台账管理。材料采购要尽量减少中间环节或直接从厂家进货,拉大与预算价的降幅,争取更大的利润空间,紧紧围绕以实现工程项目的低成本目标控制;材料采购数量原则上不得超过预算数,对于实耗数与预算数有差异时,应认真进行分析。对于施工机械费的控制,施工企业要切实加强设备的维护与保养,提高设备的利用率和完好率。对确需租用外部机械的,要做好工序的衔接,提高利用率,促使其满负荷运转,对于按完成工作量结算的外部设备,要做好原始记录,计量准确。同时,造价工程师还要按月做好成本原始资料的收集和整理工作,正确计算月度工程成本,同时要按照目标责任预算考核要求按分部分项工程分析实际成本与预算成本的差异,并对其进行分析,同时采取积极的防范措施纠正偏差,以防止对后续施工造成的不利影响及成本失控;对盈亏比例异常的现象,要特别引起重视,及时准确查清原因,使成本管理朝好的方向发展。在项目总成本上,造价工程师负责各工种直接费的审核和汇总,进行控制。5、认真做好竣工结算价的审核工作工程竣工结算是指施工企业按照合同规定的内部全部完成所承包的工程,经验收质量合格,并符合合同要求之后,向建设单位进行的最终工程价款结算。经审核的工程竣工结算是核定建设工程造价的依据。因此,竣工结算的审核是一项非常重要的工作,应着重做好以下几个方面的工作:5.1审核工程量的准确性。工程量的审核是竣工结算审核过程中最重要、最繁琐、最细致的一项工作,必须以工程竣工图、设计变更及施工现场为依据,严格按照定额规定的工程量计算规则逐项进行审核,以防止施工单位在工程竣工结算上虚增工程量来增加工程造价。5.2审查定额套用是否正确。审查所列分项工程的单价是否与定额单价相符,其名称、规格、计量单位和所包含的内容是否与单位估价表一致;对于换算的单价,首先审查单价的换算是否是定额允许的,其次审查单价换算是否正确。5.3审查各项取费标准是否符合费用定额和施工期间有关工程造价政策规定。6、结束语 从以上几个方面可以发现,降低工程成本事在人为。随着土地成本的增高,开发建设企业自身资金的筹措,加强投资控制,降低工程成本是开发企业的当务之急。所以,做好工程造价的有效控制,才能使企业立足于竞争市场,取得更好的效益,得到更高的赞誉。【参考文献】[1]谭德精,杜晓玲,吴宇经主编.工程造价计价与控制[M].重庆:重庆大学出版社,2006.[2]吴现立,冯占红.工程造价控制与管理[M].武汉:武汉理工大学出版社,2005. 还有很多相关的论文你可以到: 去看下 自己整合下就可以了