Spring river 蕴藏 abundant water power resources, among them piece the main purpose for valley segment suitable forly fixing set upping the water conservancy vital point, water conservancy vital point is a flood control to generate electricity. This text combination piece valley geography geology characteristics, hydrology characteristic, as to it's the water conservancy vital point proceeds first step design.The design, vital point of basic data, main building that main contents include the vital point of a valley water conservancy arranges the project, foundation to handle and start construction the 导s to cut the 流 etc. the contents. Under the consideration the every kind of factor, choice B - B conduct and actions this vital point the engineering's 坝 stalk line, on the choice of the 坝 type, the right every kind of 坝 type proceeds 优 weakness the comparison is after, and join together this engineering of when ground characteristics, chose the concrete entity gravity the 坝 to be used as this water conservancy the vital point's 坝 type.The 调洪 calculates the adoption the method of widespread half illustrated manual table, at the project that compare three 调洪s the project after make sured a fit, get its design flood is 306.3 rices, 校核 flood 307.1 rice, certain 坝 crest high 程 is 310.9 rice.The main building of this vital point be leak watered by 挡 water building, building, generate electricity the building, put the 空 building to constitute.Pass machine-readable( gravity 坝 stability with should dint calculation procedure) with should dint and stability than the 核 is after, and have to out not 溢流 the 坝 's breadth of economic section, 坝 crest 12.5 rice, high 125.9 rice;Leak water practical WES curve, 消 of curve adoption of the 流 's way, 坝 crest of watch bore 溢 of building adoption can the way adopt the 挑流消 can;Factory premises 坝 the segment include the segment of three machine sets with the segment of a gearing field, factory premises adoption after the 坝 type;The deep bore conduct and actions of adoption puts the 空 building, bore figure to choose to use to have no to press the 坝 inside to sluiceway.Finally start construction the 导流 choose to use the 导流 of two two pieceses the method, be designed spring river piece valley water conservancy vital point gave out aly completely by tie the narrow river bed 泄 the 流 , second periods are from the 导流 bottom bore 泄流 , project.有不能翻译的自己找找资料吧!
要看你选择的方向。
哥们,这个成果还在没,急求啊!要什么换都没问题
请参考下面2篇:【题名】:水利工程【摘要】: 水利工程基础学科混流式水轮机转轮动载荷作用下的应力特性;受漩涡作用的水下块石的起动流速;复式河槽流量计算方法比较与分析;二维溃坝洪水波的演进绕流和反射的数值模拟;分部面积超蓄产流法;天然河流被改变条件下的降雨径流预报模型;面向对象方法在河网非恒定流计算中的应用;水工材料土工合成材料加筋土抗剪作用的试验研究;新老混凝土粘结面渗透性能试验研究;水工结构土石坝沉降一填筑灰色监测模型分析;高碾压混凝土拱坝分缝形式及破坏机理研究;碾压混凝土拱坝单向间隔诱导缝等效强度研究。【题名】:水利工程【摘要】:水利工程基础学科 突扩突缩式内流消能工的数值模拟研究;湖底地形对风生流场影响的数值研究;动水环境中有限宽窄缝湍射流的水力特性研究;双局部行进波对流的时空结构;水工材料 钢筋混凝土结构锈蚀损伤的解析解;跳回失稳研究;浇筑式沥青混凝土防渗层配合比优选方法研究;堤基渗流管涌发展的理论分析。
据学术堂了解,水是人类生产和生活必不可少的宝贵资源,但其自然存在的状态并不完全符合人类的需要。只有修建水利工程,才能控制水流,防止洪涝灾害,并进行水量的调节和分配,以满足人民生活和生产对水资源的需要。以下是水利工程论文题目供大家参考。1、水利水电工程成本控制的有效措施探究2、农田水利工程在“生态农业”思路下的设计3、水利施工过程的质量监测方法4、水利工程施工中的防渗新技术及应用研究5、导流技术在水利工程大坝施工中的应用价值6、水利工程隧洞回填的灌浆施工技术浅析7、水利工程隧洞施工坍塌的处理8、矩阵图分析法在水利勘测设计单位质量管理体系内部审核中的应用9、基于BIM技术的可视化水利工程设计仿真10、水利工程管理现代化与精细化分析11、水利工程中通过竖井的物料运输费用计算12、关于基层水利档案管理工作探讨13、基于结构方程的水利施工安全影响因素研究14、大型水利工程信用风险的形成路径及治理对策15、水利水电工程系统的风险评估
也不一定,每个导师的要求不同,有的只要是上知网的期刊就行,有的则要求要是专业的期刊,所有最好还是发在专业相关的期刊上最好了,当然了,不这样其实也无所谓,因为研究生发表论文其实也是一个硬性的要求,好多导师只认你的有没有发论文到期..
分析水利工程大坝安全监测应用技术论文
1 大坝安全监测的现实应用意义及现状
(1)受到外部工程环境的影响,在大坝建设过程中,大坝容易受到过量的地震荷载及环境荷载,比如温度因素、水压力因素等,这些因素不利于提升大坝的整体安全管理效益。受到内部工程环境的影响,大坝建设容易出现一系列的施工问题,这些因素主要包括机械设备因素、人为影响因素、材料性能因素等,长期以往,会导致水利工程出现变形、裂缝、渗漏等状况,如果不能实现这些问题的及时性诊断及解决,就会不利于大坝的整体安全性运作,从而出现一系列的灾害性事故。
随着大坝工程体系的健全,大坝安全监测方案不断得到应用,这种安全监测方案属于大坝原型观测系统的范畴,需要将观测仪器进行大坝原型的置入,做好相关的现场侧脸工作,进行特征量的获取,进行大坝结构性态变化的分析。通过对大班安全监测环节的开展,有利于应对大坝变形状况、温度变化状况、应力变化状况,从而优化大坝工程理论,实现大坝整体安全管理水平的提升。随着我国社会经济的不断发展,大坝安全监测设备不断得到普及,一系列的安全监测技术不断得到应用,比如全球定位系统的应用,这些新型技术手段的使用,有利于实现大坝安全监测的整体化运行。
(2)随着时代的不断发展,我国积极引入各种先进的大坝安全检测进口仪器,实现了管理自动化模块的发展,大坝安全监测体系不断得到健全,各种新型安全监测自动化设备不断得到应用,这不断推动了我国水利水电工程安全监测自动化技术的发展。
2 大坝安全监测方案的优化
(1)为了满足现阶段大坝安全监测工作的要求,进行监测大坝整体安全状况的实时性调查是必要的,从而深入了解大坝的整体安全运转状况,进行大坝安全监测资料的收集,进行大坝工作状态的实时性评估,从而有效增强大坝的整体安全性。为了满足实际工作的要求,做好及时性监测工作是必要的,从而获得可靠性的监测数据,这需要做好监测方案的及时性分析工作,避免出现相关的安全责任事故,避免出现一系列的工程灾害事故。在施工环节中,需要做好施工质量监控管理的反馈工作,做好设计合理性的验证工作,通过对大坝整体安全性监测方案的应用,进行大坝安全状态的及时性了解。
为了实现大坝安全程度的及时性掌握,需要做好大坝工程的例行巡查工程,进行仪器监测手段的应用,实现大坝安全监测体系的健全,这需要根据工程实际状况展开分析,进行各类安全监测一起的综合性使用,进行大坝安全运作状态的分析,做好各类大坝安全动态数据信息的分析工作,进行大坝运行状态的科学性评价。及时掌握大坝安全运行信息,做好相关的调度指挥工作。在大坝项目建设过程中,做好安全监测工作是必要的,从而有效应对大坝变形状况,解决渗流压力问题,实现变形环节及渗流监测环节的协调,充分实现大坝安全形态的及时性掌握。
(2)随着时代的不断发展,一系列的水工建筑物不断得到兴建,在水工建筑物形态的观测过程中,通过对仪器设备的使用,可以满足水利大坝安全监测工作的要求,进行一整套安全监测方法的构建,从而进行观测方案的优化,有效应对混凝土的应变问题、变形问题,实现对混凝土应力的有效性计算。通过对新型差动电阻式仪器的使用,可以有效增强大坝安全检测的稳定性,有效应对大体积混凝土建筑物的变形问题、应力问题,实现对测点温度的有效性监测。在水利大坝安全检测环节中,进行新型安全检测设备的应用是必要的,从而进行振弦式仪器的使用,这种仪器设备具备良好的内部构造结构,具备良好的工程测量效益,能够满足大坝工程自动化检测的工作要求,实现水利大坝长距离测量工作的要求。在现阶段大坝变形监测过程中,各种新型仪器不断得到应用,包括一系列的遥测引张线仪、遥测垂线坐标仪器等,比较常见的遥测垂线坐标仪器包括电容感应式仪器、马达跟踪式仪器、电磁感应式仪器等,比较常见的遥测引张线仪有 CCD 模式,电容感应式等,通过对不同位移计量模式的应用,可以进行基岩深度变形状况的分析。
(3)随着我国各类水利工程技术的发展,大坝安全检测技术不断得到应用,各种新型的监测仪器不断得到发展,比如通过对差动电阻式技术的应用,可以进行面板周边施工缝的有效性检测,实现对大坝水平及垂直变形状况的有效性监测,实现信息的自动化采集,通过对不同种监测仪器的使用,实现大坝安全检测效益的提升。随着时代的发展,新型的大坝工程监测技术不断得到应用,大坝安全监测技术体系日益完善,但是整体来看,我国的大坝安全检测体系尚不健全,有些先进性的大坝安全检测技术依旧处于研发的阶段,通过对各种大坝安全监测仪器的开发及利用,可以有效提升水利大坝的整体安全监测效益。电缆运输是检测仪器的重要工作手段,在实际工作中,受到电磁场、辐射场、电气等的影响,电缆经常受到干扰,从而出现监测数据失真状况,不利于提升水工建筑物监测分析效果。
为了解决大坝安全监测工作的要求,进行检测仪器设备体系的健全是必要的,进行数据采集模块的优化,从而有效应对外部工作环境的干扰状况。在不同的.施工模块中,进行各种仪器设备的使用,做好监测仪器电缆保护管的选择工作,实现其与地网的充分性连接,切实提升工程监测数据的整体安全性、可靠性,在位移监测环节中,可以进行固定测斜仪器的使用,做好工程自动化监测工作,这种监测手段具备较高的造价成本,为了解决实际工作要求,可以进行活动式测斜仪器的使用,做好单点探头的自动化监测工作,通过对GPS 监测技术的应用,实现大坝工程安全监测成本的控制。
在大坝力学特性监测及结构损伤检测模块,需要进行大坝 CT技术的应用,实现该技术传播途径的优化,实现图像重构效益的提升,落实好温度监测环节、渗流环节、裂缝监测环节的协调,确保光纤光栅技术模块的优化,提升其自动化、多元化、智能化程度,有效提升变形监测自动化技术效益,做好水利大坝安全检测工作,实现其整体工作效益的提升。
(4)随着我国经济体系的日益健全,大坝安全监测技术不断得到应用,我国的水利大坝工程方案不断得到优化,但是目前来看,我国的水利大坝工程依旧存在很多技术上的不足,欠缺健全性的仪器设施,为了满足现阶段大坝安全监测工作的要求,进行高精度、高可靠性智能监测系统的应用是必要的,实现监控网络管理体系的健全,实现在线监测环节、离线分析环节、安全评判环节的优化,实现大坝安全风险评估方案的优化,实现大坝安全监测信息的及时性通知,确保大坝安全监测工作的稳定化发展。
3 结束语
为了满足现阶段水利大坝安全监测工作的要求,进行大坝安全监测理论体系的健全是必要的,这需要引起相关工作管理人员的重视,做好水利大坝工程的安全监测工作,实现大坝安全监测体系的健全,确保其内部工作模块的协调。
自己动手丰衣足食啊! 伙计不要太懒了! 这么做是有很大风险的! 而且他们都是用软件翻译的,效果很差劲的 所以奉劝好事自己解决吧 呵呵
水利工程水利工程毕业设计论文[博士]城市区域水土作用分析与土的结构 [博士]中小城市水利可持续发展研究 [博士]中小城市水利可持续发展研究 河口冲刷的理论与数值模拟 [硕士] 吉林西部生态环境需水量与水资源承载力研究 [硕士]航道整治河段流动特性的三维数值模拟 新疆某水电站毕业设计 某混凝土实体重力坝枢纽及发电引水管道设计 [博士]裂隙岩体可灌性及灌浆数值模拟研究 天津市城市水源合理配置研究[硕士] 【学士】某江水利枢纽坝工设计 [学士]水电站毕业设计 【学士】某江水利枢纽重力坝毕业设计 [学士]重力式沉箱码头毕业设计 [硕士]太原城区段汾河蓄水工程对地下水渗流特征影响的研究 [硕士]入库洪水资源化问题的研究与应用 [硕士]波流共同作用下水流垂直结构及污染物 [硕士]从长江三峡库尾(重庆段)淤砂中提钪试验研究 [硕士]洪水资源化利用模式及风险分析 [硕士]河道人工建筑物对复氧及溶解氧扩散影响的研究 [硕士] 市区性河流的水质数学模拟 [硕士] 湿地治污系统在洞庭湖区的应用研究 [硕士]大连市周水子地区海水入侵问题研究 [硕士] 基于模糊数学方法的洞庭湖区水安全评价 [硕士]从长江三峡库尾(重庆段)淤砂中提钪试验研究 [硕士] 长春市主要河流环境容量及其总量控制研究 [硕士]乌梁素海农田面源入湖量的核算研究 [硕士]云南糯扎渡水库水质预测研究 汉河水系上一中型水闸的毕业设计 某泵站的毕业设计 发电机继电保护的研究 毕业设计-某一级水利枢纽工程规划设计书 [硕士]大体积混凝土温度应力分析与反分析 某供水工程毕业设计报告 矩形渡槽设计[本科] 护岸工程课程设计书 某厂净水厂设计[学士] 水工钢筋混凝土课程设计 拱式渡槽设计资料 广西郁江洪水预报与调度系统研究 水利工程水情自动测报系统设计研究 重力式码头施工组织设计课程设计 云南省景洪水电站施工组织设计 拱坝计算书 松涛水利枢纽工程施工(课程、毕业设计) 土石坝毕业设计 某水利工程土石坝枢纽设计说明书 [学士]水利枢纽工程初步设计 [学士]拦河闸设计 [学士]黑河水利枢纽布置及面板堆石坝设计 [学士]土石坝施工组织设计 [学士]函江水利枢纽工程毕业设计 [学士]函江水利枢纽工程毕业设计 [博士]大坝安全管理关键技术研究 [学士]水利灌渠改建工程毕业设计 某闸工程设计图 某排水泵站的初步设计
The spring river contains abundant water power resources, among them, ZHANG GU3 DUAN4 suiteds for to fix to set up the water conservancy vital point, the main purpose of the water conservancy vital point is a flood control to generate electricity. This text combines a valley form geology characteristics, the hydrology characteristic, as to it's the water conservancy vital point carried on the first step design.The main contents includes the spring river ZHANG GU3 the basic data, main building design, vital point of the water conservancy vital point arranges the project, the foundation processing and constructions to lead to cut to flow etc. contents. Considered various factor under, the choice B - B conduct and actions originally the dam stalk line of the vital point engineering, choice in the dam type, to various dam type after carrying on the merit and shortcoming comparison, combine the local characteristics of this engineering, choose the concrete entity gravity dam conduct and actions originally the dam type of the water conservancy vital point.Adjust the 洪 calculation adoption more widespread half illustrated manual table method, at compare three adjust the project of 洪 after made sure a fit project, get it designs the flood as 306.3 meters, the flood a 307.1 meters of the school pit, make sure that a high distance of dam is 310.9 meters.Main building of this vital point from block the building of water, leak water the building, generate electricity the building and put the empty building to constitute.Pass machine-readable( the gravity dam stability and should dint calculation procedure) and should to compare with pit, the dint and stabilities are after, getting to overflow the economic section of flow the dam not,12.5 meters of a breadth of dam, high 125.9 meters;Leak water the building adoption watch bore overflows the way for flow, a curve of dam adopts the practical curve of WES, eliminating the ability method to adopt to pick to flow to eliminate the ability;The factory premises dam segment includes a segment of three machines and an installs a segment, the factory premises adoption dam is behind type;Adoption deep bore conduct and actions put the empty building, the bore figure choose and use and did not press the dam inside sluiceway.The end construction leads to flow to choose to use two expect the two pieces to lead to flow the method, on expect from tie the narrow river bed to leak to flow, two expect from lead to flow the bottom bore to leak to flow, to the spring river ZHANG GU3 the water conservancy vital point give a the design project that compares the integrity.
Spring the river is containing the rich hydro-electric resources, valley section suits in the construction hydro-junction, the hydro-junction main goal is prevents floods the electricity generation. This article unifies opens the valley terrain geology characteristic, the hydrology characteristic, has carried on the preliminary design to its hydro-junction. The main content opens the valley hydro-junction including the spring river the basic document, the main building design, the key position scheme of arrangement, ground processing as well as the construction leads dams the current and so on the content. In had considered under each kind of factor, the choice second grade - second grade took this key project the dam spool thread, in the dam choice, carries on the good and bad points comparison after each kind of dam, unifies this project the local characteristic, chose the concrete entity gravity dam to take this hydro-junction the dam. Adjusts Hong to calculate uses the quite universal semigraphical method, after has compared three accents Hong plan had determined an appropriate plan, its design flood level is 306.3 meters, the examination flood level 307.1 meters, the definite top of dam elevation is 310.9 meters. This key position main building by keeps off the water building, the drainage building, the electricity generation building, blows off the building to be composed. Passes the charging after to calculate (gravity dam is stable and stress computational procedure) and the stress and stably compares the nucleus, obtains the non- overfall dam the economical section plane, the top of dam width 12.5 meters, the height 125.9 meters; The drainage building uses the table hole overflow the way, the top of dam curve uses the practical WES curve, disappears can the way adopt selects class disappearing energy; The workshop dam section including three flow conditions and installment field sections, after the workshop uses the dam the type; Uses the deep hole achievement to blow off the building, the hole figure selects does not have presses in the dam the sluiceway. Finally constructs the conduction current to select two issues of two section of conduction current methods, an issue by ties the narrow river bed to release the class, two issues release the class by the conduction current bottom hole, opened the valley hydro-junction to the spring river to produce a quite complete design proposal.
请参考下面2篇:【题名】:水利工程【摘要】: 水利工程基础学科混流式水轮机转轮动载荷作用下的应力特性;受漩涡作用的水下块石的起动流速;复式河槽流量计算方法比较与分析;二维溃坝洪水波的演进绕流和反射的数值模拟;分部面积超蓄产流法;天然河流被改变条件下的降雨径流预报模型;面向对象方法在河网非恒定流计算中的应用;水工材料土工合成材料加筋土抗剪作用的试验研究;新老混凝土粘结面渗透性能试验研究;水工结构土石坝沉降一填筑灰色监测模型分析;高碾压混凝土拱坝分缝形式及破坏机理研究;碾压混凝土拱坝单向间隔诱导缝等效强度研究。【题名】:水利工程【摘要】:水利工程基础学科 突扩突缩式内流消能工的数值模拟研究;湖底地形对风生流场影响的数值研究;动水环境中有限宽窄缝湍射流的水力特性研究;双局部行进波对流的时空结构;水工材料 钢筋混凝土结构锈蚀损伤的解析解;跳回失稳研究;浇筑式沥青混凝土防渗层配合比优选方法研究;堤基渗流管涌发展的理论分析。
水利工程水利工程毕业设计论文[博士]城市区域水土作用分析与土的结构 [博士]中小城市水利可持续发展研究 [博士]中小城市水利可持续发展研究 河口冲刷的理论与数值模拟 [硕士] 吉林西部生态环境需水量与水资源承载力研究 [硕士]航道整治河段流动特性的三维数值模拟 新疆某水电站毕业设计 某混凝土实体重力坝枢纽及发电引水管道设计 [博士]裂隙岩体可灌性及灌浆数值模拟研究 天津市城市水源合理配置研究[硕士] 【学士】某江水利枢纽坝工设计 [学士]水电站毕业设计 【学士】某江水利枢纽重力坝毕业设计 [学士]重力式沉箱码头毕业设计 [硕士]太原城区段汾河蓄水工程对地下水渗流特征影响的研究 [硕士]入库洪水资源化问题的研究与应用 [硕士]波流共同作用下水流垂直结构及污染物 [硕士]从长江三峡库尾(重庆段)淤砂中提钪试验研究 [硕士]洪水资源化利用模式及风险分析 [硕士]河道人工建筑物对复氧及溶解氧扩散影响的研究 [硕士] 市区性河流的水质数学模拟 [硕士] 湿地治污系统在洞庭湖区的应用研究 [硕士]大连市周水子地区海水入侵问题研究 [硕士] 基于模糊数学方法的洞庭湖区水安全评价 [硕士]从长江三峡库尾(重庆段)淤砂中提钪试验研究 [硕士] 长春市主要河流环境容量及其总量控制研究 [硕士]乌梁素海农田面源入湖量的核算研究 [硕士]云南糯扎渡水库水质预测研究 汉河水系上一中型水闸的毕业设计 某泵站的毕业设计 发电机继电保护的研究 毕业设计-某一级水利枢纽工程规划设计书 [硕士]大体积混凝土温度应力分析与反分析 某供水工程毕业设计报告 矩形渡槽设计[本科] 护岸工程课程设计书 某厂净水厂设计[学士] 水工钢筋混凝土课程设计 拱式渡槽设计资料 广西郁江洪水预报与调度系统研究 水利工程水情自动测报系统设计研究 重力式码头施工组织设计课程设计 云南省景洪水电站施工组织设计 拱坝计算书 松涛水利枢纽工程施工(课程、毕业设计) 土石坝毕业设计 某水利工程土石坝枢纽设计说明书 [学士]水利枢纽工程初步设计 [学士]拦河闸设计 [学士]黑河水利枢纽布置及面板堆石坝设计 [学士]土石坝施工组织设计 [学士]函江水利枢纽工程毕业设计 [学士]函江水利枢纽工程毕业设计 [博士]大坝安全管理关键技术研究 [学士]水利灌渠改建工程毕业设计 某闸工程设计图 某排水泵站的初步设计
1.1基本概况高鸟桥电站位于榕江县西北面、平永河上游,距榕江县城35公里,地处县内平江乡与平永镇交界。距平永镇所在地4公里,平江乡所在地15公里。坝址以上集雨面积为240Km2,多年平均年径流量为1.832亿m3,多年平均径流5.81m3/S,多年最枯日平均流量0.7m3/S。由于流域植被较好,两岸大部分都是基岩,故除短暂洪水期外,河水清澈,含泥量较少。高鸟桥电站工程设计水头为15米,拦河坝高28.77 m,工程等别为四等,拦河坝为Ⅳ级建筑物。1.2水文气象资料1.2.1水库特性本方案电站坝址选在上轴线。按电站工程洪水计算规范,校核洪水取200年一遇,设计洪水取30年一遇进行计算。坝址下游无防洪要求,溢流坝堰顶不设闸门,故取正常蓄水位与堰顶高程一致。经计算,其特征水位及相应下泄流量见表1。1.2.2气象资料本流域位于雷公山暴雨中心边缘,系黔东南地区稳定多雨区,年平均降雨量约为1345.6㎜,多年平均径流深655㎜,年平均气温16.4℃,极端最低气温-7.6℃,极端最高气温37.5℃,年平均相对湿度80%,无霜期282天。全年气候温和,雨量充沛,属中亚热带湿润季风气候。1.3坝址地质条件拟建坝址为陡立型横向河谷,岩层倾向上游,持力层岩石坚硬,强度高,基岩节理裂隙虽然比较发育,但倾角都比较大,未发现缓倾裂隙的存在,对大坝稳定影响不大;坝址下游虽然存在一小断层F4,但未发现其贯穿库区,对水库的影响不大;此外,河床比较狭窄,覆盖层较薄。根据提供的地质报告资料,坝址岩石摩擦系数f为0.5~0.65,内聚力C为0.25~0.3㎏/㎝2。不足之处是坝肩岩体卸荷裂隙比较发育,风化程度较深,开挖量较大;断层F4延伸至坝址左岸山体,若建拱坝对左坝肩的稳定可能有一定影响。1.4天然建筑材料本区附近只有一处天然砂场,在弄子口寨脚河道转弯处,距工地约500米,该砂场储量较小(约1000立方米),且砂砾中含软弱颗粒及含泥较重,质量较差,建议不用。在坝址上游约100米及300米处,下游约150米处,基岩裸露,分布着厚至块状变余砂岩和中厚层粉砂质板岩,岩石坚硬,强度较高,可供开采块石及机械加工砂石料,其储量丰富,可以满足工程建筑材料的需求。建议坝址上游石场开采4000立方米左右,其余的在坝址下游石场开采。2、枢纽总体布置2.1坝轴线选择在坝址地形图上选两条坝轴线,即上坝轴与下坝轴进行比较。通过比较,上坝址基岩倾向上游,两岸基岩裸露,河床覆盖深在6米以内,渗漏问题不严重。根据钎探资料,河床覆盖层最厚6米,最薄0.3米,清基工程量不大。该坝址河流顺直,水流条件好,下泄水流离主河道左岸弯曲段远。综合上述地质、地形、水流等方面的条件,上坝轴线较下坝线条件优越,故采用上坝线作为本工程坝轴线。2.2坝型选择根据上述所提供的地形、地质条件及水文气象资料,进行综合分析如下:电站拟选坝址河谷呈“U”型,宽高比达3.1以上,拱的作用小,两岸山体稳定性较差,并因洪水流量大,泄洪建筑物较难布置,故放弃拱坝设计方案。电站附近,筑坝土料缺乏,同时坝址位置较窄,无法布置溢洪道,如布置溢洪道,还需对左坝肩进行大面积的开挖,有可能造成坝体稳定性差,工程量大,造价高,也是不可取的。若采用重力坝方案。其筑坝材料可用砼和浆砌石两种材料,能使该工程充分利用现有的自然条件,且泄洪建筑物容易布置,施工导流易于解决。居于浆砌石和纯混凝土两种坝型而言,浆砌石重力坝虽然水泥用量少,投资小,但不能实现机械化施工,人工砌筑,坝体质量难以控制,工期长,是不可取的;另外,随着改革的深入,施工质量和进度都将受到合同和国家法律的约束。因此,唯有混凝土重力坝才是较理想的坝型,它能满足由于施工工艺、组织管理和机械设备使用水平的迅速提高而使工程早日完工的要求。综合上述多方面因素,实体坝虽然工程量大,但由于其体型简单、施工方便、工期短,工程可提前发挥效益,从而使工程投资可以得到补偿,混凝土实体重力坝有利条件较多,故拟定为本工程的最优坝型。3、工程布置与坝体构造根据规范规定,大坝工程等级为四等,主要建筑物级别为4级,次要建筑物级别5级。大坝防洪标准按30年一遇洪水设计,200年一遇洪水校核。拦水坝为实体重力坝,坝顶总长62米,最大坝高28.77m,主要由非溢流坝段、溢流坝段和两侧导流墙组成,其建筑材料均为C15混凝土浇筑。3.1非溢流坝结构与构造根据前述,非溢流坝坝顶高程为356.17m,拟定坝顶宽3m,上游坝坡为垂直面;下游坝坡在高程356.17m~349.82m段为垂直面,351.42m以下坡度为1:0.6。重力坝根据工程地形地质条件,未考虑设排水沟和防渗帷幕,坝顶不设防浪墙。工程不考虑地震及冰冻作用,其抗滑稳定计算按分项系数极限状态法计算;应力分析计算采用概率极限状态设计法。经计算,稳定及应力均满足规范要求。3.2溢流坝结构与构造溢流坝段位于河床中间,有利于泄洪时水流顺畅,主河槽基岩好,抗冲能力强。结合实际情况,本工程坝顶溢流采用不设闸门的坝面溢流形式,堰顶高程与正常蓄水位齐平,即堰顶高程为349.82m,堰宽40米,堰上最大水头5.39m。溢流堰上游堰头曲线采用三圆弧形曲线,堰面曲线采用幂曲线,曲线末接1:0.6的直线段,其末端则以挑角15o、曲线半径为3.8m的反弧鼻坎。溢流坝最大堰高22.42m,最大底宽16.5mm(基础),堰顶最大下泄流量为1079.9m3/s。根据鼻坎应高于下游水位1m左右的要求,确定挑流鼻坎高程为▽坎=337.4m。3、导流墙导流墙是溢流坝边墩的延长,其作用是分隔溢流坝和非溢流坝,通过水力计算决定出其高度和长度,最后按结构要求拟定出厚度。本方案不考虑洪水对坝下建筑物的影响,水流壅高及超高取1.53m,鼻坎处导流墙高度为3.0m,导流墙在鼻坎处坎顶高程为340.4m。经计算,堰顶外侧边缘末高程为349.28m,导流墙高度为3.0m,根据溢流面曲线特征,则坝面导流墙高度与坝面法向高度为3米,即按坝面线平移3米得出导流墙边缘线,其下游与鼻坎处导流墙相交。据此得坝顶导流墙高程为352.52m。最终拟定导流墙顶厚0.5m,迎水坡度1:0,背水面坡度1:0.3。通过对高鸟桥电站混凝土重力坝的选型及方案比较,所确定的混凝土坝为当前应用较普遍的坝型,其稳定及应力计算是大坝设计的关键环节。通过采用分项系数极限状态法和概率极限状态法计算的大坝稳定及应力设计值均已满足规范要求。在今后的工作实践中,如何合理拟定坝体尺寸,有效确定分项系数及结构系数等基本参数将是我们值得研究和探讨的主要课题。更多关于工程/服务/采购类的标书代写制作,提升中标率,您可以点击底部官网客服免费咨询:
水利是国民经济和社会发展的基础产业,那水利水电工程专业的人要怎么写论文呢?本文是我为大家收集整理的水利水电工程毕业论文,欢迎参考借鉴。
摘要: 众所周知,水利水电工程的发展对我国农业的发展起着决定性作用。而这里面的防排水技术又是水电水利工程的基础,由于主要服务于农业活动,所以受到我国土地复杂的地形以及气候的干扰因素,导致工作难度加大,本文主要研究了水利水电工程防排水技术。
关键词: 水利水电;防排水;施工技术;主体建筑物
水利水电工程防排水施工受到气候和地貌的影响较大,如地形、地质、水文和气象条件等因素对工作人员以及技术干扰,所以只有在围堰的保护下才能对主建筑进行分期的施工,而在施工的过程中防排水对施工的安全具有很大的影响。
1工程中防排水简介
水利水电工程一般都是由拦河坝和电站厂房以及船闻构成。其中引水式厂房和河水需要有一定的距离,其他形式的厂房都会直接建设在河床或河道上。设计时根据使用的材料不同,拦河坝可分为土石坝、混凝土坝、橡胶坝及铜闻门坝等。本文讨论的水利水电工程一般使用的是混凝土坝,为水利水电工程防排技术的发展打下一定的基础。
2防排水系统的重要性
如果水利水电工程没有建立防排水系统,那么很容易出现较大事故,对工程企业造成经济损失,对水利水电工程的质量制造隐患,最重要的是对人民和工作人员的生命构成威胁。在水利水电工程中防排水做的不合格,那么在雨季,由于上游大量的水汹涌而下,使得大量积水无法排放,造成洪灾,所以设立防排水工作是十分必要的。只有防排水工作做好,才能保证农业的正常发展。
3围堰防排水系统的建造
围堰就是临时修建在建筑物旁起到维护作用的结构,,它的作用就是预防河水中的泥沙被冲到修建建筑物的位置,方便于挖基坑和围堰内的积水排除等工作。除了特殊的建筑物外,一般水利工程中的围堰在建筑物竣工后都会拆除,围堰的高度一定要高于最高的水位。在水利工程中围堰的作用非常之大,它不但有利于建筑物的修筑,还能对防排水体系产生巨大的影响。对于围堰的修建我要做到因地适宜,在一些黏土比较少的地段,围堰的外坡修建我们就要用混凝土,这样不仅能够做到防水防泥沙的作用,还能够避免降雨的冲刷。对于那些黏土含量较多的地段,我们可以用黏土来修筑心墙,对于外坡的.建筑使用堆石棱体修筑就可以,这样不但能够节省成本,还能够发挥出非常好的效果,还有一些更特殊的地方,如森林等,我们也可以建筑草木围堰等。我们可以通过观察建筑水利水电工程所在区域的地质地貌和建筑物的需求进行确定围堰的材料以及所需要的品质。一般的围基都会采用混凝土墙和喷射灌浆以及用黏土来进行铺盖对防排水处理。对于那些黏土含量少的地域,我们可以采用挖掘机进行协助作业,挖出的黏土进行回填来建筑墙体。
4坝基建造对防排水系统的重要性
水坝修建过程中,由于大量河水的集聚,导致水压对坝基的压力非常之大,这样就会对建筑物的稳定性造成巨大的影响,所以防排水系统在这个时候就显得异常重要。我们可以在临水区域使用帷幕灌浆来进行处理,防渗帷幕对水利水电工程施工过程所产生的坝基渗水现象具有良好的治理效果。同时防渗帷幕和坝基护坦的地方一起组成了水利水电工程中的防排水体系。
5主体建筑物防排水体系的设计
我们主要研究一下最常见的混凝土坝。在设计主建筑物的防排水体系时,我们一定要结合建筑工程的主建筑物功能和目的的特点进行设计。施工中的挡水建筑作用主要是防水,而用作排水的是挡土建筑物的设计。挡水建筑物在施工的时候对其影响最大的就是水位差引起巨大的水压,还有就是在施工时混凝土的凝固时间对其造成影响。因为混凝土坝的特点,护坡的排水方法我们可以使用土工布和排水管。将土工布和水管铺在护坡的表面或埋在护坡上,设置科学的排水系统可以让过程事半功倍;由于大多数的水利水电工程都具有较大的规模,在一定程度上可以满足排水的要求。但因为二期工程靠近闻门处混凝土的断面较小,无法承受河水的冲击力,会出现漏水现象。为了解决这个问题,我们在施工时要一边浇筑一边封模来确保毛面和缝面的质量,这个办法可以保证缝面干净振捣有效,完美解决漏水现象的发生。因为方位的不同,在施工是我们所用的防水物质就要随时调换。如果我们用止水片,那么就要根据结合面的宽度等来确定使用的种类。坝肩的地质要求可以确定防水系统中的防水技术。
通过以上的研究,我们可以清楚的了解水利水电工程的建设会受到诸多方面的影响,因为建筑物主体的规模都不小,施工的过程较长要分期完成,在这段时间内防排水关系到施工人员的安全,以及竣工后建筑物的质量问题。同时它还会对河流的水位差造成影响,大坝的临水面要及时的采用相应的措施,不然就会对整个过程的质量造成影响。
参考文献
[1]杨康宁.水利水电工程施工技术(第二版)[M].北京:中国水利水电出版社,2009.
[2]李建鹏.关于水利水电工程施工质量的控制研究[J].科技促进发展,2010(2).
[3]谢拥军.水利水电工程中混凝土单价预算的编制[J].中国城市经济,2011(14).