A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. adoption.In recent years, a 基 engineering quantity problem influence building structure of the case of the normal usage and safety is a lot of.The construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of 基 examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of 基s, is also a research heat of 基 realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering 隐 to suffer from, carrying on the evaluation to the quantity of the stake of 基 . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a 维 of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a 维 not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of 基 of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases
A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. adoption.In recent years, a engineering quantity problem influence building structure of the case of the normal usage and safety is a lot of.The construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of , is also a research heat of realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering to suffer from, carrying on the evaluation to the quantity of the stake of . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases
桩基础 has the widespread application domain, is the high-rise construction, the large-scale bridge, the deep water wharf as well as the marine petroleum platform and so on use main foundation form. In recent years, 桩基 the project quality question influence construction structure normal use and the safe instance were very many. The pile construction has the high hiding as well as the pile construction quality has very many not definite factor, looked from 基桩 the quality examination angle, the improvement examination method and the method, improve the examination work quality and the examination evaluates the result the reliability, to guarantees 基桩 the project quality and safely has the vital significance, also is 桩基 one of domain research hot spots.The low strain reflection method main function examines the pile body structure integrity, like the pile body flaw position judgement, 施工桩 long proofreading and the concrete intensity rank qualitative estimate and so on, the use obtains the reflected wave curve signal accurately to delimit breaks the pile body quality, removes the project hidden danger, to 基桩 the quality carries on the appraisal. This article has conducted the research to the Kelvin non-linearity elastic material 料桩 body integrity examination low strain reflected wave new method. Establishes the Kelvin non- line elastic material 料桩 question the unidimensional undulation new model; Produced has controlled the body the dynamic equation, the use unidimensional non-linear elasticity this construction relations infers the pile axial force and the axial strain relations, proposed the unidimensional non-linear elastic undulation question new algorithm; Uses the FORTRAN language coding, the value simulation 基桩 桩顶 speed (or displacement, acceleration) responds the time interval curve profile; Finally 基桩 builds each kind of profile storehouse to the complete existence question, will use in 基桩 the complete examination service for later. As well as low strain reflection method; The pile body integrity examines 2 words
低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|pile foundation高层建筑 High-rise buildings(分类词汇:环境资源相关 )大型桥梁super-large bridges 深水码头Deep Water Wharf海上石油平台Offshore oil platform建筑结构building structure施工construction非线性弹性材料nonlinear elastic materials桩基工程质量问题这篇虽然是科技论文,但是我觉得他翻译成“pile foundation quality question”很不妥当,我将他修改成problems of pile foundation quality,,从汉语语法之角度考虑,这里的问题两个字是多余的,去掉更好,你自己看看吧!不确定性因素Incertitude Factors基桩Foundation Pile隐蔽性(Impercephbility)axial strain轴向应变研究热点research hotspot(也有用point的)桩身缺陷位置 positions of pile defects定性估计 qualitative estimation混凝土强度等级concrete strength gradethe signal of reflected_wave curve反射波曲线信号工程隐患Project Concealed Harzard一维波动模型one-way fluctuant model控制体(control volume),本构关系 constitutive relationFORTRAN语言编制程序program written in FORTRAN language响应时程曲线波形时程曲线response time history curvePile foundation is widely used as the main basic structure of high-rise buildings,super-large bridges,deep water wharf and Offshore oil platform. During recent years,there are many bases of pile foundation quality affecting the normal working and safety of the building structures. Pile construction has high impercephbility and whose quality presents many incertitude factors,from an angel of qualitative inspection of the foundation piles, it has important significance for ensuring the quality and safety of foundation pile projects to modify the inspection methods and improving the inspection quality and the reliability of inspection & assessment results,it is also one of the research hotspots in foundation pile field. The main functions of low strain reflection wave method is to inspect the pile integrity, such as the judgment of pile defects positions, the checkout of pile lengths, and the qualitative estimation of the concrete strength grade,the judgment of the pile quality using the signal of reflected_wave curve accurately, the elimination of the project concealed harzard,and the estimation of foundation pile quality. This paper studied on the low strain reflection wave method for measuring of pile integrity made of Kelvin nonlinear elastic materials, set up a new one-way fluctuant model to treat the problems of piles made of Kelvin nonlinear elastic materials, gave out a dynamics equation of control volume,and induced the relation between pile axial forces and axial strain using the constitutive relation of one-way nonlinear elastic materials, put forward a new calculation method for the fluctuation of one-way nonlinear elastic materials, simulated the pile-top speed response time history curve (or displacement, acceleration) numerically using program written in FORTRAN language, finally the author set up a curve database of the foundation piles existing integrity problem for the integrity inspection of foundation piles in the future.
建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。我为大家整理的建筑工程质量检测技术论文,希望你们喜欢。建筑工程质量检测技术论文篇一 浅议建筑工程质量检测 【摘要】 建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。本文对检测行业的现状进行了分析,探讨了建筑工程质量检测的主要内容与检测技术,并提出了做好检测工作的策略。 【关键词】 质量检测;检测内容;策略 【中图分类号】 TU712.5【文献标识码】 B 【 文章 编号】 1727-5123(2012)03-045-02 建筑工程质量不仅关系工程的适用性和建设项目的投资效果,而且关系到人民群众生命财产的安全。随着我国现代化建筑事业的蓬勃发展,建筑规模不断扩大,一旦发生工程质量问题,会直接影响公共利益和公众安全,因而,建筑工程的质量检测越来越成为人们所关注的 热点 。 1检测行业的现状 改革开放以来,建设工程质量检测行业规模由小到大,工作类型由单一到综合,检测市场化概念已经形成。但是在实际工作中仍然存在很多问题。⑴从只能检验砂石、水泥、砖瓦、钢材发展到市政工程材料、地基基础检测、建筑工程结构可靠性检测、建筑节能检测、室内环境检测等,检测的内容越来越精细,检测技术也在不断进步;⑵建筑企业试验室属于第一方试验室,即企业为了保证自身承包的工程质量而设立的试验室,由于其自身性质很大程度上限制了它们的发展,使其在经济实力、检测能力、规模和技术力量等环节处于劣势,在检测市场所占分额很小。但是这种情况正在改变,企业的试验室正在逐步分离出来, 成立具有独立法人资格的检测机构;⑶市场的竞争,使检测费用远远低于成本,导致部分试验无法正常进行;⑷检测行业目前的技术门槛过低,造成人员技术素质较低。虽然现在实行的是见证取样,施工现场的见证人员不仅没有相应的资格,甚至有一些人员连最简单的常识都不懂,样品的真实性得不到保证,所得到的数据与实际严重不符。 2建筑工程质量检测的内容 2.1地基基础工程的质量检测。 2.1.1地基。通常采用钻孔取芯试验、静载荷试验和触探试验对复合地基进行检测。检测要求有:⑴砂石桩复合地基的质量检测要求。施工后等待一段时间,抽查检测砂石桩的处理效果;可采用静力触探、标准贯入、原位测试的 方法 检测桩间土的挤密质量;⑵振冲桩复合地基的质量检测要求。施工结束后间隔一定的时间,可采用单桩载荷试验对振冲桩的质量进行检测;对于场地复杂或是重要的工程,应检测复合地基的处理效果。 2.1.2桩基工程。桩基检测项目主要有:⑴单桩竖向承载力试验。在同一个条件下,试桩的数量应大于3根;应采用油压千斤顶加载;基准桩与压重平台支座、试桩之间的中心距应符合相关规定;制作的试桩应符合要求;加载方式选择慢速维持载荷法;测读桩沉降量的时间间隔应掌握好;严格按照要求确定单桩竖向极限承载力;⑵基桩高应变动力检测。检测之前需对电源、传感器、仪器、设定参数等进行检查,确保无误;锤击设备选用自由落锤时,应保证最大锤击落距小于3mm;如果只需检测桩身的结构完整性,可降低落距,减轻锤重;⑶混凝土灌注桩终孔持力层检验。人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验;可采用原位载荷试验测得的结果,并结合实践 经验 和桩基设计要求,对桩孔孔底土层的承载力进行复验。地基基础工程质量检测另外还有地下结构施工监测和建筑物的变形检测等。 2.2钢筋混凝土结构工程质量检测。钢筋混凝土质量检测可分成三类。⑴外观检查。对于混凝土外表产生的质量问题,可用此法,如尺寸偏差、蜂窝麻面、表面损伤、缺棱掉角、裂缝、冻害等;⑵预留试块检测。这种方法有一定的误差,如预留试块的取样不当,试块与结构没有同条件养护,试块的振捣方法与结构的施工方法相差过大,则试块就没有代表性;⑶在结构本体上进行检测。这种检测内容有:混凝土的强度和缺陷、钢筋混凝土结构质量问题的常用手段,其测试结果可作为判断结构安全问题的重要依据。后者称为破损检验,是在非破损检测尚无法确定其承载能力时使用,或对新结构需要分解其受力性能时使用。常用较成熟的非破损检测方法有:回弹法(表面硬度法)、拔出法(半破损法)、超声波法(声波法)等。回弹法是一种测量混凝土表面硬度的方法,利用回弹仪冲击动能测量回弹锤撞击混凝土表面后的回弹量,确定混凝土表面硬度,用试验方法建立表面硬度与混凝土强度的关系曲线,从而推断混凝土的强度值;拔出法是直接测定混凝土的力学特性的方法,使用拔出仪拉拔埋在混凝土表面层内的锚杆,根据混凝土的拉拔强度,推算混凝土抗压强度;超声波法可以测定混凝土的强度,用超声波发射仪,从一侧发射一列超声脉冲进入混凝土中,在另一侧接收经过混凝土介质传送的超声脉冲波,同时测定其声速、振幅、频率等参数,判断混凝土的质量。 2.3砌体结构工程检测。 2.3.1砌体结构的现场检测方法。砌体结构主要指砖砌体,砌体强度是由砖块和砂浆强度或施工时制做的砌体试块强度来决定的,传统的检测方法是直接从砌体结构上截取试样,进行抗压强度试验而砌体结构的特点导致取样存在较大难度,取样时的扰动又会对试样产生较大损伤,从而影响试验结果。因此,砌体结构的现场原位非破损或半破损试验方法理所当然地受到重视,并广泛开展研究和工程实际应用。砌体强度直接测定法包括:抽样检测法、原位检测法、动测综合法、微观结构法等。 2.3.2砌体强度的间接测定法。砌体强度与砂浆和砖块强度有直接关系。由砂浆和砖块强度等级可确定砌体的抗压强度,间接测定法就是使用专门的仪器和专门的测试方法,测量砂浆和砖块的某一项强度指标或与材料强度有关的某一项物理参数,并由此间接测定砌体强度。主要方法有:冲击法、回弹法、推出法,此外尚有筒压法、点荷法等通过测定砂浆的强度来测定砌体强度的方法,都已在工程中得到应用。 3做好检测工作的策略 3.1建立检测信用档案 良好的信用是建立社会主义市场经济体制的必然要求。检测机构及检测人员信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测机构和人员的信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,建立诚信获利和失信惩戒机制,发挥信用管理调控市场的作用。通过各种 渠道 ,宣传质量检测信用好的单位,扩大其社会信誉度和知名度。 3.2完善建筑工程质量保证体系。针对建设项目规模,建立相应等级试验检测机构和质量保证体系,对工程质量负责。试验检测机构业务范围内的有关规范、规程、标准等技术文件应齐全,试验检测应严格按有关标准、规程及规范进行。各级质量管理部门应各司其责,按质量第一的方针和全面质量管理要求,采取切实有效的 措施 ,不断提高质量管理水平。在实际工作中,应严格实行质量自检,加强质量管理和质量监督,逐步建立完善质量保证体系。还要增强建设各方面的质量意识,分工负责,责任到人,真正落实质量岗位责任制。 3.3培养高素质的技术队伍,加大技术创新的投入。勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 3.4坚持质量 教育 ,建立质量原理和质量责任制度。在质量管理工作中,质量意识的提高有两个途径:⑴靠坚持不懈的质量教育;⑵建立和落实质量管理和质量责任制度。因此,质量教育经常化和质量管理制度化是我们质量管理工作的重点。 3.5严格验收工程。完成项目工程能否交付好的产品,关键在于最后验收。⑴工序验收是验收工作的基础。工序验收的过程是:先由操作者自检,再交由班组长检验。要采取必要经济制约手段,完善签字鉴证手续,严格执行每道工序,确保质量;⑵分项分部工程验收是验收工作的主要组织部分。分项分部验收要做到规范和严细:首先,保证验收工程的全面性,验收项目的品种和数量不得缺少。其次,从保证项目到允许偏差项目,验收都要严格执行国家标准,不得降低等级,严禁弄虚作假。最后,建设(监理)单位现场质量监督员应参加验收并签字鉴证;⑶竣工工程验收是工程交工的前提。工程整体验收应注意三个环节:首先,施工单位的自评;其次,建设(监理)单位的预验;最后,工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 总之,在将建筑工程质量检测行业推向市场的过程中,要加强见证取样工作的监督,无论是招标、规划、质量监督工程的各个部门在工程的每个环节都不要放松。做到每一个样品的取样合理,真实可靠。各检测单位还要提高建筑工程质量检测的质量意识和法律意识。树立服务观念,在市场经济中找准自己的位置,树立现代 企业管理 观念,借鉴和利用一切企业管理的先进手段和办法来帮助检测机构健康发展。 建筑工程质量检测技术论文篇二 刍议建筑工程质量检测 【摘要】建筑工程的数量也随着社会主义发展而不断增加,而工程检测是现代建筑必不可少的环节,这也是保证工程施工质量的有效途径。工程检测质量的好坏关系到了整个建筑质量的好坏,结合具体的工作经验,本文对建筑工程质量检测遇到的相关问题展开了简单的探讨。 【关键词】质量检测;建筑工程;问题探讨 在建筑行业不断发展的同时,我们也看到了很多潜在的安全隐患。近几年,我国建筑行业的意外事故发生率在不断增加,很多施工场地都出现了伤亡事故。这些都在警示人们,工程建筑施工必须要做好质量检查工作。检测时需要积极运用先进的技术手段,结合科学的实施程序,提高建筑工程的检测效率,尽可能避免过大的经济损失,维护建施工的安全进行。 一、建筑工程检测的主要内容与技术 1、地基基础的检测 (1)桩基工程的检测 桩基是隐蔽工程,支撑着地面上的构筑物,它是建筑物的基础,其质量优劣直接影响到这些建筑物的安全。在桩基础的施工过程中,桩基检测是一个不可缺少的环节。 a.单桩竖向承载力。在检测的同时必须要注意几个重点:在相同环境下,保证试桩的数量在3根以上;需使用油压千斤顶进行加载;对基准桩、压重平台支座、试桩三者的间隔要控制在标准范围内;设计的试桩需要满足实际工程需要;严格控制测读桩沉降量的时间长短好;根据具体标准来限制单桩竖向极限承载力。b.基桩高应变动力。在现场进行检测工作需要结合相关要求进行:在检测前期需做好相关的检查,如:电源、仪器、设定参数等,保证无误后投入使用;在锤击设备采取自由落锤时,要将最大锤击落距控制在3mm 以内;若需要对桩身的结构整体性进行检测,需要降低落距,减小锤重。c.混凝土灌注桩终孔持力层检验。检验技术要点:人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验。 (2)建筑物的变形检测 a.倾斜。对建筑物倾斜情况实施检测是不可缺少的环节,其主要包括了直接测定法、间接测定等方式。直接测定法有:经纬仪投影法、垂线法、天顶天底仪观测法等;间接测定法有:对建筑物基础的相对沉降实施测定等。b.挠度与裂缝。通过运用检测仪器来做详细的观察;c.沉降。对地基的实际情况做好检查分析,避免因地基严重而影响到建筑质量。 (3)地下结构施工的监测 a.结构内力监测。钢筋混凝土的结构内力测试,主要是通过在支护结构构件主筋上布置钢筋应力计,以监控支护结构的应力变化。b.支护结构的侧向变形观测。采用测斜仪可以测量不同深度支护结构及土体的侧向变形程度。 二、对钢筋混凝土结构的质量检测 1.对混凝土内部状况的检测 由于混凝土材料的缺陷才导致的内部状况。这是因为施工大意、技术管理不到位等造成的。通过超声波可以探明缺陷具体存在的位置,并进行及时补救。直角传播法、钻孔对测法、单面平测法和直接穿透法等都是主要的检测方法。 2.对混凝土中钢筋的质量检测 对钢筋锈蚀的检测。如果钢筋发生锈蚀,则会对混凝土结构的安全性和耐久性会产生影响。通过采用半电池检测的方法,利用钢筋锈蚀程度与测量电位间建立的关系,对钢筋的锈蚀程度进行判断。对钢筋的位置进行检测。可以利用钢筋位置检测仪,这一先进的仪器设备进行测量,其能准确的测出混凝土中钢筋的位置以及保护层的厚度,确保其稳定性。 3.对混凝土强度的检测 主要是针对混凝土的内部结构而进行的非破损强度检测,主要运用回弹法等方法,对当前的建筑行业而言,这是对混凝土强度检测中比较常用的方式[2]。其重点主要在于:①在检测前需要对被检测对象的相关情况进行熟悉;②在构件上,要确定试样及分布其测区;③对回弹值、碳化深度要进行循环测试;④对试验数据要做好处理。 三、钢筋混凝土结构检测 (1)混凝土中钢筋的质量检测 a.钢筋锈蚀的检测。钢筋发生锈蚀会直接影响混凝土结构的耐久性和安全性。可采用半电池检测法,利用测量电位与钢筋锈蚀程度间建立的关系,判别钢筋的锈蚀程度。b.钢筋的位置检测。钢筋位置检测仪作为一种先进的仪器设备,可以准确的测定钢筋混凝土中钢筋的位置以及保护层厚度,保证其稳定性。 (2)混凝土强度 主要是针对混凝土结构的非破损强度进行,主要运用的方法包括了回弹法,这是当前建筑行而言比较常用的混凝土强度的方式。其重点在于:a.检测前需熟悉被检测对象情况;b.于构件上确定试样并分布测区;c.逐渐测量回弹值、碳化深度;d.对试验数据做好处理。 四、建筑材料的质量检测 建筑材种类繁多,各种材料进入施工现场后必须根据相关的规范要求进行试验检测,其检验的项目也必须符合国家、行业、地方的相关要求。常规检测项目有:主体结构(梁、板、柱) 砼标号及钢筋数量检测,竣工后房屋空气质量状况检测,钢筋抽样检测,混凝土试块检测,瓷砖性能检测,铝合金门窗三性检测等,这些项目都是强制性要求必须检测的项目。 五、建筑门窗 (1)塑料门窗 检测对象包括:a.根据断面图标准,对配合尺寸、断面尺寸的允差检查;b.低温落锤冲击试验;c.检测加热后的尺寸大小变化。 (2)铝合金门窗 包括:a.表面质量。检查门窗的装饰表面是否出现损伤,其表面的致密、配合情况是否良好。b.装配标准。检查运用的材料能否达到要求,其硬度与强度之关系是否合理。c.性能。门启闭力在50N 以下;抗风压性能要尽可能更强。 六、做好检测工作 1、建立检测信用档案 检测信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,就是要建立诚信获利和失信惩戒的管理机制,发挥信用管理在市场调控中的作用。 2、完善技术管理工作制度 要认真执行工程技术标准,它是工程质量和安全的最基本保障,是工程建设领域的技术法规。要想使质量管理工作科学化、规范化、程序化、制度化,必须健全和完善建设各方主体工程质量技术保证体系,建立健全工程各方主体的质量技术管理控制机制,督促施工单位结合自身情况制定施工工艺、操作规程和内部控制标准。 3、培养高素质的技术队伍,加大技术创新的投入 勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 4、严格验收工程 工程整体验收应注意三个环节:一是施工单位的自评。二是建设(监理)单位的预验。三是工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 结束语 对建筑工程实施质量检测具有十分重要的意义,对工程的质量具有决定给作用,在一定程度上可以降低工程成本的过度消耗,并对建筑物的结构安全起到了维护的作用。根据具体的需要,进而由施工单位采取相应的科学措施来进行检测。 参考文献: [1]杨莉萍,谢平.浅议工程质量检测工作的重要性及要求[J].云南建筑,2008(5) [2]王晓萍.关于混凝土构件荷载检验方法的探讨[J].河北建筑工程学院学报,2008(5) [3]周涛.浅谈工民建工程的质量检测[J].城市建设,2009(32) 看了建筑工程质量检测技术论文的人还看 1. 建筑工程技术论文范文 2. 建筑工程技术研究论文范文 3. 建筑工程技术管理毕业论文3篇 4. 建筑工程技术毕业论文范文 5. 浅谈工程技术建设论文
A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. adoption.In recent years, a 基 engineering quantity problem influence building structure of the case of the normal usage and safety is a lot of.The construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of 基 examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of 基s, is also a research heat of 基 realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering 隐 to suffer from, carrying on the evaluation to the quantity of the stake of 基 . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a 维 of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a 维 not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of 基 of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases
建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。我为大家整理的建筑工程质量检测技术论文,希望你们喜欢。建筑工程质量检测技术论文篇一 浅议建筑工程质量检测 【摘要】 建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。本文对检测行业的现状进行了分析,探讨了建筑工程质量检测的主要内容与检测技术,并提出了做好检测工作的策略。 【关键词】 质量检测;检测内容;策略 【中图分类号】 TU712.5【文献标识码】 B 【 文章 编号】 1727-5123(2012)03-045-02 建筑工程质量不仅关系工程的适用性和建设项目的投资效果,而且关系到人民群众生命财产的安全。随着我国现代化建筑事业的蓬勃发展,建筑规模不断扩大,一旦发生工程质量问题,会直接影响公共利益和公众安全,因而,建筑工程的质量检测越来越成为人们所关注的 热点 。 1检测行业的现状 改革开放以来,建设工程质量检测行业规模由小到大,工作类型由单一到综合,检测市场化概念已经形成。但是在实际工作中仍然存在很多问题。⑴从只能检验砂石、水泥、砖瓦、钢材发展到市政工程材料、地基基础检测、建筑工程结构可靠性检测、建筑节能检测、室内环境检测等,检测的内容越来越精细,检测技术也在不断进步;⑵建筑企业试验室属于第一方试验室,即企业为了保证自身承包的工程质量而设立的试验室,由于其自身性质很大程度上限制了它们的发展,使其在经济实力、检测能力、规模和技术力量等环节处于劣势,在检测市场所占分额很小。但是这种情况正在改变,企业的试验室正在逐步分离出来, 成立具有独立法人资格的检测机构;⑶市场的竞争,使检测费用远远低于成本,导致部分试验无法正常进行;⑷检测行业目前的技术门槛过低,造成人员技术素质较低。虽然现在实行的是见证取样,施工现场的见证人员不仅没有相应的资格,甚至有一些人员连最简单的常识都不懂,样品的真实性得不到保证,所得到的数据与实际严重不符。 2建筑工程质量检测的内容 2.1地基基础工程的质量检测。 2.1.1地基。通常采用钻孔取芯试验、静载荷试验和触探试验对复合地基进行检测。检测要求有:⑴砂石桩复合地基的质量检测要求。施工后等待一段时间,抽查检测砂石桩的处理效果;可采用静力触探、标准贯入、原位测试的 方法 检测桩间土的挤密质量;⑵振冲桩复合地基的质量检测要求。施工结束后间隔一定的时间,可采用单桩载荷试验对振冲桩的质量进行检测;对于场地复杂或是重要的工程,应检测复合地基的处理效果。 2.1.2桩基工程。桩基检测项目主要有:⑴单桩竖向承载力试验。在同一个条件下,试桩的数量应大于3根;应采用油压千斤顶加载;基准桩与压重平台支座、试桩之间的中心距应符合相关规定;制作的试桩应符合要求;加载方式选择慢速维持载荷法;测读桩沉降量的时间间隔应掌握好;严格按照要求确定单桩竖向极限承载力;⑵基桩高应变动力检测。检测之前需对电源、传感器、仪器、设定参数等进行检查,确保无误;锤击设备选用自由落锤时,应保证最大锤击落距小于3mm;如果只需检测桩身的结构完整性,可降低落距,减轻锤重;⑶混凝土灌注桩终孔持力层检验。人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验;可采用原位载荷试验测得的结果,并结合实践 经验 和桩基设计要求,对桩孔孔底土层的承载力进行复验。地基基础工程质量检测另外还有地下结构施工监测和建筑物的变形检测等。 2.2钢筋混凝土结构工程质量检测。钢筋混凝土质量检测可分成三类。⑴外观检查。对于混凝土外表产生的质量问题,可用此法,如尺寸偏差、蜂窝麻面、表面损伤、缺棱掉角、裂缝、冻害等;⑵预留试块检测。这种方法有一定的误差,如预留试块的取样不当,试块与结构没有同条件养护,试块的振捣方法与结构的施工方法相差过大,则试块就没有代表性;⑶在结构本体上进行检测。这种检测内容有:混凝土的强度和缺陷、钢筋混凝土结构质量问题的常用手段,其测试结果可作为判断结构安全问题的重要依据。后者称为破损检验,是在非破损检测尚无法确定其承载能力时使用,或对新结构需要分解其受力性能时使用。常用较成熟的非破损检测方法有:回弹法(表面硬度法)、拔出法(半破损法)、超声波法(声波法)等。回弹法是一种测量混凝土表面硬度的方法,利用回弹仪冲击动能测量回弹锤撞击混凝土表面后的回弹量,确定混凝土表面硬度,用试验方法建立表面硬度与混凝土强度的关系曲线,从而推断混凝土的强度值;拔出法是直接测定混凝土的力学特性的方法,使用拔出仪拉拔埋在混凝土表面层内的锚杆,根据混凝土的拉拔强度,推算混凝土抗压强度;超声波法可以测定混凝土的强度,用超声波发射仪,从一侧发射一列超声脉冲进入混凝土中,在另一侧接收经过混凝土介质传送的超声脉冲波,同时测定其声速、振幅、频率等参数,判断混凝土的质量。 2.3砌体结构工程检测。 2.3.1砌体结构的现场检测方法。砌体结构主要指砖砌体,砌体强度是由砖块和砂浆强度或施工时制做的砌体试块强度来决定的,传统的检测方法是直接从砌体结构上截取试样,进行抗压强度试验而砌体结构的特点导致取样存在较大难度,取样时的扰动又会对试样产生较大损伤,从而影响试验结果。因此,砌体结构的现场原位非破损或半破损试验方法理所当然地受到重视,并广泛开展研究和工程实际应用。砌体强度直接测定法包括:抽样检测法、原位检测法、动测综合法、微观结构法等。 2.3.2砌体强度的间接测定法。砌体强度与砂浆和砖块强度有直接关系。由砂浆和砖块强度等级可确定砌体的抗压强度,间接测定法就是使用专门的仪器和专门的测试方法,测量砂浆和砖块的某一项强度指标或与材料强度有关的某一项物理参数,并由此间接测定砌体强度。主要方法有:冲击法、回弹法、推出法,此外尚有筒压法、点荷法等通过测定砂浆的强度来测定砌体强度的方法,都已在工程中得到应用。 3做好检测工作的策略 3.1建立检测信用档案 良好的信用是建立社会主义市场经济体制的必然要求。检测机构及检测人员信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测机构和人员的信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,建立诚信获利和失信惩戒机制,发挥信用管理调控市场的作用。通过各种 渠道 ,宣传质量检测信用好的单位,扩大其社会信誉度和知名度。 3.2完善建筑工程质量保证体系。针对建设项目规模,建立相应等级试验检测机构和质量保证体系,对工程质量负责。试验检测机构业务范围内的有关规范、规程、标准等技术文件应齐全,试验检测应严格按有关标准、规程及规范进行。各级质量管理部门应各司其责,按质量第一的方针和全面质量管理要求,采取切实有效的 措施 ,不断提高质量管理水平。在实际工作中,应严格实行质量自检,加强质量管理和质量监督,逐步建立完善质量保证体系。还要增强建设各方面的质量意识,分工负责,责任到人,真正落实质量岗位责任制。 3.3培养高素质的技术队伍,加大技术创新的投入。勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 3.4坚持质量 教育 ,建立质量原理和质量责任制度。在质量管理工作中,质量意识的提高有两个途径:⑴靠坚持不懈的质量教育;⑵建立和落实质量管理和质量责任制度。因此,质量教育经常化和质量管理制度化是我们质量管理工作的重点。 3.5严格验收工程。完成项目工程能否交付好的产品,关键在于最后验收。⑴工序验收是验收工作的基础。工序验收的过程是:先由操作者自检,再交由班组长检验。要采取必要经济制约手段,完善签字鉴证手续,严格执行每道工序,确保质量;⑵分项分部工程验收是验收工作的主要组织部分。分项分部验收要做到规范和严细:首先,保证验收工程的全面性,验收项目的品种和数量不得缺少。其次,从保证项目到允许偏差项目,验收都要严格执行国家标准,不得降低等级,严禁弄虚作假。最后,建设(监理)单位现场质量监督员应参加验收并签字鉴证;⑶竣工工程验收是工程交工的前提。工程整体验收应注意三个环节:首先,施工单位的自评;其次,建设(监理)单位的预验;最后,工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 总之,在将建筑工程质量检测行业推向市场的过程中,要加强见证取样工作的监督,无论是招标、规划、质量监督工程的各个部门在工程的每个环节都不要放松。做到每一个样品的取样合理,真实可靠。各检测单位还要提高建筑工程质量检测的质量意识和法律意识。树立服务观念,在市场经济中找准自己的位置,树立现代 企业管理 观念,借鉴和利用一切企业管理的先进手段和办法来帮助检测机构健康发展。 建筑工程质量检测技术论文篇二 刍议建筑工程质量检测 【摘要】建筑工程的数量也随着社会主义发展而不断增加,而工程检测是现代建筑必不可少的环节,这也是保证工程施工质量的有效途径。工程检测质量的好坏关系到了整个建筑质量的好坏,结合具体的工作经验,本文对建筑工程质量检测遇到的相关问题展开了简单的探讨。 【关键词】质量检测;建筑工程;问题探讨 在建筑行业不断发展的同时,我们也看到了很多潜在的安全隐患。近几年,我国建筑行业的意外事故发生率在不断增加,很多施工场地都出现了伤亡事故。这些都在警示人们,工程建筑施工必须要做好质量检查工作。检测时需要积极运用先进的技术手段,结合科学的实施程序,提高建筑工程的检测效率,尽可能避免过大的经济损失,维护建施工的安全进行。 一、建筑工程检测的主要内容与技术 1、地基基础的检测 (1)桩基工程的检测 桩基是隐蔽工程,支撑着地面上的构筑物,它是建筑物的基础,其质量优劣直接影响到这些建筑物的安全。在桩基础的施工过程中,桩基检测是一个不可缺少的环节。 a.单桩竖向承载力。在检测的同时必须要注意几个重点:在相同环境下,保证试桩的数量在3根以上;需使用油压千斤顶进行加载;对基准桩、压重平台支座、试桩三者的间隔要控制在标准范围内;设计的试桩需要满足实际工程需要;严格控制测读桩沉降量的时间长短好;根据具体标准来限制单桩竖向极限承载力。b.基桩高应变动力。在现场进行检测工作需要结合相关要求进行:在检测前期需做好相关的检查,如:电源、仪器、设定参数等,保证无误后投入使用;在锤击设备采取自由落锤时,要将最大锤击落距控制在3mm 以内;若需要对桩身的结构整体性进行检测,需要降低落距,减小锤重。c.混凝土灌注桩终孔持力层检验。检验技术要点:人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验。 (2)建筑物的变形检测 a.倾斜。对建筑物倾斜情况实施检测是不可缺少的环节,其主要包括了直接测定法、间接测定等方式。直接测定法有:经纬仪投影法、垂线法、天顶天底仪观测法等;间接测定法有:对建筑物基础的相对沉降实施测定等。b.挠度与裂缝。通过运用检测仪器来做详细的观察;c.沉降。对地基的实际情况做好检查分析,避免因地基严重而影响到建筑质量。 (3)地下结构施工的监测 a.结构内力监测。钢筋混凝土的结构内力测试,主要是通过在支护结构构件主筋上布置钢筋应力计,以监控支护结构的应力变化。b.支护结构的侧向变形观测。采用测斜仪可以测量不同深度支护结构及土体的侧向变形程度。 二、对钢筋混凝土结构的质量检测 1.对混凝土内部状况的检测 由于混凝土材料的缺陷才导致的内部状况。这是因为施工大意、技术管理不到位等造成的。通过超声波可以探明缺陷具体存在的位置,并进行及时补救。直角传播法、钻孔对测法、单面平测法和直接穿透法等都是主要的检测方法。 2.对混凝土中钢筋的质量检测 对钢筋锈蚀的检测。如果钢筋发生锈蚀,则会对混凝土结构的安全性和耐久性会产生影响。通过采用半电池检测的方法,利用钢筋锈蚀程度与测量电位间建立的关系,对钢筋的锈蚀程度进行判断。对钢筋的位置进行检测。可以利用钢筋位置检测仪,这一先进的仪器设备进行测量,其能准确的测出混凝土中钢筋的位置以及保护层的厚度,确保其稳定性。 3.对混凝土强度的检测 主要是针对混凝土的内部结构而进行的非破损强度检测,主要运用回弹法等方法,对当前的建筑行业而言,这是对混凝土强度检测中比较常用的方式[2]。其重点主要在于:①在检测前需要对被检测对象的相关情况进行熟悉;②在构件上,要确定试样及分布其测区;③对回弹值、碳化深度要进行循环测试;④对试验数据要做好处理。 三、钢筋混凝土结构检测 (1)混凝土中钢筋的质量检测 a.钢筋锈蚀的检测。钢筋发生锈蚀会直接影响混凝土结构的耐久性和安全性。可采用半电池检测法,利用测量电位与钢筋锈蚀程度间建立的关系,判别钢筋的锈蚀程度。b.钢筋的位置检测。钢筋位置检测仪作为一种先进的仪器设备,可以准确的测定钢筋混凝土中钢筋的位置以及保护层厚度,保证其稳定性。 (2)混凝土强度 主要是针对混凝土结构的非破损强度进行,主要运用的方法包括了回弹法,这是当前建筑行而言比较常用的混凝土强度的方式。其重点在于:a.检测前需熟悉被检测对象情况;b.于构件上确定试样并分布测区;c.逐渐测量回弹值、碳化深度;d.对试验数据做好处理。 四、建筑材料的质量检测 建筑材种类繁多,各种材料进入施工现场后必须根据相关的规范要求进行试验检测,其检验的项目也必须符合国家、行业、地方的相关要求。常规检测项目有:主体结构(梁、板、柱) 砼标号及钢筋数量检测,竣工后房屋空气质量状况检测,钢筋抽样检测,混凝土试块检测,瓷砖性能检测,铝合金门窗三性检测等,这些项目都是强制性要求必须检测的项目。 五、建筑门窗 (1)塑料门窗 检测对象包括:a.根据断面图标准,对配合尺寸、断面尺寸的允差检查;b.低温落锤冲击试验;c.检测加热后的尺寸大小变化。 (2)铝合金门窗 包括:a.表面质量。检查门窗的装饰表面是否出现损伤,其表面的致密、配合情况是否良好。b.装配标准。检查运用的材料能否达到要求,其硬度与强度之关系是否合理。c.性能。门启闭力在50N 以下;抗风压性能要尽可能更强。 六、做好检测工作 1、建立检测信用档案 检测信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,就是要建立诚信获利和失信惩戒的管理机制,发挥信用管理在市场调控中的作用。 2、完善技术管理工作制度 要认真执行工程技术标准,它是工程质量和安全的最基本保障,是工程建设领域的技术法规。要想使质量管理工作科学化、规范化、程序化、制度化,必须健全和完善建设各方主体工程质量技术保证体系,建立健全工程各方主体的质量技术管理控制机制,督促施工单位结合自身情况制定施工工艺、操作规程和内部控制标准。 3、培养高素质的技术队伍,加大技术创新的投入 勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 4、严格验收工程 工程整体验收应注意三个环节:一是施工单位的自评。二是建设(监理)单位的预验。三是工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 结束语 对建筑工程实施质量检测具有十分重要的意义,对工程的质量具有决定给作用,在一定程度上可以降低工程成本的过度消耗,并对建筑物的结构安全起到了维护的作用。根据具体的需要,进而由施工单位采取相应的科学措施来进行检测。 参考文献: [1]杨莉萍,谢平.浅议工程质量检测工作的重要性及要求[J].云南建筑,2008(5) [2]王晓萍.关于混凝土构件荷载检验方法的探讨[J].河北建筑工程学院学报,2008(5) [3]周涛.浅谈工民建工程的质量检测[J].城市建设,2009(32) 看了建筑工程质量检测技术论文的人还看 1. 建筑工程技术论文范文 2. 建筑工程技术研究论文范文 3. 建筑工程技术管理毕业论文3篇 4. 建筑工程技术毕业论文范文 5. 浅谈工程技术建设论文
低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|pile foundation高层建筑 High-rise buildings(分类词汇:环境资源相关 )大型桥梁super-large bridges 深水码头Deep Water Wharf海上石油平台Offshore oil platform建筑结构building structure施工construction非线性弹性材料nonlinear elastic materials桩基工程质量问题这篇虽然是科技论文,但是我觉得他翻译成“pile foundation quality question”很不妥当,我将他修改成problems of pile foundation quality,,从汉语语法之角度考虑,这里的问题两个字是多余的,去掉更好,你自己看看吧!不确定性因素Incertitude Factors基桩Foundation Pile隐蔽性(Impercephbility)axial strain轴向应变研究热点research hotspot(也有用point的)桩身缺陷位置 positions of pile defects定性估计 qualitative estimation混凝土强度等级concrete strength gradethe signal of reflected_wave curve反射波曲线信号工程隐患Project Concealed Harzard一维波动模型one-way fluctuant model控制体(control volume),本构关系 constitutive relationFORTRAN语言编制程序program written in FORTRAN language响应时程曲线波形时程曲线response time history curvePile foundation is widely used as the main basic structure of high-rise buildings,super-large bridges,deep water wharf and Offshore oil platform. During recent years,there are many bases of pile foundation quality affecting the normal working and safety of the building structures. Pile construction has high impercephbility and whose quality presents many incertitude factors,from an angel of qualitative inspection of the foundation piles, it has important significance for ensuring the quality and safety of foundation pile projects to modify the inspection methods and improving the inspection quality and the reliability of inspection & assessment results,it is also one of the research hotspots in foundation pile field. The main functions of low strain reflection wave method is to inspect the pile integrity, such as the judgment of pile defects positions, the checkout of pile lengths, and the qualitative estimation of the concrete strength grade,the judgment of the pile quality using the signal of reflected_wave curve accurately, the elimination of the project concealed harzard,and the estimation of foundation pile quality. This paper studied on the low strain reflection wave method for measuring of pile integrity made of Kelvin nonlinear elastic materials, set up a new one-way fluctuant model to treat the problems of piles made of Kelvin nonlinear elastic materials, gave out a dynamics equation of control volume,and induced the relation between pile axial forces and axial strain using the constitutive relation of one-way nonlinear elastic materials, put forward a new calculation method for the fluctuation of one-way nonlinear elastic materials, simulated the pile-top speed response time history curve (or displacement, acceleration) numerically using program written in FORTRAN language, finally the author set up a curve database of the foundation piles existing integrity problem for the integrity inspection of foundation piles in the future.
桩基础在施工常见问题及处理方法论文
摘 要:正如我们所知道的, 桩基础是地基处理常用的方法之一,其中钻孔灌注桩就是桩基础施工的常用的施工方法,本文以此种方法来分析桩基础在施工过程中常见的问题及提出相应的解决对策。
关键词:桩基础;钻孔灌注桩;质量问题;处理措施
钻孔灌注桩基础是一种可以适应多种地质条件的基础地基建设的形式,在各领域的工程建设中都得到了广泛的应用。所以我们应给予其施工过程高度的重视,掌握施工过程中易出现的问题,并能予以高效率的解决。
1.桩基础施工过程中常见质量问题
桩基础施工过程中常常遇到的问题即是钻孔问题、混凝土灌注施工问题,下面本人将对这两方面进行一系列的分析。
1.1 钻孔施工问题
在钻孔施工的过程中,孔口的坍陷将会使钻孔质量无法得到保证,这是因为孔口的坍陷会导致护筒底部的土质变得松散、背后回填土不够结实,有时还会使护筒周围土质受雨水长时间浸泡等因素造成护筒失稳或脱落,这种问题会使护筒移位;有时因为钻机操作人员实施的操作不规范、穿过岩层时发生突变、钻机突然发生、机械故障等原因均有可能导致钻机发生卡钻问题;在钻孔施工时,如果塑性土发生膨胀,将会使成孔后的孔径产生弯曲、孔径局部变小,这将引起钻孔施工不能正常进行;在新疆这类松软土层中,如果进尺的速度较快、吊装钢筋笼碰撞孔壁或是未按照施工工艺的要求制备符合标准的泥浆等因素均会造成坍孔问题的发生,从而引起钻孔施工问题;在钻孔是,如果钻机的钢丝绳发生断裂、钻机出现机械故障或者钻孔发生坍塌,会使钻头掉落到孔底而无法进行正常的作业。
1.2 水下混凝土灌问题
这类施工问题主要是由封底失败、卡管、钢筋笼上浮等原因造成的。产生封底失败的主要原因是孔底沉渣厚度超过所规定的标准范围,从而引起了混凝土在灌注后没有实现水下混凝土封底,从而引起施工问题;因为混凝土具有和易性差、灌注混凝土时冲击力不足的特点,此外混凝土中还含有很多大块骨料或受潮凝固的水泥块,这就引发了卡管问题,无法正常的进行浇筑混凝土的操作;由于钢筋笼制作、堆放、吊装、运输等过程不符合施工的规范要求,钢筋骨架内径与导管外壁间距没有符合规定的尺码,导管在提升过程中挂带了钢筋笼,或是由于混凝土浇筑速度过快,混凝土面升至钢筋笼底部产生向上“浮力”导致钢筋笼上浮;由于混凝土的配合比不当、原材料也未能符合规定或灌注混凝土过程中局部坍塌的杂物土质等侵入混凝土及混凝土和易性差等因素,都会直接或间接的发生断桩的施工问题。
2.针对于施工过程中常见的问题的处理措施
2.1钻孔施工所发生的问题的应对处理措施
首先,护筒埋入在土层中的深度一定要大于水头高度,而且必须穿过松散土层、淤泥层,此外,护筒四周的回填土必须夯填密实;再者,假如发生卡钻的施工问题是,我们不要直接强行拔出,应该晃动大绳以便钻头松动后提起或者插入高压水管置换泥浆,也就是先下放钻头而后迅速上提使岩层突变物受强力冲击而破碎或回缩,从而提起钻头,切忌不能蛮拉;在施工时,应用的是加大泥浆密度、加高水头、埋深护筒等方法进行操作,在坍孔问题严重时,我们必须回填重新钻孔,以免加大了施工问题;如果采用冲击法进行钻孔,可利用投黏土块夹小片石,用低锤冲击将其挤入孔壁来制止坍孔,而当钢筋笼吊装造成坍孔时立即将钢筋笼吊出,添加泥浆护壁将坍陷物清理干净,确认不再坍塌后重新安装钢筋笼。
2.2水下混凝土灌所发生问题的应对处理措施
首先,我们要利用导管内安装高压风管的方法重新清孔,将已灌注混凝土彻底的清理干净,然后再重新开始水下混凝土浇筑,也可以先拆除导管,拔出钢筋笼,将未灌注混凝土部分回填,稍后用钻机钻头清除已灌注混凝土,然后再重新开始浇筑水下混凝土;在施工时,先慢慢的提升导管,而后快速下落导管,这样可加大混凝土灌注量而后快速提升再快速下落以冲击导管,便于导管的疏通,还可以适当的加长上部导管的长度,然后以一次性较大量混凝土来冲击混凝土达到疏通的目的;最后,我们应该关注混凝土浇注过快引起的钢筋笼上浮问题,面对这类施工问题,我们应立即控制混凝土的浇筑量和浇灌速度,并且反复上下摇动导管,采用这种方法,钢筋笼上浮现象还是得不到根治,就必须立即中止浇灌混凝土,拔出导管侯向孔内回填黏土,该桩作废处理,并及时与监理人员、设计人员联系重新补桩。
3.桩基础施工过程中的注意事项
3.1钻孔过程中的注意事项
在钻孔前,应先对桩位反复进行测量,测量的同时要在护筒上用交叉十字线的'方法涂抹红漆,这样将方便于钻孔过程及成孔后桩位的技术施工核实。在钻孔过程中,我们必须详细准确地记录地层地质的变化情况。要做到详细、准确、认真地记录钻孔记录,技术人员积极了解地质变化情况并及时向上级反映相关情况起着相当关键的作用,尤其是能够为工程变更提供合理的依据和真实数据。为了准确地了解和掌握地质变化情况,最好的办法是对钻渣及时进行取样并留取渣样。
3.2加强成孔检测
首先,施工人员应仔细查看详细真实的钻孔记录,切实准确得掌握不稳定的地层,依照不同的地形制定切实合理的灌注方案。第二,要详细记录各项检测数据,尤其是孔深的记录,这样做的主要目的在于计算泥浆沉淀速度和深度,便于做出合理的判断和采取合理的灌注办法。最后,我们应该认真做好灌前准备工作,根据土层的不同质地,应做好导管的打压试验,以确保导管的密水性符合要求。
4.结语
众所周知,钻孔桩基础是地基处理的主要方式之一,那么它施工的好坏将决定工程施工的好坏,所以我们应予以高度的重视,了解在施工的环节中可能出现哪些问题,提前做好准备,以预防为主,规范施工工序流程,做好质量控制,对可能出现的质量问题制定切实有效的防范措施,减少质量问题,杜绝质量事故的发生。
参考文献:
[1] 中国建筑科学研究院. JGJ94—2008 建筑桩基技术规范[S]. 北京:中国建筑工业出版社,2008.
谈公路工程软基处理中PHC桩检测工作
论文关键词:公路工程软基处理PHC桩试验检测
论文摘 要 :PHC桩应用于公路工程软基处理,已有多个年头,从应用到公路工程建设领域后,对于质量检测工作一直为人们所关注、重视。由于试验检测工作的准确性直接决定了软基处理质量,因此,必须确保试验数据和检测工作的质量。为了达到这一目的,必须对检测工作的各项要求进行了解掌握,下面,本人将结合自身检测工作经验,和大家一起来探讨一下关于PHC桩的各个检测事宜。 PHC桩(预应力砼管桩)在当今公路工程施工建设中,作为主要的软基处理方式之一,并不少见。对于其施工技术的和控制,目前已趋成熟,部、建设部近年来不断对PHC桩相关规范进行更新、修订,使其生产和施工得到了较好控制。然而,对于一名刚刚涉及试验检测工作的技术人员来说,如何对PHC桩进行进场检测,及如何在施打完成后对其进行事后检测,都是初次接触检测工作时必须面对的一个个问题。为了让更多初入行者能更快、更全面掌握PHC桩相关检测事宜,本人结合自身多年试验检测工作经验,从实践和便于监控检测的角度出发,对PHC桩的检测要求和相关检测事宜作一些和归纳。 一、进场质量主要检测要求 管桩无论是委托预制或是直接购买,都要把好原质量关,对于委托的单位或是购买的预制场家均应具备高强预应力管桩加工生产的施工资质,确定厂家前应会同监理、业主等前往实地认真考察,并了解该厂以前生产的产品使用效果,确保是正规的、合格的生产厂家。如果直接购买已有的产品,则在生产场地对产品进行认真论证,反复推敲?,各种证件、手续一应俱全,成品桩的外观应无蜂窝、露筋、裂缝、色感均匀、桩顶处无裂隙,桩径、管壁厚度、桩尖中心线、顶面平整度、桩体弯曲等规范有强制性要求的,必须符合有关要求,管桩起吊中应免受振动、冲撞,确保运至现场的产品是合格的产品。 管桩运到工地后,应对进入工地的所有管桩的规格、型号、尺寸、外观质量、尺寸偏差、管桩堆放及桩身破损情况等进行全面检查,不符合要求的桩禁止使用。应由有资质的检测单位对进入施工场地的管桩进行随机见证抽样检测,检测应符合下列规定: (一)沉桩前,每个厂家生产的每一种桩型随机抽取一节管桩桩节进行破坏性检测,检测项目为预应力钢筋的搞拉强度、钢筋数量、钢筋直径(可检查每延米重量)、钢筋布置、端板材质及厚度、尺寸偏差、外观质量、钢筋保护层厚度等。当抽检结果出现不符合质量要求时,应加倍检测,若再发现不合格的桩节,该批管桩不准使用并必须撤离现场。未经抽检不得施工工程桩。 (二)沉桩过程中每栋物应随机抽查已截下的桩头,进行钢筋数量、钢筋直径、预应力钢筋抗拉强度、钢筋布置、端板尺寸及钢筋保护层厚度的检测,检测数量每单体工程不应小于总管桩数的1%,且不得少于3根。 (三)应对闭口桩尖的钢板厚度、桩尖尺寸、焊缝质量等进行检测,检测数量每栋建筑物不应少于总桩数的1%,且不应少于2个桩尖。 工程桩施工前应按有关规定进行单桩竖向抗压静载荷试验,并应压至破坏。当拟采用高应变法进行单桩竖向抗压承载力的验收检测时,应先对试桩进行高应变检测,再进行单桩竖向静载荷试验并压至破坏,取得可靠的动静对比资料后,方可在验收检测中实施高应变法。对比试验数量不应少于3根,当预估总桩数少于50根时,不应少于2根。 二、单桩静载试验检测要求 当岩土工程条件简单且以压桩力控制桩长或岩石土工程条件简单且有类似经验时,可用工程桩进行单桩竖向抗压静载荷试验,但应按有关规定增加一倍的检测数量,检测应符合下列规定: (一)单栋建筑物每一条件下的桩的试验数量不应少于6根(总桩数少于50根时,不少于4根),其中有3根(总桩数少于50根时为2根)应在大量工程桩施工前进行试验。 (二)岩土工程条件相同的同一场地多栋物,当工程桩条件相同时,每栋建筑物的试验数量不应少于2根,且每一施工单位所施工桩的检测数量不应少于6根。其中每栋建筑物有1根,每个施工单位有3根桩应在大量工程桩施工前进行试验。高层建筑及试验结果离散性较大时,应由设计单位酌情增加试验数量。 (三)除去施工前进行的试验外,余下的试验宜在工程桩施工完成并按桩顶设计标高截桩后随机抽检试验;当基坑开挖较深、坑内试验困难时,也可由设计单位指定桩位,在工程桩施工过程中进行试验。 (四)单栋建筑物某一条件下的桩总数少于30根,且为裙楼、附楼下的次要桩时,至少应进行一根桩的静载荷试验。 (五)当按上述要求进行试验后,在施工正常的情况下,工程桩可不再进行单桩承载力的验收。 (六)不应采用高应变法部分或全部取代上述单桩竖向抗压静载荷试验的检测。所有工程桩应逐根对桩孔内壁进行灯光照射目测或孔内摄影检查,观察孔内是否进土、渗水,有无明显破损、错位、挠曲现象,并作出详细记录,注明发现缺陷的位置以及进土、进水的深度。 三、桩位、垂直度、水平位移的主要检测要求 (一)工程桩的`桩顶标高应进行检验,其偏差不应超过+20mm、-50mm。 (二)开挖基坑中应对工程桩的外露桩头或在桩孔内进行桩身垂直度检测,抽检数量不应少于总桩数的5%,在基坑开挖中如发现土体位移或运行影响桩身垂直度时,应加大检测数量。对倾斜率大于3%的桩不应使用:对倾斜率为1%~2%(含2%)及2%~3%的桩宜分别进行各不少于2根的单桩竖向抗压静载荷试验,并将试验得出的单桩抗压承载力乘以折减系数,作为该批桩的使用依据。载荷试验最大加载最量应为设计要求的单桩极限承载力,试验中可同时进行桩顶水平位移的测量。 四、桩身完整性检测主要要求 工程桩应进行桩身完整性的验收检测。采用低应变法检测时,甲级设计等级的桩基,抽栓数量不应小于总桩数的30%,且不应少于20根。其他桩基抽检数量不应少于总桩数的20%,且不应少于10根。 每个承台下抽检的桩数不应少于1根,且单桩、两桩承台下的桩应全数检测。抗拔桩、以桩身强度控制设计的抗压桩、超过25层的高层建筑基桩及倾斜度大于1%的桩应全数检测。当采用低应变法检测桩身完整性时,应符合以下规定: (一)出现裂缝和缺陷的永久结构的抗拔桩或以承受水平力为主的桩应意在为III类或IV类桩。 (二)桩身的混凝土受损及桩身出现斜裂缝或垂直裂缝的受压桩应判为III类或IV类桩。 (三)桩身出现轻微缺陷的受压桩宜先判为III类桩,最终判定桩的类别时,应挖开浅部的缺陷进行检查核对,结合低应变波形判别评价。挖开检查时,当裂缝长度小于桩截面周长的1/3且为水平裂缝时,可将相似波形的桩改判为II类桩。 五、结束语 总之,作为一名合格的试验检测技术人员,除了要对各种试验检测规程、检测规范的要求做到了如指掌之外,更重要的,要注得自身工作经验和专业技术的提高,因为当一组不合格的数据由于个人经验不足出现误判时,给工程带来的,往往是质量事故的发生。因此,作为质量评判的主要角色,我们必须严阵以待,谨小慎微,认真做好专业经验的培养和检测技能的提高,只有这样,才能为工程建设质量保驾护航。 参考文献: 1.建筑地基与基础施工质量验收规范GB50202-2002[S] 2.卢春华.静压高强度预应力混凝土管桩施工技术[J].科技情报,2005
请继续阅读相关推荐: 毕业论文 应届生求职
毕业论文范文查看下载 查看的论文开题报告 查阅参考论文提纲
查 阅更多的毕业论文致谢 相关毕业论文格式 查阅更多论文答辩
低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|pile foundation高层建筑 High-rise buildings(分类词汇:环境资源相关 )大型桥梁super-large bridges 深水码头Deep Water Wharf海上石油平台Offshore oil platform建筑结构building structure施工construction非线性弹性材料nonlinear elastic materials桩基工程质量问题这篇虽然是科技论文,但是我觉得他翻译成“pile foundation quality question”很不妥当,我将他修改成problems of pile foundation quality,,从汉语语法之角度考虑,这里的问题两个字是多余的,去掉更好,你自己看看吧!不确定性因素Incertitude Factors基桩Foundation Pile隐蔽性(Impercephbility)axial strain轴向应变研究热点research hotspot(也有用point的)桩身缺陷位置 positions of pile defects定性估计 qualitative estimation混凝土强度等级concrete strength gradethe signal of reflected_wave curve反射波曲线信号工程隐患Project Concealed Harzard一维波动模型one-way fluctuant model控制体(control volume),本构关系 constitutive relationFORTRAN语言编制程序program written in FORTRAN language响应时程曲线波形时程曲线response time history curvePile foundation is widely used as the main basic structure of high-rise buildings,super-large bridges,deep water wharf and Offshore oil platform. During recent years,there are many bases of pile foundation quality affecting the normal working and safety of the building structures. Pile construction has high impercephbility and whose quality presents many incertitude factors,from an angel of qualitative inspection of the foundation piles, it has important significance for ensuring the quality and safety of foundation pile projects to modify the inspection methods and improving the inspection quality and the reliability of inspection & assessment results,it is also one of the research hotspots in foundation pile field. The main functions of low strain reflection wave method is to inspect the pile integrity, such as the judgment of pile defects positions, the checkout of pile lengths, and the qualitative estimation of the concrete strength grade,the judgment of the pile quality using the signal of reflected_wave curve accurately, the elimination of the project concealed harzard,and the estimation of foundation pile quality. This paper studied on the low strain reflection wave method for measuring of pile integrity made of Kelvin nonlinear elastic materials, set up a new one-way fluctuant model to treat the problems of piles made of Kelvin nonlinear elastic materials, gave out a dynamics equation of control volume,and induced the relation between pile axial forces and axial strain using the constitutive relation of one-way nonlinear elastic materials, put forward a new calculation method for the fluctuation of one-way nonlinear elastic materials, simulated the pile-top speed response time history curve (or displacement, acceleration) numerically using program written in FORTRAN language, finally the author set up a curve database of the foundation piles existing integrity problem for the integrity inspection of foundation piles in the future.
桩基础 has the widespread application domain, is the high-rise construction, the large-scale bridge, the deep water wharf as well as the marine petroleum platform and so on use main foundation form. In recent years, 桩基 the project quality question influence construction structure normal use and the safe instance were very many. The pile construction has the high hiding as well as the pile construction quality has very many not definite factor, looked from 基桩 the quality examination angle, the improvement examination method and the method, improve the examination work quality and the examination evaluates the result the reliability, to guarantees 基桩 the project quality and safely has the vital significance, also is 桩基 one of domain research hot spots.The low strain reflection method main function examines the pile body structure integrity, like the pile body flaw position judgement, 施工桩 long proofreading and the concrete intensity rank qualitative estimate and so on, the use obtains the reflected wave curve signal accurately to delimit breaks the pile body quality, removes the project hidden danger, to 基桩 the quality carries on the appraisal. This article has conducted the research to the Kelvin non-linearity elastic material 料桩 body integrity examination low strain reflected wave new method. Establishes the Kelvin non- line elastic material 料桩 question the unidimensional undulation new model; Produced has controlled the body the dynamic equation, the use unidimensional non-linear elasticity this construction relations infers the pile axial force and the axial strain relations, proposed the unidimensional non-linear elastic undulation question new algorithm; Uses the FORTRAN language coding, the value simulation 基桩 桩顶 speed (or displacement, acceleration) responds the time interval curve profile; Finally 基桩 builds each kind of profile storehouse to the complete existence question, will use in 基桩 the complete examination service for later. As well as low strain reflection method; The pile body integrity examines 2 words
A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. adoption.In recent years, a 基 engineering quantity problem influence building structure of the case of the normal usage and safety is a lot of.The construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of 基 examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of 基s, is also a research heat of 基 realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering 隐 to suffer from, carrying on the evaluation to the quantity of the stake of 基 . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a 维 of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a 维 not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of 基 of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases
桩基础 has the widespread application domain, is the high-rise construction, the large-scale bridge, the deep water wharf as well as the marine petroleum platform and so on use main foundation form. In recent years, 桩基 the project quality question influence construction structure normal use and the safe instance were very many. The pile construction has the high hiding as well as the pile construction quality has very many not definite factor, looked from 基桩 the quality examination angle, the improvement examination method and the method, improve the examination work quality and the examination evaluates the result the reliability, to guarantees 基桩 the project quality and safely has the vital significance, also is 桩基 one of domain research hot spots.The low strain reflection method main function examines the pile body structure integrity, like the pile body flaw position judgement, 施工桩 long proofreading and the concrete intensity rank qualitative estimate and so on, the use obtains the reflected wave curve signal accurately to delimit breaks the pile body quality, removes the project hidden danger, to 基桩 the quality carries on the appraisal. This article has conducted the research to the Kelvin non-linearity elastic material 料桩 body integrity examination low strain reflected wave new method. Establishes the Kelvin non- line elastic material 料桩 question the unidimensional undulation new model; Produced has controlled the body the dynamic equation, the use unidimensional non-linear elasticity this construction relations infers the pile axial force and the axial strain relations, proposed the unidimensional non-linear elastic undulation question new algorithm; Uses the FORTRAN language coding, the value simulation 基桩 桩顶 speed (or displacement, acceleration) responds the time interval curve profile; Finally 基桩 builds each kind of profile storehouse to the complete existence question, will use in 基桩 the complete examination service for later. As well as low strain reflection method; The pile body integrity examines 2 words
公路工程地质信息 (一)强夯法处理液化地基的施工管理 江苏北部(如徐州、宿迁等)地区广泛分布废黄河泛滥沉积物,一般以亚砂土、亚粘土—细砂为主,埋层浅,地下水位高,天然地基承载力低,在地震作用下易产生液化现象。地基液化是引起构筑物破坏的主要形式,同时该地区又受到我省主要的地震危险带—郯庐地震带的影响,因此在该地区国道主干线京福、徐宿、连徐、宁宿徐、沂淮等高速公路建设中不可避免的遇到大面积液化地基处理问题。根据《公路工程抗震设计规范》(JTJ004—89),对高速公路必须进行液化地基处理,这是减轻地震灾害的根本性措施。因此,如何控制和管理好处理液化地基的施工,做到既经济有效又安全可靠,对保证高速公路建成后的正常运营、减轻地震灾害具有重大现实意义。 1 液化地基的国内外研究概况 地基液化分析与处理一直是土动力学的主要研究课题之一。液化一词最早见于1920年Hazen.A的《动力冲填坝》用来说明卡拉弗拉斯冲填坝的毁坏。1936年Casagrande首先给出了砂土液化的判别方法——临界孔隙比法。上世纪50年代,各国学者对砂土液化进行了广泛研究,主要包括:砂土液化的机理,砂土液化的预估方法,砂土液化的地基处理等。 所谓液化是指由于孔隙水压增加及有效应力降低而引起粒状材料(砂土、粉土甚至包括砾石)由固态转变成液态的过程。影响液化的因素有:①颗粒级配,包括粘粒、粉粒含量,平均粒径d50;②透水性能;③相对密度;④结构;⑤饱和度;⑥动荷载,包括振幅、持时等。 我国《工业与民用建筑抗震设计规范》(TJ11—78)根据1971年以前8次大地震的数据,参考美国、日本的有关研究成果给出了以临界标准贯入击数为指标的砂土液化判别公式。现行规范《建筑抗震设计规范》(GBJ11—89)通过对海城、唐山地震的系统研究,结合国外大量资料,对原规范进行了修改,采用了两步评判原则,并对临界标贯击数公式进行了修改,使之更符合实际。在国标《岩土工程勘察规范》(GB50021—94)中,对此又进行了补充,给出了液化比贯入阻力临界值和液化剪切波速临界值公式,用来进行液化判别。在公路工程中,基本上沿用上术两步评判原则,采用了临界标贯击数判别方法,并根据公路工程中的研究成果,给出了临界标贯击数的计算公式。这些规范在我国工程界得到了广泛应用。 2 高等级公路可液化地基处理方案的确定。 液化地基处理恰当与否,关系到整个工程的质量、投资和进度。因此其重要性已越来越多地被人们所认识。对于高速公路这样大面积处理可液化土而言,强夯法和干振碎石桩法是首选的处理手段。当全液化地基路段较长,需处理面积大,公路沿线外缘较近范围内无村庄,无重要构造物时,强夯法是比较理想的地基处理方法。 强夯法处理地基是20世纪60年代末Menard技术公司首先创立的,该方法将80…400kN重锤从落距6—40m处自由落下,给地基以冲击和振动,从而提高地基土的强度并降低其压缩性。强夯法常用来加固碎石、砂土、粘性土、杂填土、湿隐性黄土等各类地基土。由于其具有设备简单、施工速度快、适用范围广、节约三材、经济可行、效果显著等优点,经过20多年来的应用与发展,强夯法处理地基受到各国工程界的重视,并得以迅速推广,取得了较大的经济效益和社会效益。 由于强夯处理的对象(即地基土)非常复杂,一般认为不可能建立对各类地基土均适合的具有普遍意义的理论,但对地基处理中经常遇到的几种类型土,还是有规律可循的。实践证明,用强夯法加固地基,一定要根据现场的地质条件和工程作用要求,正确选用强夯参数,一般通过试验来确定以下强夯参数: (1)有效加固深度:有效加固深度既是选择地基处理方法的重要依据,又反映了处理效果。 (2)单击夯击能:单击夯击能等于锤重×落距。 (3)最佳夯击能:从理论上讲,在最佳夯击能作用下,地基土中出现的孔隙水压力达到土的自重压力,这样的夯击能称最佳夯击能。因此可根据孔隙水压力的叠加值来确定最佳夯击能。在砂性土中,孔隙水压力增长及消散过程仅为几分钟,因此孔隙水压力不能随夯击能增加而叠加,可根据最大孔隙水压力增量与夯击次数关系来确定最佳夯击能。 夯点的夯击次数,可按现场试夯得到的夯击次数和夯沉量关系曲线确定,应同时满足下列条件:(①夯坑周围地面不应发生过大隆起;②不因夯坑过深而发生起锤困难;③每击夯沉量不能过小,过小无加固作用。夯击次数也可参照夯坑周围土体隆起的情况予以确定,就是当夯坑的竖向压缩量最大,而周围土体的隆起最小时的夯击数。对于饱和细粒土,击数可根据孔隙水压力的增长和消散来决定,当被加固的土层将发生液化时的击数即为该遍击数,以后各遍击数也可按此确定。 (4)夯击遍数:夯击遍数应根据地基土的性质确定,地基土渗透系数低,含水量高,需分3—4遍夯击,反之可分两遍夯击,最后再以低能量“搭夯”一遍,其目的是将松动的表层土夯实。 (5)间歇时间:所谓间歇时间,是指相邻夯击两遍之间的时间间隔。Menard指出,一旦孔隙水压力消散,即可进行新的夯击作业。 (6)夯点布置和夯点间距:为了使夯后地基比较均匀,对于较大面积的强夯处理,夯击点一般可按等边三角形或正主形布置夯击点,这样布置比较规整,也便于强夯施工。由于基础的应力扩散作用,强夯处理范围应大于基础范围,其具体放大范围,可根据构筑物类型和重要性等因素考虑确定。 夯点间距可根据所要求加固的地基土性质和要求处理深度而定。当土质差、软土层厚时应适当增大夯点间距,当软土层较薄而又有砂类土夹层或土夹石填土等时,可适当减少夯距。夯距太小,相邻夯点的加固效应将在浅处叠加而形成硬层,影响夯击能向深部传递。 3 强夯法处理液化地基的质量控制与管理 3.1 施工单位选择 对参与施工的强夯施工单位,各施工标段中标单位要先审查其施工资质、信誉和业绩,并附有前业主对该单位的书面评价报告;任何单位不得将强夯分包给个人施工。各中标单位将经初步筛选合格的施工队伍形成书面推荐报告,经驻地监理审核后,上报主管部门,经批准后方可进场。进场后不得再分包或转包,否则,驻地监理工程师将责令分包单位立即退场,损失自负。 3.2 施工准备 编写施工组织设计,经驻地监理组审查,监理组提出书面审查意见,报总监代表审批同意方可施工。 3.3 施工管理 (1)施工单位要按设计图要求编制夯点编号图,编号图要清晰、规范、科学。 (2)施工单位必须制定严格的安全管理措施,现场操作人员必须戴安全帽,并对施工机械定期作安全检查。在强夯区四周要设置醒目的危险警告标志和安全管理措施,不允许行人和非施工车辆进入强夯区,以确保操作员、过往行人和车辆的安全。 (3)施工单位要对强夯机械进行编号,每台强夯机械必须持有监理组发放的《施工许可证》方可进行强夯施工。 (4)施工单位除在强夯机械上挂《施工许可证》外,还必须挂有《机械操作主要人员》和《施工技术参数》两块醒目的牌子,进行机械操作的主要人员必须挂牌上岗。 (5)施工单位要制定施工要点供现场人员执行。 (6)铺设垫层前要对原地面进行清表并整平,且要按每20米一个断面,每个断面5个规定测点,测量清表后标高。 (7)用水准仪测量垫层铺设前、后的对应测点标高,初步确定垫层厚度,每20米一个断面,每个断面5个规定测点,再按每断面挖1处深坑,进一步确定垫层厚度(控坑必须在测点位置上)。 (8)垫层宽度按每20米一处用钢尺丈量。 (9)按设计要求进行夯点布置,夯点定位布置用钢尺按100%的频率丈量。 (10)夯锤必须过磅称重。夯击能在强夯施工前必须检测,并满足设计要求。每夯击100次,用钢尺量一次夯锤落距。 (11)施工单位必须及时排出夯坑内积水。 (12)主、副、满夯的间隙时间要根据现场情况作必要的调整,但间隙时间必须满足72小时。需要调整间隙时间由现场监理工程师确定。 (13)遇到不需拆迁的高压电线时,施工单位必须安排集中施工的方案,市高指向供电部门申请临时停电。 (14)施工人员要认真做好强夯施工记录,记录要求清楚、真实。 (15)施工人员必须注意观察已处理路段,发现异常情况及时报告驻地监理组和有关部门。 (16)在强夯区内的构造物必须在强夯完成后,才能进行构造物的下部施工。 4 用强夯法处理砂土液化地基的质量检验评定 4.1 基本要求 碎石垫层的碎石规格和质量必须符合设计要求。强夯施工必须按夯击点确定的技术参数进行。以各个夯击点的夯击数作为施工控制数值。 4.2 实测项目表 表1 强夯法处理砂土液化地基实测项目表 项次 检查 项目规定值 或允许偏差 检查方法和频率 规定分 1 夯击能 不小于设计 1次/工点查施工记录 15 2 夯击次数 符合设计 查施工记录 15 3 垫层厚度 不小于设计 4处/200m 15 4 垫层宽度 不小于设计 4处/200m 15 5 标贯击数 符合设计 2处/工点 20 6 瑞利波 ≥200m/s 1处/工点 20 注:(1)标准贯入试验,按需3点/5000�且不少于3点进行。孔位随机 布置。特殊地段适当加密。 (2)瑞利波法(SSW)按1点/40m,在中心线两侧各15m处交叉布点。 4.3 外观鉴定 (1)填筑碎石垫层前必须清表、整平,无明显凸凹点,整平不符合要求扣2分。 (2)夯坑内积水应及时排除,不符合要求扣2分。 (3)夯后场地应平整,无局部隆起,不符合要求扣2分。 4.4 分项工程质量等级评定 (1)分项工程评分在85分及以上者为优良;70~85分者为合格;70分以下者为不合格。 (2)若标贯击数、瑞利波不合格时,则该分项工程不合格,可进行加固处理,再重新评定其质量等级。 5 结语 在京福、徐宿、宁宿徐等高速公路液化地基强夯加固的施工实践中,由于建设、监理及施工单位的高度重视,严格按有关质量要求和“施工指导意见”进行控制,尤其对强夯参数的确定都是经反复试验论证后,选择合适的参数指导施工,使强夯法处理液化地基段达到了设计要求,从已建成的高速公路处理路段的工后路基沉降观测看,处理段液化地基强夯加固达到了预期目的。
公路桥梁工程试验检测技术研究论文
近几年,我国的公路桥梁工程中的试验检测技术取得了很好的发展,但是在实际的工程施工中,试验检测技术还是没有得到应有的重视,这样就致使了我国的公路桥梁事故的频发。通过这些施工事故,我们可以得出要想保障公路桥梁的施工质量,最为保险的一项工作就是要进行公路桥梁施工的试验检测。本文针对公路桥梁施工中的试验检测技术的应用从三个方面进行叙述。第一个方面是简单阐述公路桥梁工程中试验检测技术的应用重要性;第二个方面是简要阐述公路桥梁施工工程中的试验检测技术的具体原因和相关的内容。第三个方面是简要阐述公路桥梁施工工程中的试验检测技术的具体的技术点。下面进行详细的介绍。
一、公路桥梁工程中试验检测技术的应用重要性
关于公路桥梁工程中试验检测技术的应用重要性的阐述,本文从四个方面进行阐述。第一个方面是公路桥梁工程施工中的试验检测技术的应用是对整个桥梁工程的施工质量的一种保障。第二个方面是公路桥梁工程施工中的试验检测技术的应用能够找出施工中应用的正确的施工材料,节约了施工的成本。第三个方面是公路桥梁工程施工中的试验检测技术的应用可以推进这项新技术的发展和推广。第四个方面是公路桥梁工程施工中的试验检测技术的应用能够检测工程中使用的材料的优劣性。下面进行详细的叙述。(1)公路桥梁工程施工中的试验检测技术的应用是对整个桥梁工程的施工质量的一种保障。我们在进行公路桥梁的试验检测应用是要采集相关的检测理论,并且要熟练的掌握试验检测的相关的操作技能和有关的公路桥梁的知识,只有这样才能够进行较为准确的试验检测数据。这些数据主要包含了施工的工程参数,施工中的质量控制参数和施工结束时的验收评定数据等等。(2)公路桥梁工程施工中的试验检测技术的应用能够找出施工中应用的正确的施工材料,节约了施工的成本。通过公路桥梁的`施工中的试验检测技术的应用,我们可以甄别施工用的材料的特性,这样可以通过施工现场的条件来进行材料的选取和供应。这样就会减少施工材料的运输时间和采买成本。通过试验检测我们可以大幅度的降低工程的实际造价。同时还可以就地取材,通过试验可以很准确的得出当地材料的基本信息,是否符合我们施工中的要求等。(3)公路桥梁工程施工中的试验检测技术的应用可以推进这项新技术的发展和推广。在试验检测技术的应用中,我们可以使用新型的工艺和新型的材料来进行公路桥梁的施工。我们要通过新型的技术的应用来判断这种新技术的可行性和有效性等特性,为我们的公路桥梁的施工提供更多的可能。整体推进施工的进程和施工进度及施工质量。(4)公路桥梁工程施工中的试验检测技术的应用能够检测工程中使用的材料的优劣性。我们通过试验的新型技术来辨别施工用的材料的质量的好坏,进而我们可以总结出来一套相关的鉴别材料优劣的手段,这样对于提升公路桥梁施工的质量有很大的帮助。
二、公路桥梁施工工程中的试验检测技术的具体原因和相关的内容
关于公路桥梁施工工程中的试验检测技术的具体原因和相关的内容的阐述,本文主要从两个方面进行阐述。第一方面是公路桥梁施工中的试验检测技术的应用具体原因;第二个方面是公路桥梁施工中的试验检测技术的相关的内容。下面进行详细的叙述。(1)简述公路桥梁施工中的试验检测技术的应用具体原因。首先是试验检测技术的应用可以为公路桥梁的施工提供充足的施工和设计的材料;其次是试验检测技术的应用能够提升公路桥梁的质量要求,可以通过试验给出桥梁承载力的最大值,提升桥梁的质量。第三是试验检测技术的应用可以提前检测出施工过程中的施工质量事故,排除施工质量的隐患。第四是试验检测技术的应用可以提升施工的质量规范要求。最后是试验检测技术的应用能够为公路桥梁的施工提供正确的设计标准。(2)简述公路桥梁施工中的试验检测技术的相关的内容。试验检测技术主要是检测施工中的使用材料,包括石沙和混凝土等,还包括成品和半成品等。我们通过这些材料的检测得出最优的施工用材料。对于不合格的施工用材料进行打废处理。我们在这一个过程中,要严格的按照相关的程序进行试验检测。
三、公路桥梁施工工程中的试验检测技术的具体的技术点
关于公路桥梁施工工程中的试验检测技术的具体的技术点的阐述,主要是通过简述试验检测技术中的静载试验技术。简述试验检测技术中静载试验的试验主要技术点。首先,我们要进行三种变形的监测和试验。我们要对桥梁的竖向挠度,桥梁的侧向挠度及桥梁的扭转变形量这三个数据进行实时的监控。我们在进行桥梁的钢结构的相关检测时,我们要至少采用三个试验点来进行相关的试验,并且我们要通过实验来得出最大值和最小值,通过比较来得出相应的施工应力区间,总结得出桥梁的偏载特性。其次,我们要详细的检查桥梁的本体是否出现裂缝。我们应该采用相关的技术设备来检测初始的裂缝,通过设备的检测,我们可以得出相应的载荷值,我们要对裂缝的位置,长短发展的方向及闭合情况进行详细的记录。如果在试验中,我们没有得到预期的最大负荷值,我们要停止相关的负荷试验,只是进行裂缝的观察,通过经验来完成相关的载荷的收集工作。如果我们在试验中遇到结构较为复杂的桥梁,我们要对桥梁的静载试验作出详细的记录,要观察应力载荷的变化的趋势,并且要对桥梁的制作进行结构上的评定,对伸缩量和伸缩角度进行试验。
A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. adoption.In recent years, a engineering quantity problem influence building structure of the case of the normal usage and safety is a lot of.The construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of , is also a research heat of realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering to suffer from, carrying on the evaluation to the quantity of the stake of . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases