这是一小段,看看行吧,行我就全传给你Organization of this textCivil engineering,the oldest of the engineering specialties,is the planning,design,construction, and management of the built environment.This environment includes all structures built according to scientific principles,from irrigation and drainage systems to rocket-launching facilities.土木工程,最老的工程专业,是建筑环境的规划、设计、施工和管理。这个环境包括从灌溉和排水系统到火箭发射设施的所有根据科学原理建造的结构物。Civil engineers build roads,bridges,tunnels,dams,harbors,power plants,water and sewage systems,hospitals,schools,mass transit,and other public facilities essential to modern society and large population concentrations.土木工程师修建道路、桥梁、隧道、大坝、港口、发电站、水系统和污水系统,医院、学校、公共交通系统,以及现代化社会和大量人口集中的地方所必需的其他公共设施。Civil engineering and civil engineersThey also build privately owned facilities such as airports, railroads,pipelines, skyscrapers, and other large structures designed for industrial,commercial, or residential use.他们也修建私人拥有的设施,如机场、铁路、水渠、高楼大厦,和为工业、商业、民用设计的其他大型建筑。
你是哪个省的啊 看看如果可以的话 可以给你一份全面的
The urban river embankment discuss the ecological constructionAnonymous XXXXXXXXAbstract: the urban river embankment construction as the object, discuss the current social background, analyses and compares the river embankment design of traditional methods and characteristics of ecological methods, and puts forward three modes of ecological design and their advantages and disadvantages, and expounds the present situation of the ecological construction in domestic bank and future : the bank; Ecology; Design way; Domestic situationText:A, backgroundRiver Banks part is the amphibious interlaced transition belt, has the remarkable edge effect. Here are active substances, nutrient and energy flow, offer a habitat for a variety of creatures. Natural state Banks often species richness, productivity traditional embankment design often single ?一、背景河流的堤岸部分是水陆交错的过渡地带,具有显著的边缘效应。这里有活跃的物质、养分和能量的流动,为多种生物提供了栖息地。自然状态下的堤岸往往物种丰富、生产力高。传统的堤岸设计往往会单纯从防洪角度出发,采用土堤或者土石混合堆砌起来高高的堤岸。它的优点在于高度的可靠性,结构设计后加起防护堤岸抗流水冲刷能力显著增强。对于洪水暴发频繁、侵蚀严重的区段,这样的设计无可厚非,而对于一般河流堤岸的修建,这样的设计则显得缺乏环境的美化和绿化,同时也破坏许多对生态起重要作用的自然因素,如破坏植被与河床间的联系,造成冲刷侵蚀转移等。另外,河流作为城市风貌不可多得的珍惜资源,也是城市风貌的特色要素,它的景观塑造显得十分必要。同时,堤岸景观建设必然使滨河地区土地价值提升,滨水开发的高投资回报的特点更增强了对城市堤岸景观建设的需求。二、需求——堤岸的生态化建设河流堤岸作为城市中最邻近河流的区域,是城市与河流的衔接线,它的景观规划是提高城市生活品质的需要,也是丰富城市景观的需要。生态化建设,它的根本思路是运用自然本身抗干扰和自我修复的能力来处理人与自然的关系。生态设计方法不同于传统用人工的结构和形式来取代自然的方法,而是用自然的结构和形式来顺应自然的进程。将河岸与河道在生态上联系起来,也就实现了物质、养分、能量的交流:对于生物,它提供了合适的栖息地;植物根系可固着土壤,枝叶可截留雨水,过滤地表迳流,抵抗流水冲刷,从而起到保护堤岸、增加堤岸结构的稳定性、净化水质、涵养水源的作用,而且随着时间的推移,这些作用被不断加强。同时,生态化建设以自然的外貌出现,容易与环境取得协调,造价也较低,不需要长期的维护管理。三、河流堤岸生态化设计方式河流堤岸生态化设计,要遵守生态设计的原则,注重地方性、保护与节约自然资本、让自然做功、显露自然,主要体现在对地域气候环境、河流地质地貌、水文变化的适应,对河流生态环境的考虑,对堤岸地形的处理和对筑堤材料的选择和构造方式方面。1) 人工类:传统方法是采用块石或混凝土块砖等堆砌。可在此基础上加以改进以适应河流景观设计的需求。a) 块石或混凝土块砖干砌,不用砂浆。这样在砌块之间就留有空隙,为后期滨河植物的生长提供了空间。随着时间的推移,堤岸会逐渐呈现出自然的风貌。b) 堤岸采用台阶式分级,台阶面上的空间加以利用,种植植物。当然这两种改进方法对于河岸处现有植被仍存在一定的不良影响,人工痕迹也过于明显。2) 自然类:充分利用堤岸植被原型,可直接将适用于滨河地带生长的植被种植于堤岸上,利用植物的根、茎、叶来稳固堤岸,防止侵蚀、控制沉积的同时也为生物提供了栖息地。3) 人工自然相结合综合了以上两种方法的优点,具有人工结构的稳定性和自然的外貌,见效快、生态效益好,以下为常见的两种类型:a) 种植植物的堆石将由大小不同的石块组成的堆石置于与水接触的土壤表面,再把活体切枝插入石堆中使斜坡更加稳定。根系可提高强度,植被可遮盖石块,使堤岸外貌更加自然。b) 与植物结合使用的插孔式混凝土块将预制的混凝土块以连锁的形式置于岸底的浅渠中,再将植物切枝或植株扦插于混凝土块之间和堤岸上部,其上覆土压实,再播种草本植物。堤岸生态化建设也存在一定的局限性。如:选用的材料及建造方法不同,堤岸的防护能力相差很大,需要运用多学科知识认真分析,这就为设计人员提出了更大的挑战;建造初期若受到强烈干扰,则会影响到以后防护作用的发挥等。这也就对河流堤岸的生态化设计提出了更高的要求。四、国内现状1)省会城市在我国省会城市及计划单列市中有近80%进行了堤岸景观规划。(参考文献[3])城 市 项目名称 城 市 项目名称北 京 长河城市水系统综合治理 南 宁 堤岸园工程长 沙 湘江风光带 宁 波 滨江大道沿江景观工程成 都 府南河绿化工程 上 海 外滩、陆家嘴滨江大道福 州 闵江江滨公园 沈 阳 浑河观光旅游带广 州 珠江二沙段堤岸景观、芳村长堤建设 太 原 汾河公园贵 阳 南明河景观绿化工程 天 津 海河堤岸改造工程哈尔滨 松花江南岸沿江风景长廊 武 汉 汉口江滩一二期工程昆 明 盘龙江中段滨水生态景观建设 西 安 灞河大水大绿工程兰 州 黄河风情线 重 庆 南滨路滨江旅游观光大道从规划后建成情况看,这些城市河流堤岸景观项目都得到了当地政府与市民的肯定。在这些项目中,堤岸既可成为当地最具吸引力的城市公园,如太原的汾河公园和福州的江滨公园;堤岸也可成为市民日常休闲活动的热点地段,如南宁的堤路园和武汉的汉口江滩工程;堤岸还可成为城市最具特色的地段,如重庆的南滨路滨江旅游观光大道;堤岸更可成为城市旅游的热点,如上海的外滩和陆家嘴滨江大道。总之,经过景观规划的堤岸已成为当地最具特色的地区。从建设效果看,相对堤岸的原来面貌而言,统计资料中的这些景观工程都是较成功的,都成为当地城市关注的热点,成为当地政府的政绩工程,成为当地的民心工程。城市河流堤岸通过景观规划,有效地改善了滨河地段的环境,并带动滨河地段的开发。但必须清醒地认识到,这些城市堤岸景观项目规划并非尽善尽美,也存在这样或那样的问题,仍有待完善。2)中小城市城市经济实力的强大决定了其城市建设水平的高标准和高水平。中小城市河流堤岸景观与统计资料中的城市存在较大的差距,存在更多的问题。特别是由于资金问题,堤岸景观是,纯人工,状态的钢筋混凝土防洪堤,或保持自然防洪状态的土石堤,没有经过景观规划,易造成城市资源的极大浪费。五、前景目前,河流景观建设,特别是城市河流景观建设,在中国正方兴未艾;在发达国家中也是一个久盛不衰的话题。 回顾发达国家河流景观建设的历史,自20世纪70年代以来,随着人们环境意识的普遍增强,重视河流景观的生态功能已成为一个时代的呼唤,河流景观建设的生态设计方法也已得到了空前的重视和发展。他山之石可以攻玉,借鉴发达国家已经形成的成熟的理念和做法,可以使我们少走弯路,搭上隆隆前进的生态建设之车。
土木工程的key哀,速度,
土木工程的英文是Civil Engineering ,直译是民用工程,它是建造各种工程的统称。它既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材料设备和进行的勘测,设计施工,保养,维修等专业技术。土木工程随着人类社会的进步而发展,至今已经演变成为大型综合性的学科,它已经出许多分支,如:建筑工程,铁路工程,道路工程,桥梁工程,特种工程结构,给水排水工程,港口工程,水利工程,环境工程等学科。土木工程共有六个专业:建筑学,城市规划,土木工程,建筑环境与设备工程,给水排水工程和道路桥梁工程。土木工程作为一个重要的基础学科,有其重要的属性:综合性,社会性,实践性,统一性。土木工程为国民经济的发展和人民生活的改善提供了重要的物质技术基础,对众多产业的振兴发挥了促进作用,工程建设是形成固定资产的基本生产过程,因此,建筑业和房地产成为许多国家和地区的经济支柱之一。.古代的土木工程有很长的时间跨度,大致从公元前500年新石器时代出现原始的土木工程活动到16世纪末意大利的文艺复兴,导致土木工程走上迅速发展的道路为止,前后经历了两千多年。在这段时间内,由于科学理论发展及其缓慢,土木工程也没有突破习惯的发展。从17世纪中页开始到20 世纪40年代第二次世界大战结束为止的300年间,国外的建筑取得了长足的进步。土木工程进入了定量分析阶段。一些理论的发展,新材料的出现,新工具的发明,都使土木工程科学日渐完善和成熟。到了近代,二战结束之后,许多国家经济起飞,现代科学日益进步,从而为进一步发展提供了强大的动力和物质基础。人们生活水平的不断提高,必然要求越来越舒适的居住环境,在这种情况下,建筑的发展直接推动了土木工程的发展。总的来说土木工程是一门古老的学科,它已经取得了巨大的成就,未来的土木工程将在人们的生活中占据更重要的地位。地球环境的日益恶化,人口的不断增加,人们为了争取生存,为了争取更舒适的生存环境,必将更加重视土木工程。在不久的将来,一些重大项目将会陆续兴建,插入云霄的摩天大楼,横跨大样的桥梁,更加方便的交通将不是梦想。科技的发展,以及地球不断恶化的环境必将促使土木工程向太空和海洋发展,为人类提供更广阔的生存空间。近年来,工程材料主要是钢筋,混凝土,木材和砖材,在未来,传统材料将得到改观,一些全新的更加适合建筑的材料将问世,尤其是化学合成材料将推动建筑走向更高点。同时,设计方法的精确化,设计工作的自动化,信息和智能话技术的全面引入,将会是人们有一个更加舒适的居住环境。一句话,理论的发展,新材料的出现,计算机的应用,高新技术的引入等都将使土木工程有一个新的飞跃.English is the Civil Engineering Civil Engineering, civil engineering is literally, it is the construction of the project collectively. It means building objects that the construction on the ground, underground, water works facilities, equipment and materials to use in surveying, design construction, maintenance, repair and other professional skills. Civil Engineering with the progress of the human society, has been transformed into large integrated disciplines, it has a number of branches, such as : construction, rail projects, road projects, bridge projects, special project structure, water drainage works, the port project, water, environmental engineering disciplines. A total of six professional Civil Engineering : architecture, urban planning, civil engineering, construction and environmental engineering equipment, water drainage works and road bridge Engineering as an important foundation subjects, its important attribute : an integrated, social, practicality, uniformity. Civil Engineering for the development of the national economy and improve the living standards of the people provided important material and technological foundation for the revitalization of many industries played a catalytic role in the construction of fixed assets is a basic production process, the construction and real estate in many countries and regions become a pillar of the economyAncient Civil Engineering has a long time span, roughly 500 years before Christ from the original date in civil engineering activities to the 16 century Italian Renaissance, resulting in the rapid development of the Civil Engineering on the road today, and has experienced more than 2,000 years. During this period, due to the development of scientific theories and slow, there is no breakthrough in civil engineering from 17 pages to 40 years in the 20th century end of the Second World War 300 years, foreign construction made great strides. Civil Engineering has entered a phase of quantitative analysis. Some theoretical development, the emergence of new materials, new tools of invention, the Civil Engineering Science is perfection and maturity. In modern times, after the end of World War II, many countries economic takeoff, the increasing advances of modern science, so as to provide a powerful impetus to further development and material basis. People's living conditions continue to improve, more and more comfortable living environment for the inevitable in the circumstances, the construction of development directly to the Civil Engineering development.
问题一:毕业论文外文翻译是什么意思?有什么要求? 外文翻译要求:(1)选定外文文献后先给指导老师看,得到老师的确认通过后方可翻译。(2)选择外文翻译时一定选择外国作者写的文章,可从学校中知网或者外文数据库下载。(3)外文翻译字数要求3000字以上,从外文互章起始处开始翻译,不允许从文章中间部分开始翻译,翻译必须结束于文章的一个大段落。 问题二:毕业论文的外文文献是什么意思?是说找一篇外文文献,然后把它翻译成中文吗? 5分 是在知网上(应该是Ebhos罚差不多是这个,具体记不清了)找到一篇与你论文主旨相关的英文文章,然后可以从头翻译或者从当中开始翻译。 问题三:外文翻译是什么 5分 呵呵 就是找一篇和自己的论文相关的外文,翻译成中文即可! 呵呵 问题四:毕业论文中的外文翻译可以在什么网站找到? 先到百度文库,找一篇此类文档中文的,然后用有道翻译,或是谷歌在线翻译翻成英 文,然后把英文放上面,中文放下面。希望可以帮到你。如果要找标准的PDF格式外文文 献,可以在谷歌,用英文文献名+空格+PDF 这样比较容易找到。 第一是Google搜索,主要是英文,尤其是其学术搜索,意义大。 第二,通过各大学图书馆系统,进入几个主流的出版发行集团。 第三,利用网络免费储存、电子书系统。尤其是国外多。 1、论文题目:要求准确、简练、醒目、新颖。 2、目录:目录是论文中主要段落的简表。(短篇论文不必列目录) 3、提要:是文章主要内容的摘录,要求短、精、完整。字数少可几十字,多不超过三百字为宜。 4、关键词或主题词:关键词是从论文的题名、提要和正文中选取出来的,是对表述论文的中心内容有实质意义的词汇。关键词是用作机系统标引论文内容特征的词语,便于信息系统汇集,以供读者检索。每篇论文一般选取3-8个词汇作为关键词,另起一行,排在“提要”的左下方。主题词是经过规范化的词,在确定主题词时,要对论文进行主题,依照标引和组配规则转换成主题词表中的规范词语。 5、论文正文:(1)引言:引言又称前言、序言和导言,用在论文的开头。 引言一般要概括地写出作者意图,说明选题的目的和意义, 并指出论文写作的范围。引言要短小精悍、紧扣主题。〈2)论文正文:正文是论文的主体,正文应包括论点、论据、论证过程和结论。主体部分包括以下内容:a.提出-论点;b.分析问题-论据和论证;c.解决问题-论证与步骤;d.结论。 6、一篇论文的参考文献是将论文在和写作中可参考或引证的主要文献资料,列于论文的末尾。参考文献应另起一页,标注方式按《GB7714-87文后参考文献著录规则》进行。中文:标题--作者--出版物信息(版地、版者、版期):作者--标题--出版物信息所列参考文献的要求是:(1)所列参考文献应是正式出版物,以便读者考证。(2)所列举的参考文献要标明序号、著作或文章的标题、作者、出版物信息。 一,选题要新颖。 这次我的论文的成功,和高分,得到导师的赞许,都是因为我论文的选题新颖所给我带来的好处。最好涉及护理新领域,以及新进展,这样会给人耳目一新的感觉。 二,大量文献做基础 仔细查阅和你论文题目和研究范围相关的文献,大量的文献查阅会你的论文写作铺垫,借鉴别人的思路,和好的语言。而且在写作过程不会觉得语言平乏,当然也要自己一定的语言功底做基矗 三,一气呵成 做好充分的准备,不要每天写一些,每天改一些,这样会打断自己的思路,影响文章的连贯。 四,尽量采用多的专业术语 可能口语化的表达会给人带来亲切感,但论文是比较专业的形式,是有可能做为文献来查阅和检索的,所以论文语言的专业化,术语化会提升自己论文的水平。 五,用正规格式书写 参考正规的论文文献,论文格式。不要因为格式问题,而影响到你论文的质量。 六,最好在计算机上完成写作过程 如果有条件最好利用电脑来完成写作过程,好处以下几点:1,节省时间,无论打字的速度慢到什么程度,肯定要比手写的快。2,方便,大量的文献放在手边,一个一个查阅是很不方便的,文献都是用数据库编辑,所以都是在电脑上完成。提前先在电脑上摘要出重点,写出提纲,随时翻阅,方便写作。3,修改编辑,在电脑随时对文章进行修改编辑都是非常的方便。4,随时存档,写一段,存一段,防止突然停电,或者电脑当机。本人就是吃了这个大亏,一个晚上的劳动......>> 问题五:外文参考文献怎么找 在中国期刊网ki/里找,有那种英文的文献,之后翻译过来。万方、维普都可以。或者直接到外人数据库找。 APS美国物理学会电子出版物 AIP美国物理研究所电子出版物 ASME美国机械工程师学会电子期刊 ASCE美国土木工程协会电子期刊 ACS美国化学学会数据库 IOP英国皇家物理学会期刊 RSC英国皇家化学学会期刊 AIAA美国航空航天学会 John Wiley电子期刊 Kluwer电子期刊 Springer LINK 电子期刊 EBSCO学术、商业信息数据库 Elsevier Science IEEE/IEE Electronic Library ACM Digital Library 但估计你们学校没有数据库。 如果找不到干脆找个中文的自己翻译过来算了。 问题六:外文文献引证号是什么 我看到有些只写一个数字,期刊号是不是第几期?如[2]何龄修.读顾城《南明史》[J].中国史研究学刊,1998,(3):167-173这里面的(3)就是期刊号,这个是不是这个学术期刊的第3期 问题七:毕业论文中的外文翻译可以在什么网站找到?非常感谢! 学校的数据库,中国知网应该都有,根据专业也可以选择国外比较有名的数据库,推荐几个我用过的吧 ABI,ACM,ASTP,American Chemical Society ,Blackwell Science-Blackwell synergy EBSCO综合类,强烈推荐,Engineering Index 工科是离不开EI的,IEEE 电子类必备,HighWire Press,ISI学术权威 ,National Technical Information Service 个人比较喜欢的,推荐 问题八:论文的外文翻译是什么意思 需要帮忙可以找我 外文翻译就是一篇跟你题目相关的文章然后翻译出来 问题九:毕设外文文献翻译和毕设是个什么关系?我怎么觉得外文翻译和我的毕设 文献翻译应该是毕业设计的前期准备工作吧,毕竟你需要知道你所选取的课题在国内外的研究现状才能确定研究方向啊 问题十:外文翻译是翻译什么 楼主您好:你只要用一种非中国语言的外语翻译一篇你的毕业论文即可!谢谢采纳!如果您满意的话就给五星评价吧!如有疑问请追问!
刚好我也在做毕业设计 把我的给你用吧! Traditional Construction ProceduresAs mentioned before, construction under the traditional construction procedure is performed by contractors. While they would like to satisfy the owner and the building designers, contractors have the main objective of making a profit. Hence, their initial task is to prepare a bid price based on an accurate estimate of construction costs. This requires development of a concept for performance of the work and a construction time schedule. After a contract has been awarded, contractors must furnish and pay for all materials, equipment, power, labor, and supervision required for construction. The owner compensates the contractors for construction costs and general contractor assumes overall responsibility for construction of a building. The contractor engages subcontractors who take responsibility for the work of the various trades required for construction. For example, a plumbing contractor installs the plumbing, an electrical contractor installs the electrical system, and an elevator contractor installs elevators. Their contracts are with the general contractor, and they are paid by the general , in addition to a general contractor, the owner contracts separately with specialty contractors, such as electrical and mechanical contractors, who perform a substantial amount of the work require for a building. Such contractors are called prime contractors. Their work is scheduled and coordinated by the general contractor, but they are paid directly by the also, the owner may use the design-build method and award a contract to an organization for both the design and construction of a building. Such organizations are called design-build contractors. One variation of this type of contract is employed by developers of groups of one-family homes or low-rise apartment buildings. The homebuilder designs and constructs the dwellings, but the design is substantially completed before owners purchase the of the construction procedure often is difficult. Consequently, some owners seek assistance from an expert, called a professional construction manager, with extensive construction experience, who receives a fee. The construction manager negotiates with general contractors and helps select one to construct the building. Managers usually also supervise selection of subcontractors. During construction, they help control costs, expedite equipment and material deliveries, and keep the work on schedule. In some cases, instead, the owner may prefer o engage a construction program manager, to assist in administrating both design and contractors employ labor that may or may not be unionized. Unionized craftspeople are members of unions that are organized by construction trades, such as carpenter, plumber, and electrician unions, Union members will perform only the work assigned to their construction, all work should be inspected. For this purpose, the owner, often through the architect and consultants, engages inspectors. The field inspectors may be placed under the control of an owner’s representative, who may be titled clerk of the works, architect’s superintendent, engineer’s superintendent, or resident engineer. The inspectors have the responsibility of ensuring that construction meets the requirements of the contract documents and is performed under safe conditions. Such inspections may be made at frequent addition, inspections also are made by representatives of one or more governmental agencies. They have the responsibility of ensuring that construction meets legal requirements and have little or no concern with detailed conformance with the contract documents. Such legal inspections are made periodically or at the end of certain stages of construction. One agency that will make frequent inspections is the local or state building department, whichever has jurisdiction. The purpose of these inspections is to ensure conformance with the local or state building is a description of the basic traditional construction procedure for a multistory the award of a construction contract to a general contractor, the owner may ask the contractor to start a portion of the work before signing of the contract by giving the contractor a letter of intent or after signing of the contract by issuing a written notice to proceed. The contractor then obtains construction permits, as required, form governmental agencies, such as the local building, water, sewer, and highway general contractor plans and schedules construction operations in detail and mobilizes equipment and personnel for the project. Subcontractors are notified of the contract award and issued letters of intent or awarded subcontracts, then are given, at appropriate times, notices to construction starts, the general contractor orders a survey to be made of adjacent structures and terrain, both for the record and to become knowledgeable of local conditions. A survey is then made to lay out offices for the contractor are erected on or near the site. If desirable for safety reasons to protect passersby, the required to be removed from the site are demolished and the debris is carted , the site is prepared to receive the building. This work may involve grading the top surface to bring it to the proper elevations, excavating to required depths for basement and foundations, and shifting of utility piping. For deep excavations, earth sides are braced and the bottom is construction starts with the placement of foundations, on which the building rests. This is followed by the erection of load-bearing walls and structural framing. Depending on the height of the building, ladders, stairs, or elevators may be installed to enable construction personnel to travel from floor to floor eventually to the roof. Also, hoists may be installed to lift materials to upper levels. If needed, temporary flooring may be placed for use of the building rises, pipes, ducts, and electric conduit and wiring are installed. Then, permanent floors, exterior walls, and windows are constructed. At the appropriate time, permanent elevators are installed. If required, fireproofing is placed for steel framing. Next, fixed partitions are built and the roof and its covering are put is place,Finishing operations follow. There include installation of the following: ceilings; tile; wallboard; wall paneling; plumbing fixtures; heating furnaces; air-conditioning equipment; heating and cooling devices for rooms; escalators; floor coverings; window glass; movable partitions; doors; finishing hardware; electrical equipment and apparatus, including lighting fixtures, switches, transformers, and controls; and other items called for in the drawings and specifications. Field offices, fences, bridges, and other temporary construction must be removed from the site. Utilities, such as gas, electricity, and water, are hooked up to the building. The sit is landscaped and paved. Finally, the building interior is painted and owner’s representatives then give the building a final inspection. If they find that the structure conforms with the contract documents, the owner accepts the project and gives the general contractor final payment on issuance by the building department of a certificate of occupancy, which indicates that the completed building meets building-code requirements.传统的施工程序众所周知,在传统的施工程序中进行施工的承包商。尽管他们想满足业主和建筑设计师的要求,但是最终还是以赚取利润为主要目标的。因此,他们最初的任务是对编写投标价格的建筑成本进行准确的估计。这就需要进行前期调查的工作并且做出施工时间表。等合约批出后,施工方必须提供所有材料并支付其费用,设备,电力,劳动力。业主此时需要进行必要的监督。一个总承包商承担一个建筑整体的责任。从事分包的承建商则需承担建造工程所需的各个工作。例如,管道承包商安装水管,电业承办商安装电气系统,电梯则由电梯承包商安装。他们与总承包商签订合同,费用由总承包商支付。有时候,除了一个总承包商,还有各种专业承包商,如电气和机械承包商,执行工作时需要与业主签订合同。这种承包商被称为间接承包商。他们的工作,由总承包商协调,但它们都是由业主直接联系。还有些时候,业主可以使用设计建造方法同时兼有设计和建筑施工单位的职能。这些单位被称为设计建造承包商。这方面的一个类型的合同聘用的变化是由一户住宅或低层住宅建筑群的开发。在房屋建筑设计和建造的住房,但设计之前需要由购买房屋的业主完成。施工过程管理往往是困难的。因此,一些业主会去寻求专家的协助,这些专家被称为专业施工经理,他们具有丰富的施工经验。施工经理与总承包商进行谈判,并选择其中一个项目。施工经理通常还监督分包商。在施工期间,它们有助于控制成本,加快运送设备和材料,并保持工作的进度。在依法行政,协助设计和建设的情况下,业主可以选择从事建筑项目经理。建筑承包商雇用的劳动力,一般有大工和小工。大工再建筑工程中从事技术活,如木工,管道工,工会成员和电工工会,小工则执行了分配给他们的工作。在施工期间,一切工作都要验收。因此,业主通过建筑师和监理经常进行督查。可能是名为工程员,建筑师或驻地工程师。作为业主的代表实地视察。核查人员必须确保工程符合合同文件的要求,并在安全的条件下进行的责任。这种检查可作出重复。此外,验收还是需要一个或多个政府机构的代表。他们必须确保工程符合法律要求,并负责检查与合同文件是否一致。这种视察一般定期或在某些阶段施工结束以后进行。地方或国家建设部门具有管辖权。这些检查的目的是确保符合当地或国家的建筑规范。以下是传统多层建筑施工的基本程序。建造开始后合同授予开发商,业主可要求开发商开始施工之前签约给或之后签约发出书面通知的同时另一部分工作继续进行。紧接着施工方根据需要获取建筑许可证,例如当地的建设,供水,污水处理,政府机构和公路部门。总承包商的计划和进度详细施工作业以及动员项目设备和人员。分包商得到通知后,做出签订合同的意向或授予分包合同书,然后给出在适当的时候进行通知。在施工前启动,总承包商要进行的一项调查就是邻近结构和地形,这些都要记录在案,并要熟悉当地情况。这项调查结束以后,随即进行布局建设。承建商的现场办事处都建在施工现场或附近。为了安全起见,必须从脚手架上移除的东西,产生的碎片都要运走。下一步,该网架是为建设工程准备的。这项工作为地下室开挖和基础开挖的深度,以及公用事业管道转移找到正确的标高。深挖掘,土方支撑,底部排出。建筑开始于基础上,然后是承重墙和结构框架的施工。梯子,楼梯,或电梯的安装,可让施工人员往返于各个楼层。此外,可安装卷扬机来运送材料。由于建筑高度的上升,管道,电力管道和线路安装以及永久地板,外墙,窗户和构造的影响。在适当的时候,永久的电梯安装。再需要的情况下可以安装防火卷帘。其次,屋顶等地方也需要安装。精加工工序安装有包括以下内容:天花板,瓷砖,墙板,墙壁镶板,水管装置,加热炉,空气调节设备,加热和冷却室装置;自动扶梯;地板,窗户玻璃;活动板,门;电气设备和仪器,包括照明灯具,开关,变压器,控制器,遵照项目的图纸和规格。外地办事处,围栏,桥梁和其他临时建筑,公共设备,如天然气,电力管道,水管,都连接到建筑上。最后,是建筑物内部的打扫和清洗。业主的代表,会给建设工程作最后检查。如果他们满意并认为符合合同文件,那么业主接受该项目,并交给总承包商的一个占用证书,这表明,总承包商已完成建设,建设部门再根据建筑规范的要求发放最后付款。
有一篇施工监控的论文,你查收一下吧,希望对你有用!
有一篇施工监控的论文,你查收一下吧,希望对你有用!
土木工程的key哀,速度,
The urban river embankment discuss the ecological constructionAnonymous XXXXXXXXAbstract: the urban river embankment construction as the object, discuss the current social background, analyses and compares the river embankment design of traditional methods and characteristics of ecological methods, and puts forward three modes of ecological design and their advantages and disadvantages, and expounds the present situation of the ecological construction in domestic bank and future : the bank; Ecology; Design way; Domestic situationText:A, backgroundRiver Banks part is the amphibious interlaced transition belt, has the remarkable edge effect. Here are active substances, nutrient and energy flow, offer a habitat for a variety of creatures. Natural state Banks often species richness, productivity traditional embankment design often single ?一、背景河流的堤岸部分是水陆交错的过渡地带,具有显著的边缘效应。这里有活跃的物质、养分和能量的流动,为多种生物提供了栖息地。自然状态下的堤岸往往物种丰富、生产力高。传统的堤岸设计往往会单纯从防洪角度出发,采用土堤或者土石混合堆砌起来高高的堤岸。它的优点在于高度的可靠性,结构设计后加起防护堤岸抗流水冲刷能力显著增强。对于洪水暴发频繁、侵蚀严重的区段,这样的设计无可厚非,而对于一般河流堤岸的修建,这样的设计则显得缺乏环境的美化和绿化,同时也破坏许多对生态起重要作用的自然因素,如破坏植被与河床间的联系,造成冲刷侵蚀转移等。另外,河流作为城市风貌不可多得的珍惜资源,也是城市风貌的特色要素,它的景观塑造显得十分必要。同时,堤岸景观建设必然使滨河地区土地价值提升,滨水开发的高投资回报的特点更增强了对城市堤岸景观建设的需求。二、需求——堤岸的生态化建设河流堤岸作为城市中最邻近河流的区域,是城市与河流的衔接线,它的景观规划是提高城市生活品质的需要,也是丰富城市景观的需要。生态化建设,它的根本思路是运用自然本身抗干扰和自我修复的能力来处理人与自然的关系。生态设计方法不同于传统用人工的结构和形式来取代自然的方法,而是用自然的结构和形式来顺应自然的进程。将河岸与河道在生态上联系起来,也就实现了物质、养分、能量的交流:对于生物,它提供了合适的栖息地;植物根系可固着土壤,枝叶可截留雨水,过滤地表迳流,抵抗流水冲刷,从而起到保护堤岸、增加堤岸结构的稳定性、净化水质、涵养水源的作用,而且随着时间的推移,这些作用被不断加强。同时,生态化建设以自然的外貌出现,容易与环境取得协调,造价也较低,不需要长期的维护管理。三、河流堤岸生态化设计方式河流堤岸生态化设计,要遵守生态设计的原则,注重地方性、保护与节约自然资本、让自然做功、显露自然,主要体现在对地域气候环境、河流地质地貌、水文变化的适应,对河流生态环境的考虑,对堤岸地形的处理和对筑堤材料的选择和构造方式方面。1) 人工类:传统方法是采用块石或混凝土块砖等堆砌。可在此基础上加以改进以适应河流景观设计的需求。a) 块石或混凝土块砖干砌,不用砂浆。这样在砌块之间就留有空隙,为后期滨河植物的生长提供了空间。随着时间的推移,堤岸会逐渐呈现出自然的风貌。b) 堤岸采用台阶式分级,台阶面上的空间加以利用,种植植物。当然这两种改进方法对于河岸处现有植被仍存在一定的不良影响,人工痕迹也过于明显。2) 自然类:充分利用堤岸植被原型,可直接将适用于滨河地带生长的植被种植于堤岸上,利用植物的根、茎、叶来稳固堤岸,防止侵蚀、控制沉积的同时也为生物提供了栖息地。3) 人工自然相结合综合了以上两种方法的优点,具有人工结构的稳定性和自然的外貌,见效快、生态效益好,以下为常见的两种类型:a) 种植植物的堆石将由大小不同的石块组成的堆石置于与水接触的土壤表面,再把活体切枝插入石堆中使斜坡更加稳定。根系可提高强度,植被可遮盖石块,使堤岸外貌更加自然。b) 与植物结合使用的插孔式混凝土块将预制的混凝土块以连锁的形式置于岸底的浅渠中,再将植物切枝或植株扦插于混凝土块之间和堤岸上部,其上覆土压实,再播种草本植物。堤岸生态化建设也存在一定的局限性。如:选用的材料及建造方法不同,堤岸的防护能力相差很大,需要运用多学科知识认真分析,这就为设计人员提出了更大的挑战;建造初期若受到强烈干扰,则会影响到以后防护作用的发挥等。这也就对河流堤岸的生态化设计提出了更高的要求。四、国内现状1)省会城市在我国省会城市及计划单列市中有近80%进行了堤岸景观规划。(参考文献[3])城 市 项目名称 城 市 项目名称北 京 长河城市水系统综合治理 南 宁 堤岸园工程长 沙 湘江风光带 宁 波 滨江大道沿江景观工程成 都 府南河绿化工程 上 海 外滩、陆家嘴滨江大道福 州 闵江江滨公园 沈 阳 浑河观光旅游带广 州 珠江二沙段堤岸景观、芳村长堤建设 太 原 汾河公园贵 阳 南明河景观绿化工程 天 津 海河堤岸改造工程哈尔滨 松花江南岸沿江风景长廊 武 汉 汉口江滩一二期工程昆 明 盘龙江中段滨水生态景观建设 西 安 灞河大水大绿工程兰 州 黄河风情线 重 庆 南滨路滨江旅游观光大道从规划后建成情况看,这些城市河流堤岸景观项目都得到了当地政府与市民的肯定。在这些项目中,堤岸既可成为当地最具吸引力的城市公园,如太原的汾河公园和福州的江滨公园;堤岸也可成为市民日常休闲活动的热点地段,如南宁的堤路园和武汉的汉口江滩工程;堤岸还可成为城市最具特色的地段,如重庆的南滨路滨江旅游观光大道;堤岸更可成为城市旅游的热点,如上海的外滩和陆家嘴滨江大道。总之,经过景观规划的堤岸已成为当地最具特色的地区。从建设效果看,相对堤岸的原来面貌而言,统计资料中的这些景观工程都是较成功的,都成为当地城市关注的热点,成为当地政府的政绩工程,成为当地的民心工程。城市河流堤岸通过景观规划,有效地改善了滨河地段的环境,并带动滨河地段的开发。但必须清醒地认识到,这些城市堤岸景观项目规划并非尽善尽美,也存在这样或那样的问题,仍有待完善。2)中小城市城市经济实力的强大决定了其城市建设水平的高标准和高水平。中小城市河流堤岸景观与统计资料中的城市存在较大的差距,存在更多的问题。特别是由于资金问题,堤岸景观是,纯人工,状态的钢筋混凝土防洪堤,或保持自然防洪状态的土石堤,没有经过景观规划,易造成城市资源的极大浪费。五、前景目前,河流景观建设,特别是城市河流景观建设,在中国正方兴未艾;在发达国家中也是一个久盛不衰的话题。 回顾发达国家河流景观建设的历史,自20世纪70年代以来,随着人们环境意识的普遍增强,重视河流景观的生态功能已成为一个时代的呼唤,河流景观建设的生态设计方法也已得到了空前的重视和发展。他山之石可以攻玉,借鉴发达国家已经形成的成熟的理念和做法,可以使我们少走弯路,搭上隆隆前进的生态建设之车。
这个要靠你自己找了,你可以上万方网找,还有那也可以找的.但你们学校必须买那样的数据库.
几年级的啊?
你是哪个省的啊 看看如果可以的话 可以给你一份全面的
有一篇施工监控的论文,你查收一下吧,希望对你有用!
外表上被限制的混凝土压缩行为 综合夹克。 部分A : 实验性研究 . Berthet, E. Ferrier *, P. Hamelin 部分内容:摘要本文提出一次实验性调查的结果关于碳和E玻璃FRP夹克外表上限制的具体短的专栏压缩行为的。 不同的参量的影响例如禁闭水平、夹克的机械性能和具体核心的耐压强度被学习了。 结果表示,外在禁闭可能极大改进标本的强度极限和延展性。 局限的混凝土应力反应双线: 在第一个线性区域,平原行为和被限制的具体标本是相似的,而在第二个类塑料分支,局限的混凝土行为取决于主要夹克mechanicals物产。 测试结果显示出, ···
土木工程施工论文范例篇2 浅析土木工程施工管理问题 【摘要】如今建筑行业已经成为我国国民经济的重要支柱产业,随着施工技术的不断创新,各种类型的施工项目不断涌现,各种土木工程项目也随处可见,对土木工程项目的管理问题也越来越凸显出来,因此我们需要对土木工程施工管理提出新的要求。本文针对目前土木工程施工管理中存在的问题,分析其原因,提出了改进土木工程施工管理的建议,以促进土木工程施工管理的健康可持续性发展。 【关键字】土木工程;施工管理;管理问题 1、引言 土木工程项目施工管理工作就是在土木工程施工阶段,对各种施工生产活动管理工作进行有效的组织,使施工过程变得规范化、合理化,避免因施工不当而产生的经济损失,并保证土木工程的质量。土木工程施工过程的好坏,不仅直接影响了整个企业的经济效益,更对企业的施工信誉有着重大影响。近几年来,土木工程施工管理体制不断进行改革,广泛实施了招投标制度,对土木工程施工的标准也越来越严格。在土木工程实际施工中,存在着监理人员、施工作业人员素质偏低,工程招标的不规范,管理体制不健全,安全管理重视程度低,环境保护意识差等问题,直接影响了土木工程的施工管理工作。因此,加强土木工程施工管理就显得十分有必要,下面针对土木工程施工管理中存在的问题进行分析。 2、土木工程施工管理中存在的问题 监理人员、施工作业人员素质偏低 首先,目前土木工程的监理人员存在着素质偏低的情况,不重视施工管理,多数人认为监理工作的范围就是对施工阶段的管理,缺乏工程勘察、设计、研究等方面的经验,而且对这些方面也不够重视,多数监理人员在工作中存在敷衍的心态。实际上一些土木工程出现质量问题很大程度上是监理不严所致。 其次,从施工作业人员来看,由于现阶段市场上人力成本增长较快,大部分施工企业出于成本方面考虑,内部雇佣的固定施工作业人员很少,有工程项目时临时聘用市场上一些非专业人员,他们大多数来自于农村的农民工,没有接受过专业的施工技术培训,对工程施工的工序及操作规范等方面知之甚少,加之技术培训跟不上,专业水平普遍较低,主要表现在施工过程中,操作不规范,技艺不娴熟,很难达到施工质量标准要求,使得工程施工质量难以得到有效的保证。 土木工程招标管理不规范 在土木工程项目中,存在招标管理不规范的现象。国内对于一些工程项目普遍存在招标“走后门”的现象,导致在招标时弄虚作假,招标工作没有按照规定的顺序进行,造成了项目承包价格不合理,甚至一些土木工程项目承包时的价格已经低于成本价,这样承包商就会在土木工程实际施工时偷工减料,对工程的质量造成了严重的影响。 管理体制问题 管理体制与土木工程施工项目管理的特点不相适应。土木工程施工项目的主要特征是它的单件性和永久性,这就决定了土木工程施工要进度快、质量优、成本低、安全好,要进行综合性管理,加强约束的控制性管理。 此外,施工企业是以管理体制为依据对土木工程进行管理的,管理体制不完善将会影响到整个土木工程的施工建设。国内的土木工程项目为了节省人力开支,采取了大量削减工程的管理机构、管理部门以及管理人员的方式,直接导致施工单位管理人员的缺乏,这样既可能降低了管理部门员工工作的热情度与积极性,又可能制约了管理工作的实际落实,管理工作没有真正落实,难以发挥管理土木工程的作用。 对安全管理重视不够 任何工程施工都是以安全为基本前提,安全管理也是进行土木工程管理的关键,安全既影响到施工单位的声誉,同时也直接影响了施工单位的经济效益。但是就安全意识来看,多数施工人员存在缺乏安全意识的情况。首先是在土木工程的管理工作中,没有完善的组织机构,缺乏施工安全意识;没有专门的人员对施工人员进行安全培训,造成施工现场的安全管理意识不够,同时没有相对应的安全管理措施。 环境保护意识问题 主要表现在:施工噪音严重扰民,影响民众工作、生活和休息;建筑垃圾带来安全隐患,清运、存放和再利用不科学;缺乏对生态环境的保护,对耕地的非法占用,对绿地的破坏及对未破坏的环境也不能有效保护。 3、土木工程施工管理的改进建议 提高监理人员管理素质 作为施工单位进行工程管理的直接人员,对土木工程的勘察、设计、研究以及工程的整体施工都应该起到监督管理的作用,首先施工单位在选择监理人员的时候,应该选用具有综合素质的监理人员,对其技术、管理水平、管理经验都应该有更高的要求,同时在其实施管理的过程中不断培训监理人员的管理知识,从而提高其管理水平。监理人员应该常驻于施工现场,这样才能保证及时观测、掌握施工项目,如果发现问题应该及时与发生问题环节的工作人员以及工程的领导进行及时汇报,从而及时采取控制措施进行解决,争取最大限度的降低问题可能带来的损失。 规范土木工程的招标 对于土木工程招标中存在的徇私舞弊行为,应该在招标时对招标的标准进行严格控制,避免弄虚作假,将土木工程交由信誉好、工程质量高的施工单位。施工企业针对自身质量管理模式,制定出关于工程质量目标与方针的质量管理手册,为土木工程能够顺利进行提供完善的质量保证体系,确保工程质量。 推行项目管理责任制 由于建筑工程项目的规模大、分项工程和单项工程比较多,因此,在施工管理和合同管理方面难度较大。在精干主体的基础上,必须进一步减化生产关系,减少管理层次变金字塔式的管理为扁平式管理。项目经理要保证工程项目的协调有序实施,同时企业内部要用完善的管理机制和监督机制保证项目经理责任制的落实。建设承包公司下达生产计划和各项经济技术考核指标,以保证实现预期的项目管理目标。此外,还要建立起一套完善的项目管理责任体系,以便明确项目管理责任人及建设承包公司与各施工生产单位的管理责任。 解决施工过程中的环境问题 想要有效地降低土建施工带来的环境问题,可以采取以下的一些措施: (1)采用先进的施工技术。主要是在施工过程中大量的应用各种环保技术,减少施工造成的大气中有害气体、粉尘、以及废弃物和噪声等施工公害。首先要在施工过程中采用先进的技术来控制施工产生的噪音,同时采用先进的施工技术还能缩短施工周期、节省原材料,可以极大的降低对周围环境造成的施工影响。 (2)施工中使用优质的工程材料。施工中材料的选择,直接决定了对环境的影响程度。优质的工程材料可以把对周围环境的影响控制到最低。在施工过程中采用优质材料还能极大的避免在施工过程中的安全隐患的出现。 (3)引进先进的施工机械设备,这样可以极大的提高施工的效率。 4、结语 综上所述,土木工程施工管理仍面临着很多的问题,有很多新东西要去研究。监理人员、施工作业人员素质偏低,工程招标的不规范,管理体制不健全,安全管理重视程度低,环境保护意识差等问题都制约了土木工程管理水平的提高。我们在工作中只有善于发现问题,积极寻找解决的办法,才能不断的纠正土木工程施工管理中存在的漏洞。项目工程开始实施后的主要环节就是施工管理,因此必须对这一问题提起足够的重视,确保高质量的完成土木工程施工。 参考文献 [1]穆静波.土木工程施工[M].北京:中国建筑工业出版社,2009. [2]陈兴武.浅谈如何加强工民建工程施工管理[J].价值工程,2010(18). [3]王烨.土木工程施工管理中存在的问题分析及相关建议[J].城市建设理论研究,2012. 猜你喜欢: 1. 土木工程施工技术论文范文 2. 土木工程施工论文范文 3. 关于土木工程施工毕业论文 4. 土木工程论文范本 5. 土木工程论文免费范例
土木工程施工论文结课范文篇3 浅谈土木工程施工技术教学问题及解决对策 土木工程是建筑学科中非常具有基础性的和代表性的学科,其涉及到的方面是非常广的,其中包含土木施工的技术和土木工程施工等基础性的问题及学科。通过土木工程施工课程的学习和研究,学生不仅仅掌握的是关于土木建设的基础知识,更加训练的是工程师的基本能力和职业技能的培养。但是,为了能够达到更好的教学效果,其实还是需要有很多的问题去改革和总结土木教育的问题。教学工作者需要及时对这些问题进行归纳,总结经验,提高自身的专业教学水平。本文主要针对土木工程施工教学中的一些问题归纳及经验进行阐述。并且对土木施工技术的教学中所涉及到的一些问题提出一些笔者自己的建议,希望能够给高校土木建设的课程带来一定的帮助。 土木工程实施技术教学的现状 土木建设施工中的实施教程是每个学习者都要参与的,这是一项基础而又重要的课程,每个人都要参与其中。对于土木工程的学习者来说,这既是一门基础性的学科,但是有起着至关重要的学习内容,另一方面,该项课程的难点就是在于要将所学的基础和课本知识相互结合,并应用实践当中,,只有面对每一个实际性的问题有所解决,才能使得这门课程的学习更加深入,我国现阶段对于土木工程施工课程的教育其实已经在理论上有所深入,但是很多时候,对于施工技术还有施工安全,或者是施工的管理等一系列问题还是存在很多需要更加深入研究的文图,所以,我们还是需要对现阶段的土木施工技术的教学情况进行一定的完善或者是补充。 土木工程实施技术教学中存在的问题 随着技术的不断发展,原有的教材其实已经不能很好的与现有技术结合,很多的技术都是没有完全认真的覆盖的有很多已经不需要的内容还是留存在教材当中,不仅仅是加重学生和老师的负担,又学习了一些已经淘汰了的知识。尽管在教材的改革和教师的交流中已经对某些新的技术与新的内容有所更替,但是,对于不断发展和进步的土木建设施工设计来说,这样的更新是远远不够的,学生学习的内容不能适应真正的要求,这是一个非常严重的问题。 所以为了能够适应现阶段的社会发展,那就一定要改革现有的学科知识要求和学科教学的体系,这样才能够使得在日常的学习打下良好的实践基础,而不是为了去迎合教师的教学内容或者是仅仅为了得到一些学位证明。一个土木建筑者一定要具备应有的素质和知识储备。另外一点,现阶段课程的时间设计和教师的内容设计都是有一些不合理的问题的,教师不能在设定的时间内完成规定的教学内容,或者是因为教学的内容比较繁杂,导致学生在接受到内容后不能完全接纳吸收,这样就使得课程的学习受到一定的阻碍。 教学目标是很难的实现的,很容易对这门课程产生一定厌恶心理,这是会出现一定教学问题的。对于土木工程的教学是要贯穿很多东西,而且许多学科都是在其中交错的,所以实习和实践内容都要包含在一起的。最重要的一个问题就是,对于教学过程中,是否真的能够将教学所学到的东西和在实践中需要的东西相互结合的。如果实践是没有效果的,并且忽略学习的综合性和有效性,那么将会给以后知识的运用带来很大的麻烦,所以需要教师在进行课程设计和日常教学时都对这些方面有所重视,在学习中就要给学生一定的启发和提示,这样,才能让学生在日后的工作中有所帮助。 土木工程实施技术教学中问题的解决建议 优化现有的教学内容和教学实践及教学规划,将新的设计和新的内容根据专业的需要迅速融入到当下的教学任务来进行,另外重要的就是要根据土木工程下属的其他学科进行合理的配制和规划,改善现在术业无专攻的状况,让各位学生能更好的将所学知识应用到实践当中去。尽管学科的知识不需要的每一个方面都会覆盖的,要精选的关于不同学科有关土木专业中比较精华的部分,其中应该涵盖到知识的各个方面,包括土木工程细节性的学科。也要讨论到施工中具体出现的各种问题。另外,随着互联网和其他一些教学形式的出现,其实,很多时候土工施工教学的课堂也可以变得生动有趣,凭借着一些新式的教学和授课手段,都可以改善现在课堂只有老师一人讲,学生参与互差的状况,这样将会使学生对于这门基础课程的学习更加有兴趣和 爱好 。并且很多新的设备可以准确模拟出施工的现场状况,这样就可以有更加直观的教学环境和教学影响。通过融合课程内容的设置和时间的要求。 教师可以根据自己的授课内容和习惯将这些现代化的内容直接融入进去,用现代化的手段将课程内容顺利的融入课堂,通过图文以及教师授课同时进行的方式,不但可以加快学生的理解,这样的教学环境可以让学生的理解能力达到最好的一个效果。同时可以将学术论文或者其他 渠道 刊载的最新的内容覆盖到平时的授课中去,这样学生了解到的就是最新的知识和内容。教师要根据学生的反馈和课堂状况,实时的改善自己的教学进度和教学目标,让学生更好的适应课堂和接受授课内容。但是现在使用先进的教学设备还会存在一些问题,就是没有比较成功或者已经形成体系的教学材料或者教学的应用工具,所以还需要一线的学生和老师共同努力,去交流,并且要摄取更多真实的施工场景,将这些最贴近学生和实际操作的经验与教学的新手段紧密的结合起来,这样不仅仅规避了以前照本宣科的劣势,还让学生和老师有了一个更加深入的交流和探讨。这样新做出的课件相信能够更加的有效和合理的。 也希望土木施工的教育者能够积极的参与到这项工作当中。学生通过观摩活动,能够将学科知识与实际操作相互结合,并且提出自己的理念和观点,并且能够最直接的在现场接受经验教训,为今后的实际工作提供一个良好的开端和积累。为培养合格的土木工程专业人才及学生 毕业 后从事工程实践活动打下良好的基础。土木工程施工技术施工方案设计, 通过对具体的施工目标设计施工技术方案使学生熟悉和掌握施工过程中施工方案的编制原则、 依据、 方法和步骤; 要加深学生对于土木施工这一课程的合理科学有效性的理解,并且更为深入的去掌握这门学科在日常实践中所能带来的重要益处和重要的作用。 在很多教学中,有些有经验的老师会将自己的学生带到真正的施工现场,这样就能让学生更加了解实际的施工情况到底是怎样的。但是这其中还是存在一些问题的,学生和老师在出入工地时,不论是安全还是传授知识的有效性都是受到影响的,学生需要和老师进行长时间的具体性的沟通,这样得到的反馈才能让老师更为容易知道学生的具体情况并且将讲授的内容给布置下去。这样才能让实践活动起到其应有的效果。 结语 我国的土木建设团队还需要进一步的充沛,很多情况下土木建设的团队还是缺乏很多的技术支持,所以教师如果能够在教学中更加符合学生的要求,教授的内容能够更加贴近实际,并且能够将实际的知识要点覆盖其中,这样才能培养出适合现代化建设的团队,因此,改革教育团队的能力,这个教育中的各项资源,将土木建设教育中的各项问题有机的结合起来并给出科学合理的解决办法,这样才能真正的建设一支符合市场需求土木施工的团队。也希望本文能对土木施工的教学给予一些有利的帮助。 猜你喜欢: 1. 土木工程施工论文结课范文 2. 土木工程施工技术论文范文 3. 土木工程施工论文范例 4. 关于土木工程施工毕业论文 5. 土木工程施工论文范文 6. 土木工程施工实习报告范文
土木工程毕业设计摘要模板
毕业设计是教学过程的最后阶段采用的一种总结性的实践教学环节。以下是我收集的土木工程毕业设计摘要,欢迎查看!
以土木工程为主的建筑业是我国国民经济的重要组成部分,是国民生产总值和劳动力的主要贡献者。从2003年至2012年,全国建筑安全形势在总体上呈现好转态势,但与发达国家相比,形势依然十分严峻。
究其主要原因是建筑业安全文化的缺乏。安全文化,自上个世纪80年代被提出来以来,被证实是解决人因失误最有效的办法和手段。本文对安全文化理论进行深入剖析,在此基础上结合我国土木工程施工安全事故案例,建立了我国土木工程安全文化模型,将安全文化分为三个层次:人、组织及环境,人的层面包括安全行为、安全意识和专业知识/安全知识;组织层面包括安全信念、管理者的承诺、员工的参与、沟通交流、安全政策、规则和指导方针、安全培训;环境层面包括社会文化、经济、法律、技术、项目环境和利益相关者。根据此模型针对施工单位工人、管理人员和监理人员设计调查问卷,并在全国范围内进行安全文化调查。本文利用因子分析法对回收数据进行分析,提取主要的影响因子并计算其得分,根据此结果对我国土木工程安全文化现状进行分析,发现:
1)施工单位的安全文化整体水平不高,管理人员和工人的安全意识还不错,但还有待提高。施工单位内的安全管理水平一般,工程项目利益相关者对施工单位有一定的负面影响,管理人员和工人对自己工作的认识均不够清晰,并且工程项目上存在很多影响安全的因素,需要加以重视;
2)监理单位的安全文化整体水平较好,监理的安全意识较好,监理单位也很注重内部安全管理,履行自己的安全监督职责。存在的主要问题是监理人员需要提高他们的专业/安全知识,同时,对业主与施工单位的负面影响应多加注意,因为这是影响安全监理的一个严重障碍。
针对调查分析结果提出改进我国土木工程安全文化的建议:
1)施工单位应健全项目安全管理组织,加强与各利益相关方的沟通交流,加强对管理人员及工人的培训,提高其技术水平、专业知识及安全知识;
2)监理单位应提高监理人员的安全管理业务素质,以增强监理人员的安全知识和专业知识,并加强与施工单位的沟通。并提出了对策和建议。
本文从承包商角度,对国际大型土木承包工程项目投标过程中的风险评估方法进行深入系统地研究。针对国际大型土木工程的特点,建立定性与定量相结合的数学模型,同时力图尽可能考虑风险因素的相关性,以深刻描述客观事物。本论文的研究方法可供承包商在对投标项目进行风险评估时参考,对在工程咨询中介机构中工作的造价工程师、监理工程师等也有一定的参考价值。
第一章,介绍了课题研究背景和国内外的最新研究动态,提出了本文的主要研究内容和技术路线。
第二章,对国际大型土木工程的投标程序、投标定价的模式以及投标理论研究状况进行分析,在此基础上系统分析了国际大型土木工程承包项目投标风险的总体结构、特性、测度指标和影响因素,提出工程投标风险评估是由选标风险评估、成本预测风险评估、投标工期风险评估、施工方案风险评估四部分组成。
第三章,针对承包单位面对选标的两种情况,分别建立了基于改进的AHP方法的选标风险评估模型和基于灰色关联分析的工程风险评估模型。
第四章,引入描述成本估算准确性的指标----成本估价风险的概念,分析了影响成本估价风险的影响因素;为准确地评价成本估算风险,对影响成本估价风险的风险因素之间的相关系数的求法进行研究;建立了基于偏最小二乘回归分析(PLS)的工程费用估算模型;建立了因素相关和独立条件下基于MAT LAB/SIMULINK的成本风险仿真模型,通过案例研究,对比了两个模型的仿真效果;研究了成本风险的`敏感度问题。
第五章,对项目施工工期和费用之间的相关性进行深入研究;考虑施工工期风险与费用估计风险之间的相互制约、相互影响的关系的基础上,建立了非线形的多加性随机网络(GERT)模型,用于工期风险的估计预测;对多加性随机网络的工期-费用优化问题进行了探讨。
第六章,采用网络层次分析ANP(Analytic Network Process)方法来评价施工方案风险,结果表明是否考虑风险因素相关,往往会影响最终的评价结果。第七章,对全文所做的工作进行总结,对今后的工作进行了展望。
随着大跨度结构和超高层建筑的不断发展,大型土木工程结构健康监测的研究与应用越来越受到学术界和工程界的重视。本文系统地开展土木工程结构性能监测系统和损伤识别方法的理论与实验研究,建立一种可用于测试结构动态响应以及监测交通流的新型水泥基压电传感系统,提出一种基于结构动态响应统计特征的结构损伤识别人工神经网络方法,从而发展结构健康监测系统与方法。
主要研究工作与创新成果包括以下几个方面:
(1)在水泥基压电复合材料的基础上,研制了一种新型水泥基压电传感器,实验检测了传感器的频率独立性、线性度等基本性能,并使用标定程序确定了传感器的测量范围、灵敏度、线性度、滞回度和灵敏度界限等使用参数。研究结果表明,所研制的水泥基压电传感器具有很好的频率独立性和高度的输入输出线性关系,适用于大型土木工程结构的性能监测。
(2)建立了包括水泥基压电传感器、专门开发的小型电荷放大器、多通道数据采集仪和监测软件的水泥基压电传感系统,并将其应用到短柱和框架结构的动态响应测试以及交通流的监测等方面。模型实验结果表明,水泥基压电传感系统不仅可以准确地测试结构或构件的动态应力响应,还可以准确地监测交通流(包括人流和车流),并可以通过计算水泥基压电传感器的脉冲响应幅值来区分交通流中车辆的种类。
(3)在结构随机振动理论的基础上推导出结构动态响应的统计特征与结构损伤位置和损伤程度之间的关系,通过敏感性分析确定了以结构动态位移响应方差作为结构损伤识别的损伤指标,分析了使用该损伤指标可以部分消除测试误差的原理。数值模拟了一三跨连续梁在白噪声激励下的动态响应,观察了在不同损伤位置和损伤程度下结构动态位移响应方差的变化,从而评估了选择结构动态位移响应方差作为损伤指标的可行性。
(4)提出了一种基于结构动态响应统计特征的结构损伤识别人工神经网络方法。在人工神经网络结构中,以结构动态响应方差和协方差的变化作为神经网络的输入,以结构的损伤位置和损伤程度作为神经网络的输出。数值模拟了一三跨连续梁的损伤识别过程,其中包含单损伤和多损伤两种损伤工况,每种损伤工况中又分为损伤位置识别和损伤程度识别。数值模拟结果表明,训练好的神经网络可以准确识别出结构的损伤位置和损伤程度,从而验证了所提出的基于结构动态响应统计特征的结构损伤识别人工神经网络方法的有效性与可靠性。
(5)采用所提出的基于结构动态响应统计特征的结构损伤识别人工神经网络方法,对一组两端固结的模型梁进行了结构损伤识别的模型实验。模型梁由铝合金型材制作,模拟带翼缘的薄壁箱梁。在实验中,分别采用单损伤工况和多损伤工况对神经网络进行训练和测试。实验结果表明,经过训练的神经网络可以基本准确地识别出结构损伤位置和损伤程度,从而进一步验证了所提出的基于结构动态响应统计特征的结构损伤识别人工神经网络方法的有效性与可靠性。