• 回答数

    4

  • 浏览数

    106

纯洁的毛灾灾
首页 > 学术期刊 > 国外研究冬奥经济的论文

4个回答 默认排序
  • 默认排序
  • 按时间排序

北京宇盛

已采纳

国外对冬奥会的研究现状?采用文献资料法对国外已有冬季奥运会筹办研究进行综述,成果主要集中在两个方面:第一是冬奥会筹办过程中的核心领域,包括冬奥会筹办的外部保障机制...

354 评论

windy幸福快降临

In Vancouver we are building the 2010 Winter Olympics Athlete's Village to exceptional levels of sustainability. After the games three quarters of the the 1,000+ residential dwellings will be sold at market rates while approximately 250 will become non-market housing for seniors and low income singles and families. This is intended to be a demonstration of the best urban planning, architectural, and engineering practices in the world today and act as the model for future local high-density development. The larger Southeast False Creek neighbourhood, of which the Olympic Village is the first phase, will include an elementary school, a streetcar line, parks, day cares, commercial, retail, office space, at least one grocery store, a community centre, a marina for non-motorized boats and kayaks, and a mixture of subsidized and market housing for 10,000 to 15,000 people, all built to very high levels of environmental sustainability (minimum LEED Silver equivalence).The 16 building, million square foot, single phase Olympic Village is being built to the LEED Gold standard while the Community Centre is being built to LEED Platinum. The building that will become seniors' housing is going to attempt to reach the Net-Zero standard, which represents annual energy, water, and carbon neutrality. All of the buildings will feature green roofs, passive solar design, beyond-code insulation and glazing, and low/no VOC paint and carpets. Rain water will be retained in cisterns to be used for irrigation of the green roofs and landscaping. The buildings will be heated and cooled using an in-slab hydronic system connected to a hybrid district heating/cooling system powered by high-efficiency natural gas boilers and heat exchange system that will use both ground-source heat pipes and an innovative heat exchange system tied into the sewer pipes to recover their latent heat. Electricity comes from local hydroelectric dams. A streetcar will run through the neighbourhood and connect it to two nearby rapid transit stations. All parking is underground and well below average in its parking to dwelling ratio. As an interesting final note, after the Olympics the buyers of the Village’s apartments and rowhouses will be given the names and nationalities of the athletes who stayed in their homes while competing. I think that’s a nice touch.

303 评论

点評狂魔

不知你是否经常看北京晚报,那上面曾经有很多的介绍国外的奥运场馆的后期利用,及中国奥运场馆的利用。大约在鸟巢公众开放的时间左右的那几期...

296 评论

紫茎泽蓝2011

悬赏分很诱惑,但小弟实在无能为力。希望你谅解。

247 评论

相关问答

  • 冬奥精神研究论文

    北京冬残奥会即将于3月4日开幕,残奥健儿们即将登上冰雪赛场,比赛将在北京、延庆、张家口三个赛区同时举行。下面我为大家带来北京冬残奥会精神 作文 ,希望大家喜

    Yun云2870 4人参与回答 2023-12-08
  • 小学生冬奥会项目研究论文

    北京冬奥会的筹备和举办,更是推动中国 文化 传播和塑造国家形象的契机。下面是我整合的2022年北京冬奥会小学生主题 作文 ,一起来看看吧。 2022年北

    我爱鸡爪啊 6人参与回答 2023-12-11
  • 2022北京冬奥会物理论文研究

    答:会采用二氧化碳跨临界直冷制冰系统制冰 1、首次使用二氧化碳作为制冷剂,力求能够贯彻“节俭。绿色、智慧”要点。 2、这个措施将应用于部分场馆,包括但不限于有速

    兔了里个酱酱 6人参与回答 2023-12-09
  • 冬奥主题论文

    2022冬奥会征文1中国人的冬奥情缘2015年7月31日传来好消息,北京成功申办2022年冬奥会。在消息公布的当日,人们十分激动,外面更是锣鼓喧天,鞭炮齐鸣。其

    小吃货圈圈y 7人参与回答 2023-12-08
  • 经济法的国内外研究现状论文

    题目·《对经济法概念、对象、体系的再认识》·《论经济法体系》·《经济法与民法视野中的干预——对民法与经济法关系及经济法体系的研究》·《论建立我国经济法体系的方法

    忘心敛意 2人参与回答 2023-12-08