• 回答数

    4

  • 浏览数

    234

上海阿稀
首页 > 学术期刊 > 地基检测专业论文

4个回答 默认排序
  • 默认排序
  • 按时间排序

petite妮妮崽

已采纳

低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|pile foundation高层建筑 High-rise buildings(分类词汇:环境资源相关 )大型桥梁super-large bridges 深水码头Deep Water Wharf海上石油平台Offshore oil platform建筑结构building structure施工construction非线性弹性材料nonlinear elastic materials桩基工程质量问题这篇虽然是科技论文,但是我觉得他翻译成“pile foundation quality question”很不妥当,我将他修改成problems of pile foundation quality,,从汉语语法之角度考虑,这里的问题两个字是多余的,去掉更好,你自己看看吧!不确定性因素Incertitude Factors基桩Foundation Pile隐蔽性(Impercephbility)axial strain轴向应变研究热点research hotspot(也有用point的)桩身缺陷位置 positions of pile defects定性估计 qualitative estimation混凝土强度等级concrete strength gradethe signal of reflected_wave curve反射波曲线信号工程隐患Project Concealed Harzard一维波动模型one-way fluctuant model控制体(control volume),本构关系 constitutive relationFORTRAN语言编制程序program written in FORTRAN language响应时程曲线波形时程曲线response time history curvePile foundation is widely used as the main basic structure of high-rise buildings,super-large bridges,deep water wharf and Offshore oil platform. During recent years,there are many bases of pile foundation quality affecting the normal working and safety of the building structures. Pile construction has high impercephbility and whose quality presents many incertitude factors,from an angel of qualitative inspection of the foundation piles, it has important significance for ensuring the quality and safety of foundation pile projects to modify the inspection methods and improving the inspection quality and the reliability of inspection & assessment results,it is also one of the research hotspots in foundation pile field. The main functions of low strain reflection wave method is to inspect the pile integrity, such as the judgment of pile defects positions, the checkout of pile lengths, and the qualitative estimation of the concrete strength grade,the judgment of the pile quality using the signal of reflected_wave curve accurately, the elimination of the project concealed harzard,and the estimation of foundation pile quality. This paper studied on the low strain reflection wave method for measuring of pile integrity made of Kelvin nonlinear elastic materials, set up a new one-way fluctuant model to treat the problems of piles made of Kelvin nonlinear elastic materials, gave out a dynamics equation of control volume,and induced the relation between pile axial forces and axial strain using the constitutive relation of one-way nonlinear elastic materials, put forward a new calculation method for the fluctuation of one-way nonlinear elastic materials, simulated the pile-top speed response time history curve (or displacement, acceleration) numerically using program written in FORTRAN language, finally the author set up a curve database of the foundation piles existing integrity problem for the integrity inspection of foundation piles in the future.

248 评论

甜甜的daisy

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of , is also a research heat of realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering to suffer from, carrying on the evaluation to the quantity of the stake of . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

99 评论

最爱的mango

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a 基 engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of 基 examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of 基s, is also a research heat of 基 realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering 隐 to suffer from, carrying on the evaluation to the quantity of the stake of 基 . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a 维 of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a 维 not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of 基 of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

103 评论

赏你五个指头

湿陷性黄土地基处理研究

黄土湿陷性对人类工程活动危害很大,常使建筑物、渠道、库岸、道路护坡造成破坏。以下是我收集整理的湿陷性黄土地基处理研究论文,和大家一起分享。

摘要: 通过梳理湿陷性黄土成因及各地基处理方法的适用范围、优缺点,结合黄韩侯铁路房屋湿陷性黄土地基处理方案的工程实例,以技术经济分析方式,得出了湿陷性黄土地区铁路房屋地基处理的一般方法,对湿陷性黄土地区铁路房屋的修建具有很好的借鉴作用。

关键词 : 湿陷性黄土;铁路房屋;地基处理垫层法;挤密法

湿陷性黄土是一种特殊性质的土,具有在自重或外部荷重下或二者共同作用下,受水浸湿后结构迅速破坏发生突然下沉的性质.它在中国分布广泛,主要集中在山西、陕西、甘肃大部分地区以及河南西部.此外,新疆、山东、辽宁、宁夏、青海、河北及内蒙古的部分地区也有分布,但不连续.

铁路房屋是铁路生产、运营的核心,发挥着指挥、调度、监控、服务等作用,对整个铁路的安全运营起着十分重要的作用,是整体铁路系统中不可缺少的一部分.鉴于湿陷性黄土的危害性和铁路房屋的重要性,在湿陷性黄土地区的铁路站房建设,必须采取处理措施,以保证站房结构的安全.

由于国内对铁路房屋湿陷性处理措施的专项研究和实例介绍不多,本文特从理论与实践相结合的角度对此问题展开论述.

1 黄土的湿陷机理及防止措施

黄土的湿陷性机理

黄土的结构特点和胶结物质的水溶特性决定了黄土湿陷的机理[1].湿陷性黄土是一种非饱和的欠压密土,具有大孔和垂直节理,在天然湿度下,其压缩性较低,强度较高,但遇水浸湿时,土的强度显著降低,在附加压力或在附加压力与土的自重压力下引起的湿陷变形,是一种下沉量大、下沉速度快的失稳性变形.造成黄土湿陷的原因可总结为:

(1)黄土的力学性质从内部改变了黄土在浸水及外部荷载因素下,使剪应力超过抗剪强度,从而发生湿陷.

(2)黄土内部受浸水湿化作用下,使土壤自身摩擦力降低,外部扰动作用诱发湿陷.

(3)黄土内部结构发生崩解,使黄土颗粒间胶结强度弱化,颗粒间相对迁移,并伴随小颗粒进入大间隙.同时由于颗粒间胶结被水溶解,在外部扰动作用下强度已不堪平衡,造成土质结构损坏.

湿陷性黄土的防止措施

黄土湿陷性对人类工程活动危害很大,常使建筑物、渠道、库岸、道路护坡造成破坏.笔者认为,改变湿陷性黄土的结构特性是防止黄土湿陷性的核心,而防止或减小建筑物地基浸水湿陷则是防止黄土湿陷性的关键点.

防止湿陷性黄土地基湿陷的综合措施主要有地基处理、防水措施和结构措施三种.其中地基处理措施主要用于改善土的物理力学性质,减小或消除地基的湿陷变形;防水措施主要用于防止或减少地基受水浸湿;结构措施主要用于减小或调整建筑物的不均匀沉降,或使上部结构适应地基的变形[2].三种措施作用、功能、侧重点各不相同,在实践中要采取以地基处理为主的综合措施,标本兼治,突出重点,消除隐患.

防止黄土湿陷性的地基处理措施主要有以下几种:

(1)垫层法:包括土垫层和灰土垫层,是将基底以下湿陷性土层部分或者全部挖除,用2:8或3:7灰土局部或整片进行换填并分层夯实,适用于消除基底以下 1~3m的湿陷性黄土.具有施工简易、快捷、造价低的优点,但这种措施处理的黄土厚度有限,不适用于较厚的湿陷性黄土地层,还需做好防水,地面水及管道漏水仍可能渗入土层引起不均匀沉降.

(2)强夯法:是反复将夯锤(10~60t)提到一定高度(10~40m)使其自由落下,给地基以冲击和振动能量,从而提高地基承载力、降低其压缩性,改善地基性能.该法设备简单、工期短、节省劳力材料、造价低廉.处理深度一般在3~7m,对非自重湿陷性黄土效果明显.它要求场地有足够空间,对土壤含水量要求高,且施工造成的震动大,对周围建筑有影响,不适宜在城区使用,施工前试验和完工后检验时间长(30d).

(3)挤密法:是用灰土或土层夯实的桩体,形成增强体,与挤密的桩间土一起组成复合地基,共同承受基础的上部荷载.成孔挤密主要有沉管、冲击、夯扩、爆扩等方法,适用于厚度在3~15m的湿陷性黄土,由于桩体和桩间土的双效作用使得挤密法地基处理的整体效果好,不但消除或部分消除了黄土的湿陷性,还提高了地基土的承载力、增强了其水稳性.

(4)预浸水法:宜用于处理厚度大于10m,自重湿陷量的计算值不小于 500mm的场地.浸水结束后,地面6m以下湿陷性可全部消除,地面6m以内湿陷性也可大幅度减小,但该法耗时太长,往往影响工期,需水量也大,缺水地区不适用.浸水使场地周围地表下沉开裂,容易影响附近建筑物的安全,所以规定至既有建筑物的距离不小于50m,而且一般在浸水结束后,还需进行补充勘察工作,重新评定地基土的湿陷性,并采用垫层或其他方法处理上部湿陷性黄土层,无形中增加了成本、延长了工期.

当以上地基处理措施都不能满足设计要求时,可采用桩基础来消除黄土的湿陷性,此法安全可靠,但是投资费用较大.

2 工程实例

铁路车站站房综合楼

黄韩侯铁路新建白水、澄城、合阳北站站房在陕西省渭南市境内,位于陇东—陕北—晋西的湿陷性黄土带上,此地区自重性黄土分布广泛,厚度一般大于10m,地基湿陷等级一般为3~4级,湿陷性较敏感.经现场钻孔检测,三站均为4级自重性湿陷性黄土,与《湿陷性黄土地区建筑规范(GB 50025-2004)》判定一致.以澄城站站房施工场地为例,土层从上至下分布为:

(1)人工填土:厚约.

(2)黏质黄土:厚约,黄褐色,成份以黏粒为主,黏性一般,土质均匀,土体结构疏松,可见针状孔隙及虫孔,含少量钙丝及钙质结核,岩芯呈散块状及短柱状,其中:~含大量钙丝,~含大量钙质结核,具IV级自重湿陷性.fak=150kPa.(3)砂质黄土: 厚约,棕褐色,成份以黏粒为主,黏性一般,土质均匀,土体结构较紧密,可见少量针状孔隙,硬塑,岩芯呈短柱状,具IV级自重湿陷性.fak=150kPa.

经现场探孔检测,白水站和合阳北站站房与澄城站房一样,均为IV级自重湿陷性黄土,且厚度较大.站房为300人小型铁路车站站房,房屋结构采用全现浇钢筋混凝土结构,主体1层,局部2层,建筑高度12m,建筑面积2500m2,设计使用年限为50年,房屋基础采用钢筋混凝土独立基础,地基基础设计等级为丙级.

设计要求处理后复合地基承载力特征值不小于180kpa,桩间土平均挤密系数不小于.

根据现场情况、房屋结构及国家有关规范的要求综合分析测算,对三站站房地基采用灰土挤密桩的方式进行处理.灰土挤密桩材料按2:8配合比,桩径400mm,桩长度为10m,梅花状布桩,桩距900mm.施工完毕后,经检测三站站房复合地基承载力特征值为225kPa,桩间土平均挤密系数大于,地基承载力提升明显,满足设计要求。

单层小型砌体房屋

黄韩侯铁路韩城车站待检室及清扫房位于陕西省韩城市韩城火车站内,拟建房屋地质资料如下:

(1)杂填土:由粉质粘土与大量砖瓦碎片组成,结构杂乱,土质不均,厚约1m,Ⅱ级普通土.

(2)黏性黄土:分布于填土底面以下,黄褐色,硬塑—可塑,虫孔及大孔隙发育,具湿陷性,工程场地均有分布,属中等压缩性土.厚约10m,底部为棕红色古土壤层.Ⅱ级普通土.fak=120kpa,具Ⅲ级自重湿陷性.

待检室及清扫房建筑面积,层数1层,层高,结构形式为砖混,设计使用年限为50年,地基基础设计等级为丙级,基础采用柱下墙下条形基础,要求处理后的地基承载力特征值不小于180kpa.

地基处理采用基底以下换填3m厚3:7灰土垫层,每边宽出基础边不小于,垫层分层夯实,压实系数不小于.用换填法处理地基后,压实系数不小于,地基承载力特征值为195kpa,满足设计要求.

多层框架房屋

(3)黄韩侯铁路芝阳站运转综合房屋,建筑面积,二层框架结构,层高.拟建房屋地质资料为:黏性黄土:浅棕黄—黄褐色,厚度大于 20m,土质均匀,夹有钙质网膜及零星姜石,硬塑,Ⅱ普通土,fak=150kpa,属自重型湿陷性黄土,湿陷等级Ⅳ级,湿陷土层厚度约25~35m.地表水不发育.钻孔深度未见地下水,土壤冻结深度37cm,要求地基处理后复合地基承载力特征值不小于180kpa.

拟采用3:7灰土挤密桩进行地基处理,桩长6m,桩径450mm,等边三角形布桩,桩距1000mm.但由于现场施工场地不能满足灰土挤密桩处理宽度的要求,经计算,将地基处理方案修改为3:7灰土换填处理地基,处理厚度为基底下3m,宽出基础边缘各2m,灰土压实系数不小于.

现场施工完毕后,经检测,地基承载力特征值大于180kpa,满足设计要求.

工程造价分析

从上表可以看出,对铁路房屋的重要建筑如火车站站房由于其重要性宜采用灰土挤密桩进行地基处理以保证其结构的安全性,其他房屋宜采用换填灰土垫层的方法对地基进行处理,相较挤密法既能有效节省工期、又能显著降低造价,可作为铁路一般房屋处理湿陷性黄土的首选方法.

3 结语

(1)本文以陕西黄韩侯铁路房屋湿陷性黄土地基处理为例,针对房屋所处的现场情况和地质条件,论述了采取的垫层法和挤密法的房屋地基处理方案,并进行了经济技术分析,得出了铁路站房适用灰土挤密法、一般房屋适用垫层法进行湿陷性黄土地理处理结论.

(2)目前对湿陷性黄土的研究成果主要集中在地方民建方面,铁路方面主要集中在对路基的'处理方面[3,4],对铁路房屋的研究极少、类型也单一[5].由于铁路房屋的特殊性,下一步应加强湿陷性黄土地区铁路房屋地区地基处理方法的探索和研究,尤其是地方民建较少使用的其他技术(如DDC桩、钻孔灌注桩、震动碎石桩等),注意案例的收集和数据的积累,以推动湿陷性黄土地基处理技术的发展.

(3)在湿陷性黄土地基处理时,要根据《湿陷性黄土地区建筑规范》(GB50025)、《建筑地基处理技术规范》(JGJ79)的要求,结合所建建筑物的特点、地质条件、要求的地基承载力、施工难易程度、节省投资等方面,进行技术经济分析,选择最合适的房屋地基处理方案,避免资源的浪费.

(4)灰土挤密桩的施工机械属大型施工机械,由于成本原因,现在使用的机械都较为陈旧,因此要研究一套切实可行的安全控制方法和安全操作规程,确保施工安全.

(5)湿陷性黄土房屋地基经过地基处理后湿陷性消除或降低,能达到建筑物荷载的要求,但是我们在实践中还应该采取结构(如考虑框架结构,结构内外设置变形缝等)、防水(如扩大站房外散水的宽度、增加防水卷材等)等措施,继续结构、防水、维护这方面的研究和探索,在实践中不断探索防止湿陷性黄土的方法,防止地基湿陷对建筑物的危害.

参考文献:

(1)张晓宇.湿陷性黄土地区建筑的地基处理措施[J].山西建筑,2014(3):76.

(2)GB 50025-2004,湿陷性黄土地区建筑规范[S].79.

(3)摇裕春,李安洪,罗照新,孙莺.郑西客专湿陷性黄土地基处理技术研究[J].铁道工程学报,2013(9):15—19.

(4)赵如意.黄韩侯铁路湿陷性黄土地基处理措施研究与设计[J].科技创新导报,2013(5):113.

(5)袁二丽.湿陷性黄土地段房屋地基处理方案及造价分析[J].铁路工程造价管理,2013(3):8-10.

164 评论

相关问答

  • 专业的论文检测

    靠谱的论文查重网站: 一、中国知网 由清华大学和清华同方发起,在党和国家领导以及教育部、中宣部、科技部、新闻出版总署、国家版权局和国家发改委的大力支持下,在全国

    洛林小叮当 8人参与回答 2023-12-07
  • 地基基础检测毕业论文

    一. 前言生产实习是土木工程专业教学计划中必不可少的实践教学环节,它是所学理论知识与工程实践的统一。在实习过程中,我以一个住宅小区为实习场所,参加工程施工工作,

    吃生鱼片的猫 3人参与回答 2023-12-05
  • 地基基础实验与检测论文

    湿陷性黄土地基处理研究 黄土湿陷性对人类工程活动危害很大,常使建筑物、渠道、库岸、道路护坡造成破坏。以下是我收集整理的湿陷性黄土地基处理研究论文,和大家一起分享

    changyin1116 3人参与回答 2023-12-09
  • 地基测量毕业论文

    建筑施工毕业论文的整理的思路我们可以依据建筑施工毕业的引言、建筑施工中常见问题的现状及危害、建筑施工采用的措施、建筑施工总结四部分内容。其中建筑施工中常见问题的

    helloJ80430 3人参与回答 2023-12-08
  • 测量宅基地毕业论文

    近年来,几乎所有的村庄都经常遇到这样一群人,他们带着自己的设备,甚至测量无人居住的房屋。有时候,因为村子里有更多的房子,他们需要呆几天才能离开。有时候,当村子里

    闹闹美食家 5人参与回答 2023-12-06