首页 > 学术期刊知识库 > 电力系统论文中英文翻译

电力系统论文中英文翻译

发布时间:

电力系统论文中英文翻译

Title:Function Analysis based on the Transformers of Infrared Measuring TemperatureAbstract:Aiming to the traditional handy infrared equipment of measuring temperature used to transformers can't satisfy the requests of intelligent transformers and electricity system a maintenance and monitoring of trasformers' function status. We bring up a system based on the infrared measuring temperature system. Finally it proves that this system can monitor the transformers' function status remotely and analyze the function status by the temperature data and photographs.

1工作原理距离保护 Distance relays use voltages and currents acquired at the relay location to calculate the apparent impedance of the line from relay point to the fault point.距离继电器的使用电压和电流后天在接力的位置来计算的表观阻抗线中继站的故障点。 The calcu- lated apparent impedance Z is compared with the set- ting impedance Zset to decide whether the fault is inter- nal or external.的计算, lated明显阻抗Z是同一套婷阻抗Zset决定是否断层间的信号或外部。 During normal operation, the apparent impedance is generally larger than the Zset.在正常操作期间,明显的阻抗一般大于Zset 。 If the apparent impedance is less than Zset, then it is concluded that a fault has probably occurred in the protected line.如果明显阻抗小于Zset ,那么得出的结论是有可能发生故障的保护线。 Under fault conditions, the distance relay energizes the circuits to trip relevant circuit breakers to isolate the faulted line from the rest of the system[8].故障条件下,距离继电器的电路注入行有关断路器隔离断行的其余部分系统[ 8 ] 。 shows the working principle of distance protection.图1显示的工作原理,距离保护。 The startup element starts protection devices or fault calculating programs when fault occurs in the pro- tected line.启动元件启动保护装置或过失计算程序发生故障时,在亲tected线。 The measuring element, which is the center of distance protection, calculates the line impedance between the fault point and relay point.测量元素,这是中心的距离保护,计算线路阻抗之间的故障点和中继点。 The time delay element determines different time delays according to the result of the measuring element.的时间延迟因素确定不同的时间延迟根据测量结果的因素。 The output element executes the decision of protection.输出内容的决定,执行保护。 2 Configuration of simulation system 2配置的仿真系统 The dynamic simulation system for distance protec- tion proposed in this paper is designed according to its working principle and elementary configuration.动态仿真系统的距离保护法本文提出的目的是根据其工作原理和基本配置。 As shown in , the simulation system is composed of electromagnetic transient computing module, PT & CT module, data reading module, U & I display module, startup module, Fourier algorithm module, phase selec- tion module, impedance computing module, impedance comparison module and so on.图2所示的仿真系统是由电磁暂态计算模块,印尼与CT模块,数据读取模块, ü &余显示模块,启动模块,傅氏算法模块,相选择法模块,阻抗计算模块,阻抗比较模块等。 In this closed-loop simu- lation, the relay trip signal is fed back to control the cir- cuit breaker of power system model.在这个闭环仿真,接力行程信号反馈给控制电路- cuit断路器的电力系统模型。 This closed-loop simulation approach has greatly enhanced the accuracy of simulation and made it possible to simulate the dynamic interactions between power systems and protection systems.这闭环模拟方法,大大提高模拟的准确性和使之能够模拟动态电力系统之间的相互作用和保护系统。 Fault transient computing based on PSB 故障暂态计算的基础上公安局 The PSB was designed to provide a modern design tool that will allow users to rapidly and easily build models that simulate power systems.公安局的目的是提供一个现代化的设计工具,允许用户迅速,方便地建立模型,模拟电力系统。 The blockset uses the Simulink environment, allowing a model to be built using simple click and drag procedures.该模块利用Simulink环境下,允许的模式是采用简单的按一下并拖曳程序。 The libraries contain models of typical power equipment, such as transformers, lines, machines, and power electronics.该库包含型号的典型功耗设备,如变压器,线路,机器,电力电子技术。 These model's validity is based on the experience of the Power Systems Testing and Simulation Laboratory of Hydro-Québec, a large North American utility located in Canada.这些模型的有效性是基于经验,电力系统测试和模拟实验室水电魁北克,大型北美实用设在加拿大。 Matlab and its time domain solver Simulink create a friendly and open system.基于Matlab和Simulink的时域求解创建一个友好和开放的系统。 New models and libraries of power equipments may just be added to this package.新的模式和图书馆的电力设备可能会被添加到该程序包。 In this developing environment, we can finish all kinds of power system simulations[5—7]在此开发环境,我们可以完成各种各样的电力系统仿真[ 5-7 ]

1工作原理距离保护 距离继电器的使用电压和电流后天在接力的位置来计算的表观阻抗线中继站的故障点。的计算, lated明显阻抗Z是同一套婷阻抗Zset决定是否断层间的信号或外部。在正常操作期间,明显的阻抗一般大于Zset 。如果明显阻抗小于Zset ,那么得出的结论是有可能发生故障的保护线。故障条件下,距离继电器的电路注入行有关断路器隔离断行的其余部分系统[ 8 ] 。 图1显示的工作原理,距离保护。启动元件启动保护装置或过失计算程序发生故障时,在亲tected线。测量元素,这是中心的距离保护,计算线路阻抗之间的故障点和中继点。的时间延迟因素确定不同的时间延迟根据测量结果的因素。输出内容的决定,执行保护。 2配置的仿真系统 动态仿真系统的距离保护法本文提出的目的是根据其工作原理和基本配置。图2所示的仿真系统是由电磁暂态计算模块,印尼与CT模块,数据读取模块, ü &余显示模块,启动模块,傅氏算法模块,相选择法模块,阻抗计算模块,阻抗比较模块等。在这个闭环仿真,接力行程信号反馈给控制电路- cuit断路器的电力系统模型。这闭环模拟方法,大大提高模拟的准确性和使之能够模拟动态电力系统之间的相互作用和保护系统。 故障暂态计算的基础上公安局 公安局的目的是提供一个现代化的设计工具,允许用户迅速,方便地建立模型,模拟电力系统。该模块利用Simulink环境下,允许的模式是采用简单的按一下并拖曳程序。 该库包含型号的典型功耗设备,如变压器,线路,机器,电力电子技术。这些模型的有效性是基于经验,电力系统测试和模拟实验室水电魁北克,大型北美实用设在加拿大。 基于Matlab和Simulink的时域求解创建一个友好和开放的系统。新的模式和图书馆的电力设备可能会被添加到该程序包。在此开发环境,我们可以完成各种各样的电力系统仿真[ 5-7 ]

1系统的工作原理,距离保护 距离继电器使用电压和电流继电器位置购入的计算出明显的阻抗继电器点故障点。草拟的液压- Z是比较明显的阻抗匹配阻抗Zset街的设置,来决定是否故障是国际米兰- nal或外部。在正常运行过程中通常是明显的阻抗大于Zset。如果有明显的阻抗比Zset,然后得出错误可能发生在受保护的线。故障,距离传递给线路断路器行程相关的隔离断裂线与其他系统[8]。 图一显示了距离保护系统的工作原理。启动元素开始保护装置或故障计算程序中出现故障时tected亲。测量元件,它的中心距离保护,计算出了故障线路阻抗之间的观点和传递。延时单元决定了不同的时间延迟的结果表明测量元件。输出单元实行决策的保护。 2配置的仿真系统 动态仿真系统的特点,提出了在距离布鲁泰克-兴文章根据其工作原理、基本结构。在图2所示,仿真系统是由电磁暂态计算模块、玻璃纸、CT模块、数据的读取模块,你和我显示模块、启动模块、傅里叶算法模块、相selec -兴模块、阻抗计算模块、阻抗比较模块等。在这个闭环仿真试中的实现形式-螺旋桨,传递之旅信号反馈到控制有关的电力系统cuit——模型。这个闭环仿真方法大大提高了精度仿真模拟,使电力系统的动态互动和保护系统。 故障暂态计算基于寻求帮助 这个PSB用于提供现代设计工具,让用户快速并且容易建立数学模型,模拟电源系统。利用Simulink环境的仿真模型,使得建使用简单的点击并拖动的程序。 这个库包含了模型的典型的电力设备,诸如变压器、线条、机械、电力电子学。这些模型的有效性是基于经验的电力系统的测试和仿真实验室Hydro-Quebec、大量的北美效用位于加拿大。 Matlab的时域求解Simulink和它为你创造一个友好、开放的系统。新模式和图书馆的电力设备可能只是被添加到这个包裹。在这个发展环境,我们就能完成各种电力系统仿真[5 - 7]

电力英语翻译研究论文

做毕设的? 用翻译器翻译一下,再自己改改语序什么的,查查牛津词典看看专业词汇翻得对不对。

Do not cut power belt load replacement high pressure isolator operating method research Abstract: High pressure isolator in the 10kV distribution network indispensable, mainly installs in distribution line's contact point, the partition place, the branch line and so on place, forms the obvious cut-off point in the electric circuit, and participates in the change movement way massively the floodgate operation but actually, therefore presents like this such breakdown unavoidably. Because the live-wire work may create the huge economic efficiency and the social efficiency, therefore in has under the live-wire work premise to be possible to adopt charged processing this kind of breakdown generally, the work method may adopt the belt load or the idling carries on replaces two ways, but considered in reality isolator's damaged condition (sometimes causes isolator to be unable the loss which separation) and the power cut creates, the main method needs to adopt the belt load replacement isolator. Key words: High pressure isolator; Belt load; Replacement

This paper first book according to the mission to system and routes and all load parameter, this paper analyses load development trend. Consult the relevant information design first, collection and research a lot of material, and translate the related foreign material, then analyzed to load, precise calculation and analysis of load growth from the necessity of clarified, then through wipeout of substation of generalization and built to qualify to consider, and through the direction of load data analysis, safety, economy and reliability into consideration, determine the 35kV voltage level 110 kv and worked two approach compared with cable connections to determine the Lord in ways that do the Lord wiring system design, 110 kv side chose to expand inside bridge connection mode, the consumers 10KV single busbar subsection wiring way, then tong ?

This paper first book according to the mission to system and routes and all load parameter, this paper analyses load development trend. Consult the relevant information design first, collection and research a lot of material, and translate the related foreign material, then analyzed to load, precise calculation and analysis of load growth from the necessity of clarified, then through wipeout of substation of generalization and built to qualify to consider, and through the direction of load data analysis, safety, economy and reliability into consideration, determine the 35kV voltage level 110 kv and worked two approach compared with cable connections to determine the Lord in ways that do the Lord wiring system design, 110 kv side chose to expand inside bridge connection mode, the consumers 10KV single busbar subsection wiring way, then through the load calculation and power supply range identified the main transformer sets, capacity and model, with three, determine the transformer capacity as the 50000KVA, SZ10-50000 / type, then the standard 110 to short-circuit calculation method of what value is analyzed and processing. According to the maximum continuous working current and short circuit calculation results of calculation of isolating switch, bus, voltage transformer, current transformer and the selection. On the main transformer in setting calculation and analysis of the lightning part, determine the calculation and analysis, the method, and lightning made corresponding principle diagram. Thus finished 110 kv substations electrical parts of the consumers 10KV/design. 满意不?

论文翻译英译中

有道相对来说要专业些,但是所有的翻译软件包括谷歌都只是翻译成名词性短语,建议译后再检查!

论文翻译,自己翻译的比较靠谱。

He was awarded his PhD for a thesis on industrial robots.

他凭一篇研究工业机器人的论文获得博士学位。

Please write an abstract of this article 〔 thesis 〕.

请写一份这本书〔这篇论文〕的`摘要。

Your thesis wouldn't get across if you used too many technical terms in it.

如果你用了过多的专门术语,你的论文就不会被人理解。

He is writing his doctoral thesis in electrical engineering.

他在写关于电气工程学的博士论文。

付费翻译平台一般都是先支付再翻译,本人找到一家翻译平台,这家一直是专门做pdf阅读器的,因此本人觉得他自动翻pdf也会比较擅长,就预付费翻译了一篇10页左右的pdf,但是花了半个多小时不说,最关键的是翻译效果很一般,又贵,于是果断放弃。找北京译顶科技,性价比高,我就是在那边做的。 统一查下。

电力系统杂志

TM 电工技术 1.中国电机工程学报 2. 电力系统自动化 3. 电工技术学报4.电网技术 5. 电池6. 电源技术7. 高电压技术8. 电工电能新技术9. 中国电力 10. 继电器(改名为:电力系统保护与控制)11. 电力自动化设备12. 电力系统及其自动化学报 13.电力电子技术 14. 高压电器15. 微特电机16. 电化学17. 电机与控制学报18. 华北电力大学学报19. 变压器20. 微电机21. 电气传动22. 磁性材料及器件23.电机与控制学报 24.华东电力25.绝缘材料 26低压电器. 27. 电瓷避雷器28.蓄电池29.电气应用30.大电机技术31.电测与仪表 32.照明工程学报TN 无线电电子学,电信技术 1.电子学报 2. 半导体学报3. 通信学报4. 电波科学学报5. 北京邮电大学学报6.光电子、激光 7. 液晶与显示8.电子与信息学报9.系统工程与电子技术10.西安电子科技大学学报 11. 现代雷达12. 红外与毫米波学报 13. 信号处理14. 红外与激光工程 15半导体光电16. 激光与红外17. 红外技术18. 光电工程19. 电路与系统学报20.微电子学21. 激光技术 22. 电子元件与材料23. 固体电子学研究与进展 24.电信科学25.半导体技术26. 微波学报27. 电子科技大学学报28. 光通信技术29. 激光杂志30. 光通信研究31. 重庆邮电学院学报.自然科学版(改名为:重庆邮电大学学报.自然科学版)32.功能材料与器件学报33.光电子技术34. 应用激光35.电子技术应用 36. 数据采集与处理37.压电与声光38. 电视技术39.电讯技术 40.应用光学 41. 激光与光电子学进展42.微纳电子技术43.电子显微学报

电子技术最著名。

《电力信息化》国家电网办的,编辑部在北京。比较容易发表,不收审稿和发表的费用。免费的。

杂志都是以论文形式发表的,

收录在很多收费的数据库里面。

如果想要的话,可以充一些钱然后进入数据库下载。

你也可以说说你想要哪种类型的论文,我了解的都可以给你说说看。

电力系统中文核心期刊

1.中国电机工程学报;2.电网技术;3.电力系统自动化;4.高电压技术;5.电工技术学报;6.电工电能新技术;7.电力自动化设备;8.电力系统及其自动化学报;9.电池;10.电源技术; 11.电力系统保护与控制;12.电力电子技术;13.中国电力;14.高压电器;15.电机与控制学报;16.微特电机;17.磁性材料及器件;18.电气传动;19.华东电力;20.微电力;21.电化学;22.电瓷避雷器;23.电机与控制应用;24.华北电力大学学报(自然科学版);25.现代电力;26.电气应用;27.绝缘材料;28.变压器;29.电测与仪表;30.大电机技术

评职称用吗可以提供帮助

最新的北大中文核心期刊目录中:能源电力方面期刊有:中国电力、华东电力。电工技术方面期刊有:电网技术、高电压技术、电工电能新技术、高压电器、变压器、蓄电池、华北电力大学学报,这些是与电力供电有关的核心期刊

中国电机工程学报、电工技术学报、电力系统自动化 、电机与控制学报、电力系统及其自动化学报、电气自动化、电测与仪表、电网技术、高电压技术、电池、电源技术 电化学 电工电能新技术、中国电力 、高压电器、继电器、 电力电子技术、变压器、电工技术杂志 电气传动 、中小型电机、 低压电器、 电力自动化设备、蓄电池、微电机、微特电机、大电机技术、华北电力大学学报

  • 索引序列
  • 电力系统论文中英文翻译
  • 电力英语翻译研究论文
  • 论文翻译英译中
  • 电力系统杂志
  • 电力系统中文核心期刊
  • 返回顶部