首页 > 毕业论文 > 桥梁毕业论文外文文献

桥梁毕业论文外文文献

发布时间:

桥梁毕业论文外文文献

Traditional Construction ProceduresAs mentioned before, construction under the traditional construction procedure is performed by contractors. While they would like to satisfy the owner and the building designers, contractors have the main objective of making a profit. Hence, their initial task is to prepare a bid price based on an accurate estimate of construction costs. This requires development of a concept for performance of the work and a construction time schedule. After a contract has been awarded, contractors must furnish and pay for all materials, equipment, power, labor, and supervision required for construction. The owner compensates the contractors for construction costs and general contractor assumes overall responsibility for construction of a building. The contractor engages subcontractors who take responsibility for the work of the various trades required for construction. For example, a plumbing contractor installs the plumbing, an electrical contractor installs the electrical system, and an elevator contractor installs elevators. Their contracts are with the general contractor, and they are paid by the general , in addition to a general contractor, the owner contracts separately with specialty contractors, such as electrical and mechanical contractors, who perform a substantial amount of the work require for a building. Such contractors are called prime contractors. Their work is scheduled and coordinated by the general contractor, but they are paid directly by the also, the owner may use the design-build method and award a contract to an organization for both the design and construction of a building. Such organizations are called design-build contractors. One variation of this type of contract is employed by developers of groups of one-family homes or low-rise apartment buildings. The homebuilder designs and constructs the dwellings, but the design is substantially completed before owners purchase the of the construction procedure often is difficult. Consequently, some owners seek assistance from an expert, called a professional construction manager, with extensive construction experience, who receives a fee. The construction manager negotiates with general contractors and helps select one to construct the building. Managers usually also supervise selection of subcontractors. During construction, they help control costs, expedite equipment and material deliveries, and keep the work on schedule. In some cases, instead, the owner may prefer o engage a construction program manager, to assist in administrating both design and contractors employ labor that may or may not be unionized. Unionized craftspeople are members of unions that are organized by construction trades, such as carpenter, plumber, and electrician unions, Union members will perform only the work assigned to their construction, all work should be inspected. For this purpose, the owner, often through the architect and consultants, engages inspectors. The field inspectors may be placed under the control of an owner’s representative, who may be titled clerk of the works, architect’s superintendent, engineer’s superintendent, or resident engineer. The inspectors have the responsibility of ensuring that construction meets the requirements of the contract documents and is performed under safe conditions. Such inspections may be made at frequent addition, inspections also are made by representatives of one or more governmental agencies. They have the responsibility of ensuring that construction meets legal requirements and have little or no concern with detailed conformance with the contract documents. Such legal inspections are made periodically or at the end of certain stages of construction. One agency that will make frequent inspections is the local or state building department, whichever has jurisdiction. The purpose of these inspections is to ensure conformance with the local or state building is a description of the basic traditional construction procedure for a multistory the award of a construction contract to a general contractor, the owner may ask the contractor to start a portion of the work before signing of the contract by giving the contractor a letter of intent or after signing of the contract by issuing a written notice to proceed. The contractor then obtains construction permits, as required, form governmental agencies, such as the local building, water, sewer, and highway general contractor plans and schedules construction operations in detail and mobilizes equipment and personnel for the project. Subcontractors are notified of the contract award and issued letters of intent or awarded subcontracts, then are given, at appropriate times, notices to construction starts, the general contractor orders a survey to be made of adjacent structures and terrain, both for the record and to become knowledgeable of local conditions. A survey is then made to lay out offices for the contractor are erected on or near the site. If desirable for safety reasons to protect passersby, the required to be removed from the site are demolished and the debris is carted , the site is prepared to receive the building. This work may involve grading the top surface to bring it to the proper elevations, excavating to required depths for basement and foundations, and shifting of utility piping. For deep excavations, earth sides are braced and the bottom is construction starts with the placement of foundations, on which the building rests. This is followed by the erection of load-bearing walls and structural framing. Depending on the height of the building, ladders, stairs, or elevators may be installed to enable construction personnel to travel from floor to floor eventually to the roof. Also, hoists may be installed to lift materials to upper levels. If needed, temporary flooring may be placed for use of the building rises, pipes, ducts, and electric conduit and wiring are installed. Then, permanent floors, exterior walls, and windows are constructed. At the appropriate time, permanent elevators are installed. If required, fireproofing is placed for steel framing. Next, fixed partitions are built and the roof and its covering are put is place,Finishing operations follow. There include installation of the following: ceilings; tile; wallboard; wall paneling; plumbing fixtures; heating furnaces; air-conditioning equipment; heating and cooling devices for rooms; escalators; floor coverings; window glass; movable partitions; doors; finishing hardware; electrical equipment and apparatus, including lighting fixtures, switches, transformers, and controls; and other items called for in the drawings and specifications. Field offices, fences, bridges, and other temporary construction must be removed from the site. Utilities, such as gas, electricity, and water, are hooked up to the building. The sit is landscaped and paved. Finally, the building interior is painted and owner’s representatives then give the building a final inspection. If they find that the structure conforms with the contract documents, the owner accepts the project and gives the general contractor final payment on issuance by the building department of a certificate of occupancy, which indicates that the completed building meets building-code requirements.传统的施工程序众所周知,在传统的施工程序中进行施工的承包商。尽管他们想满足业主和建筑设计师的要求,但是最终还是以赚取利润为主要目标的。因此,他们最初的任务是对编写投标价格的建筑成本进行准确的估计。这就需要进行前期调查的工作并且做出施工时间表。等合约批出后,施工方必须提供所有材料并支付其费用,设备,电力,劳动力。业主此时需要进行必要的监督。一个总承包商承担一个建筑整体的责任。从事分包的承建商则需承担建造工程所需的各个工作。例如,管道承包商安装水管,电业承办商安装电气系统,电梯则由电梯承包商安装。他们与总承包商签订合同,费用由总承包商支付。有时候,除了一个总承包商,还有各种专业承包商,如电气和机械承包商,执行工作时需要与业主签订合同。这种承包商被称为间接承包商。他们的工作,由总承包商协调,但它们都是由业主直接联系。还有些时候,业主可以使用设计建造方法同时兼有设计和建筑施工单位的职能。这些单位被称为设计建造承包商。这方面的一个类型的合同聘用的变化是由一户住宅或低层住宅建筑群的开发。在房屋建筑设计和建造的住房,但设计之前需要由购买房屋的业主完成。施工过程管理往往是困难的。因此,一些业主会去寻求专家的协助,这些专家被称为专业施工经理,他们具有丰富的施工经验。施工经理与总承包商进行谈判,并选择其中一个项目。施工经理通常还监督分包商。在施工期间,它们有助于控制成本,加快运送设备和材料,并保持工作的进度。在依法行政,协助设计和建设的情况下,业主可以选择从事建筑项目经理。建筑承包商雇用的劳动力,一般有大工和小工。大工再建筑工程中从事技术活,如木工,管道工,工会成员和电工工会,小工则执行了分配给他们的工作。在施工期间,一切工作都要验收。因此,业主通过建筑师和监理经常进行督查。可能是名为工程员,建筑师或驻地工程师。作为业主的代表实地视察。核查人员必须确保工程符合合同文件的要求,并在安全的条件下进行的责任。这种检查可作出重复。此外,验收还是需要一个或多个政府机构的代表。他们必须确保工程符合法律要求,并负责检查与合同文件是否一致。这种视察一般定期或在某些阶段施工结束以后进行。地方或国家建设部门具有管辖权。这些检查的目的是确保符合当地或国家的建筑规范。以下是传统多层建筑施工的基本程序。建造开始后合同授予开发商,业主可要求开发商开始施工之前签约给或之后签约发出书面通知的同时另一部分工作继续进行。紧接着施工方根据需要获取建筑许可证,例如当地的建设,供水,污水处理,政府机构和公路部门。总承包商的计划和进度详细施工作业以及动员项目设备和人员。分包商得到通知后,做出签订合同的意向或授予分包合同书,然后给出在适当的时候进行通知。在施工前启动,总承包商要进行的一项调查就是邻近结构和地形,这些都要记录在案,并要熟悉当地情况。这项调查结束以后,随即进行布局建设。承建商的现场办事处都建在施工现场或附近。为了安全起见,必须从脚手架上移除的东西,产生的碎片都要运走。下一步,该网架是为建设工程准备的。这项工作为地下室开挖和基础开挖的深度,以及公用事业管道转移找到正确的标高。深挖掘,土方支撑,底部排出。建筑开始于基础上,然后是承重墙和结构框架的施工。梯子,楼梯,或电梯的安装,可让施工人员往返于各个楼层。此外,可安装卷扬机来运送材料。由于建筑高度的上升,管道,电力管道和线路安装以及永久地板,外墙,窗户和构造的影响。在适当的时候,永久的电梯安装。再需要的情况下可以安装防火卷帘。其次,屋顶等地方也需要安装。精加工工序安装有包括以下内容:天花板,瓷砖,墙板,墙壁镶板,水管装置,加热炉,空气调节设备,加热和冷却室装置;自动扶梯;地板,窗户玻璃;活动板,门;电气设备和仪器,包括照明灯具,开关,变压器,控制器,遵照项目的图纸和规格。外地办事处,围栏,桥梁和其他临时建筑,公共设备,如天然气,电力管道,水管,都连接到建筑上。最后,是建筑物内部的打扫和清洗。业主的代表,会给建设工程作最后检查。如果他们满意并认为符合合同文件,那么业主接受该项目,并交给总承包商的一个占用证书,这表明,总承包商已完成建设,建设部门再根据建筑规范的要求发放最后付款。

关于对高等级公路中小跨径桥梁设计分析论文关键词:墩台;设计;耐久性;结构; 斜交桥 论文摘要: 一般公路中的桥梁常以正交布设为主,但为了满足公路技术标准,应使路线线形流畅、连续,部分桥梁须服从路线走向,不可避免会出现一些斜交桥梁,因此在公路桥梁设计中,斜交桥梁的桥型布置、结构形式的选择是否合理将对桥梁施工难度、结构耐久性及工程造价有较大影响。本文根据多年从事公路桥梁设计工作的经验,总结了中小跨径斜交桥的布设方法,并且指出应根据桥梁所处位置的路线线形、斜交角度、河流情况等因素,通过方案比较,选择合适的桥型布置,从而使斜交桥设计合理、施工方便、经济美观。 一、斜弯桥梁的一般布设 处于弯道中的斜交桥梁设计,一方面,应使桥梁结构简单,构件类型少,尺寸统一,便于机械化生产装配,便于施工,桥型布置应与路线线形协调一致,偏差小。另一方面,应达到经济、适用、美观,与周围环境相协调。桥梁布置孔数为1 孔~2 孔时,墩台一般采用平行布置,上部预制构件采用平行布置,主要优点是同一孔上部预制构件尺寸统一,可减少模板型号,施工方便。当桥梁处于曲线半径较小的弯道上时,采用平行布置会出现少许偏差,对2 孔桥梁墩台宜按折线形平行布置。但前后桥台的轴线与路线的斜交角不同,构造尺寸及斜角也不一致,前后孔墩台尺寸、支座位置、柱距均有差别,设计上相对繁琐,施工也不方便。桥梁布置孔数多于3 孔时,墩台一般采用法向布置,上部预制构件采用径向布置,即各片梁板轴线的端部分别位于同一半径上,此时,同一孔的各片梁板布置不平行,须由铰缝宽度进行调整;主要优点是下部构造尺寸统一,即桥墩帽梁尺寸、支座位置、柱距均相同,上部预制构件尺寸型号一般为单孔桥面布置梁板的片数,因此,桥梁布置孔数较多时,墩台宜采用法向布置,既方便设计,又便于施工。对左右幅分离式斜弯桥的设计,左右幅桥墩台一般应分别进行设计,特别是斜交角度大、曲线半径相对较小时,左右幅桥墩台的尺寸将相差较大,只能以不同的参数控制进行尺寸计算,可推算左右幅桥各自的斜交角后,进行简化设计,才能使左右幅桥墩台布设的误差相应减小,更接近路线线形。 二、斜交桥梁的特殊布设 错台布置:适用于左右幅为分离式斜交桥梁,跨越河道有通航要求。如珠邵高速公路第八合同段中K32 + 大桥,横断面布置为分离式左右幅桥,位于弯道半径R = 1600 m 的曲线上,本桥跨越河流宽度约20 m ,路线与河流的斜交角为150°。本桥设计:限于本工程大、中桥梁采用统一跨径,上部预制构件尽量要求统一,本桥上部构造采用7 孔20 m 预制空心板,下部构造采用钻孔灌注桩基础,如果按河流方向布置桥墩、桥台,可满足河道通航要求,但桥梁构件出现30°锐角构造,其受力极不利,质量难以保证,也不符合规范要求,经多方案比较,最后墩台以斜交角度135°布置,而左右幅桥须采用错台7 m 布设,这样可改善构件的受力条件,也能满足河道通航及河岸上设置机耕路的要求。 设置异形梁板过渡孔:适用于斜跨河流及跨过正交通道的桥梁。如珠邵高速公路第六合同段中K23 + 619. 25 大桥,位于弯道半径R = 1 600 m 的曲线上,本桥跨越河流宽度约72 m ,机耕路、通道多处,路线与河流的斜交角为120°。该桥设计:上部构造采用20 m预制空心板,1 号~7 号孔为斜交110°布置,9 号~38 号孔为正交布置,8 号孔为过渡孔,采用异形板过渡,下部构造采用钻孔灌注桩基础,采用这种方法布设,主要考虑旱桥相对较长,仅在跨越河流部分采用斜交布置,达到降低工程造价的目的。可满足河道通航及河岸上设置机耕路、通道的要求。路线与河流的斜交角较大时采用正交布置:适用于路线与河流的斜交角大于150°且河流不通航的桥梁。如汕遮公路改建工程(左幅为已建成公路,在右侧拓宽,形成上下行公路) 中K15 + 中桥,本桥跨越河流宽度约25 m ,路线与河流的斜交角为150°,原左幅桥上部构造为4 孔13 m 空心板斜交150°布置,下部构造为四柱式墩台;右幅加宽,如果参照左幅桥布置设计,斜交角度太大,不够合理,因此,设计时做深入、细致的研究,基于本桥跨越河道不通航,上部构造采用5 孔13 m 空心板正交布置,下部构造采用二柱式墩台,钻孔灌注桩基础,设计控制右幅桥墩柱位与左幅桥墩沿水流方向一致,避免上部构造空心板、下部构造帽梁出现30°锐角构造,提高结构的性能,施工方便,保证工程质量,且可减少桥梁下部构造工程数量,降低工程造价。 结语 中小跨径斜交桥梁的设计,应根据桥梁所处位置的路线线形、斜交角度、河流情况及工程总体设计要求等诸方面综合考虑,做深入、细致的研究,通过方案比较,选择合适的桥型布置,使斜交桥设计合理,符合规范要求,施工方便,耐久适用,经济美观。 参考文献: 1. 吴香国; 不完整结构屈曲及其可靠性评定方法研究 [D];哈尔滨工程大学; 2006年 2. 张小庆; 结构体系可靠度分析方法研究 [D];大连理工大学; 2003年 3. 沈照伟; 基于可靠度的海洋工程随机荷载组合及设计方法研究 [D];浙江大学; 2004年 4. 孙晓燕; 服役期及加固后的钢筋混凝土桥梁可靠性研究 [D];大连理工大学; 2004年 5. 仲伟秋; 既有钢筋混凝土结构的耐久性评估方法研究 [D];大连理工大学; 2003年 6. 杨则英; 既有钢筋混凝土桥梁安全性耐久性综合评估法研究 [D];大连理工大学; 2004年 7. 禹智涛; 既有钢筋混凝土桥梁可靠性评估的若干问题研究 [D];华南理工大学; 2003年 8. 孙晓燕,黄承逵,孙保沭; 既有桥梁外贴纤维布加固后可靠度分析[J]; 东南大学学报(自然科学版); 2005年03期; 109-114

知道上面传不了,先给你看两个题目:Cost-effectiveness related to the earthquake resisting system of multi-span bridges成本效益与地震有关的多跨桥梁抵抗系统Vibration, control and monitoring of long-span bridges—recent research, developments and practice in Japan日本振动,控制和监测研究,发展大跨度桥梁最新研究与实践上面文献来自Elsevier 数据库 文献不会有Word格式,一般是pdf,你可以转化为Word;桥梁类文献都会有图片的,你不需要的话自己去掉就行了;另外文献一般不会有10-30页这么多,你需要的话我可以传给你,或者你查到其它满意的文献不方便下的话可以找我,我可以通过教育网下载。查外文文献可以在以下数据库中查到:APS美国物理学会期刊数据库Conference Proceedings Citation Index - Science (CPCI-S)Emerald期刊库数据库Essential Science Indicators数据库Encyclopedia Britannica OnlineElsevier 数据库Ei CompendexEBSCO 数据库ICE(英国土木工程师协会)全文期刊数据库I Mech E(英国机械工程师协会)数据库INSPEC科学文摘数据库IEEE/IEE(IEL)数据库ICONDA(国际建筑数据库)Intel Technology JournalIndex to Scientific and Technical ProceedingsJournal Citation Reports on the WebJSTOR西文过刊全文库科技报告数据库LexisNexisLWW数据库MathSciNet美国科学研究出版社免费期刊Marklines全球汽车信息平台(Marklines Automobile Information Platform)MIT & IEEE-Wiley eBooks电子书数据库Nature Geoscience电子期刊数据库nature期刊电子版的回溯档Nature系列电子期刊NTIS数据库netlibrary(ebsco电子图书)网络图书馆NSTL国家科技图书文献中心OSA美国光学学会Optics Infobase数据库OCLC First SearchOVID 数据库OSO牛津在线学术专著数据库OUP牛津期刊数据库PQDD博硕士论文文摘数据库PQDD学位论文全文数据库Royal Society of Chemistry电子期刊数据库REASON睿则恩教育视频数据库Springer电子图书数据库SpringerProtocols实验室指南SpringerMaterials数据库SAGE Knowledge电子书数据库SAGE Premier电子期刊SEG( Society of Exploration Geophysicists) Digital LibrarySocial Sciences Citation Index,Arts & Humanities Citation IndexSciFinder ScholarScience OnlineSpringer LinkSIAM数据库TRANSPORT(交通运输文摘)Taylor & Francis OnlineTaylor & Francis社科期刊数据库Tech science press电子期刊数据库Taylor & Francis科技期刊数据库WorldSciNet世界科技期刊网Ulrich s Periodicals Directory乌里希期刊指南Web of Science(SCI)Wiley-Blackwell电子期刊数据库卓越联盟图书馆知识共享服务平台

土木工程的英文是Civil Engineering ,直译是民用工程,它是建造各种工程的统称。它既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材料设备和进行的勘测,设计施工,保养,维修等专业技术。土木工程随着人类社会的进步而发展,至今已经演变成为大型综合性的学科,它已经出许多分支,如:建筑工程,铁路工程,道路工程,桥梁工程,特种工程结构,给水排水工程,港口工程,水利工程,环境工程等学科。土木工程共有六个专业:建筑学,城市规划,土木工程,建筑环境与设备工程,给水排水工程和道路桥梁工程。土木工程作为一个重要的基础学科,有其重要的属性:综合性,社会性,实践性,统一性。土木工程为国民经济的发展和人民生活的改善提供了重要的物质技术基础,对众多产业的振兴发挥了促进作用,工程建设是形成固定资产的基本生产过程,因此,建筑业和房地产成为许多国家和地区的经济支柱之一。.古代的土木工程有很长的时间跨度,大致从公元前500年新石器时代出现原始的土木工程活动到16世纪末意大利的文艺复兴,导致土木工程走上迅速发展的道路为止,前后经历了两千多年。在这段时间内,由于科学理论发展及其缓慢,土木工程也没有突破习惯的发展。从17世纪中页开始到20 世纪40年代第二次世界大战结束为止的300年间,国外的建筑取得了长足的进步。土木工程进入了定量分析阶段。一些理论的发展,新材料的出现,新工具的发明,都使土木工程科学日渐完善和成熟。到了近代,二战结束之后,许多国家经济起飞,现代科学日益进步,从而为进一步发展提供了强大的动力和物质基础。人们生活水平的不断提高,必然要求越来越舒适的居住环境,在这种情况下,建筑的发展直接推动了土木工程的发展。总的来说土木工程是一门古老的学科,它已经取得了巨大的成就,未来的土木工程将在人们的生活中占据更重要的地位。地球环境的日益恶化,人口的不断增加,人们为了争取生存,为了争取更舒适的生存环境,必将更加重视土木工程。在不久的将来,一些重大项目将会陆续兴建,插入云霄的摩天大楼,横跨大样的桥梁,更加方便的交通将不是梦想。科技的发展,以及地球不断恶化的环境必将促使土木工程向太空和海洋发展,为人类提供更广阔的生存空间。近年来,工程材料主要是钢筋,混凝土,木材和砖材,在未来,传统材料将得到改观,一些全新的更加适合建筑的材料将问世,尤其是化学合成材料将推动建筑走向更高点。同时,设计方法的精确化,设计工作的自动化,信息和智能话技术的全面引入,将会是人们有一个更加舒适的居住环境。一句话,理论的发展,新材料的出现,计算机的应用,高新技术的引入等都将使土木工程有一个新的飞跃.English is the Civil Engineering Civil Engineering, civil engineering is literally, it is the construction of the project collectively. It means building objects that the construction on the ground, underground, water works facilities, equipment and materials to use in surveying, design construction, maintenance, repair and other professional skills. Civil Engineering with the progress of the human society, has been transformed into large integrated disciplines, it has a number of branches, such as : construction, rail projects, road projects, bridge projects, special project structure, water drainage works, the port project, water, environmental engineering disciplines. A total of six professional Civil Engineering : architecture, urban planning, civil engineering, construction and environmental engineering equipment, water drainage works and road bridge Engineering as an important foundation subjects, its important attribute : an integrated, social, practicality, uniformity. Civil Engineering for the development of the national economy and improve the living standards of the people provided important material and technological foundation for the revitalization of many industries played a catalytic role in the construction of fixed assets is a basic production process, the construction and real estate in many countries and regions become a pillar of the economyAncient Civil Engineering has a long time span, roughly 500 years before Christ from the original date in civil engineering activities to the 16 century Italian Renaissance, resulting in the rapid development of the Civil Engineering on the road today, and has experienced more than 2,000 years. During this period, due to the development of scientific theories and slow, there is no breakthrough in civil engineering from 17 pages to 40 years in the 20th century end of the Second World War 300 years, foreign construction made great strides. Civil Engineering has entered a phase of quantitative analysis. Some theoretical development, the emergence of new materials, new tools of invention, the Civil Engineering Science is perfection and maturity. In modern times, after the end of World War II, many countries economic takeoff, the increasing advances of modern science, so as to provide a powerful impetus to further development and material basis. People's living conditions continue to improve, more and more comfortable living environment for the inevitable in the circumstances, the construction of development directly to the Civil Engineering development.

毕业论文桥梁外文文献怎么找

下面分享几个常用的学术网站,可以登陆搜索国内外文献——

1. sci-hub

大名鼎鼎的 sci-hub 是一个由俄罗斯牛人开发的可以下载任意文献杂志的工具,只要输入你想要下载的文献题目、DOI 等信息就可以获取到该文献的真实地址并在线浏览,当然更重要的是可以下载。

2. BASE

BASE 是德国比勒费尔德(Bielefeld) 大学图书馆开发的一个多学科的学术搜索引擎,提供对全球异构学术资源的集成检索服务。它整合了德国比勒费尔德大学图书馆的图书馆目录和大约 160 个开放资源(超过 200 万个文档)的数据。

3. 谷歌学术

免费搜索学术文章的 Google 网络应用。2004 年 11 月,Google 第一次发布了 Google 学术搜索的试用版。该项索引包括了世界上绝大部分出版的学术期刊, 可广泛搜索学术文献的简便方法。

可以从一个位置搜索众多学科和资料来源:来自学术著作出版商、专业性社团、预印本、各大学及其他学术组织的经同行评论的文章、论文、图书、摘要和文章。

4. Library Genesis

Library Genesis 号称是帮助全人类知识无版权传播的计划。网站上论文很多,下载方便,还有很多外文书籍和中文书籍,几乎每天都在更新。这也是一个神奇网站,基本上所有的外文书籍和论文都可以搜到并下载,最近的学术论文也可以下载。

Library Genesis 和 Sci-Hub 可谓患难兄弟,之前都因为爱思唯尔惹上纠纷,而且从 Library Genesis 下载不了的还可以从网页直接链接到 Sci-Hub 下载。

5. 百度学术

涵盖了各类学术期刊,会议论文,旨在为国内外学者提供最好的科研体验。

百度学术搜素可以检索到收费和免费的学术论文,并通过时间筛选,标题,关键字,摘要,作者,出版物,文献类型被引用的次数等细化指标提高检索的精准性。

通过百度学术,都能搜到知网,万方,维普等学术网站的论文,台湾文献的论文也可以收集,其中的一项论文求救功能,相当实用。不过,百度学术只是一个学术信息搜索引擎,如果下载还得到知网等数据库。

6. Cnpiec LINK service

一个方便快捷的查阅国外各类期刊文献的综合网络平台,cnpLINKer 即中国链接服务,目前主要提供约 3600 种外国期刊的目次和文摘的查询检索,电子全文链接及期刊国内馆藏分布查询功能。并时时与国外出版社保持数据内容的一致性和最新性。

外文文献可以通过知网查找,方法如下。

系统:机械革命S3 Pro、Windows10、百度浏览器

1、首先,在知网的检索栏中输入要查询的文章标题,点击检索后。

2、选择页面上的“外文”。检索出来全部的就是外文文献了。

3、接着,点击自己要找的目标文献,接着就会看到跳转到了“CNKI学术搜索”页面。

4、然后,在“Sources”下带有链接图标的就是文章来源。

5、点击后在新页面中找到“PDF”文件。

6、点击就可以下载打开查看正文了。(如果不能打开可能此文章需要付费)。

毕设外文文献查找方法如下:

1、论文:中国知网

中国知网作为是国内毕业生常用的毕业论文检索平台,不仅有学术文献、外文文献、学位论文、还有报纸、会议、年鉴、工具书等各类资源。

同时也收录了大量的论文资料,是我们计算机专业毕业论文不可缺少的网站。而且还提供查重检测系统,清楚了解毕业论文的查重率,更加后期论文的修改。

2、毕设:毕设帮

这个网站是,我们上大学时候,隔壁室友推荐的网站,这个网站有很多成品计算机专业毕业设计,有成品也有定制,还有毕业论文,网站中还有答疑解惑的内容,能更清楚毕业设计需要准备什么,以及如何答辩等干货,算是我的宝藏网站啦。

3、技术:CSDN

学习专业技术,为毕业后从事程序行业做准备的这个网站是很多程序员经常去的社区,还有很多干活资料可以下载,查看,是我在大学中学不到的知识,更具有实操性和普遍性。

4、特效:codepen

想要前端好看,酷炫的页面或特效,自己不会写,怎么办?这个网站可以帮上忙,codepen为你提供各种各样的前端效果。

5、图标:iconfon

毕业设计中想要一些好看的图标,来丰富和美化页面,这个网站真是解放了我们,阿里巴巴图标库里的图标非常的丰富,还可以改变图标颜色,用起来更顺心。

6、页面模板:站长之家

我们很多人对前端页面的设计不在行,那就直接用这个网站的模板,资源很多,也有很多免费啦,简直就是计算机专业的福利啊

桥梁毕业论文文献综述

桥梁与隧道工程论文参考文献

参考义献 这是论文中很重要、也是存在问题较多的一部分。那么,桥梁与隧道工程论文参考文献有哪些呢?下面我为大家收集一些优秀的范例,大家不妨多加参考!

桥梁与隧道工程论文参考文献一

[1] Measor .,New, The design and construction of the Royal Festival Hall, South Bank[J] Journal Instn Civ. Engrs, 1951,36241-318.

[2]曹艳梅,夏禾,王鲲鹏.紧邻既有铁路桥基础施工对行车影响的预评估.铁道学报.(3):95-101.

[3]饶明贵,既有线旁钻孔灌注桩施工方法[J].铁道工程学报.2003,(1):145-149.

[4]罗鹏,邻近既有线路桥梁挖孔桩基础施工安全性分析[J].施工技术与测技术.2008,28 249-252.

[5]吴庆润,邻近既有铁路的.大直径超深钻孔桩施工关键技术[J].地基基础.2012,34 (3):176-179.

[6]朱建才,许明来,朱剑锋,徐日庆,周群建,钻孔桩施工对既有桥桥墩安全性影响试验研究[J].工程勘察.2012,(3): 27-32.

[7] Gunn M J,Yan,R W M. Stress transfer and around a di^)hragm wallpanel [J]. of Geotechnical and Geoenvironmental &igineering, 1998,124(7):638-648.

[8] , , . The Influence Of Pile Group Loading On ExistingTunnels [J], Geotechniqe, 2004,54(6)351 -362.

[9]陈隆,叶涛,群桩施工全过程模拟,工业建筑,2010. (40): 1011-1017.

[10]李智彦,丁振明,钻孔灌注桩施工对邻近桥桩基影响的数值模拟.公路交通科技.2013.(4):70-76.

[11]高晓燕,钻孔灌注桩施工对既有并行高铁线桥梁的影响.山西建筑.2015,(3):163-164.

[12] Ming-Fang, Chang, ., Hong Zhu. Construction effect on toad transfer along bored piles [J].Journal of Geotechnical and Geoenvironmental Engineering, 2004,130(4):426-437.

[13] Burland, LB. Shaft friction of piles in clay-a simple fundamental approach! J]. GroundEngineering. 1973, 6(3): 30-42.

[14] Skempton, . Cast in-situ bored piles in London Clay [J] . Geotechnique, 1959,9(4):153-173.

桥梁与隧道工程论文参考文献二

[15] Meyerhof,GG,Murdock, . An investigation of the bearing capacity of some bored and drivenpiles in London Clay [J].Geotechnique, 1953,3(7)267-282.

[16] Clayton, C. R. I,Milititsky, J. Installation effects and the performance of bored piles in stiffClay[J]. Ground Engineering, 1983,16(2): 17-22.

[17] . , Concrete pressures on formwork. CIRIA association. Report 108,1985.

[18] Lings,., Ng, , . The lateral pressure of wet concrete in diaphragm wallpanels cast und^ bentonite [C]. Civ. Engrs Geotech. Engng, 1994,107:163-172.

[19] Symons, , Carder, D. R. Stress changes in stiff clay caused by the installation of embeddedretaining walls [M]. Retaining structures. Thomas Telford, London, UK, 1993,227-236.

[20] DeBeer E E & WaOays M. Forces induced in piles by unsymmetrical surcharges on the soilaround the pfles[A]. Proc 5thECSM FE[C].Madrid :1972,325-332.

[21] Leussink, K And Wenz, ., 1969,Storage Yard Foundatio on Soft Coheesive , Seventh international Conference on Sofl Mechanics,\bL9,1972,149-155.

[22] tfcyman L,Boersm a F. Bending moments in piles due to lateral earth pressure[A].Proc 5ThICSMFE[C], Paris:1961:425-429.

[23] Wenz K P. Large scale tests for determination of lateral loads on piles in soft cohesive soils[A].Proc 8thICSMFE[C]. Moscow:19732-5.

[24]梁发云,于峰.土体水平位移对邻近既有桩基承载性状影响分析.岩土力学,2010,32:449—454.

[25]杨敏,朱碧堂,陈福全.堆载引起某厂房坍塌事故的初步分析[J].岩土工程学报,2002^24(4): 446-450.

[26]张陈蓉,黄茂松,李早.被动群桩的分析方法与验证[C].中国土木工程学会第十届土力学及岩土工程学术会议论文集.重庆:重庆大学出版社,2007.

[27] Matsui hong W P& I to T. Earth pressure on piles in a row due to lateral soil movements [ J]. Soiland Foundations. 1982,22( 2):71-81.

[28] Poulos H G, Chen L T& Hull T S. Model tests on single piles subjected to lateral soilmovement[ J]. Soil and Foundations. 1995,35(4) :85-92.

设计结构主体,框架结构简单的介绍,主要的原辅材料,建造的前后工序步骤,功能构件的构思,安全防护的考量,满足通行功能的设计上限(包括:车辆日通行量、非正常状态下可承受重量的上限),抗山洪冲击的等级(多少年一遇的标准或者是每平方米多少个兆帕的标准)。桥上楼阁的主体结构样式,楼阁的原辅材料,楼阁的建造工序,楼阁的装修风格,楼阁实际可使用的内部容积和面积。重点要突出在桥梁上建造楼阁的独创特色,以及要引用古今中外众多楼桥的结构特点,并突出这个项目与其他众多类似项目相比的独到之处。北门新桥是我们家乡新建的桥梁,其建造和装修风格可以说是开创了本地乃至本省桥梁建设的先河,从桥墩的土建工程一直到漆面的描画,完全摒弃传统的桥梁或亭台楼阁的建造元素,在建造的过程中不断采用新方法、新工艺、新技术、新材料以及新思维。这座桥梁的筹建过程也非常曲折,自从三年前这座几十上百年的桥梁被洪水冲垮以来,本村、镇以及市委相关部门多次会商修缮、加固桥梁的事宜,怎奈因为资金、技术、气候、土地归属等问题,此事一直搁置不前。建造桥梁的资金完全采取民间集资、捐款、乐助的方式解决,期间有几位大企业家个人出资几百万,我们感到万分感谢和荣幸!同时,随着这座新桥的落成,与新桥宽阔的桥面形成鲜明反差的是桥两边原本狭窄的道路就成了交通通畅的瓶颈,近日本村与市政府商议对两侧的道路进行拓宽美化,顺便推进本市旧城改造的进程,这不可谓不是一件幸事。我希望你能很好向世人表现它的不凡气度与精湛工艺。先谢谢你!

历史桥梁毕业论文参考文献

桥梁与隧道工程论文参考文献

参考义献 这是论文中很重要、也是存在问题较多的一部分。那么,桥梁与隧道工程论文参考文献有哪些呢?下面我为大家收集一些优秀的范例,大家不妨多加参考!

桥梁与隧道工程论文参考文献一

[1] Measor .,New, The design and construction of the Royal Festival Hall, South Bank[J] Journal Instn Civ. Engrs, 1951,36241-318.

[2]曹艳梅,夏禾,王鲲鹏.紧邻既有铁路桥基础施工对行车影响的预评估.铁道学报.(3):95-101.

[3]饶明贵,既有线旁钻孔灌注桩施工方法[J].铁道工程学报.2003,(1):145-149.

[4]罗鹏,邻近既有线路桥梁挖孔桩基础施工安全性分析[J].施工技术与测技术.2008,28 249-252.

[5]吴庆润,邻近既有铁路的.大直径超深钻孔桩施工关键技术[J].地基基础.2012,34 (3):176-179.

[6]朱建才,许明来,朱剑锋,徐日庆,周群建,钻孔桩施工对既有桥桥墩安全性影响试验研究[J].工程勘察.2012,(3): 27-32.

[7] Gunn M J,Yan,R W M. Stress transfer and around a di^)hragm wallpanel [J]. of Geotechnical and Geoenvironmental &igineering, 1998,124(7):638-648.

[8] , , . The Influence Of Pile Group Loading On ExistingTunnels [J], Geotechniqe, 2004,54(6)351 -362.

[9]陈隆,叶涛,群桩施工全过程模拟,工业建筑,2010. (40): 1011-1017.

[10]李智彦,丁振明,钻孔灌注桩施工对邻近桥桩基影响的数值模拟.公路交通科技.2013.(4):70-76.

[11]高晓燕,钻孔灌注桩施工对既有并行高铁线桥梁的影响.山西建筑.2015,(3):163-164.

[12] Ming-Fang, Chang, ., Hong Zhu. Construction effect on toad transfer along bored piles [J].Journal of Geotechnical and Geoenvironmental Engineering, 2004,130(4):426-437.

[13] Burland, LB. Shaft friction of piles in clay-a simple fundamental approach! J]. GroundEngineering. 1973, 6(3): 30-42.

[14] Skempton, . Cast in-situ bored piles in London Clay [J] . Geotechnique, 1959,9(4):153-173.

桥梁与隧道工程论文参考文献二

[15] Meyerhof,GG,Murdock, . An investigation of the bearing capacity of some bored and drivenpiles in London Clay [J].Geotechnique, 1953,3(7)267-282.

[16] Clayton, C. R. I,Milititsky, J. Installation effects and the performance of bored piles in stiffClay[J]. Ground Engineering, 1983,16(2): 17-22.

[17] . , Concrete pressures on formwork. CIRIA association. Report 108,1985.

[18] Lings,., Ng, , . The lateral pressure of wet concrete in diaphragm wallpanels cast und^ bentonite [C]. Civ. Engrs Geotech. Engng, 1994,107:163-172.

[19] Symons, , Carder, D. R. Stress changes in stiff clay caused by the installation of embeddedretaining walls [M]. Retaining structures. Thomas Telford, London, UK, 1993,227-236.

[20] DeBeer E E & WaOays M. Forces induced in piles by unsymmetrical surcharges on the soilaround the pfles[A]. Proc 5thECSM FE[C].Madrid :1972,325-332.

[21] Leussink, K And Wenz, ., 1969,Storage Yard Foundatio on Soft Coheesive , Seventh international Conference on Sofl Mechanics,\bL9,1972,149-155.

[22] tfcyman L,Boersm a F. Bending moments in piles due to lateral earth pressure[A].Proc 5ThICSMFE[C], Paris:1961:425-429.

[23] Wenz K P. Large scale tests for determination of lateral loads on piles in soft cohesive soils[A].Proc 8thICSMFE[C]. Moscow:19732-5.

[24]梁发云,于峰.土体水平位移对邻近既有桩基承载性状影响分析.岩土力学,2010,32:449—454.

[25]杨敏,朱碧堂,陈福全.堆载引起某厂房坍塌事故的初步分析[J].岩土工程学报,2002^24(4): 446-450.

[26]张陈蓉,黄茂松,李早.被动群桩的分析方法与验证[C].中国土木工程学会第十届土力学及岩土工程学术会议论文集.重庆:重庆大学出版社,2007.

[27] Matsui hong W P& I to T. Earth pressure on piles in a row due to lateral soil movements [ J]. Soiland Foundations. 1982,22( 2):71-81.

[28] Poulos H G, Chen L T& Hull T S. Model tests on single piles subjected to lateral soilmovement[ J]. Soil and Foundations. 1995,35(4) :85-92.

大型桥梁运架设备安装中的直线度测量 精测公司 李学仕 【摘 要】 本文介绍了杭州湾跨海大桥50m预制箱梁运架设备安装过程中,应用导线法测量设备构件直线度的方法。 【关键词】 导线法 直线度 安装测量 杭州湾跨海大桥 杭州湾跨海大桥(全长36km)50m预制箱梁的制、运、架大型设备统称五大设备,其尺寸庞大, 结构复杂,安装精度要求高,均采用工厂制造构件,运输到现场再安装的方式;其中长大构件组装连接后的直线度(保持各点在一条直线上,不产生平面弯曲)是控制设备安装精度的一项重要指标,需要在安装过程中不断监控测量,及时提供实时数据,以指导安装施工。一般情况下,测量直线可在直线的端头置镜,瞄准直线方向,检查直线上的点,即可及时知道直线度情况;如果在直线上因地形条件限制而无法架设测量仪器时,如何快速测量直线度和保证测量精度呢?设备安装应属工业安装测量问题,但桥梁运架设备须在施工现场安装,我们采用工程测量方法解决了这一问题。本文介绍在杭州湾跨海大桥50m箱梁运架设备安装过程中应用导线法测量设备构件直线度的方法。 1 实现原理 图 1 测量直线度就是确定测点到直线的偏移距离。在待测直线外任意P点置镜,选择待测直线上A、B两点(可选择两端点)作为直线控制点(如图1),建立以A点为原点,AB连线为X轴正向的坐标系(简称A坐标系),易知在该坐标系下的Y坐标就是距AB直线方向的偏离值。 利用全站仪先测量出直线控制点A、B到置镜点P的距离S1、S2和角度a,即可计算出在上述坐标系下的P点坐标和PB或PA的方位;然后在全站仪中设置测站坐标和方位(定位与定向),即可直接测量直线上其他点的坐标,以直观分析各测点相对于直线AB的偏离程度(直线度)。 P点坐标计算方法,这里介绍利用导线法计算。首先建立一个临时坐标系(简称P坐标系),以P为坐标原点,PA连线为X轴的正向,由测量的距离和角度计算出A、B的临时坐标以及AB、PB、PA的方位,然后根据方位差计算PA、PB在A坐标系中的方位以及P点的坐标。 在上述临时坐标系中:P点的坐标(0,0),PA的方位=0,A点的坐标(S1,0);PB的方位=a,B点的坐标[S2×cosa,S2×sina];AB的方位=w,由AB坐标反算得到。 在A坐标系中,AB的方位=0,则根据P坐标系中的方位关系得到:PA的方位=-w,PB的方位=a-w,从而P点的坐标X=-S1×cosw,Y=S1×sinw。 在作业现场上述计算可以利用程序型计算器计算快速得到,如使用Casio fx4500计算的代码 为:EFA (E=S1,F=S2,A=a) Pol(Fcos(A)-E,Fsin(A))n(AB的距离S) n(PB的方位) X=-Ecos(W)n(P点的坐标) Y=Esin(W)n 2 精度分析 由上述建立的坐标系可知,直线度的误差即测量中主要看观测点Y坐标误差。 根据公式Y=Yp+S×sinα,可知主要误差来源是距离误差、方向误差和定向误差。观测时,采 用配套小棱镜,直接对中观测目标,对中误差极小;观测距离不长,一般在60m以内,同一气象条件下,测距精度较高;同时很容易觇准目标,方向观测精度较高。在仅顾及观测误差影响的情况下,Y的中误差:m2y=sin2αm2s+S2cos2αm2α若设:ms=1mm,mα=4〃,S=60m,上式若取m2y=m2s+S2m2α,可以得出my最大误差也不过1•5mm。 杭州湾跨海大桥50m箱梁运架设备的直线度、铅直度安装精度一般要求达到5mm,此为极限 误差,则安装总中误差为2•5mm,包括安装和测量误差。根据测量误差取安装误差的1/ 2倍的原则,得到测量误差为安装总误差的1/ 3倍,即测量误差为2•5/ 3=1•4mm。可见上述测量方法是可以达到测量要求的。 3 操作方法 在待测直线外适当地点(大致在直线中间部位)架设好仪器;全站仪照准A点,方向置零,测量 距离S1;照准B点,测量角度a和距离S2,保持仪器不动;利用计算器计算A坐标系中P点的坐标和PB的方位,输入到全站仪中;开始从B到A测量直线上的点坐标并记录数据。 4 测量应用 (1) LGB1600架桥机 LGB1600架桥机主要结构是其沿桥梁方向左右两大机臂,均为110m长的矩形钢框架梁(截面尺寸为宽2•2m×高3•2m)。两机臂由前后两端钢横梁联系。每条机臂分为10段,长度分别为11•88m×9+4•3m,各段之间用钢板螺栓连接。 拼装时,先拼装为3大段(3节+3节+4节),再将3大段依次连接起来。构件体形庞大,各大段拼装以及三大段整体拼装时会产生线性扭曲,为使结构按设计精度安装(直线度要求5mm以内),需要在连接螺栓进行初拧前、终拧前以及终拧后对机臂进行直线度测量,而更多的是在安装调整过程中进行实时测量,要求较快测量出数据。机臂尺寸较大,在大臂外没有位置架设测量仪器,但可架设在机臂顶面,采用导线法建立以大臂纵向为X轴的坐标系,根据测量得出的Y坐标,可方便地看出大臂的弯折情况。终拧后的测量结果数据将作为安装竣工数据进行构件空间结构模拟演算。 在大臂顶面有两股运梁小车走行轨道,中心间距为2m(制造精度较高)。同时测量两股轨道对 应点,由Y坐标差可检验测量精度。从测量结果看,间距最大相差2mm,从而验证了用该方法测量的结果是可靠的。 提梁机台车主梁的上下弦杆直线度测量 ML800提梁机 ML800提梁机(见图3)由主梁、刚性支腿和柔性支腿以及走行小车等组成,主梁为钢桁架,其尺寸为长64m×宽4•7m×高8•5m。上下弦杆均由六段截面为工字型的钢构件螺栓连接组成,安装时,需要对各弦杆各段间的连接点进行直线度测量(直线度要求为5mm)。建立以主梁纵向为X轴的坐标系,用导线法测量各节点的坐标,可以方便的得出各节点连线的直线度情况。 (3)提梁机台车主梁上下弦杆连接立柱垂直度测量 提梁机台车主梁上下弦杆用斜撑和立柱连接,安装时需要对立柱相对于主梁纵横向的倾斜进 行测量(上下对应点在平面上的投影纵横向距离要求5mm内)。使用导线法,同样建立以主梁纵向为X轴的坐标系,分别测量立柱的上、下端对应位置的平面坐标,比较纵横坐标差值,可以迅速得到每根立柱的倾斜状态,以及各立柱之间的相互倾斜状态,及时安装调整到正确位置。 (4)提梁机刚性支腿安装测量 提梁机左侧的刚性支腿(高度27•3m)在安装时平放在地面上如图4所示,C、D、E、F处于同一个平面内(连线尺寸为4m×7•5m),与主梁安装好以后在同一水平面,均为带螺孔的钢板与主梁对应螺拴钢板对位连接;与地面轨道走行台车连接端的A、B(距离15m)为带销孔的钢板,与走行台车上对应销子相连接,安装后处于水平,与CDEF平行。安装时平放地面,需要控制AB与CD及CDEF平行,且CDEF钢板处于同一平面内(此时为竖直面)。 同样使用导线法测量,建立以A为原点、AB为X轴的坐标系,测量C、D、E、F的坐标,即可知道C、D、E、F是否处于同一竖直面内(据Y坐标)以及是否与AB平行。 5 结语 应用导线法测量大型设备的直线度、铅直度,可以方便、快速的获得准确测量结果,及时为现场安装施工提供可靠数据,为杭州湾跨海大桥50m箱梁五大设备顺利安装投入使用、确保架梁工期赢得了宝贵时间。 参 考 文 献 1 李青岳、陈永奇•工程测量学•测绘出版社;1995•5

道路 桥梁浅论梁【bridge】指的是为道路跨越天然或人工障碍物而修建的建筑物。桥梁一般讲由五大部件和五小部件组成,五大部件是指桥梁承受汽车或其他车辆运输荷载的桥跨上部结构与下部结构,是桥梁结构安全的保证.包括(1)桥跨结构(或称桥孔结构.上部结构)、(2)支座系统、(3)桥墩、(4)桥台、(5)墩台基础.五小部件是指直接与桥梁服务功能有关的部件,过去称为桥面构造.包括(1)桥面铺装、(2)防排水系统、(3)栏杆、(4)伸缩缝、(5)灯光照明.桥梁的分类:按用途分为公路桥、公铁两用桥、人行桥、机耕桥、过水桥等。按跨径大小和多跨总长分为小桥、中桥、大桥、特大桥。按结构分为梁式桥,拱桥,钢架桥,缆索承重桥(斜拉桥和悬索桥)四中基本体系,此外还有组合体系桥按行车道位置分为上承式桥、中承式桥、下承式桥按使用年限可分为永久性桥、半永久性桥、临时桥按材料类型分为木桥、圬工桥、钢筋砼桥、预应力桥、钢桥桥梁分类 多孔跨径总长L(米) 单孔跨径L0(米)特大桥 L≥500 L0≥100大桥 L≥100 L0≥40中桥 30

序号 文献标题 文献来源 年期 来源数据库 1 浅析道路与桥梁中的超限运输 硅谷 2008/06 中国期刊全文数据库 2 坚持“双向服务” 发挥桥梁和纽带作用——广州道路运输行业协会 广东交通 2007/06 中国期刊全文数据库 3 洛阳市人民政府办公室关于印发全市道路桥梁隧道排查及隐患集中整治专项活动实施方案的通知 洛阳市人民政府公报 2008/03 中国期刊全文数据库 4 城镇道路桥梁设计规范 岩土力学 2008/02 中国期刊全文数据库 5 市政道路与桥梁施工质量问题探讨 科技创新导报 2008/07 中国期刊全文数据库 6 道路与桥梁专业顶岗毕业实习的实践与思考 职业技术 2008/03 中国期刊全文数据库 7 发挥桥梁和纽带作用——访河南省焦作市道路运输协会 商用汽车 2008/04 中国期刊全文数据库 8 道路桥梁工程专业毕业设计的探索 黑龙江科技信息 2008/13 中国期刊全文数据库 9 黄河水院道路桥梁工程技术专业进入国家“高职211”示范建设专业 黄河水利职业技术学院学报 2008/02 中国期刊全文数据库 10 黄河水院道路桥梁工程技术专业进入国家“高职211”示范建设掠影 黄河水利职业技术学院学报 2008/02 中国期刊全文数据库 共有记录186条 上页 下页

道路桥梁毕业论文高架桥

既然你这么急,给你推荐一个人吧 他能帮你的,很快Q9281 06483

毕业设计指导书(桥梁工程设计)2007年4月I、毕业设计的目的毕业设计是教学计划中的一个重要的教学环节。要求学生综合运用所学基础理论、专业理论和基本技能(包括实践知识),按照任务书的要求,独立地解决常用桥梁的设计、计算及施工方案等方面的问题,目的在于:1. 巩固和系统加深已学到的理论知识和实践知识;2. 培养学生根据相应的设计规范、手册及参考书等进行设计工作的能力;3. 提高学生的运算能力和绘图的基本技巧。II、毕业设计的内容以下按毕业设计的内容进行说明。一、桥梁初步设计学生根据《设计任务书》的要求和具体情况,做第一阶段初步设计。初步设计需着重完成:桥梁的总体规划,初步拟定桥梁结构的主要尺寸、估算工作数量,提供主要材料的用量和全桥造价的概算指标等一系列工作。具体内容包括:(一)调查桥梁的使用任务、桥位附近的地形、地质、水文情况(此部分内容在《设计任务书》中有所反映),了解当地建筑材料来源和施工单位的技术水平与施工机械等情况。(二)选择桥位:一般地,桥位的选择,原则上应服从路线的总方向,路桥综合考虑。(三)桥梁纵、横断面设计:包括桥梁总跨径的确定,桥梁分孔、桥面标高与桥下净空,桥上及桥头的纵坡布置等。(四)选择墩、台及基础型式。(五)初步拟定上、下部结构各部分主要尺寸。(六)明确桥面构造措施。完成上述步骤后,即可绘制方案与编制说明书。初步设计方案图应按三视图绘制纵向立面图与横向剖面图,并加纵向平面图。其中纵向立面图与平面图的比例尺应相同,可采用1:1000~1:500;对于剖面图,为清晰起见比例尺可用大一些,如1:200~1:150,视图幅地位而定。1. 立面图中应标明:(1) 桥梁总长度;(2) 桥梁结构的计算跨度;(3) 台顶高度与桥台斜度;(4) 枯水位、常水位、通航水位与计算洪水位;(5) 桥面纵坡以及各控制点的设计标高,如基础标高、墩(台)帽标高、桥面标高、通航桥孔的梁底标高等;对于桥下有通航(或通车)要求的桥孔,需用虚线标明净空界限框图;(6) 注明桥台与桥墩的编号,自左至右按0、1、2……顺序编号(0号为左桥台)。2. 在横剖面图中应标明行车道宽及桥面总宽、主梁(或拱肋的间距、或墩台)的横向尺寸,横坡大小,并绘出桥面铺装与泄水管轴线等。3. 平面图中需注明主要平面尺寸(栏杆、人行道与行车道、墩台距离等),对城市道路桥梁还要求标明管线位置。初步方案图中还应列出各方案的主要材料数量,并加附注说明采用的规范名称与荷载等级。本桥进行设计的任务,编制初步设计方案的根据原则,孔径计算,工程材料估算及其依据,应及时整理成说明书,要求言简意赅,其中引用的文献资料名称以及冗繁的计算过程,均列附录备查。二、技术设计桥梁结构设计的一般方法是,首先凭借经验或修改已有设计作出初始方案,对于现行公路桥梁用得较多的普通钢筋混凝土或预应力混凝土结构,先应找出控制断面,求出各控制断面的内力并绘出包络图,然后进行配筋设计。接着是判别是否满足规范的要求,如不满足规范的要求则应修改设计。设计的过程是:设计、校核、修改设计、再校核,反复进行几次,直至较好地满足规范的要求。这部分的设计主要训练学生正确拟定结构构造,进行上下部结构的力学分析,构件截面设计与连接设计,进行刚度与稳定性验算,进一步了解与应用《桥涵设计规范》,查阅与应用有关参考资料,最后要求绘制结构施工图。技术设计大体上可按如下步骤进行:(1) 在初步设计方案的基础上拟定细部构造和尺寸;(2) 分组进行恒载和活载计算;(3) 内力分析以及内力组合;(4) 配筋计算;(5) 绘制施工图。具体的计算步骤需编程进行。设计计算完成后要求绘制施工图,内容包括:(1) 桥面板配筋构造;(2) 主梁(或拱肋)配筋和模板图,对预应力混凝土梁还须绘制预应力钢束构造图;(3) 横隔梁配筋图及连接构造详图(对桁架拱桥则为剪力撑配筋图);(4) 墩(台)帽结构详图;(5) 人行道及栏杆构造图。各结构施工图比例尺按图幅设计布置在1:100~1:10之间,大比例尺用于局部大样图。技术设计必须在绘图后及时整理一份设计计算说明书,最后连同结构施工图及初步方案设计说明书一起,呈交指导教师。要求计算准确,图面规范。III、毕业设计时间安排按学校的时间安排进行。如果学校没有时间安排,则按初步设计2周、技术设计8周、答辩准备及答辩共1周安排设计进度。IV、主要参考书籍资料1. 公路工程技术标准(JTG B01-2003).人民交通出版社,. 公路桥涵设计通用规范(JTG D60-2004).人民交通出版社,. 公路钢筋混凝土及预应力混凝土桥涵设计规范(JTG D62-2004). 人民交通出版社,. 公路圬工桥涵设计规范(JTG D61-2005).人民交通出版社,. 公路桥涵设计手册《基本资料》. 人民交通出版社,. 公路桥涵设计手册《梁桥》. 人民交通出版社,. 公路桥涵设计手册《拱桥》. 人民交通出版社,. 公路桥涵设计手册《墩台与基础》. 人民交通出版社,. 公路桥涵标准图(部分).10. 范立础主编. 预应力混凝土连续梁桥. 人民交通出版社,. 匡文起等. 结构矩阵分析和程序设计. 人民交通出版社,1991.

毕业论文怎么写?首先要弄明白作格式,其次是选题,再次是确定立意,最后是材料搜集和写作。一、毕业论文格式:1、标题。首行居中,字号一般比正文大两号。2、作者。标题下一行,居中,字号比标题小一号。3、摘要。一般100-200字内。字号同正文。4、关键词。即文章核心词的提炼,能体现文章中心。字号同正文。5、正文。毕业论文字数一般不低于3000字。字号5号。6、参考文献。二、毕业论文选题。你可以到百度上搜一搜与你相关的学科论文题目,你会从中获得很大启迪。三、毕业论文立意。你可以在比较中找到别人还没说到或说得不全面的地方作为自己的立意方向。四、材料搜集。就是搜集能证明自己立意的素材。可以通过图书搜集,也可以通过百度查找。五、毕业论文写作。要注意格式正确,用语规范,条理清晰,论证充分。

施工组织设计是施工企业积极参与市场竞争,承揽建设项目,编制投标文件的重要组成部分。下文是我为大家整理的关于工程施工组织设计 毕业 论文的 范文 ,欢迎大家阅读参考!工程施工组织设计毕业论文篇1 《分析公路桥梁工程施工组织设计》 摘要:根据国家经济建设十二五的规划,高速公路建设作为带动经济、惠民的基建项目,也得到了前所未有的发展。桥梁施工组织设计作为高速公路建设的重要组成部分,结合公路施工的特点如何编制出即保质量又经济的精细化公路桥梁施工组织设计,是高速公路建设中的重点工作。 关键词:公路桥梁工程;施工组织设计 引言: 随着我国经济的飞速发展,使高速公路建设成本、质量控制也被人越来越关注,桥梁作为公路中重要组成部分,随着交通运输量的显著提高 ,其保证质量在公路建设中的重要性也颇显突出,而桥梁施工组织设计对保证工程质量起到了关键的作用。 1.工程概况 本工程为某高速公路河口至双凤段第十四合同段,位于郁南县境内,路线经历洞镇农林村,沿线X472县道、村道及机耕便道经过,交通不方便。本合同段全长,起迄里程为K87+850~K92+150,总工期要求26个月,其中桥梁18个月。桥梁工程:含有大中桥梁11座,依里程桩号分别为龙庆宫高架桥、石排口高架桥、竹粒高架一桥、竹粒高架二桥、RK90+412中桥、RK90+545中桥、白石岭中桥、路下寨高架桥、路下寨跨线桥、大用跨线桥、连城河大桥。 现以连城河大桥和路下寨跨线桥为例介绍工程概况: 连城河大桥(里程:K98+600~K99+120) 连城河大桥在路线上处于整体式路基段,左、右幅桥梁布置不等长,在大桩号处有40m长属于半路半桥设计,左幅中心里程K98+840,桥跨组合12×40,桥长,右幅中心里程K98+855,桥跨组合13×40,桥长,上部构造为预应力砼先简支后连续刚构T梁。 桩基 桩直径为φ150cm、φ180cm、φ200cm,桩长为16 m~44m,桩基性质属嵌岩桩与摩擦桩,桩基共56根。 墩柱 采用实心薄壁单墩式桥墩,墩高 m~30 m,墩柱宽度均为,厚度分为两种,分别为160 cm厚墩柱配两根φ180cm桩基及180cm厚墩柱配两根φ200cm桩基,墩顶为变截面盖梁,桥台为柱式台。 上部构造 40m预应力砼先简支后连续刚构T梁 1. 2路下寨跨线桥(里程:K95+090~K95+560) 本桥主线跨县道X472,路线上处于整体式路基段,由于起点连接黄茅冲隧道,桥梁前段对应隧道路线设置,中央分隔带为,然后渐变到3m,左幅中心里程K95+325,桥跨组合30+11×40,桥长,右幅中心里程K95+327,桥跨组合26+11×40,桥长,上部构造为预应力砼先简支后连续刚构T梁。 桩基 桩直径为φ150cm、φ230cm、φ250cm,桩长为11 m ~40m,桩基性质属嵌岩桩与摩擦桩,桩基共54根。 墩柱 立柱直径为φ180cm、200cm,采用双柱式桥墩,柱高度为14 m ~52m,桥台为柱式台。 上部构造 40 m预应力简支后连续刚构T梁 2.公路桥梁工程施工组织设计的内容 施工组织设计是指导整个施工工程全过程的经济文件,简单的说可以包括施工准备和施工过程中两大块,单位工程施工组织设计是指出具体施工 方法 技术指导的文件。工程施工组织设计的内容主要包括了以下几点: 施工准备实施计划 施工准备实施计划是保证工程圆满完成的必要准备,它主要包括现场准备、技术准备、机械设备、材料工具以及相关配件准备等,在技术准备中应该要指出季节性施工项目的安排详情,整个施工准备实施计划必须注明工作单位、工作量、各项任务完成进度等,必须以纸质文件给出。 施工方案、施工方法及其技术 措施 施工方案、施工方法及其技术措施是施工组织设计的核心部分,这部分需结合工程施工现场实际情况与设计施工目的,以及达到何种标准等来进行设计,这部分内容主要包括制定施工顺序、细化施工项目、估定施工工程量以及工人劳动量、计算机械设备等施工工具的使用量,以及各个分项工程的施工时间之间的配合,要保证施工工期满足合同所要求。 实物工程量 根据施工现场的具体情况,如地质水文条件等,并结合设计文件的要求来精确计算各个分项工程的工作量情况。 各项需用量计划 根据精确计算出的实物工程量与施工进度要求来制定各项计划用表,主要包括机械设备、材料以及劳动力所需等计划用表,各项需用量计划是施工各阶段的准备阶段,它是开启整个工程施工的钥匙。 施工设计图 施工设计图也是工程施工组织设计中的一个重要部分,它指明了整个工程的结构,施工技术人员需结合设计图来进行施工。 各项经济技术指标 各项经济技术指标是关系到施工单位经济利益的关键所在,远超指标会使施工单位利益受损,不达标便不能满足设计需求。在施工过程中,需要认真的按照施工规范、操作规程和设计文件来进行施工,才能保证各项经济技术指标到一个理想效果。 3.如何做好公路桥梁工程施工组织设计 在做好每个细节工作,保证不出现上述常见问题的同时,如何做好公路桥梁工程施工组织设计,一直是工程施工人员所需要解决的问题。当前的社会的竞争十分激烈,在施工单位中亦是如此,施工企业要想健康而快速的发展,做好工程施工组织设计是施工企业亟待解决的问题,以下几点可以有效帮助做好公路桥梁工程施工组织设计: 高度重视施工图设计文件的施工要求 编制人员要充分了解施工图设计文件的相关要求,分析工程的特点,针对工程特殊部分及其工艺要求,来制定切实可靠的施工措施。 扩大施工组织设计的深度和范围 在完成 文章 前面所述的内容基础上,可评估出设计图纸的合理性及经济性,扩大技术积累,加快技术转化,实现设计与施工技术的一体化。 加强施工组织设计编制人员的 教育 培训 施工组织设计文件质量的高低很大程度上取决于施工组织设计编制人员的水平。在当今社会如此高速发展的情况下,提高施工技术人员的水平,对任何一个施工单位起来说都是十分重要的,加强其教育培训能起到很好的促进作用。 管理者的思想观念要适应现代社会的发展 二十一世纪是进入高速发展的信息化年代,管理者只有不断去适应现代化发展的需要,才能对施工组织设计注入符合新时代的血液,才能带领着团队不断前进。 4.结语 做好公路桥梁工程施工组织设计能有效提高工程施工效率,也成为了施工单位提高经济效益有效手段,同时,它还是衡量施工单位施工技术水平和管理水平的一个重要标志。 工程施工组织设计毕业论文篇2 《浅析园林绿化工程施工组织设计》 摘要:本文通过对园林绿化工程施工组织设计实践与研究,分析了在园林绿化施工组织设计中存在的问题,提出施工组织设计是工程施工中最关键的步骤之一,施工组织设计应充分考虑施工实际,并就如何进一步加强施工组织设计进行了探讨。 关键词:园林绿化;工程施工;组织设计 施工组织设计是进行施工管理的纲领性文件,是施工技术与施工项目管理有机结合的产物,对于能否实现科学施工具有战略指导和战术管理的双重意义。针对园林绿化工程这样的“简易工程”,更加需要全面、正确的认识施工组织设计的前瞻性和科学性,认真结合工程实际,科学、合理地进行编制和优化,并在后续施工中认真加以贯彻落实,确保设计意图的实现。近年来,随着国家对工程招投标的强制规范,绝大部分招标单位都把施工组织设计作为选择中标单位的重要依据之一,这一方面强化了投标单位认真做好施工组织设计的意识,但另一方面我们也清醒的认识到不少单位的施工组织设计脱离工程实际,以应付中标为目的,为以后的施工管理埋下了隐患。 一、园林绿化工程施工组织设计中存在的问题 1.违规编制施工组织设计。 根据相关规定,施工组织设计必须存入施工档案,接受建设单位以及上级主管部门的检查,而现在一些施工单位为了应付检查,往往等到施工开始甚至是竣工验收前才草草进行编制,一些监理工程师违规进行签字,完全违背了施工强制规定。这种以应付检查为目的编制的施工组织设计,根本起不到指导施工的作用,同样没有规范施工组织设计指导下的园林施工也必然是难以达标的。 2.施工组织设计编制脱离实际。 一些单位即便按照规定提前编制了施工组织设计,但在编制过程中脱离施工实际,简单抄袭工艺流程和一些流于形式的内容,不对施工具体进行详细科学的论证,特别是有针对性的防范风险的具体措施更是缺乏,以致在施工出现问题后查找施工组织设计一无所获。 3.施工组织设计内容不规范。 主要体现在,①编制依据存在问题。要么编制依据没有体现,要么依据的规定文件已经过期,要么把一些 经验 做法作为依据。②编制内容不完整。施工方案、工艺要求不具体;对特殊过程和关键步骤描述不清楚;内容缺乏层次,前后逻辑混乱。③文件引用不规范。文件名称与原文不符;没有所引用的条款号,施工时查找难度大。④没有按照相关规定进行审核、审批。 二、园林绿化工程施工组织设计的原则及内容 进行园林绿化工程的组织施工设计,要确定重点,保证进度,为建设总进度保留相当的余地;要重视前期的施工准备,科学、全面的预见施工过程中可能存在的问题及需求;要科学选择施工方法,特别是针对不同季节、不同植物施工要合理选择施工工艺;充分利用正式工程,尽量减少暂设工程。施工组织设计主要有:编制说明,包括业主提供的施工图、有关政策和文件规定、招标书、施工单位相关情况,编制要求、相关标准规范、编制原则等;工程概况,包括工程概述、工程范围、施工现场条件等;人力及资源、机械保证措施,包括施工组织、施工部署、主要管理人员及简历、劳动力计划、劳动力保证措施、材料保证措施、资金保证措施、施工机械设备情况;工程进度计划及工期保证措施,包括总工期、开竣工具体日期以及人材机投入、组织施工方面、进度控制办法等。 三、施工组织设计优化 1.施工方案的优化。 园林工程建设涵盖土方工程、给水及排水工程、水景工程、园路工程、假山工程、 种植 工程、供电工程等内容,要以选择合理的施工方案为编制核心,充分借鉴国内外先进的技术和经验,尽量使用先进的技术和方法,提高施工效率、降低施工成本,根据工程实际特点,将技术可行性及经济合理性统一起来。对可能采用的施工方法进行技术经济评价,选择最佳方案。按照工程实际,结合人材机、施工方法等,科学选定主要工程的施工方案。针对具体园林绿化工程可参考以下工序:验收场地、场地清理、定点放线、挖树穴、种植、养护、补植、移交。对于反季节种植、古树名木移栽、南北植物互种、景观土建等技术性要求较高、危险性较大的施工内容,还需制订专项施工方案,增强针对性。同时园林植物都是有生命的,这一点在编制施工组织设计时尤为重要,要根据植物的习性确定种植和养护方案,这样才能提高成活率。 2.施工组织机构及人员的优化。 施工组织机构需明确工程分几个工程组完成,以及各工程组的所属关系及负责人,真正做到事事有人负责、人人有事负责。人员安排要根据施工进度计划,按时间顺序安排,要选派专业化的职工队伍,对施工人员的组织结构进行系统安排。 3.施工组织设计质量衡量标准的优化。 要根据施工实际选择合理的施工质量衡量标准,不能一概求告、求全作为具有生命特征的建设施工项目,至少需经历种植施工、养护施工两个时期,施工周期往往超过一年,施工质量要充分考虑这两个施工期的各自特点,合理加以安排。园林绿化工程的施工组织设计标准一定要充分考虑植物的生长周期,确保选用标准的科学合理。 4.施工组织设计编制工具的优化。 随着信息技术迅速发展,电脑和网络在工程制图、预算管理等方面发挥了巨大的作用,但限于施工管理人员的认识还不到位,目前信息技术在工程管理领域的应用还不尽如人意。电脑和网络可以及时、高效的获得各种信息并快速加以处理,大大加快施工组织设计编制速度,编制质量也更有保障。目前,随着项目经理负责制的落实,项目经理现场管理水平越来越受到重视,这就要求企业建立自己的项目管理信息系统,以全面客观的收集现场施工信息,及时发现各类问题,对施工组织设计进行再优化,使施工过程更加符合设计意图和施工实际,确保项目按计划完成。 5.不同施工时期的优化。 施工单位中标后,要加强和建设单位的交流和沟通,充分了解建设单位的意图,也要让建设单位充分了解施工过程,通过沟通选择最优化的施工组织设计。还要特别注意查找原设计过程中的不足,并加以优化,以降低施工成本,提高施工效益。进场后,项目经理等要组织人员对施工图纸进行认真审核,对设计的增大施工要素配置、降低施工难度、达不到环保和质量要求、缺乏安全保障等方面进行优化。施工开始后,对施工的现实情况越来越明晰,对发现的设计不符合实际等情况如需变更设计,需要收集充分的资料,认真加以分析,改动并得到监理签认。同时还要注意相关注意事项,尊重科学和事实,补充完善实施性施工组织设计。 随着城镇化的不断加快,人们对园林绿化的要求越来越高,这就给施工组织设计提出了更高的要求。因此无论是施工单位,还是建设单位都必须高度重视施工组织设计,认真做好施工组织设计,同时在施工过程中还要不断优化,只有这样才能保证工程的顺利进行。 参考文献: [1]常莹.浅谈园林工程的特点及管理[J].今日科苑,2007,(7):22-23. [2]孟令树.优化施工组织设计[J].海河水利.2009,(2). [3]陈宗平.ISO9001标准在园林企业的应用与推广[J].南方农业,2010,(4):64-66. 工程施工组织设计毕业论文篇3 《公路施工组织设计》 摘要: 近些年,国家对基础性建设的投入越来越大,我们的公路建设也日益增多。公路工程是一项综合性、系统性较强的工程,是集路基、路面、路线、桥涵、隧道等于一体的综合体系。随着经济社会的发展和施工工艺的不断进步,人们对公路工程的要求也更加严格。为了保证公路建设的正常施工,就需要工程设计按时按量完成。而如何处理好质量与工期的矛盾则是公路设计者面临的难题。本文对公路工程设计的重要性,步骤等进行一个分析研究。 关键词: 公路工程;设计;系统性;施工工艺;项目;质量;分析 0 引言 随着我国经济的发展,我国公路交通运输等行业都飞速发展起来,为了使等级较低的村道、乡道等交通满足人们日益增长的交通需求,我们就对高速公路、省干线公路等进行完善;各省市县对较低等级的山区公路和城镇道路的改建也日益重视起来,增加投资建设资金等方面,以此来完善公路交通网的建设。在公路提级改建项目中,山区地形由于地质复杂,在升级过程中路线布设受平纵横断面等条件和影响因素诸多;我们根据已完成的各级公路提级改建项目设计过程中的一些经验,对公路提级改建中总体及路线设计有以下几点认识,希望对今后的公路项目建设和提级改造项目建设能起到一定的指导作用。 1 施工组织设计重技术轻管理的现象严重 我国公路建设项目传统的施工组织设计一般包括的内容有:工程概况、施工技术方案、施工进度计划、资源供应计划、施工平面图设计等。尽管有的施工组织设计编制了技术组织措施的内容,但也仅从确保工程质量、安全、进度方面提出了相应的保证措施,工程技术性措施较强,管理措施较为薄弱,可操作性差,组织措施、经济措施及合同措施不力。因此,这样的施工组织设计是一种工程技术性的施工组织文件。 ①缺少施工部署措施工程项目的施工,在市场经济条件下,施工企业通过招投标获取项目,企业法人就是项目法人,而施工项目经理是企业法人在项目上的全权代理人。施工项目经理在施工前要与施工企业法人签订项目管理目标 责任书 ,界定项目经理在项目实施中应达到的质量、安全、进度、成本、环保、文明施工的目标,明确项目经理的责、权、利。因此,项目经理部必然要通过各种管理手段和措施对其目标、施工组织、总包与分包和资源供应进行规划,做出施工部署措施,而过去那种编制施工组织设计的作法就不能适应了。 ②缺少风险管理措施项目施工中自然存在许多风险,有技术上的风险和非技术风险,如果工程项目在施工前没有对风险识别、分析,没有做出抗风险对策,导致的后果将是严重的,这已是许多工程施工证明了的事实。而过去那种施工组织设计的作法一旦项目遇到风险,则施工组织设计将是一纸空文,失去指导作用。 ③缺少全面的技术组保证措施在一般的实施性施工组织设计的技术组织措施中,仅有保证工程质量、安全、工期,冬雨季施工的措施,没有保证成本、环境保护、文明施工的措施,这是不全面的。 2 公路工程施工组织设计存在问题 尽管一些施工组织设计编制的内容措施,只从确保工程质量安全和进度等方面提出的相关的保证措施,但是也存在一些可操作性差等不足。因此,我们就要完善以下缺少的管理措施内容: 缺少风险管理措施 项目施工中存在很多风险,这就需要我们在工程项目施工前增强对风险的识别、分析能力,这样才能在有风险的时候进行风险对策,避免产生严重的后果。 缺少全面的技术组保证措施 在一般的施工组织设计的技术措施中,我们只保证工程质量、安全、工期,冬雨季施工等措施外,还要重视施工成本、环境保护、文明施工等方面措施。由于工程竞争激烈,就需要我们降低成本率来使企业获得更多的利润,因此我们在保证工程质量的全体下,必须要实现降低成本的计划。 缺少全面的施工组织设计技术经济指标 同项目的施工方案所达到的技术指标也会有所不同。因此,就需要我们对施工性项目的施工组织设计进行应有的评价和考核。在过去的施工组织设计者,由于操作的各不相同,就对评价项目、考核项目的施工组织水平带来了一定困难。 3 公路设计的影响因素 选线因素 在进行选线的时候,我们需要全方面进行考虑 ,尤其是对公路进行升级改造的时候,因为大多路线的走向已经基本确定了,我们在选线的时候在不影响原有线路的情况下选择更优的可行路线走向。 此外,改建项目设计中心线的位置可能为两种:当旧路基基本能满足改建断面的需求时,选择旧路中心线作为基准;当旧路基与改建断 面相 差较大时,选择旧路边线作为基准,两者都能很好的利用旧路基,这是相当重要的,这对道路标高的控制,施工方案有决定性作用。 平面设计因素 平曲线指标是视距及行车安全的首要影响因素,其要素应根据规范满足其组成要求。在平面设计中,其要点无非圆曲线半径、缓和曲线长度、超高加宽以及直线段长度等能否满足规范。在公路提级改建中,我们既希望能将平面线型严格满足规范要求以达行车安全,也希望在改建的过程中以人为本,注重环保,减少对山体环境的破坏,这就需要一个平衡点。 4 施工组织设计编制的步骤 由于施工工程项目的大小不同,所要求编制组织设计的内容也有所不同,但其方法和步骤基本大同小异,大致可按以下步骤进行。 收集编制依据文件和资料 ①工程项目设计施工图纸。②工程项目所要求的施工进度和要求。③施工定额、工程概预算及有关技术经济指标。④施工中可配备的劳力、材料和机械装备情况。⑤施工现场的自然条件和技术经济资料。 编写工程概况 主要阐述工程的概貌、特征和特点,以及有关要求等。 选择施工方案、确定施工方法 主要确定对工程施工的先后顺序、选择施工机械类型及其合理布置.明确工程施工的流向及流水参数的计算,确定主要项目的施工方法等(总设计还需先做出施工总体布署方案)。 制定施工进度计划 包括对分部分项工程量的计算、绘制进度图表。对进度计划的调整平衡等。 计算施工现场所需要的各种资源需用量及其供应计划(包括各种劳力、材料、机械及其加工预制品等)。 绘制施工平面图 其他 提出对有关工得的质量通病和易于发生安全问题的环节。订出防治措施、制定降低成本(如节约劳力、材料、机具及临时设施费等)的具体措施、超奖减罚等的具体要求和技术经济指标。 5 加强公路工程施工设计规范化管理对策 我国加入WTO组织后,给我国建筑行业带来机遇和挑战,主要表现在以下两个方面的竞争,即技术水平和管理水平竞争。为了适应新形势下的发展,就要各施工管理部门掌握现代管理方法并加以利用,以此保证自己在竞争中有足够的实力。随着计算机及 网络技术 的迅速发展,各个行业在辅助管理上都运用计算机的功能进行操作,因此就需要掌握现代计算机技术等知识,因为所有的竞争归根到底还是知识和人才的竞争,所以还需要多一些人才的培养计划。 6 小结 在编制施工组织的时候,我们既要重视科学的管理,还要讲究经济效益。因此,就需要我们在不同的条件下对不同的施工对象采取不同的管理措施。在策划重点的时候还要根据实际情况出发,这样才能制定出规范性强、符合业主质量需求的施工组织设计方案,并且能够因地制宜的对各个阶段的施工进行全面的指导。 参考文献: [1]石冠跃.浅谈公路工程设计中对工程地质勘察资料(数据)的分析、论证及其应用[J].石河子科技,2004(01). [2]李勇.公路工程建设中勘测设计存在的问题及影响因素分析[J].中国新技术新产品,2011(02). [3]孙爱民.关于如何合理控制公路工程造价的探讨[J].科技信息,2011(07). [4]公路工程设计变更管理办法[J].交通标准化,2005(08). 猜你喜欢: 1. 建筑施工毕业论文范文 2. 施工组织设计实训心得体会 3. 工程施工组织设计论文 4. 施工组织设计实习心得 5. 建设施工组织论文

  • 索引序列
  • 桥梁毕业论文外文文献
  • 毕业论文桥梁外文文献怎么找
  • 桥梁毕业论文文献综述
  • 历史桥梁毕业论文参考文献
  • 道路桥梁毕业论文高架桥
  • 返回顶部