A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. adoption.In recent years, a engineering quantity problem influence building structure of the case of the normal usage and safety is a lot of.The construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of , is also a research heat of realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering to suffer from, carrying on the evaluation to the quantity of the stake of . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases
低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|pile foundation高层建筑 High-rise buildings(分类词汇:环境资源相关 )大型桥梁super-large bridges 深水码头Deep Water Wharf海上石油平台Offshore oil platform建筑结构building structure施工construction非线性弹性材料nonlinear elastic materials桩基工程质量问题这篇虽然是科技论文,但是我觉得他翻译成“pile foundation quality question”很不妥当,我将他修改成problems of pile foundation quality,,从汉语语法之角度考虑,这里的问题两个字是多余的,去掉更好,你自己看看吧!不确定性因素Incertitude Factors基桩Foundation Pile隐蔽性(Impercephbility)axial strain轴向应变研究热点research hotspot(也有用point的)桩身缺陷位置 positions of pile defects定性估计 qualitative estimation混凝土强度等级concrete strength gradethe signal of reflected_wave curve反射波曲线信号工程隐患Project Concealed Harzard一维波动模型one-way fluctuant model控制体(control volume),本构关系 constitutive relationFORTRAN语言编制程序program written in FORTRAN language响应时程曲线波形时程曲线response time history curvePile foundation is widely used as the main basic structure of high-rise buildings,super-large bridges,deep water wharf and Offshore oil platform. During recent years,there are many bases of pile foundation quality affecting the normal working and safety of the building structures. Pile construction has high impercephbility and whose quality presents many incertitude factors,from an angel of qualitative inspection of the foundation piles, it has important significance for ensuring the quality and safety of foundation pile projects to modify the inspection methods and improving the inspection quality and the reliability of inspection & assessment results,it is also one of the research hotspots in foundation pile field. The main functions of low strain reflection wave method is to inspect the pile integrity, such as the judgment of pile defects positions, the checkout of pile lengths, and the qualitative estimation of the concrete strength grade,the judgment of the pile quality using the signal of reflected_wave curve accurately, the elimination of the project concealed harzard,and the estimation of foundation pile quality. This paper studied on the low strain reflection wave method for measuring of pile integrity made of Kelvin nonlinear elastic materials, set up a new one-way fluctuant model to treat the problems of piles made of Kelvin nonlinear elastic materials, gave out a dynamics equation of control volume,and induced the relation between pile axial forces and axial strain using the constitutive relation of one-way nonlinear elastic materials, put forward a new calculation method for the fluctuation of one-way nonlinear elastic materials, simulated the pile-top speed response time history curve (or displacement, acceleration) numerically using program written in FORTRAN language, finally the author set up a curve database of the foundation piles existing integrity problem for the integrity inspection of foundation piles in the future.
水泥喷粉深层搅拌桩沉桩问题分析及处理论文
摘要:深层搅拌桩进行地基加固有喷粉和喷浆两种施工方法,设计人员在地基天然含水量大于60%的情况下,从降低地基含水量考虑,常常选用喷粉法。而在天然地基含水量大的情况下采用喷粉法施工,由于流塑状淤泥在喷粉施工时风压气流的作用下,在搅拌过程中因受扰动发生液化,强度来不及形成,造成沉桩。通过施工现场试验,证明改用喷浆法施工的搅拌桩解决沉桩问题是有效的,工程造价变化不大,是可行的。
关键词:路基工程 深层搅拌桩 沉桩 喷浆法
一、前言:
深层搅拌桩经过近二十年的发展,由于施工技术和施工机械的成熟已经被广泛地用于软土地基加固、边坡支护、基坑及堤坝防渗等方面。深层搅拌桩可以增加软土地基的承载力,减少沉降量,提高边坡的稳定性,以及具有快速、经济、有效等特点,而被应用在公路桥头软土地基上,以加快公路的施工进度,消除或缓解桥头跳车等问题。其施工方法分为喷粉和喷浆两种方法。设计人员在地基天然含水量大于60%的情况下,从降低地基含水量考虑,常常选用喷粉法。由于地质条件千变万化,其中若存在淤泥含水量过大,采用喷粉法则可能出现沉桩问题。以下通过对采用喷粉法出现沉桩工程问题分析及提出处理方法与同行探讨。
二、工程实例
1、工程简况
某高等级公路在K9+753~K10+836桥头186m采用水泥喷粉桩处理,水泥喷粉桩按正三角形布置,桩径采用50cm,桩距1.5m,平均桩长10m,水泥掺入比15%,即每延米50kg水泥,标号425#。施工单位在施工配套设备进行标定、试桩方案经过监理单位和业主单位同意的情况下采用喷粉法进行试桩试验,共试59根,其中的21根桩发生沉桩,沉桩深度一般为1.1m~4.5m不等。
2、沉桩原因分析
水泥深层搅拌桩加固机理是通过水泥的水解和水化反应、水泥水化物与土颗粒之间的离子交换和团粒化作用、凝硬作用、碳酸化作用等一系列化学反应而成为具有整体性、水稳定性和一定强度的水泥土桩体。因此,可从地质、施工工艺两方面来分析沉桩原因。
地质方面,由于各地质层土质的差异而产生水泥加固土的效果不同,一般认为含有高岭石、多水高岭石、蒙脱石等粘土矿物的软土加固效果较好,而含有伊里石、氯化物和水铝英石等矿物的粘性土以及有机质含量高、酸碱度(PH值)较低的粘性土加固效果较差。各地质层的含水量的不同,也是引起水泥和土一系列化学反应而形成强度的速度不同的原因。
施工工艺方面,水泥与土搅拌不均匀,甚至水泥与土无法混合。这与施工机械的各施工参数有关,如钻进速度、钻头转速、提升速度、喷粉压、水泥用量等有关。必须通过试验桩根据不同地质层、不同土质、不同土压力找到合适的施工参数,加以严格控制,使桩体均匀,防止缩颈、断颈等现象。
1)地质方面
在第一次试桩的一排7根桩中,靠路线前进方向右侧有4根桩沉桩。在试桩后第七天对其中两根进行抽芯检测,发现桩体上均有两段水泥明显不凝固。在试桩后第十天对发生沉桩的地质进行补勘,具体地层由上至下为:
①填砂:河砂,层厚为0.5m.
②粉质粘土:灰黄、灰褐色,可塑,稍湿~湿,随深度增加渐变为软塑状,层厚为1.2m。
③淤泥:深灰、灰黑色,软塑~流塑,饱和,粘性强,滑腻,岩性均一,底部0.5m含腐殖物,层厚为6.0m。
④淤泥质粘土:灰、青灰色,软塑,饱和,粘性较强,均匀,层厚为1.8m。
⑤淤泥夹砂:灰、青灰色,软塑,含较多中粗砂,含量在30%~50%,松散状,层厚为1.5m。
⑥砂层:浅灰色,稍密~中密,饱和,以粗砂为主,含粘性土,级配良好,层厚为1.9m。
⑦粉质粘土夹砂:灰黄、棕黄色,软塑,湿,含量在20%~50%,岩性不均,层厚为2.6m。
⑧砂层:以中粗砂为主,灰白、灰黄色,中密,饱和,含粘性土,级配良好,层厚为0.3m。
软土物理力学指标很差,淤泥平均含水量为90%,天然孔隙比2.51,直快剪C=6.79Kpa,φ=7.36。
从以上地质补勘分析,主要有以下原因:
(1)由于该段淤泥含水量为90%,而喷粉(50~60kg/m)后水泥在桩体内吸水是有限的,参照相近项目试验结果可知,短期内水泥加固土含水量减少量低于水泥掺入比,也就是该段淤泥经水泥加固土的含水量仍为75%以上,搅拌时的土和水泥还是处于流塑~软塑状,压缩模量小,抗剪强度低;喷50~60kg/m水泥9m后增加4500~5400KN自重力。处于流塑~软塑状水泥加固土压缩模量小,自身自重引起桩压缩量就大;水泥加固土抗剪强度低自身自重引起侧向挤出量大;
(2)桩身周围土受扰动土体下沉后,土对桩侧表面产生向下的负摩阻力。当土和水泥还是处于流塑~软塑状、压缩模量小、抗剪强度低时,在负摩阻力的作用下发生沉桩。
(3)该段淤泥的灵敏度大,灵敏度是原状试样的无侧限抗压强度与相同含水量重塑试样的无侧限抗压强度之比。从试桩现场,试桩桩位砂垫层表面挤压出来的`淤泥很稀,表明其重塑后强度很低,灵敏性高。
(4)喷粉在桩体内吸水,引起桩体周围土体孔隙压力消散、产生下沉,短时间增加对桩体的负摩阻力,而此时水泥加固土的强度很低且增长慢。
总的来说,是在喷粉初期,水泥加固土的强度承受不了水泥加固土的自重力和负摩阻力的作用而发生沉桩。
2)施工工艺方面
在施工工艺方面,针对沉桩问题,结合地质情况较差的实际,在施工工艺上找沉桩的原因。试桩时各施工参数(钻进速度、钻头转速、提升速度、喷粉压、水泥用量等)作了有效控制。在第二次试桩52根桩中,采用不同钻进速度、不同钻头转速、不同提升速度、不同喷粉压、不同水泥用量进行严格控制。试桩中虽然采用加大喷粉量至75kg/m,仍未解决沉桩问题。
察看试桩现场,试桩桩位砂垫层表面存在大量淤泥,据分析软塑~流塑状淤泥是在喷粉施工时风压气流的作用下,搅拌过程中因受扰动发生液化,液化的淤泥上涌至地表面,造成桩体范围内淤泥质的减少而沉桩。
增加喷粉量解决不了沉桩问题的原因在于:
(1)增加喷粉量即增加桩体自重力;
(2)增加喷粉量导致喷粉在桩体内吸水量增加,引起桩体周围土体孔隙压力消散加快、产生下沉,短时间对桩体的负摩阻力增大,因增加喷粉量水泥加固土的强度提高不显著,在喷粉初期,水泥加固土的强度仍承受不了水泥加固土的自重力和负摩阻力的作用而发生沉桩。
3、处理方法
通过以上分析,沉桩是由于在喷粉初期,土体受扰动,水泥加固土的强度承受不了水泥加固土的自重力和负摩阻力的作用而发生沉桩。改用在水泥浆液中加入适量的早强剂喷浆法施工可以解决喷粉法施工成桩初期水泥加固土的强度承受不了水泥加固土的自重力和负摩阻力发生沉桩问题。主要原因:
(1)早强剂可以使水泥加固土的强度迅速提高,而早强剂在水泥浆中搅拌可以较均匀;
(2)水泥浆液注入土体发生水泥的水解和水化反应、水泥水化物与土颗粒之间的离子交换和团粒化作用、凝硬作用、碳酸化作用等一系列化学反应而成为具有整体性、水稳定性和一定强度的水泥土桩体时,浆液本身存在足够水,不需吸收天然地基的水,并未引起桩体周围土体孔隙压力消散、产生对桩体的负摩阻力。
因此,改用喷浆法施工并在水泥浆液中加入适量的早强剂,以解决喷粉法施工成桩初期水泥加固土的强度承受不了水泥加固土的自重力和负摩阻力的作用而发生沉桩的问题。
喷浆施工参数:
成桩直径: 50㎝
钻进速度: 控制在2~3档(30~50cm/min)
电流表读数: 进入持力层I≥60A
桩底持续喷浆搅拌时间: ≥30s
提升喷浆速度: ≤30cm/min
喷浆压力: 0.6~1.0Mpa
水泥浆水灰比: 0.5
早强剂掺量(水泥掺比): 0.8%
水泥浆搅拌时间: ≥30min(每拌)
喷浆搅拌桩施工工艺按中华人民共和国交通部发布《公路软土地基路堤设计与施工技术规范》JTJ017-96关于加固土桩技术规范进行。全部穿过淤泥进入持力层50㎝。
以上施工参数进行现场试桩,试桩七天后进行桩体抽芯检测,从桩体抽芯结果来看,成桩连续性与完整性均较好,无沉桩问题。由业主组织设计单位、监理单位和施工单位召开软基处理技术专题会议,决定K9+753~K10+836桥头186m原采用喷粉法施工搅拌桩改为喷浆法施工,原合同单价不变。该段在改用喷浆法施工后,无出现沉桩问题,证明采用喷浆法施工的搅拌桩解决沉桩问题是有效的。工程造价变化不大,经济上是可行的。
三、结语
在高含水量软基中采用深层搅拌桩处理,从降低地基含水量考虑,常常选用喷粉法施工。而当采用喷粉法出现沉桩问题时,改用在水泥浆液中加入适量的早强剂喷浆法施工来解决沉桩问题。经实践证明采用喷浆法施工的搅拌桩解决沉桩问题是有效的、经济上是可行的。
现如今,随着我国社会经济的不断发展,土 木工 程施工技术也随之不断改革、发展,为我国城市及乡镇的建设作出重大贡献。我整理了土木工程技术3000字论文,欢迎阅读!土木工程技术3000字论文篇一:《试谈土木工程建筑施工技术》 [摘要]本文介绍了土木工程建筑施工的特点及传统的施工技术,并分析了新型的土木工程施工技术,指出施工技术的未来发展趋势,尤其是新型防水施工技术、钢结构施工技术、混凝土施工技术等,为土木工程的相关工作者提供参考。 [关键词]土木工程;施工技术;创新;发展 随着我国社会经济的不断发展,土木工程施工技术也随之不断改革、发展,为我国城市及乡镇的建设作出重大贡献。现就土木工程的传统施工技术与新型施工技术进行分析、对比。 1.土木工程建筑施工特点 1.1复杂性。由于各项土木工程建筑产品的功能性及类型不同,而且施工技术随着工程施工所在地及周边环境条件而变化,因此,土木工程建筑施工具有一定的复杂性。 1.2流动性。由于建筑产品是固定的,出现单件组织施工的情况下,项目和地点则不断变换,因此,要求施工人员、机具、建筑材料要随建筑物建造的地点而流动。 1.3长期性。土木工程的建筑物体积一般较为庞大、施工周期长,少则几个月,多则几年、甚至十几年才能建成。 1.4危险性。由于建筑工程中的露天作业较多,高空作业多,极易受自然条件影响,其危险性较高。 1.5综合性。土木工程建筑施工的协作单位较多、牵涉面广,它需要多行业、多工种的配合协作,综合性很强。 2.土木工程的传统施工技术 2.1地基基础施工技术。地基基础施工的主要施工 方法 为桩基础施工,包括:承载能力极限状态和正常使用极限状态。一方面,按承载性状划分,基桩包括:摩擦型桩和端承型桩。摩擦型桩又分为摩擦桩和端承摩擦桩,端承桩又分为端承桩和摩擦端承桩。摩擦桩在承载能力极限状态下,桩顶竖向荷载是由桩侧摩阻承受,端阻力可以忽略。而端承摩擦桩在极限状态下,桩顶竖向荷载则是由桩侧阻力承受主要部分。端承桩在极限状态下,桩顶竖向荷载由桩端阻力承受,桩侧阻力可以忽略。而摩擦端承桩则是由桩端阻力承受大部分的竖向荷载。另一方面,按照成桩方法划分,包括:非挤土桩、挤土桩和部分挤土桩,制作基桩的材料也主要分为木桩、混凝土桩、钢桩等,不同类型和不同材料桩的施工方案和适宜的基础亦有所不同。在桩基础施工中,通过结合主要单根桩的施工质量来确定桩型,并进行综合考虑,尤其是群桩基础,尽量避免发生不均匀沉降。其中,桩基础施工中钻孔灌注桩的主要步骤是:桩定位放线、钻机就位并校正垂直度、钻孔清土、灌注并搅拌混凝土、制作安放钢筋笼、成桩验收并进行质量检验。 2.2钢结构施工技术。钢结构施工主要是吊装构件,首先,在施工前应当事先做好准备工作,包括场地清理、道路修筑、基础准备、构件运输、检查装备等。其次,钢构件运送先后顺序要按照施工顺序进行,构件运到现场后,应尽量存放在起吊位置,并用足够支承面的木枕垫底。在吊装前应该核准构件标号、位置,并清除表面,摩擦面要保持干燥清洁。最后,应当准备灭火器谨防发生火灾,这主要是由于钢结构工程的特殊性,可能会在施工过程中用到氧气、乙炔类焊接工具,容易引发火灾。 2.3混凝土结构施工技术。按照施工中浇制混凝土的地点主要包括:预制法和现浇法。其中,预制法是在别处而非施工现场浇筑混凝土,预制混凝土以其低廉的成本、出色的性能,成为建筑业的新宠。在使用预制法施工时,应当确保预制模的尺寸准确,并严格按照施工顺序进行。另外,现浇法则是在施工现场支模浇筑混凝土,是大多数建筑物采用的方式,其应用更为广泛。 3.土木工程施工新技术 3.1防水施工新技术 3.1.1冷作业防水施工。当前,我国防水施工技术不断发展,正朝冷作业方向发展,其中,各种防水材料也有很大发展。我国生产的聚氯乙烯防水卷材、SBS改性沥青防水卷材、APP改性沥青防水卷材、聚氨酯涂料及603卷材等,其中部分材料性能已达到或接近国际先进水平。 3.1.2防水混凝土结构。防水混凝土结构,主要通过混凝土本身的自密实性,实现其防水性能,例如地下室、水池、水泵房等。防水混凝土结构不仅具有承重、围护、抗渗和抗裂等多重作用,而且其耐侵蚀度和耐冻融度较高。 3.2大跨度的钢结构施工新技术 大跨度的钢结构施工技术主要包括:高强厚钢板工地焊接技术、大型网壳钢结构安装技术、大跨度空间钢结构临时支撑卸载技术、大跨度钢结构计算机控制液压提升安装技术、大跨度柱面网壳折叠展开提升安装技术、钢结构整体平移安装技术、旋转开启式钢屋盖安装技术、拱形多轨道开启式钢屋盖安装技术、桅杆钢结构提升安装技术、预应力钢结构施工技术、索膜结构施工技术、爬升塔式起重机悬置布置及使用技术、重型塔式起重机置于永久结构上的使用技术、重型履带起重机置于永久结构上的使用技术、大型旋转式龙门起重机的应用技术以及大型桁式龙门起重机的应用技术等。 3.3混凝土施工新技术 3.3.1清水混凝土施工技术。清水混凝土技术,以原始的浇筑混凝土面直接作为装饰性表面,属于现浇钢筋混凝土技术。清水混凝土施工操作简便,成本也较低,大大提高了土木工程建筑的牢固程度。它不仅满足了高层建筑对工艺的高要求,而且属于一次浇筑成型的施工技术,仅在表面涂一层或两层透明的保护剂,该施工技术环保性急天然性较高,而且施工质量较高,外形美观。如中国首例现浇清水混凝土风格美术馆――辽河美术馆,具有朴实无华、自然沉稳的外观韵味。 3.3.2钢纤维混凝土施工新材料。在确保建筑产品实用性的前提下,为了迎合人类对土木建筑愈来愈高的审美要求,也为了展现建筑的艺术美感,我国行业专家已研究出了在普通的混凝土中掺入适量的钢纤维,再经均匀拌合而成的钢纤维混凝土。这一突破性的新材料,不仅弥补了施工中建筑材料抗拉能力不足的问题,而且还能够增强混凝土构件的抗剪性、抗裂性和耐久性。另外,钢纤维混凝土还具有优良的抗冲击能力,对于提高建筑施工质量具有重要意义。 土木工程技术3000字论文篇二:《试谈土木工程技术创新阐述》 摘要 :土木工程施工在我国的建筑类施工中起着重要的作用,在施工中的地位也越来越重,土木工程关系到我国城市建设发展水平和建筑业的发展,铁路建设是土木工程施工的重要内容,只有加强土木工程技术的创新才能推动我国铁路建设不断发展。本文着重对土木工程施工的创新手段进行了深入阐述,表现了加强土木工程技术创新对土木工程施工发展起到的重要作用。 关键词 :土木工程 施工技术 前言 土木工程的英文是Civil Engineering ,直译是民用工程,它是建造各种工程的统称。它既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材料设备和进行的勘测,设计施工,保养,维修等专业技术。 一、土木工程施工技术的特点 随着经济和科学技术的发展,新材料、新结构不断出现,大规模、技术复杂的土木工程结构也越来越多,施工技术也相应随之不断发展。我国正处在经济高速发展时期,工程建设数量多,规模大,促进了我国施工技术的发展。由于土木工程的特点,决定了其生产组织与一般的工厂生产组织不同,每项工程都需要根据工程性质和特点,单独进行施工组织,施工组织是否科学合理直接影响到工程项目的成败,一般来说,土木工程施工具有如下特点:固定性和流动性:流动性包括施工队伍的流动和在同一工程上工人在作业空间上的流动;多样性和单件性:工程各不相同,完全一样的工程几乎没有庞大性和协作性、综合性:需要建设、设计、施工、监理、材料供应商等多家不同单位配合协作完成;复杂性和易受干扰性:技术、管理复杂,易受气候、周围环境等外界因素干扰;投资大、生产周期长。(一)桩基施工技术。土木工程中的桩基施工要求施工人员要合理的选择适合桩型进行施工,还要充分的考虑好单桩和群装的选择,以达到单桩基施工质量的标准,如果施工用的是群桩,就要想到地基会不会出现不均匀沉降问题;在进行预制的桩基吊运时,要充分的考虑因吊运对桩基产生的强烈冲击感和振动感;施工人员还要有效的进行对桩基钻孔和混凝土的灌注工作,对桩基完成了定位放线和校正以及钻机的垂直效果、钻土和清土、混凝土的灌注搅拌、制作安放钢筋笼、校验等一些工作后,就要对施工的质量进行检验,查看是否达到施工的规范和标准。 (二)混凝土构造技术施工也是常见的铁路施工方法。施工中的预制方法和现行浇灌是混凝土的施工机构中比较常见的施工方法。预制混凝土方法是混凝土在逐渐的施工管理中被广泛认可的应用,预制的方法具有成本低廉、性价比高等优点,在使用预制混凝土构造技术时要首先考虑预制工具的大小尺寸并且要严格按照施工的规范操作进行。现浇的施工方法比预制的施工方法应用时间更早,这种方法在施工的现场通过支模对其浇筑。 二、工程中的建筑结构 建筑工程就是兴建房屋规划,勘测,设计,施工的总称。 房屋建筑一般包括十个部分:(1)埋在地下的基础和地下室(2)承载外力并把力传到基础的柱子,楼板,梁,框架墙,屋盖及支撑体系(3)四周的饿维护结构和中间的隔墙(4)房屋内外的装饰(5)控制环境的供暖,通风,空气调节,照明,防火隔声等系统(6)楼梯间,电梯或自动扶梯等垂直传输系统(7)闭路电视,电话,计算机网络等通讯体系(8)电力系统(9)卫生设备和给水排水系统(10)垃圾处理系统。 Pier Luigi Nervy说过:建筑结构说穿了,不过就是受力体的反力与内部应力如何与外力达到平衡。建筑首先要解决,也是必须要解决的问题就是受力的问题。我们把解决这个问题的学科称为建筑力学。建筑力学有可以分为:静力学,材料力学和结构力学三大力学体系。建筑力学是讨论和研究建筑结构及构件在荷载和其他因素影响的工作状况,也就是建筑的强度,刚度,稳定性。在载荷作用下,承受载荷和传递载荷的建筑结构和构件会引起周围的物体对它们的作用,同时物件本身受载荷作用而产生变形,并且存在着破坏的可能性,但是结构本身就具有一定的抵抗变形和破坏的能力,而结构的承载能力的大小是与构件的材料,截面的几何尺寸,受力性质,工作条件和构造情况有关。而这些关系都可以由力学关系式通过计算而得以解决。 三、土木工程施工技术研究 1.软土地基施工与石方爆破施工 软土地基施工特点:往往不能满足承载力和变形能力的要求,施工时如果采取 措施 不当,往往会发生路基或建筑物地基失稳或严重下沉,造成建筑物破坏或不能正常使用,需要进行加固,加固方法:换土垫层法、强夯法、振冲法、砂桩挤密法、深层搅拌法、堆载预压法、化学法等;土石方爆破施工:适用环境:开挖时遇到岩石,施工现场地下障碍物的清除、旧建筑物和构筑物的拆除,施工的工序:打孔放药、引爆、排渣;特点:施工费用低、效率高、有震动和粉尘危害,对旧建筑物、构筑物的拆除,还可以采用静力破碎等配合施工工艺,是拆除在低震动、低粉尘、无公害的情况下进行。 2.灌注桩施工与墩式基础施工 (1)灌注桩施工是在施工现场的桩位处用机械或人工成孔,然后在孔内放入钢筋笼、浇筑混凝土(或者直接浇筑混凝土)而成的一种施工方法。成孔工艺:干作业成孔、泥浆护壁成孔、套管成孔、人工成孔、爆扩成孔等。其特点:能适应地层的变化、施工时振动小、噪声低、工艺要求较高、施工后混凝土需要养护且不能立即承受荷载。 (2)墩式基础是在人工或机械成孔的大直径孔中浇筑混凝土(或者放钢筋笼、浇筑混凝土)而成的大直径基础。目前,我国多用人工挖孔,故又称为大直径人工挖孔桩。墩式基础特点:端部直接支撑在岩石或坚硬土层上,桩的强度和刚度都很大,有较大的承载能力。 3.沉井基础施工 沉井是由刃脚、井筒、内隔墙等组成的呈圆形或矩形的筒状钢筋混凝土结构,多用于重型设备基础、桥墩、水泵站、取水结构、超高层建筑物的基础等,施工过程:施工时首先制作井筒,然后在井筒内挖土,使井筒靠其自重沉入土中。井筒的最下端为刃脚,形状如刀刃,在沉井下沉过程中使沉井切入土中。沉井的外壁为井筒,在下沉过程中起挡土作用,同时靠其自重可以克服筒壁与土之间的摩阻力和刃脚底部的土阻力,使沉井能在自重作用下逐步下沉。 4.预应力混凝土工程施工 预应力混凝土结构的截面小、刚度大、抗裂性和耐久性好,能充分发挥钢材和混凝土各自的性能,在土木工程中得到了广泛的应用。其施工具体方法主要分为以下三种: (1)先张法施工:先张拉预应力钢筋,然后再浇筑混凝土构件的一种施工方法主要施工过程是在浇筑混凝土构件之前,张拉预应力钢筋并将其临时锚固在台座或钢模上,然后浇筑混凝土构件,待混凝土到达一定强度、混凝土与钢筋之间有足够的粘结力后,放松预应力钢筋,借助混凝土与预应力钢筋之间的粘结,使混凝土产生预压应力。 (2)后张法施工:是先制作混凝土构件后张拉预应力钢筋的一种施工方法,要施工过程:先制作混凝土构件并预留孔道,待混凝土达到一定强度后,将预应力钢筋传入孔道,利用张拉机具张拉预应力钢筋,然后用锚具将预应力钢筋锚固在构件端部,最后进行孔道灌浆。 (3)粘结预应力施工:是在后张法基础上发展起来,要施工过程:采用表面有涂料、外面包有塑料套管的预应力筋,铺设在模板内,然后浇筑混凝土,待混凝土到达设计要求的强度后,再进行预应力筋的张拉、锚固。 四、结束语 总之,土木工程施工技术在近几十年虽然有了飞速发展,但是土木工程施工至今仍以手工操作、半机械作业为主,劳动效率大大低于其他产业部门,还属于劳动力密集型的产业,现代土木工程施工技术的发展方向,除了要有满足当前土木工程建设需要而与之配套的施工技术,还要向高效率、无公害、高质量、机械化、智能化、高技术含量、信息化的方向发展。 参考文献: [1]段树金主编.土木工程概论.北京:中国铁道出版社,2005. [2]关于土木工程施工的探讨. 土木工程技术3000字论文篇三:《试谈高层建筑施工土木工程问题》 一、高层土木建筑简介 当今,为了能适应社会发展需求,高层建筑的结构越来越大,这就需要土木工程技术的支持,所以,这两者之间的关系不可分割,高层建筑的可靠性、安全性、依旧依赖于土木施工质量的保障,只有找出阻碍各方面原因,才能解决土木行业还没有解决的问题,才能给高层建筑做道路铺垫,才能有效提升行业的发展速度。 二、施工特点分析 高层建筑施工具有很多特点,包括以下几点; 1.我们都知道,高层建筑的工序不仅繁多,而且不劳动量大作业工序还复杂,施工管理与协调工作相当难做; 2.鉴于高层项目占地与体积都很大,施工前期需要准备很多的建筑材料与机械设备,庞大的规模的建设,需要2年到3年时间才能竣工,甚至更长时间。长时间的建设周期,有可能会错过新技术与新型材料的到来;存在着错过新技能的风险; 3.高层建筑项目都很危险,所谓高层建筑一般都是30层左右的高度,在如此高度的环境下作业容易造成安全事故的发生,所以,在高层项目中需要有组织有计划的安排布局,把施工质量安排稳妥,事故防范于未然。 三、施工质量的控制分析 (一)裂缝的产生 裂缝的产生对于施工质量来说是一个非常严峻的问题,也是在高层建筑工程里面比较普遍的一种疾病。导致裂缝形成的原因诸多,有动态与静态的,甚至还有稳定的和闭合的。所以,想要保住整个建筑质量,就需要把裂缝问题这一环节处理妥当。要整治工程的裂缝问题,首先要发现裂缝开裂的原因,分析其裂缝对建筑整体的影响,分析其原因所在后,在对其进行处理。在施工的设计阶段,就需要采取有效的预防措施分别有:将荷载的作用降低、释放作用效应。 (二)解析混凝土浇筑强度控制 在整个项目建设阶段中,混凝土浇筑环节最为重要。首先,在浇筑作业时要采取先进的技术和方法,一旦浇筑面积扩大,需要停止作业。要对浇筑层做冷却处理,保证混凝土与水的恒温在25°的范围内。完毕浇筑后,要注意温度是否有变化,要对数据进行记录整理,为2次浇筑做准备。当在进行2次浇筑时,需要把控好时间。需要在第一层混凝土呈半凝结状态下进行,与此同时,将捣振器的使用范围与力度调整好,这样有助于效避免了裂缝的产生。其次,要科学合理浇筑,盲目的不按照施工程序操作会导致严重的质量问题。在整个浇筑阶段中,现场的监理人员要严格检测结点这个位置,因为,结点是整个浇筑物的关键部位,其质量的优劣直接影响着整个工程的质量。 四、各方面影响工程质量的因素与措施 (一)影响施工质量的因素 在当前形势下,对项目建设施工提出了很大的要求,但是,在以往传统的组织里,组织者的思想还是陈旧,创新意识不全,这就导致工程质量不达标,经济下滑。 (二)重建不重管 建设高层建筑时,会使用到各式各样的设备,施工进度的快慢取决于施工期的设备选择,所以在选择设备的时候要考虑设备的参数和性能,做好“用前检查,用后保养”的习惯。如果检查工作遗漏或是觉得检查多此一举,这将会导致安全隐患的产生,后果不可想象。譬如:施工中一台三脚架的质量出现了质量问题,是因为前后期的检查工作有遗漏做不到位,那么在施工阶段中可能会出现坍塌的现象,更为严重的会导致人员的死亡。为此,相关管理员要把设备机械管理好,避免因为机械引发的安全事故;在项目里,假设管理员和施工员都不按照正常的 规章制度 办事,不重视操作规程,这将会严重影响工作质量,给实际工作带来安全隐患。 (三)质量监督不到位存在漏洞 进行项目时有时会有塌方的现象出现,会给施工造成严重的影响,导致这些问题是没有重视某处周围的环境因素。致使工程质量监督中通常会出现建筑周边环境的监控不到位。 由于周围的环境因素没有考虑周全,在实际工作中会受到外界的影响,地下水的结构遭到破坏,这就导致土质变软,然后承载能力就会有所下降。因此,在建设项目之前需要对周围的环境进行了解,综合考虑会影响到施工质量的因素,做好应对措施,记录工作 日记 ,杜绝事故的再次发生。 五、提升高层建筑施工质量的控制措施 (一)增强监管力度 面对管理的缺陷,在这一问题上就要采取逐个解决的措施。首先,对于设备的管理,需要匹配相关的专业人士管理。工程开工前期,需要将设备全面检查,从而保证设备的正常使用,施工过程中也要定期对设备检查防止其损坏。竣工后,要及时清洗养护设备,将养护工作做好,保证设备使用后完整。其次,加强规范建筑业规章制度,严格遵循各方面制度,完善协作机制,相互监督帮助。在次,加强 安全 教育 的学习,增长安全意识,建立创新性的安全监管手段,把 安全生产 做到位。 综上,增强监管力度是保证建筑工程有条不紊的进行的重要基础。 (二)纳入科技技术及优秀人才 建筑行业的专向发展,缺少不了先进的科学技术以及优秀的人才配合。管理人员的专业素养对高层建筑施工管理质量起着至关重要的作用,相对于当前 文化 过低的的操作员来说,理论和实践会受到外界的约束,这将严重的影响着工程的建设。可见,人才的储蓄尤为重要,除此之外,还要在技术上面将技术更新,借鉴国外先进技术和先进设备,在当前形势下,落后将会被淘汰,技术的与时俱进是保证工程质量的重要前提。 六、结语
灌注桩系是指在工程现场通过机械钻孔、钢管挤土或人力挖掘等手段在地基土中形成桩孔,并在其内放置钢筋笼、灌注混凝土而做成的桩,依照成孔方法不同,灌注桩又可分为沉管灌注桩、钻孔灌注桩和挖孔灌注桩等几类。钻孔灌注桩是按成桩方法分类而定义的一种桩型。灌注桩由最早的100多年前的1893年,因为工业的发展以及人口的增长,高层建筑不断增加,但是因为好多城市的地基条件比较差,不能直接承受由高层建筑所传来的压力,地表以下存在着厚度很大的软土或中等强度的黏土层,建造高层建筑如仍沿用当时通用的摩擦桩,必然产生很大的沉降。于是工程师们借鉴了掘井技术发明了在人工挖孔中浇筑钢筋混凝土而成桩。于是在随后的50年之后,即20世纪40年代初随着大功率钻孔机具的研制成功首先在美国问世,二战后,世界各地特别是欧美发达国家经济复苏与发展,时至今日,随着科学技术的日新月异发展,钻孔灌注桩在高层、超高层的建筑物和重型构筑物中被广泛应用。当然,在我国,钻孔灌注桩设计及施工水平也得到了长足的发展。钻孔灌注桩通常为一种非挤土桩,也有的为部分挤土桩。钻孔灌注桩的类型可以分为:A. 按桩径大小分,可分为如下几种:小桩 由于桩径小,施工机械、施工场地、施工方法较为简单,多用于基础加固和复合桩基础中(如:树根桩)。中桩 成桩方法和施工工艺繁多,工业与民用建筑物中大量使用,是目前使用最多的一类桩。大桩 桩径大且桩端不可扩大,单桩承载力高,近20年发展快,多用于重型建筑物、构筑物、港口码头、公路铁路桥涵等工程。B. 按成桩工艺,钻孔灌注桩可以分为:干作业法钻孔灌注桩;泥浆护壁法钻孔灌注桩;套管护壁法钻孔灌注桩。钻孔灌注桩的特点钻孔灌注桩具有以下技术特点:a. 施工时基本无噪音、无振动、无地面隆起或侧移,因此对环境和周边建筑物危害小;b. 大直径钻孔灌注桩直径大、入土深;c. 对于桩穿透的图层可以在空中作原位测试,以检测土层的性质;d. 扩底钻孔灌注桩能更好地发挥桩端承载力;e. 经常设计成一柱一桩,无需桩顶承台,简化了基础结构形式;f. 钻孔灌注桩通常布桩间距大,群桩效应小;g. 某些利用“挤扩支盘”钻孔灌注桩可以有效减少桩径和桩长,提高桩的承载力,减少沉降量;h. 可以穿越各种土层,更可以嵌入基岩,这是别的桩型很难做到的;i. 施工设备简单轻便,能在较低的净空条件下设桩;j. 钻孔灌注桩在施工中,影响成桩质量的因素较多,质量不够稳定,有时候会发生缩径、桩身局部夹泥等现象,桩侧阻力和桩端阻力的发挥会随着工艺而变化,且又在较大程度上受施工操作影响;k. 因为钻孔灌注桩的承载力非常高,所以进行常规的静载试验一般难以测定其极限荷载,对于各种工艺条件下的桩受力,变形及破坏机理现在尚未完全被人们掌握。设计理论有待进一步完善。钻孔灌注桩施工方法钻孔灌注桩的施工,因其所选护壁形成的不同,有泥浆护壁方式法和全套管施工法两种。1)泥浆护壁施工法冲击钻孔,冲抓钻孔和回转钻削成孔等均可采用泥浆护壁施工法。该施工法的过程是:平整场地→泥浆制备→埋设护筒→铺设工作平台→安装钻机并定位→钻进成孔→清孔并检查成孔质量→下放钢筋笼→灌注水下混凝土→拔出护筒→检查质量。施工顺序(1)施工准备施工准备包括:选择钻机、钻具、场地布置等。钻机是钻孔灌注桩施工的主要设备,可根据地质情况和各种钻孔机的应用条件来选择。(2)钻孔机的安装与定位安装钻孔机的基础如果不稳定,施工中易产生钻孔机倾斜、桩倾斜和桩偏心等不良影响,因此要求安装地基稳固。对地层较软和有坡度的地基,可用推土机推平,在垫上钢板或枕木加固。为防止桩位不准,施工中很重要的是定好中心位置和正确的安装钻孔机,对有钻塔的钻孔机,先利用钻机的动力与附近的地笼配合,将钻杆移动大致定位,再用千斤顶将机架顶起,准确定位,使起重滑轮、钻头或固定钻杆的卡孔与护筒中心在一垂线上,以保证钻机的垂直度。钻机位置的偏差不大于2cm。对准桩位后,用枕木垫平钻机横梁,并在塔顶对称于钻机轴线上拉上缆风绳。(3)埋设护筒钻孔成败的关键是防止孔壁坍塌。当钻孔较深时,在地下水位以下的孔壁土在静水压力下会向孔内坍塌、甚至发生流砂现象。钻孔内若能保持壁地下水位高的水头,增加孔内静水压力,能为孔壁、防止坍孔。护筒除起到这个作用外,同时好有隔离地表水、保护孔口地面、固定桩孔位置和钻头导向作用等。制作护筒的材料有木、钢、钢筋混凝土三种。护筒要求坚固耐用,不漏水,其内径应比钻孔直径大(旋转钻约大20cm,潜水钻、冲击或冲抓锥约大40cm),每节长度约2~3m。一般常用钢护筒。(4)泥浆制备钻孔泥浆由水、粘土(膨润土)和添加剂组成。具有浮悬钻渣、冷却钻头、润滑钻具,增大静水压力,并在孔壁形成泥皮,隔断孔内外渗流,防止坍孔的作用。调制的钻孔泥浆及经过循环净化的泥浆,应根据钻孔方法和地层情况来确定泥浆稠度,泥浆稠度应视地层变化或操作要求机动掌握,泥浆太稀,排渣能力小、护壁效果差;泥浆太稠会削弱钻头冲击功能,降低钻进速度。(5)钻孔钻孔是一道关键工序,在施工中必须严格按照操作要求进行,才能保证成孔质量,首先要注意开孔质量,为此必须对好中线及垂直度,并压好护筒。在施工中要注意不断添加泥浆和抽渣(冲击式用),还要随时检查成孔是否有偏斜现象。采用冲击式或冲抓式钻机施工时,附近土层因受到震动而影响邻孔的稳固。所以钻好的孔应及时清孔,下放钢筋笼和灌注水下混凝土。钻孔的顺序也应实事先规划好,既要保证下一个桩孔的施工不影响上一个桩孔,又要使钻机的移动距离不要过远和相互干扰。(6)清孔钻孔的深度、直径、位置和孔形直接关系到成装置量与桩身曲直。为此,除了钻孔过程中密切观测监督外,在钻孔达到设计要求深度后,应对孔深、孔位、孔形、孔径等进行检查。在终孔检查完全符合设计要求时,应立即进行孔底清理,避免隔时过长以致泥浆沉淀,引起钻孔坍塌。对于摩擦桩当孔壁容易坍塌时,要求在灌注水下混凝土前沉渣厚度不大于30cm;当孔壁不易坍塌时,不大于20cm。对于柱桩,要求在射水或射风前,沉渣厚度不大于5cm。清孔方法是使用的钻机不同而灵活应用。通常可采用正循环旋转钻机、反循环旋转机真空吸泥机以及抽渣筒等清孔。其中用吸泥机清孔,所需设备不多,操作方便,清孔也较彻底,但在不稳定土层中应慎重使用。其原理就是用压缩机产生的高压空气吹入吸泥机管道内将泥渣吹出。(7)灌注水下混凝土清完孔之后,就可将预制的钢筋笼垂直吊放到孔内,定位后要加以固定,然后用导管灌注混凝土,灌注时混凝土不要中断,否则易出现断桩现象。2)全套管施工法全套管施工法的施工顺序。其一般的施工过程是:平场地、铺设工作平台、安装钻机、压套管、钻进成孔、安放钢筋笼、防导管、浇注混凝土、拉拔套管、检查成桩质量。全套管施工法的主要施工步骤除不需泥浆及清孔外,其它的与泥浆护壁法都类同。压入套管的垂直度,取决于挖掘开始阶段的5~6m深时的垂直度。因此应该随使用水准仪及铅垂校核其垂直度。
建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。我为大家整理的建筑工程质量检测技术论文,希望你们喜欢。建筑工程质量检测技术论文篇一 浅议建筑工程质量检测 【摘要】 建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。本文对检测行业的现状进行了分析,探讨了建筑工程质量检测的主要内容与检测技术,并提出了做好检测工作的策略。 【关键词】 质量检测;检测内容;策略 【中图分类号】 TU712.5【文献标识码】 B 【 文章 编号】 1727-5123(2012)03-045-02 建筑工程质量不仅关系工程的适用性和建设项目的投资效果,而且关系到人民群众生命财产的安全。随着我国现代化建筑事业的蓬勃发展,建筑规模不断扩大,一旦发生工程质量问题,会直接影响公共利益和公众安全,因而,建筑工程的质量检测越来越成为人们所关注的 热点 。 1检测行业的现状 改革开放以来,建设工程质量检测行业规模由小到大,工作类型由单一到综合,检测市场化概念已经形成。但是在实际工作中仍然存在很多问题。⑴从只能检验砂石、水泥、砖瓦、钢材发展到市政工程材料、地基基础检测、建筑工程结构可靠性检测、建筑节能检测、室内环境检测等,检测的内容越来越精细,检测技术也在不断进步;⑵建筑企业试验室属于第一方试验室,即企业为了保证自身承包的工程质量而设立的试验室,由于其自身性质很大程度上限制了它们的发展,使其在经济实力、检测能力、规模和技术力量等环节处于劣势,在检测市场所占分额很小。但是这种情况正在改变,企业的试验室正在逐步分离出来, 成立具有独立法人资格的检测机构;⑶市场的竞争,使检测费用远远低于成本,导致部分试验无法正常进行;⑷检测行业目前的技术门槛过低,造成人员技术素质较低。虽然现在实行的是见证取样,施工现场的见证人员不仅没有相应的资格,甚至有一些人员连最简单的常识都不懂,样品的真实性得不到保证,所得到的数据与实际严重不符。 2建筑工程质量检测的内容 2.1地基基础工程的质量检测。 2.1.1地基。通常采用钻孔取芯试验、静载荷试验和触探试验对复合地基进行检测。检测要求有:⑴砂石桩复合地基的质量检测要求。施工后等待一段时间,抽查检测砂石桩的处理效果;可采用静力触探、标准贯入、原位测试的 方法 检测桩间土的挤密质量;⑵振冲桩复合地基的质量检测要求。施工结束后间隔一定的时间,可采用单桩载荷试验对振冲桩的质量进行检测;对于场地复杂或是重要的工程,应检测复合地基的处理效果。 2.1.2桩基工程。桩基检测项目主要有:⑴单桩竖向承载力试验。在同一个条件下,试桩的数量应大于3根;应采用油压千斤顶加载;基准桩与压重平台支座、试桩之间的中心距应符合相关规定;制作的试桩应符合要求;加载方式选择慢速维持载荷法;测读桩沉降量的时间间隔应掌握好;严格按照要求确定单桩竖向极限承载力;⑵基桩高应变动力检测。检测之前需对电源、传感器、仪器、设定参数等进行检查,确保无误;锤击设备选用自由落锤时,应保证最大锤击落距小于3mm;如果只需检测桩身的结构完整性,可降低落距,减轻锤重;⑶混凝土灌注桩终孔持力层检验。人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验;可采用原位载荷试验测得的结果,并结合实践 经验 和桩基设计要求,对桩孔孔底土层的承载力进行复验。地基基础工程质量检测另外还有地下结构施工监测和建筑物的变形检测等。 2.2钢筋混凝土结构工程质量检测。钢筋混凝土质量检测可分成三类。⑴外观检查。对于混凝土外表产生的质量问题,可用此法,如尺寸偏差、蜂窝麻面、表面损伤、缺棱掉角、裂缝、冻害等;⑵预留试块检测。这种方法有一定的误差,如预留试块的取样不当,试块与结构没有同条件养护,试块的振捣方法与结构的施工方法相差过大,则试块就没有代表性;⑶在结构本体上进行检测。这种检测内容有:混凝土的强度和缺陷、钢筋混凝土结构质量问题的常用手段,其测试结果可作为判断结构安全问题的重要依据。后者称为破损检验,是在非破损检测尚无法确定其承载能力时使用,或对新结构需要分解其受力性能时使用。常用较成熟的非破损检测方法有:回弹法(表面硬度法)、拔出法(半破损法)、超声波法(声波法)等。回弹法是一种测量混凝土表面硬度的方法,利用回弹仪冲击动能测量回弹锤撞击混凝土表面后的回弹量,确定混凝土表面硬度,用试验方法建立表面硬度与混凝土强度的关系曲线,从而推断混凝土的强度值;拔出法是直接测定混凝土的力学特性的方法,使用拔出仪拉拔埋在混凝土表面层内的锚杆,根据混凝土的拉拔强度,推算混凝土抗压强度;超声波法可以测定混凝土的强度,用超声波发射仪,从一侧发射一列超声脉冲进入混凝土中,在另一侧接收经过混凝土介质传送的超声脉冲波,同时测定其声速、振幅、频率等参数,判断混凝土的质量。 2.3砌体结构工程检测。 2.3.1砌体结构的现场检测方法。砌体结构主要指砖砌体,砌体强度是由砖块和砂浆强度或施工时制做的砌体试块强度来决定的,传统的检测方法是直接从砌体结构上截取试样,进行抗压强度试验而砌体结构的特点导致取样存在较大难度,取样时的扰动又会对试样产生较大损伤,从而影响试验结果。因此,砌体结构的现场原位非破损或半破损试验方法理所当然地受到重视,并广泛开展研究和工程实际应用。砌体强度直接测定法包括:抽样检测法、原位检测法、动测综合法、微观结构法等。 2.3.2砌体强度的间接测定法。砌体强度与砂浆和砖块强度有直接关系。由砂浆和砖块强度等级可确定砌体的抗压强度,间接测定法就是使用专门的仪器和专门的测试方法,测量砂浆和砖块的某一项强度指标或与材料强度有关的某一项物理参数,并由此间接测定砌体强度。主要方法有:冲击法、回弹法、推出法,此外尚有筒压法、点荷法等通过测定砂浆的强度来测定砌体强度的方法,都已在工程中得到应用。 3做好检测工作的策略 3.1建立检测信用档案 良好的信用是建立社会主义市场经济体制的必然要求。检测机构及检测人员信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测机构和人员的信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,建立诚信获利和失信惩戒机制,发挥信用管理调控市场的作用。通过各种 渠道 ,宣传质量检测信用好的单位,扩大其社会信誉度和知名度。 3.2完善建筑工程质量保证体系。针对建设项目规模,建立相应等级试验检测机构和质量保证体系,对工程质量负责。试验检测机构业务范围内的有关规范、规程、标准等技术文件应齐全,试验检测应严格按有关标准、规程及规范进行。各级质量管理部门应各司其责,按质量第一的方针和全面质量管理要求,采取切实有效的 措施 ,不断提高质量管理水平。在实际工作中,应严格实行质量自检,加强质量管理和质量监督,逐步建立完善质量保证体系。还要增强建设各方面的质量意识,分工负责,责任到人,真正落实质量岗位责任制。 3.3培养高素质的技术队伍,加大技术创新的投入。勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 3.4坚持质量 教育 ,建立质量原理和质量责任制度。在质量管理工作中,质量意识的提高有两个途径:⑴靠坚持不懈的质量教育;⑵建立和落实质量管理和质量责任制度。因此,质量教育经常化和质量管理制度化是我们质量管理工作的重点。 3.5严格验收工程。完成项目工程能否交付好的产品,关键在于最后验收。⑴工序验收是验收工作的基础。工序验收的过程是:先由操作者自检,再交由班组长检验。要采取必要经济制约手段,完善签字鉴证手续,严格执行每道工序,确保质量;⑵分项分部工程验收是验收工作的主要组织部分。分项分部验收要做到规范和严细:首先,保证验收工程的全面性,验收项目的品种和数量不得缺少。其次,从保证项目到允许偏差项目,验收都要严格执行国家标准,不得降低等级,严禁弄虚作假。最后,建设(监理)单位现场质量监督员应参加验收并签字鉴证;⑶竣工工程验收是工程交工的前提。工程整体验收应注意三个环节:首先,施工单位的自评;其次,建设(监理)单位的预验;最后,工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 总之,在将建筑工程质量检测行业推向市场的过程中,要加强见证取样工作的监督,无论是招标、规划、质量监督工程的各个部门在工程的每个环节都不要放松。做到每一个样品的取样合理,真实可靠。各检测单位还要提高建筑工程质量检测的质量意识和法律意识。树立服务观念,在市场经济中找准自己的位置,树立现代 企业管理 观念,借鉴和利用一切企业管理的先进手段和办法来帮助检测机构健康发展。 建筑工程质量检测技术论文篇二 刍议建筑工程质量检测 【摘要】建筑工程的数量也随着社会主义发展而不断增加,而工程检测是现代建筑必不可少的环节,这也是保证工程施工质量的有效途径。工程检测质量的好坏关系到了整个建筑质量的好坏,结合具体的工作经验,本文对建筑工程质量检测遇到的相关问题展开了简单的探讨。 【关键词】质量检测;建筑工程;问题探讨 在建筑行业不断发展的同时,我们也看到了很多潜在的安全隐患。近几年,我国建筑行业的意外事故发生率在不断增加,很多施工场地都出现了伤亡事故。这些都在警示人们,工程建筑施工必须要做好质量检查工作。检测时需要积极运用先进的技术手段,结合科学的实施程序,提高建筑工程的检测效率,尽可能避免过大的经济损失,维护建施工的安全进行。 一、建筑工程检测的主要内容与技术 1、地基基础的检测 (1)桩基工程的检测 桩基是隐蔽工程,支撑着地面上的构筑物,它是建筑物的基础,其质量优劣直接影响到这些建筑物的安全。在桩基础的施工过程中,桩基检测是一个不可缺少的环节。 a.单桩竖向承载力。在检测的同时必须要注意几个重点:在相同环境下,保证试桩的数量在3根以上;需使用油压千斤顶进行加载;对基准桩、压重平台支座、试桩三者的间隔要控制在标准范围内;设计的试桩需要满足实际工程需要;严格控制测读桩沉降量的时间长短好;根据具体标准来限制单桩竖向极限承载力。b.基桩高应变动力。在现场进行检测工作需要结合相关要求进行:在检测前期需做好相关的检查,如:电源、仪器、设定参数等,保证无误后投入使用;在锤击设备采取自由落锤时,要将最大锤击落距控制在3mm 以内;若需要对桩身的结构整体性进行检测,需要降低落距,减小锤重。c.混凝土灌注桩终孔持力层检验。检验技术要点:人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验。 (2)建筑物的变形检测 a.倾斜。对建筑物倾斜情况实施检测是不可缺少的环节,其主要包括了直接测定法、间接测定等方式。直接测定法有:经纬仪投影法、垂线法、天顶天底仪观测法等;间接测定法有:对建筑物基础的相对沉降实施测定等。b.挠度与裂缝。通过运用检测仪器来做详细的观察;c.沉降。对地基的实际情况做好检查分析,避免因地基严重而影响到建筑质量。 (3)地下结构施工的监测 a.结构内力监测。钢筋混凝土的结构内力测试,主要是通过在支护结构构件主筋上布置钢筋应力计,以监控支护结构的应力变化。b.支护结构的侧向变形观测。采用测斜仪可以测量不同深度支护结构及土体的侧向变形程度。 二、对钢筋混凝土结构的质量检测 1.对混凝土内部状况的检测 由于混凝土材料的缺陷才导致的内部状况。这是因为施工大意、技术管理不到位等造成的。通过超声波可以探明缺陷具体存在的位置,并进行及时补救。直角传播法、钻孔对测法、单面平测法和直接穿透法等都是主要的检测方法。 2.对混凝土中钢筋的质量检测 对钢筋锈蚀的检测。如果钢筋发生锈蚀,则会对混凝土结构的安全性和耐久性会产生影响。通过采用半电池检测的方法,利用钢筋锈蚀程度与测量电位间建立的关系,对钢筋的锈蚀程度进行判断。对钢筋的位置进行检测。可以利用钢筋位置检测仪,这一先进的仪器设备进行测量,其能准确的测出混凝土中钢筋的位置以及保护层的厚度,确保其稳定性。 3.对混凝土强度的检测 主要是针对混凝土的内部结构而进行的非破损强度检测,主要运用回弹法等方法,对当前的建筑行业而言,这是对混凝土强度检测中比较常用的方式[2]。其重点主要在于:①在检测前需要对被检测对象的相关情况进行熟悉;②在构件上,要确定试样及分布其测区;③对回弹值、碳化深度要进行循环测试;④对试验数据要做好处理。 三、钢筋混凝土结构检测 (1)混凝土中钢筋的质量检测 a.钢筋锈蚀的检测。钢筋发生锈蚀会直接影响混凝土结构的耐久性和安全性。可采用半电池检测法,利用测量电位与钢筋锈蚀程度间建立的关系,判别钢筋的锈蚀程度。b.钢筋的位置检测。钢筋位置检测仪作为一种先进的仪器设备,可以准确的测定钢筋混凝土中钢筋的位置以及保护层厚度,保证其稳定性。 (2)混凝土强度 主要是针对混凝土结构的非破损强度进行,主要运用的方法包括了回弹法,这是当前建筑行而言比较常用的混凝土强度的方式。其重点在于:a.检测前需熟悉被检测对象情况;b.于构件上确定试样并分布测区;c.逐渐测量回弹值、碳化深度;d.对试验数据做好处理。 四、建筑材料的质量检测 建筑材种类繁多,各种材料进入施工现场后必须根据相关的规范要求进行试验检测,其检验的项目也必须符合国家、行业、地方的相关要求。常规检测项目有:主体结构(梁、板、柱) 砼标号及钢筋数量检测,竣工后房屋空气质量状况检测,钢筋抽样检测,混凝土试块检测,瓷砖性能检测,铝合金门窗三性检测等,这些项目都是强制性要求必须检测的项目。 五、建筑门窗 (1)塑料门窗 检测对象包括:a.根据断面图标准,对配合尺寸、断面尺寸的允差检查;b.低温落锤冲击试验;c.检测加热后的尺寸大小变化。 (2)铝合金门窗 包括:a.表面质量。检查门窗的装饰表面是否出现损伤,其表面的致密、配合情况是否良好。b.装配标准。检查运用的材料能否达到要求,其硬度与强度之关系是否合理。c.性能。门启闭力在50N 以下;抗风压性能要尽可能更强。 六、做好检测工作 1、建立检测信用档案 检测信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,就是要建立诚信获利和失信惩戒的管理机制,发挥信用管理在市场调控中的作用。 2、完善技术管理工作制度 要认真执行工程技术标准,它是工程质量和安全的最基本保障,是工程建设领域的技术法规。要想使质量管理工作科学化、规范化、程序化、制度化,必须健全和完善建设各方主体工程质量技术保证体系,建立健全工程各方主体的质量技术管理控制机制,督促施工单位结合自身情况制定施工工艺、操作规程和内部控制标准。 3、培养高素质的技术队伍,加大技术创新的投入 勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 4、严格验收工程 工程整体验收应注意三个环节:一是施工单位的自评。二是建设(监理)单位的预验。三是工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 结束语 对建筑工程实施质量检测具有十分重要的意义,对工程的质量具有决定给作用,在一定程度上可以降低工程成本的过度消耗,并对建筑物的结构安全起到了维护的作用。根据具体的需要,进而由施工单位采取相应的科学措施来进行检测。 参考文献: [1]杨莉萍,谢平.浅议工程质量检测工作的重要性及要求[J].云南建筑,2008(5) [2]王晓萍.关于混凝土构件荷载检验方法的探讨[J].河北建筑工程学院学报,2008(5) [3]周涛.浅谈工民建工程的质量检测[J].城市建设,2009(32) 看了建筑工程质量检测技术论文的人还看 1. 建筑工程技术论文范文 2. 建筑工程技术研究论文范文 3. 建筑工程技术管理毕业论文3篇 4. 建筑工程技术毕业论文范文 5. 浅谈工程技术建设论文
低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|pile foundation高层建筑 High-rise buildings(分类词汇:环境资源相关 )大型桥梁super-large bridges 深水码头Deep Water Wharf海上石油平台Offshore oil platform建筑结构building structure施工construction非线性弹性材料nonlinear elastic materials桩基工程质量问题这篇虽然是科技论文,但是我觉得他翻译成“pile foundation quality question”很不妥当,我将他修改成problems of pile foundation quality,,从汉语语法之角度考虑,这里的问题两个字是多余的,去掉更好,你自己看看吧!不确定性因素Incertitude Factors基桩Foundation Pile隐蔽性(Impercephbility)axial strain轴向应变研究热点research hotspot(也有用point的)桩身缺陷位置 positions of pile defects定性估计 qualitative estimation混凝土强度等级concrete strength gradethe signal of reflected_wave curve反射波曲线信号工程隐患Project Concealed Harzard一维波动模型one-way fluctuant model控制体(control volume),本构关系 constitutive relationFORTRAN语言编制程序program written in FORTRAN language响应时程曲线波形时程曲线response time history curvePile foundation is widely used as the main basic structure of high-rise buildings,super-large bridges,deep water wharf and Offshore oil platform. During recent years,there are many bases of pile foundation quality affecting the normal working and safety of the building structures. Pile construction has high impercephbility and whose quality presents many incertitude factors,from an angel of qualitative inspection of the foundation piles, it has important significance for ensuring the quality and safety of foundation pile projects to modify the inspection methods and improving the inspection quality and the reliability of inspection & assessment results,it is also one of the research hotspots in foundation pile field. The main functions of low strain reflection wave method is to inspect the pile integrity, such as the judgment of pile defects positions, the checkout of pile lengths, and the qualitative estimation of the concrete strength grade,the judgment of the pile quality using the signal of reflected_wave curve accurately, the elimination of the project concealed harzard,and the estimation of foundation pile quality. This paper studied on the low strain reflection wave method for measuring of pile integrity made of Kelvin nonlinear elastic materials, set up a new one-way fluctuant model to treat the problems of piles made of Kelvin nonlinear elastic materials, gave out a dynamics equation of control volume,and induced the relation between pile axial forces and axial strain using the constitutive relation of one-way nonlinear elastic materials, put forward a new calculation method for the fluctuation of one-way nonlinear elastic materials, simulated the pile-top speed response time history curve (or displacement, acceleration) numerically using program written in FORTRAN language, finally the author set up a curve database of the foundation piles existing integrity problem for the integrity inspection of foundation piles in the future.
A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. adoption.In recent years, a 基 engineering quantity problem influence building structure of the case of the normal usage and safety is a lot of.The construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of 基 examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of 基s, is also a research heat of 基 realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering 隐 to suffer from, carrying on the evaluation to the quantity of the stake of 基 . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a 维 of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a 维 not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of 基 of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases
公路工程地质信息 (一)强夯法处理液化地基的施工管理 江苏北部(如徐州、宿迁等)地区广泛分布废黄河泛滥沉积物,一般以亚砂土、亚粘土—细砂为主,埋层浅,地下水位高,天然地基承载力低,在地震作用下易产生液化现象。地基液化是引起构筑物破坏的主要形式,同时该地区又受到我省主要的地震危险带—郯庐地震带的影响,因此在该地区国道主干线京福、徐宿、连徐、宁宿徐、沂淮等高速公路建设中不可避免的遇到大面积液化地基处理问题。根据《公路工程抗震设计规范》(JTJ004—89),对高速公路必须进行液化地基处理,这是减轻地震灾害的根本性措施。因此,如何控制和管理好处理液化地基的施工,做到既经济有效又安全可靠,对保证高速公路建成后的正常运营、减轻地震灾害具有重大现实意义。 1 液化地基的国内外研究概况 地基液化分析与处理一直是土动力学的主要研究课题之一。液化一词最早见于1920年Hazen.A的《动力冲填坝》用来说明卡拉弗拉斯冲填坝的毁坏。1936年Casagrande首先给出了砂土液化的判别方法——临界孔隙比法。上世纪50年代,各国学者对砂土液化进行了广泛研究,主要包括:砂土液化的机理,砂土液化的预估方法,砂土液化的地基处理等。 所谓液化是指由于孔隙水压增加及有效应力降低而引起粒状材料(砂土、粉土甚至包括砾石)由固态转变成液态的过程。影响液化的因素有:①颗粒级配,包括粘粒、粉粒含量,平均粒径d50;②透水性能;③相对密度;④结构;⑤饱和度;⑥动荷载,包括振幅、持时等。 我国《工业与民用建筑抗震设计规范》(TJ11—78)根据1971年以前8次大地震的数据,参考美国、日本的有关研究成果给出了以临界标准贯入击数为指标的砂土液化判别公式。现行规范《建筑抗震设计规范》(GBJ11—89)通过对海城、唐山地震的系统研究,结合国外大量资料,对原规范进行了修改,采用了两步评判原则,并对临界标贯击数公式进行了修改,使之更符合实际。在国标《岩土工程勘察规范》(GB50021—94)中,对此又进行了补充,给出了液化比贯入阻力临界值和液化剪切波速临界值公式,用来进行液化判别。在公路工程中,基本上沿用上术两步评判原则,采用了临界标贯击数判别方法,并根据公路工程中的研究成果,给出了临界标贯击数的计算公式。这些规范在我国工程界得到了广泛应用。 2 高等级公路可液化地基处理方案的确定。 液化地基处理恰当与否,关系到整个工程的质量、投资和进度。因此其重要性已越来越多地被人们所认识。对于高速公路这样大面积处理可液化土而言,强夯法和干振碎石桩法是首选的处理手段。当全液化地基路段较长,需处理面积大,公路沿线外缘较近范围内无村庄,无重要构造物时,强夯法是比较理想的地基处理方法。 强夯法处理地基是20世纪60年代末Menard技术公司首先创立的,该方法将80…400kN重锤从落距6—40m处自由落下,给地基以冲击和振动,从而提高地基土的强度并降低其压缩性。强夯法常用来加固碎石、砂土、粘性土、杂填土、湿隐性黄土等各类地基土。由于其具有设备简单、施工速度快、适用范围广、节约三材、经济可行、效果显著等优点,经过20多年来的应用与发展,强夯法处理地基受到各国工程界的重视,并得以迅速推广,取得了较大的经济效益和社会效益。 由于强夯处理的对象(即地基土)非常复杂,一般认为不可能建立对各类地基土均适合的具有普遍意义的理论,但对地基处理中经常遇到的几种类型土,还是有规律可循的。实践证明,用强夯法加固地基,一定要根据现场的地质条件和工程作用要求,正确选用强夯参数,一般通过试验来确定以下强夯参数: (1)有效加固深度:有效加固深度既是选择地基处理方法的重要依据,又反映了处理效果。 (2)单击夯击能:单击夯击能等于锤重×落距。 (3)最佳夯击能:从理论上讲,在最佳夯击能作用下,地基土中出现的孔隙水压力达到土的自重压力,这样的夯击能称最佳夯击能。因此可根据孔隙水压力的叠加值来确定最佳夯击能。在砂性土中,孔隙水压力增长及消散过程仅为几分钟,因此孔隙水压力不能随夯击能增加而叠加,可根据最大孔隙水压力增量与夯击次数关系来确定最佳夯击能。 夯点的夯击次数,可按现场试夯得到的夯击次数和夯沉量关系曲线确定,应同时满足下列条件:(①夯坑周围地面不应发生过大隆起;②不因夯坑过深而发生起锤困难;③每击夯沉量不能过小,过小无加固作用。夯击次数也可参照夯坑周围土体隆起的情况予以确定,就是当夯坑的竖向压缩量最大,而周围土体的隆起最小时的夯击数。对于饱和细粒土,击数可根据孔隙水压力的增长和消散来决定,当被加固的土层将发生液化时的击数即为该遍击数,以后各遍击数也可按此确定。 (4)夯击遍数:夯击遍数应根据地基土的性质确定,地基土渗透系数低,含水量高,需分3—4遍夯击,反之可分两遍夯击,最后再以低能量“搭夯”一遍,其目的是将松动的表层土夯实。 (5)间歇时间:所谓间歇时间,是指相邻夯击两遍之间的时间间隔。Menard指出,一旦孔隙水压力消散,即可进行新的夯击作业。 (6)夯点布置和夯点间距:为了使夯后地基比较均匀,对于较大面积的强夯处理,夯击点一般可按等边三角形或正主形布置夯击点,这样布置比较规整,也便于强夯施工。由于基础的应力扩散作用,强夯处理范围应大于基础范围,其具体放大范围,可根据构筑物类型和重要性等因素考虑确定。 夯点间距可根据所要求加固的地基土性质和要求处理深度而定。当土质差、软土层厚时应适当增大夯点间距,当软土层较薄而又有砂类土夹层或土夹石填土等时,可适当减少夯距。夯距太小,相邻夯点的加固效应将在浅处叠加而形成硬层,影响夯击能向深部传递。 3 强夯法处理液化地基的质量控制与管理 3.1 施工单位选择 对参与施工的强夯施工单位,各施工标段中标单位要先审查其施工资质、信誉和业绩,并附有前业主对该单位的书面评价报告;任何单位不得将强夯分包给个人施工。各中标单位将经初步筛选合格的施工队伍形成书面推荐报告,经驻地监理审核后,上报主管部门,经批准后方可进场。进场后不得再分包或转包,否则,驻地监理工程师将责令分包单位立即退场,损失自负。 3.2 施工准备 编写施工组织设计,经驻地监理组审查,监理组提出书面审查意见,报总监代表审批同意方可施工。 3.3 施工管理 (1)施工单位要按设计图要求编制夯点编号图,编号图要清晰、规范、科学。 (2)施工单位必须制定严格的安全管理措施,现场操作人员必须戴安全帽,并对施工机械定期作安全检查。在强夯区四周要设置醒目的危险警告标志和安全管理措施,不允许行人和非施工车辆进入强夯区,以确保操作员、过往行人和车辆的安全。 (3)施工单位要对强夯机械进行编号,每台强夯机械必须持有监理组发放的《施工许可证》方可进行强夯施工。 (4)施工单位除在强夯机械上挂《施工许可证》外,还必须挂有《机械操作主要人员》和《施工技术参数》两块醒目的牌子,进行机械操作的主要人员必须挂牌上岗。 (5)施工单位要制定施工要点供现场人员执行。 (6)铺设垫层前要对原地面进行清表并整平,且要按每20米一个断面,每个断面5个规定测点,测量清表后标高。 (7)用水准仪测量垫层铺设前、后的对应测点标高,初步确定垫层厚度,每20米一个断面,每个断面5个规定测点,再按每断面挖1处深坑,进一步确定垫层厚度(控坑必须在测点位置上)。 (8)垫层宽度按每20米一处用钢尺丈量。 (9)按设计要求进行夯点布置,夯点定位布置用钢尺按100%的频率丈量。 (10)夯锤必须过磅称重。夯击能在强夯施工前必须检测,并满足设计要求。每夯击100次,用钢尺量一次夯锤落距。 (11)施工单位必须及时排出夯坑内积水。 (12)主、副、满夯的间隙时间要根据现场情况作必要的调整,但间隙时间必须满足72小时。需要调整间隙时间由现场监理工程师确定。 (13)遇到不需拆迁的高压电线时,施工单位必须安排集中施工的方案,市高指向供电部门申请临时停电。 (14)施工人员要认真做好强夯施工记录,记录要求清楚、真实。 (15)施工人员必须注意观察已处理路段,发现异常情况及时报告驻地监理组和有关部门。 (16)在强夯区内的构造物必须在强夯完成后,才能进行构造物的下部施工。 4 用强夯法处理砂土液化地基的质量检验评定 4.1 基本要求 碎石垫层的碎石规格和质量必须符合设计要求。强夯施工必须按夯击点确定的技术参数进行。以各个夯击点的夯击数作为施工控制数值。 4.2 实测项目表 表1 强夯法处理砂土液化地基实测项目表 项次 检查 项目规定值 或允许偏差 检查方法和频率 规定分 1 夯击能 不小于设计 1次/工点查施工记录 15 2 夯击次数 符合设计 查施工记录 15 3 垫层厚度 不小于设计 4处/200m 15 4 垫层宽度 不小于设计 4处/200m 15 5 标贯击数 符合设计 2处/工点 20 6 瑞利波 ≥200m/s 1处/工点 20 注:(1)标准贯入试验,按需3点/5000�且不少于3点进行。孔位随机 布置。特殊地段适当加密。 (2)瑞利波法(SSW)按1点/40m,在中心线两侧各15m处交叉布点。 4.3 外观鉴定 (1)填筑碎石垫层前必须清表、整平,无明显凸凹点,整平不符合要求扣2分。 (2)夯坑内积水应及时排除,不符合要求扣2分。 (3)夯后场地应平整,无局部隆起,不符合要求扣2分。 4.4 分项工程质量等级评定 (1)分项工程评分在85分及以上者为优良;70~85分者为合格;70分以下者为不合格。 (2)若标贯击数、瑞利波不合格时,则该分项工程不合格,可进行加固处理,再重新评定其质量等级。 5 结语 在京福、徐宿、宁宿徐等高速公路液化地基强夯加固的施工实践中,由于建设、监理及施工单位的高度重视,严格按有关质量要求和“施工指导意见”进行控制,尤其对强夯参数的确定都是经反复试验论证后,选择合适的参数指导施工,使强夯法处理液化地基段达到了设计要求,从已建成的高速公路处理路段的工后路基沉降观测看,处理段液化地基强夯加固达到了预期目的。
建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。我为大家整理的建筑工程质量检测技术论文,希望你们喜欢。建筑工程质量检测技术论文篇一 浅议建筑工程质量检测 【摘要】 建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。本文对检测行业的现状进行了分析,探讨了建筑工程质量检测的主要内容与检测技术,并提出了做好检测工作的策略。 【关键词】 质量检测;检测内容;策略 【中图分类号】 TU712.5【文献标识码】 B 【 文章 编号】 1727-5123(2012)03-045-02 建筑工程质量不仅关系工程的适用性和建设项目的投资效果,而且关系到人民群众生命财产的安全。随着我国现代化建筑事业的蓬勃发展,建筑规模不断扩大,一旦发生工程质量问题,会直接影响公共利益和公众安全,因而,建筑工程的质量检测越来越成为人们所关注的 热点 。 1检测行业的现状 改革开放以来,建设工程质量检测行业规模由小到大,工作类型由单一到综合,检测市场化概念已经形成。但是在实际工作中仍然存在很多问题。⑴从只能检验砂石、水泥、砖瓦、钢材发展到市政工程材料、地基基础检测、建筑工程结构可靠性检测、建筑节能检测、室内环境检测等,检测的内容越来越精细,检测技术也在不断进步;⑵建筑企业试验室属于第一方试验室,即企业为了保证自身承包的工程质量而设立的试验室,由于其自身性质很大程度上限制了它们的发展,使其在经济实力、检测能力、规模和技术力量等环节处于劣势,在检测市场所占分额很小。但是这种情况正在改变,企业的试验室正在逐步分离出来, 成立具有独立法人资格的检测机构;⑶市场的竞争,使检测费用远远低于成本,导致部分试验无法正常进行;⑷检测行业目前的技术门槛过低,造成人员技术素质较低。虽然现在实行的是见证取样,施工现场的见证人员不仅没有相应的资格,甚至有一些人员连最简单的常识都不懂,样品的真实性得不到保证,所得到的数据与实际严重不符。 2建筑工程质量检测的内容 2.1地基基础工程的质量检测。 2.1.1地基。通常采用钻孔取芯试验、静载荷试验和触探试验对复合地基进行检测。检测要求有:⑴砂石桩复合地基的质量检测要求。施工后等待一段时间,抽查检测砂石桩的处理效果;可采用静力触探、标准贯入、原位测试的 方法 检测桩间土的挤密质量;⑵振冲桩复合地基的质量检测要求。施工结束后间隔一定的时间,可采用单桩载荷试验对振冲桩的质量进行检测;对于场地复杂或是重要的工程,应检测复合地基的处理效果。 2.1.2桩基工程。桩基检测项目主要有:⑴单桩竖向承载力试验。在同一个条件下,试桩的数量应大于3根;应采用油压千斤顶加载;基准桩与压重平台支座、试桩之间的中心距应符合相关规定;制作的试桩应符合要求;加载方式选择慢速维持载荷法;测读桩沉降量的时间间隔应掌握好;严格按照要求确定单桩竖向极限承载力;⑵基桩高应变动力检测。检测之前需对电源、传感器、仪器、设定参数等进行检查,确保无误;锤击设备选用自由落锤时,应保证最大锤击落距小于3mm;如果只需检测桩身的结构完整性,可降低落距,减轻锤重;⑶混凝土灌注桩终孔持力层检验。人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验;可采用原位载荷试验测得的结果,并结合实践 经验 和桩基设计要求,对桩孔孔底土层的承载力进行复验。地基基础工程质量检测另外还有地下结构施工监测和建筑物的变形检测等。 2.2钢筋混凝土结构工程质量检测。钢筋混凝土质量检测可分成三类。⑴外观检查。对于混凝土外表产生的质量问题,可用此法,如尺寸偏差、蜂窝麻面、表面损伤、缺棱掉角、裂缝、冻害等;⑵预留试块检测。这种方法有一定的误差,如预留试块的取样不当,试块与结构没有同条件养护,试块的振捣方法与结构的施工方法相差过大,则试块就没有代表性;⑶在结构本体上进行检测。这种检测内容有:混凝土的强度和缺陷、钢筋混凝土结构质量问题的常用手段,其测试结果可作为判断结构安全问题的重要依据。后者称为破损检验,是在非破损检测尚无法确定其承载能力时使用,或对新结构需要分解其受力性能时使用。常用较成熟的非破损检测方法有:回弹法(表面硬度法)、拔出法(半破损法)、超声波法(声波法)等。回弹法是一种测量混凝土表面硬度的方法,利用回弹仪冲击动能测量回弹锤撞击混凝土表面后的回弹量,确定混凝土表面硬度,用试验方法建立表面硬度与混凝土强度的关系曲线,从而推断混凝土的强度值;拔出法是直接测定混凝土的力学特性的方法,使用拔出仪拉拔埋在混凝土表面层内的锚杆,根据混凝土的拉拔强度,推算混凝土抗压强度;超声波法可以测定混凝土的强度,用超声波发射仪,从一侧发射一列超声脉冲进入混凝土中,在另一侧接收经过混凝土介质传送的超声脉冲波,同时测定其声速、振幅、频率等参数,判断混凝土的质量。 2.3砌体结构工程检测。 2.3.1砌体结构的现场检测方法。砌体结构主要指砖砌体,砌体强度是由砖块和砂浆强度或施工时制做的砌体试块强度来决定的,传统的检测方法是直接从砌体结构上截取试样,进行抗压强度试验而砌体结构的特点导致取样存在较大难度,取样时的扰动又会对试样产生较大损伤,从而影响试验结果。因此,砌体结构的现场原位非破损或半破损试验方法理所当然地受到重视,并广泛开展研究和工程实际应用。砌体强度直接测定法包括:抽样检测法、原位检测法、动测综合法、微观结构法等。 2.3.2砌体强度的间接测定法。砌体强度与砂浆和砖块强度有直接关系。由砂浆和砖块强度等级可确定砌体的抗压强度,间接测定法就是使用专门的仪器和专门的测试方法,测量砂浆和砖块的某一项强度指标或与材料强度有关的某一项物理参数,并由此间接测定砌体强度。主要方法有:冲击法、回弹法、推出法,此外尚有筒压法、点荷法等通过测定砂浆的强度来测定砌体强度的方法,都已在工程中得到应用。 3做好检测工作的策略 3.1建立检测信用档案 良好的信用是建立社会主义市场经济体制的必然要求。检测机构及检测人员信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测机构和人员的信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,建立诚信获利和失信惩戒机制,发挥信用管理调控市场的作用。通过各种 渠道 ,宣传质量检测信用好的单位,扩大其社会信誉度和知名度。 3.2完善建筑工程质量保证体系。针对建设项目规模,建立相应等级试验检测机构和质量保证体系,对工程质量负责。试验检测机构业务范围内的有关规范、规程、标准等技术文件应齐全,试验检测应严格按有关标准、规程及规范进行。各级质量管理部门应各司其责,按质量第一的方针和全面质量管理要求,采取切实有效的 措施 ,不断提高质量管理水平。在实际工作中,应严格实行质量自检,加强质量管理和质量监督,逐步建立完善质量保证体系。还要增强建设各方面的质量意识,分工负责,责任到人,真正落实质量岗位责任制。 3.3培养高素质的技术队伍,加大技术创新的投入。勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 3.4坚持质量 教育 ,建立质量原理和质量责任制度。在质量管理工作中,质量意识的提高有两个途径:⑴靠坚持不懈的质量教育;⑵建立和落实质量管理和质量责任制度。因此,质量教育经常化和质量管理制度化是我们质量管理工作的重点。 3.5严格验收工程。完成项目工程能否交付好的产品,关键在于最后验收。⑴工序验收是验收工作的基础。工序验收的过程是:先由操作者自检,再交由班组长检验。要采取必要经济制约手段,完善签字鉴证手续,严格执行每道工序,确保质量;⑵分项分部工程验收是验收工作的主要组织部分。分项分部验收要做到规范和严细:首先,保证验收工程的全面性,验收项目的品种和数量不得缺少。其次,从保证项目到允许偏差项目,验收都要严格执行国家标准,不得降低等级,严禁弄虚作假。最后,建设(监理)单位现场质量监督员应参加验收并签字鉴证;⑶竣工工程验收是工程交工的前提。工程整体验收应注意三个环节:首先,施工单位的自评;其次,建设(监理)单位的预验;最后,工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 总之,在将建筑工程质量检测行业推向市场的过程中,要加强见证取样工作的监督,无论是招标、规划、质量监督工程的各个部门在工程的每个环节都不要放松。做到每一个样品的取样合理,真实可靠。各检测单位还要提高建筑工程质量检测的质量意识和法律意识。树立服务观念,在市场经济中找准自己的位置,树立现代 企业管理 观念,借鉴和利用一切企业管理的先进手段和办法来帮助检测机构健康发展。 建筑工程质量检测技术论文篇二 刍议建筑工程质量检测 【摘要】建筑工程的数量也随着社会主义发展而不断增加,而工程检测是现代建筑必不可少的环节,这也是保证工程施工质量的有效途径。工程检测质量的好坏关系到了整个建筑质量的好坏,结合具体的工作经验,本文对建筑工程质量检测遇到的相关问题展开了简单的探讨。 【关键词】质量检测;建筑工程;问题探讨 在建筑行业不断发展的同时,我们也看到了很多潜在的安全隐患。近几年,我国建筑行业的意外事故发生率在不断增加,很多施工场地都出现了伤亡事故。这些都在警示人们,工程建筑施工必须要做好质量检查工作。检测时需要积极运用先进的技术手段,结合科学的实施程序,提高建筑工程的检测效率,尽可能避免过大的经济损失,维护建施工的安全进行。 一、建筑工程检测的主要内容与技术 1、地基基础的检测 (1)桩基工程的检测 桩基是隐蔽工程,支撑着地面上的构筑物,它是建筑物的基础,其质量优劣直接影响到这些建筑物的安全。在桩基础的施工过程中,桩基检测是一个不可缺少的环节。 a.单桩竖向承载力。在检测的同时必须要注意几个重点:在相同环境下,保证试桩的数量在3根以上;需使用油压千斤顶进行加载;对基准桩、压重平台支座、试桩三者的间隔要控制在标准范围内;设计的试桩需要满足实际工程需要;严格控制测读桩沉降量的时间长短好;根据具体标准来限制单桩竖向极限承载力。b.基桩高应变动力。在现场进行检测工作需要结合相关要求进行:在检测前期需做好相关的检查,如:电源、仪器、设定参数等,保证无误后投入使用;在锤击设备采取自由落锤时,要将最大锤击落距控制在3mm 以内;若需要对桩身的结构整体性进行检测,需要降低落距,减小锤重。c.混凝土灌注桩终孔持力层检验。检验技术要点:人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验。 (2)建筑物的变形检测 a.倾斜。对建筑物倾斜情况实施检测是不可缺少的环节,其主要包括了直接测定法、间接测定等方式。直接测定法有:经纬仪投影法、垂线法、天顶天底仪观测法等;间接测定法有:对建筑物基础的相对沉降实施测定等。b.挠度与裂缝。通过运用检测仪器来做详细的观察;c.沉降。对地基的实际情况做好检查分析,避免因地基严重而影响到建筑质量。 (3)地下结构施工的监测 a.结构内力监测。钢筋混凝土的结构内力测试,主要是通过在支护结构构件主筋上布置钢筋应力计,以监控支护结构的应力变化。b.支护结构的侧向变形观测。采用测斜仪可以测量不同深度支护结构及土体的侧向变形程度。 二、对钢筋混凝土结构的质量检测 1.对混凝土内部状况的检测 由于混凝土材料的缺陷才导致的内部状况。这是因为施工大意、技术管理不到位等造成的。通过超声波可以探明缺陷具体存在的位置,并进行及时补救。直角传播法、钻孔对测法、单面平测法和直接穿透法等都是主要的检测方法。 2.对混凝土中钢筋的质量检测 对钢筋锈蚀的检测。如果钢筋发生锈蚀,则会对混凝土结构的安全性和耐久性会产生影响。通过采用半电池检测的方法,利用钢筋锈蚀程度与测量电位间建立的关系,对钢筋的锈蚀程度进行判断。对钢筋的位置进行检测。可以利用钢筋位置检测仪,这一先进的仪器设备进行测量,其能准确的测出混凝土中钢筋的位置以及保护层的厚度,确保其稳定性。 3.对混凝土强度的检测 主要是针对混凝土的内部结构而进行的非破损强度检测,主要运用回弹法等方法,对当前的建筑行业而言,这是对混凝土强度检测中比较常用的方式[2]。其重点主要在于:①在检测前需要对被检测对象的相关情况进行熟悉;②在构件上,要确定试样及分布其测区;③对回弹值、碳化深度要进行循环测试;④对试验数据要做好处理。 三、钢筋混凝土结构检测 (1)混凝土中钢筋的质量检测 a.钢筋锈蚀的检测。钢筋发生锈蚀会直接影响混凝土结构的耐久性和安全性。可采用半电池检测法,利用测量电位与钢筋锈蚀程度间建立的关系,判别钢筋的锈蚀程度。b.钢筋的位置检测。钢筋位置检测仪作为一种先进的仪器设备,可以准确的测定钢筋混凝土中钢筋的位置以及保护层厚度,保证其稳定性。 (2)混凝土强度 主要是针对混凝土结构的非破损强度进行,主要运用的方法包括了回弹法,这是当前建筑行而言比较常用的混凝土强度的方式。其重点在于:a.检测前需熟悉被检测对象情况;b.于构件上确定试样并分布测区;c.逐渐测量回弹值、碳化深度;d.对试验数据做好处理。 四、建筑材料的质量检测 建筑材种类繁多,各种材料进入施工现场后必须根据相关的规范要求进行试验检测,其检验的项目也必须符合国家、行业、地方的相关要求。常规检测项目有:主体结构(梁、板、柱) 砼标号及钢筋数量检测,竣工后房屋空气质量状况检测,钢筋抽样检测,混凝土试块检测,瓷砖性能检测,铝合金门窗三性检测等,这些项目都是强制性要求必须检测的项目。 五、建筑门窗 (1)塑料门窗 检测对象包括:a.根据断面图标准,对配合尺寸、断面尺寸的允差检查;b.低温落锤冲击试验;c.检测加热后的尺寸大小变化。 (2)铝合金门窗 包括:a.表面质量。检查门窗的装饰表面是否出现损伤,其表面的致密、配合情况是否良好。b.装配标准。检查运用的材料能否达到要求,其硬度与强度之关系是否合理。c.性能。门启闭力在50N 以下;抗风压性能要尽可能更强。 六、做好检测工作 1、建立检测信用档案 检测信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,就是要建立诚信获利和失信惩戒的管理机制,发挥信用管理在市场调控中的作用。 2、完善技术管理工作制度 要认真执行工程技术标准,它是工程质量和安全的最基本保障,是工程建设领域的技术法规。要想使质量管理工作科学化、规范化、程序化、制度化,必须健全和完善建设各方主体工程质量技术保证体系,建立健全工程各方主体的质量技术管理控制机制,督促施工单位结合自身情况制定施工工艺、操作规程和内部控制标准。 3、培养高素质的技术队伍,加大技术创新的投入 勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 4、严格验收工程 工程整体验收应注意三个环节:一是施工单位的自评。二是建设(监理)单位的预验。三是工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 结束语 对建筑工程实施质量检测具有十分重要的意义,对工程的质量具有决定给作用,在一定程度上可以降低工程成本的过度消耗,并对建筑物的结构安全起到了维护的作用。根据具体的需要,进而由施工单位采取相应的科学措施来进行检测。 参考文献: [1]杨莉萍,谢平.浅议工程质量检测工作的重要性及要求[J].云南建筑,2008(5) [2]王晓萍.关于混凝土构件荷载检验方法的探讨[J].河北建筑工程学院学报,2008(5) [3]周涛.浅谈工民建工程的质量检测[J].城市建设,2009(32) 看了建筑工程质量检测技术论文的人还看 1. 建筑工程技术论文范文 2. 建筑工程技术研究论文范文 3. 建筑工程技术管理毕业论文3篇 4. 建筑工程技术毕业论文范文 5. 浅谈工程技术建设论文
汽车检测是指为了确定汽车技术状况是否达到标准或工作能力是否正常而进行的检查和测量。下面是我为大家精心推荐的汽车检测技术论文,希望能够对您有所帮助。
国内汽车检测技术概况
[摘 要]本文通过了解我国国内汽车检测技术的概念及其分类,介绍了我国一些先进前沿的汽车检测技术,阐述了我国汽车检测技术的发展概况,针对我国汽车检测技术中的不足之处,结合我国汽车检测技术的具体发展形势,提出了我国汽车检测技术的发展方向,这对我国汽车检测技术的发展具有一定的现实指导意义。
[关键词]汽车检测;检测技术;国内现状;发展概况
中图分类号:F407.471 文献标识码:A 文章 编号:1009-914X(2015)03-0056-01
1.汽车检测的概念
汽车检测是指为了确定汽车技术状况是否达到标准或工作能力是否正常而进行的检查和测量。汽车检测技术则是指在汽车检测这一过程中所有与之相关的检测硬件和检测软件的研发和使用技术。
2.汽车检测技术的分类
2.1 安全环保检测
安全环保检测主要是针对汽车的安全运行和环境保护方面的检测,这种检测又分为定期检测和不定期检测。该检测的目的是为了确定车辆是否具备符合要求的外观容貌以及良好的安全性能,同时对汽车的环境污染程度进行有效控制。在汽车不解体的情况下,对汽车建立安全监控体系,确保汽车能高效、安全和低污染的运行。
2.2 综合性能检测
综合性能检测是指对汽车的综合性能实行定期或者不定期的检测。该检测的目的是为了确定汽车是否具有良好的动力性、可靠性、安全性、噪声污染性以及排气净化性。该检测主要针对汽车的故障及其原因或隐患部位实行质量监督和检测,从而建立汽车质量监控体系,来达到该检测技术的目的。
3.国内汽车检测技术的发展情况
3.1 国内汽车检测技术的发展历程
(1)20世纪60年代,我国汽车检测技术处于起步阶段。我国开始研究汽车检测技术开始于20世纪60年代,为了满足当时的汽车维修需要,我国交通部门研究和开发了发动机汽缸漏气量检测仪以及点火正时灯等一些基本的检测仪器。
(2)20世纪70年代,我国汽车检测技术进入发力发展阶段。随着我国汽车生产技术以及人们汽车使用率的飞速增长,我国交通部门开始进入大力发展汽车检测技术的阶段。汽车检测的仪器设备增多,检测项目增多,检测标准和规则也得到进一步的完善,建立了汽车性能综合检验台。
(3)20世纪80年代,我国汽车检测技术进入快速发展阶段。随着我国科学技术和国民经济的飞速发展,我国汽车制造业和交通运输业也得到了飞速发展。因此,对汽车检测技术和设备的需求也日益增涨。我国汽车检测技术因此进入其发展的蓬勃向上时期。
(4)20世纪90年代至今,我国汽车检测技术已经发展相对成熟。迈入90年代后,我国汽车检测技术从其设备的研制、开发以及生产都有了自身的一套运作体系。90年代是我国汽车检测技术的发展高潮时期。虽然目前我国的汽车检测技术与外国仍存在一定的差距,其发展的过程中也存在有一些问题和不足,但我国汽车检测技术也在不断的吸收借鉴完善自己,保证自身良好的发展态势,努力为其创造广阔的发展前景。
3.2 目前国内具有代表性的先进前沿的汽车检测技术
(1)虚拟仪器检测技术
虚拟仪器检测技术是指通过自由增减测试系统配置,利用系统配置单元器件,按照每一个项目测试的要求标准,可以直观和有效的得出监测结果,从而提高测试技术的效率。
(2)将GPS技术与车辆检测相结合
该技术主要是利用了能够接受卫星定位信号的GPS系统,将其与汽车检测技术系统相结合,从而达到快捷有效的检测过程。
(3)利用汽车四轮定位进行检测
四轮定位仪主要是依据车轮定位得到检测数据,它利用图像显示并记录汽车四轮的运作情况,与汽车检测数据结果分析相结合,从而达到检测目的。
4.国内汽车检测技术发展过程中存在的问题
4.1 国内汽车检测站的经营管理过程中存在行政干预问题
在我国,安全检测是由公安部门来建立管理的。因此我国的综合性能检测站都由交通部门直接建立并管理或者由地方企业建立但仍由交通部门管理。这种行政管理形式,往往造成了检测结果的不真实、检测过程的不规范或者检测项目不完善的情况,甚至是伪造一些监测数据。
4.2 我国汽车检测存在重复检测的问题
目前,我国有权对汽车进行检测的机构至少有三种,即安检站、机动车尾气排放检测站以及汽车综合性能检测站。这三个机构又分别归隶属于公安、环保、和交通管理部门。这些部门从各自的职能要求出发对车辆进行必要的检查和监测,容易造成车辆的重复检查,在加大汽车检测工作量的同时,给车主也带来不便。
4.3 检测技术有待进一步完善
目前,我国的进口汽车检测标准体系主要依赖于外国检测标准,因此针对我国汽车具体发展情况,我国的汽车检测技术有待进一步提高和完善。例如,我国目前的技术可以对车辆的正面、侧面、追尾等事故进行检测,但对侧面碰撞、追尾碰撞等事故却缺乏相关的检测标准。这也急需我国汽车检测技术的提高和完善。
4.4 我国汽车检测人员的整体专业能力和专业素质有待提高
一方面,我国的汽车检测人员的专业检测能力有待提高。一些检测人员本身缺乏基本的汽车知识,检测操作不规范,对检测结果的分析能力不够,不能很好的判断汽车是否达到检测标准。另一方面,我国汽车检测人员的自身素质不够,一些检测人员故意抬高检测收费标准,为了个人利益不顾集体利益,甚至为一些没有达到标准的车辆伪造数据。这些都是造成安全隐患的个人因素,也不利于我国检测技术的研发和推广。
5.解决国内汽车检测技术发展过程中的问题的有效 措施
5.1 汽车检测技术基础实现规范化
在我国汽车检测技术的发展过程中,汽车检测的硬件技术一直以来都比汽车检测技术中的软件技术更受重视。这种想法往往会导致对一些基础性技术研究的忽略。因此,我国汽车检测技术的发展方向应该注重与硬件配套的软件检测技术的完善和提高。这方面主要做到三点:一,制定并完善汽车检测项目的限值标准和检测 方法 ;二,完善汽车技术状况检测的评定细则,将全国各地的检测要求和具 体操 作技术进行统一和规范化;三,严格执行综合性能检测站对大型检测设备的认证规则,确保综合性能检测站有能力胜任并履行其检测职责。
5.2 汽车检测设备实现智能化
虽然目前我国的汽车检测技术以及检测设备的智能化与国外的检测存在一定的差距,但是我国汽车检测设备正积极学习并通过进口一些外国先进检测设备来提高并完善我国汽车检测设备的智能化。检测设备的智能化使检测设备具有专家检测和诊断系统以及智能化的功能,可以在较短时间较快较准确的对汽车状况进行检测,并诊断出汽车发生故障的部位以及故障原因,从而让维修人员能够迅速解除故障。节约了劳动成本,提高了劳动效率。
5.3 汽车检测管理实现网络化
随着计算机和 网络技术 的飞速发展,我国各个行业都在逐步实现其管理的网络化,汽车检测行业也不例外。目前,虽然我国的部分汽车综合性能检测站已经实现了计算机管理系统检测,但计算机监控系统并不完善,而且各个检测站之间采用的计算机检测方式也都一致。为了逐步实现我国汽车检测管理的一致性和有效性,我国汽车检测应该积极推进其管理的网络化。
6. 总结
随着我国经济和社会的进步以及汽车工业的发展,我国汽车检测技术也必须不断的提高和完善。为了使汽车维修人员的工作越来越轻松,提高汽车检测结果准确性,我国汽车检测技术的发展越来越趋向于自动化、网络化和智能化。汽车检测技术的完善和提高有利于我国交通事业以及环保事业的发展,从而为我国经济和社会的发展提供良好的外在环境。
参考文献
[1] 初君浩;浅析汽车检测技术的发展[J];科技致富向导;2014(08)25.
[2] 王洪亮;汽车检测技术的若干问题的思考[J];无线互联科技;2013(12)15.
作者简介
张彦(1975-)女,汉族,山东菏泽人,助理工程师,大学学历, 毕业 于山东省委党校经济管理专业,研究方向为车辆检测、维修。
点击下页还有更多>>>汽车检测技术论文
A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. adoption.In recent years, a 基 engineering quantity problem influence building structure of the case of the normal usage and safety is a lot of.The construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of 基 examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of 基s, is also a research heat of 基 realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering 隐 to suffer from, carrying on the evaluation to the quantity of the stake of 基 . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a 维 of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a 维 not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of 基 of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases
桩基础 has the widespread application domain, is the high-rise construction, the large-scale bridge, the deep water wharf as well as the marine petroleum platform and so on use main foundation form. In recent years, 桩基 the project quality question influence construction structure normal use and the safe instance were very many. The pile construction has the high hiding as well as the pile construction quality has very many not definite factor, looked from 基桩 the quality examination angle, the improvement examination method and the method, improve the examination work quality and the examination evaluates the result the reliability, to guarantees 基桩 the project quality and safely has the vital significance, also is 桩基 one of domain research hot spots.The low strain reflection method main function examines the pile body structure integrity, like the pile body flaw position judgement, 施工桩 long proofreading and the concrete intensity rank qualitative estimate and so on, the use obtains the reflected wave curve signal accurately to delimit breaks the pile body quality, removes the project hidden danger, to 基桩 the quality carries on the appraisal. This article has conducted the research to the Kelvin non-linearity elastic material 料桩 body integrity examination low strain reflected wave new method. Establishes the Kelvin non- line elastic material 料桩 question the unidimensional undulation new model; Produced has controlled the body the dynamic equation, the use unidimensional non-linear elasticity this construction relations infers the pile axial force and the axial strain relations, proposed the unidimensional non-linear elastic undulation question new algorithm; Uses the FORTRAN language coding, the value simulation 基桩 桩顶 speed (or displacement, acceleration) responds the time interval curve profile; Finally 基桩 builds each kind of profile storehouse to the complete existence question, will use in 基桩 the complete examination service for later. As well as low strain reflection method; The pile body integrity examines 2 words
A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. adoption.In recent years, a engineering quantity problem influence building structure of the case of the normal usage and safety is a lot of.The construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of , is also a research heat of realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering to suffer from, carrying on the evaluation to the quantity of the stake of . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases
谈公路工程软基处理中PHC桩检测工作
论文关键词:公路工程软基处理PHC桩试验检测
论文摘 要 :PHC桩应用于公路工程软基处理,已有多个年头,从应用到公路工程建设领域后,对于质量检测工作一直为人们所关注、重视。由于试验检测工作的准确性直接决定了软基处理质量,因此,必须确保试验数据和检测工作的质量。为了达到这一目的,必须对检测工作的各项要求进行了解掌握,下面,本人将结合自身检测工作经验,和大家一起来探讨一下关于PHC桩的各个检测事宜。 PHC桩(预应力砼管桩)在当今公路工程施工建设中,作为主要的软基处理方式之一,并不少见。对于其施工技术的和控制,目前已趋成熟,部、建设部近年来不断对PHC桩相关规范进行更新、修订,使其生产和施工得到了较好控制。然而,对于一名刚刚涉及试验检测工作的技术人员来说,如何对PHC桩进行进场检测,及如何在施打完成后对其进行事后检测,都是初次接触检测工作时必须面对的一个个问题。为了让更多初入行者能更快、更全面掌握PHC桩相关检测事宜,本人结合自身多年试验检测工作经验,从实践和便于监控检测的角度出发,对PHC桩的检测要求和相关检测事宜作一些和归纳。 一、进场质量主要检测要求 管桩无论是委托预制或是直接购买,都要把好原质量关,对于委托的单位或是购买的预制场家均应具备高强预应力管桩加工生产的施工资质,确定厂家前应会同监理、业主等前往实地认真考察,并了解该厂以前生产的产品使用效果,确保是正规的、合格的生产厂家。如果直接购买已有的产品,则在生产场地对产品进行认真论证,反复推敲?,各种证件、手续一应俱全,成品桩的外观应无蜂窝、露筋、裂缝、色感均匀、桩顶处无裂隙,桩径、管壁厚度、桩尖中心线、顶面平整度、桩体弯曲等规范有强制性要求的,必须符合有关要求,管桩起吊中应免受振动、冲撞,确保运至现场的产品是合格的产品。 管桩运到工地后,应对进入工地的所有管桩的规格、型号、尺寸、外观质量、尺寸偏差、管桩堆放及桩身破损情况等进行全面检查,不符合要求的桩禁止使用。应由有资质的检测单位对进入施工场地的管桩进行随机见证抽样检测,检测应符合下列规定: (一)沉桩前,每个厂家生产的每一种桩型随机抽取一节管桩桩节进行破坏性检测,检测项目为预应力钢筋的搞拉强度、钢筋数量、钢筋直径(可检查每延米重量)、钢筋布置、端板材质及厚度、尺寸偏差、外观质量、钢筋保护层厚度等。当抽检结果出现不符合质量要求时,应加倍检测,若再发现不合格的桩节,该批管桩不准使用并必须撤离现场。未经抽检不得施工工程桩。 (二)沉桩过程中每栋物应随机抽查已截下的桩头,进行钢筋数量、钢筋直径、预应力钢筋抗拉强度、钢筋布置、端板尺寸及钢筋保护层厚度的检测,检测数量每单体工程不应小于总管桩数的1%,且不得少于3根。 (三)应对闭口桩尖的钢板厚度、桩尖尺寸、焊缝质量等进行检测,检测数量每栋建筑物不应少于总桩数的1%,且不应少于2个桩尖。 工程桩施工前应按有关规定进行单桩竖向抗压静载荷试验,并应压至破坏。当拟采用高应变法进行单桩竖向抗压承载力的验收检测时,应先对试桩进行高应变检测,再进行单桩竖向静载荷试验并压至破坏,取得可靠的动静对比资料后,方可在验收检测中实施高应变法。对比试验数量不应少于3根,当预估总桩数少于50根时,不应少于2根。 二、单桩静载试验检测要求 当岩土工程条件简单且以压桩力控制桩长或岩石土工程条件简单且有类似经验时,可用工程桩进行单桩竖向抗压静载荷试验,但应按有关规定增加一倍的检测数量,检测应符合下列规定: (一)单栋建筑物每一条件下的桩的试验数量不应少于6根(总桩数少于50根时,不少于4根),其中有3根(总桩数少于50根时为2根)应在大量工程桩施工前进行试验。 (二)岩土工程条件相同的同一场地多栋物,当工程桩条件相同时,每栋建筑物的试验数量不应少于2根,且每一施工单位所施工桩的检测数量不应少于6根。其中每栋建筑物有1根,每个施工单位有3根桩应在大量工程桩施工前进行试验。高层建筑及试验结果离散性较大时,应由设计单位酌情增加试验数量。 (三)除去施工前进行的试验外,余下的试验宜在工程桩施工完成并按桩顶设计标高截桩后随机抽检试验;当基坑开挖较深、坑内试验困难时,也可由设计单位指定桩位,在工程桩施工过程中进行试验。 (四)单栋建筑物某一条件下的桩总数少于30根,且为裙楼、附楼下的次要桩时,至少应进行一根桩的静载荷试验。 (五)当按上述要求进行试验后,在施工正常的情况下,工程桩可不再进行单桩承载力的验收。 (六)不应采用高应变法部分或全部取代上述单桩竖向抗压静载荷试验的检测。所有工程桩应逐根对桩孔内壁进行灯光照射目测或孔内摄影检查,观察孔内是否进土、渗水,有无明显破损、错位、挠曲现象,并作出详细记录,注明发现缺陷的位置以及进土、进水的深度。 三、桩位、垂直度、水平位移的主要检测要求 (一)工程桩的`桩顶标高应进行检验,其偏差不应超过+20mm、-50mm。 (二)开挖基坑中应对工程桩的外露桩头或在桩孔内进行桩身垂直度检测,抽检数量不应少于总桩数的5%,在基坑开挖中如发现土体位移或运行影响桩身垂直度时,应加大检测数量。对倾斜率大于3%的桩不应使用:对倾斜率为1%~2%(含2%)及2%~3%的桩宜分别进行各不少于2根的单桩竖向抗压静载荷试验,并将试验得出的单桩抗压承载力乘以折减系数,作为该批桩的使用依据。载荷试验最大加载最量应为设计要求的单桩极限承载力,试验中可同时进行桩顶水平位移的测量。 四、桩身完整性检测主要要求 工程桩应进行桩身完整性的验收检测。采用低应变法检测时,甲级设计等级的桩基,抽栓数量不应小于总桩数的30%,且不应少于20根。其他桩基抽检数量不应少于总桩数的20%,且不应少于10根。 每个承台下抽检的桩数不应少于1根,且单桩、两桩承台下的桩应全数检测。抗拔桩、以桩身强度控制设计的抗压桩、超过25层的高层建筑基桩及倾斜度大于1%的桩应全数检测。当采用低应变法检测桩身完整性时,应符合以下规定: (一)出现裂缝和缺陷的永久结构的抗拔桩或以承受水平力为主的桩应意在为III类或IV类桩。 (二)桩身的混凝土受损及桩身出现斜裂缝或垂直裂缝的受压桩应判为III类或IV类桩。 (三)桩身出现轻微缺陷的受压桩宜先判为III类桩,最终判定桩的类别时,应挖开浅部的缺陷进行检查核对,结合低应变波形判别评价。挖开检查时,当裂缝长度小于桩截面周长的1/3且为水平裂缝时,可将相似波形的桩改判为II类桩。 五、结束语 总之,作为一名合格的试验检测技术人员,除了要对各种试验检测规程、检测规范的要求做到了如指掌之外,更重要的,要注得自身工作经验和专业技术的提高,因为当一组不合格的数据由于个人经验不足出现误判时,给工程带来的,往往是质量事故的发生。因此,作为质量评判的主要角色,我们必须严阵以待,谨小慎微,认真做好专业经验的培养和检测技能的提高,只有这样,才能为工程建设质量保驾护航。 参考文献: 1.建筑地基与基础施工质量验收规范GB50202-2002[S] 2.卢春华.静压高强度预应力混凝土管桩施工技术[J].科技情报,2005