A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. adoption.In recent years, a engineering quantity problem influence building structure of the case of the normal usage and safety is a lot of.The construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of , is also a research heat of realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering to suffer from, carrying on the evaluation to the quantity of the stake of . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

203 评论

嘻哈精神9999

低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|pile foundation高层建筑 High-rise buildings(分类词汇:环境资源相关 )大型桥梁super-large bridges 深水码头Deep Water Wharf海上石油平台Offshore oil platform建筑结构building structure施工construction非线性弹性材料nonlinear elastic materials桩基工程质量问题这篇虽然是科技论文,但是我觉得他翻译成“pile foundation quality question”很不妥当,我将他修改成problems of pile foundation quality,,从汉语语法之角度考虑,这里的问题两个字是多余的,去掉更好,你自己看看吧!不确定性因素Incertitude Factors基桩Foundation Pile隐蔽性(Impercephbility)axial strain轴向应变研究热点research hotspot(也有用point的)桩身缺陷位置 positions of pile defects定性估计 qualitative estimation混凝土强度等级concrete strength gradethe signal of reflected_wave curve反射波曲线信号工程隐患Project Concealed Harzard一维波动模型one-way fluctuant model控制体(control volume),本构关系 constitutive relationFORTRAN语言编制程序program written in FORTRAN language响应时程曲线波形时程曲线response time history curvePile foundation is widely used as the main basic structure of high-rise buildings,super-large bridges,deep water wharf and Offshore oil platform. During recent years,there are many bases of pile foundation quality affecting the normal working and safety of the building structures. Pile construction has high impercephbility and whose quality presents many incertitude factors,from an angel of qualitative inspection of the foundation piles, it has important significance for ensuring the quality and safety of foundation pile projects to modify the inspection methods and improving the inspection quality and the reliability of inspection & assessment results,it is also one of the research hotspots in foundation pile field. The main functions of low strain reflection wave method is to inspect the pile integrity, such as the judgment of pile defects positions, the checkout of pile lengths, and the qualitative estimation of the concrete strength grade,the judgment of the pile quality using the signal of reflected_wave curve accurately, the elimination of the project concealed harzard,and the estimation of foundation pile quality. This paper studied on the low strain reflection wave method for measuring of pile integrity made of Kelvin nonlinear elastic materials, set up a new one-way fluctuant model to treat the problems of piles made of Kelvin nonlinear elastic materials, gave out a dynamics equation of control volume,and induced the relation between pile axial forces and axial strain using the constitutive relation of one-way nonlinear elastic materials, put forward a new calculation method for the fluctuation of one-way nonlinear elastic materials, simulated the pile-top speed response time history curve (or displacement, acceleration) numerically using program written in FORTRAN language, finally the author set up a curve database of the foundation piles existing integrity problem for the integrity inspection of foundation piles in the future.

320 评论

小开心文文

水泥喷粉深层搅拌桩沉桩问题分析及处理论文

摘要:深层搅拌桩进行地基加固有喷粉和喷浆两种施工方法,设计人员在地基天然含水量大于60%的情况下,从降低地基含水量考虑,常常选用喷粉法。而在天然地基含水量大的情况下采用喷粉法施工,由于流塑状淤泥在喷粉施工时风压气流的作用下,在搅拌过程中因受扰动发生液化,强度来不及形成,造成沉桩。通过施工现场试验,证明改用喷浆法施工的搅拌桩解决沉桩问题是有效的,工程造价变化不大,是可行的。

关键词:路基工程 深层搅拌桩 沉桩 喷浆法

一、前言:

深层搅拌桩经过近二十年的发展,由于施工技术和施工机械的成熟已经被广泛地用于软土地基加固、边坡支护、基坑及堤坝防渗等方面。深层搅拌桩可以增加软土地基的承载力,减少沉降量,提高边坡的稳定性,以及具有快速、经济、有效等特点,而被应用在公路桥头软土地基上,以加快公路的施工进度,消除或缓解桥头跳车等问题。其施工方法分为喷粉和喷浆两种方法。设计人员在地基天然含水量大于60%的情况下,从降低地基含水量考虑,常常选用喷粉法。由于地质条件千变万化,其中若存在淤泥含水量过大,采用喷粉法则可能出现沉桩问题。以下通过对采用喷粉法出现沉桩工程问题分析及提出处理方法与同行探讨。

二、工程实例

1、工程简况

某高等级公路在K9+753~K10+836桥头186m采用水泥喷粉桩处理,水泥喷粉桩按正三角形布置,桩径采用50cm,桩距1.5m,平均桩长10m,水泥掺入比15%,即每延米50kg水泥,标号425#。施工单位在施工配套设备进行标定、试桩方案经过监理单位和业主单位同意的情况下采用喷粉法进行试桩试验,共试59根,其中的21根桩发生沉桩,沉桩深度一般为1.1m~4.5m不等。

2、沉桩原因分析

水泥深层搅拌桩加固机理是通过水泥的水解和水化反应、水泥水化物与土颗粒之间的离子交换和团粒化作用、凝硬作用、碳酸化作用等一系列化学反应而成为具有整体性、水稳定性和一定强度的水泥土桩体。因此,可从地质、施工工艺两方面来分析沉桩原因。

地质方面,由于各地质层土质的差异而产生水泥加固土的效果不同,一般认为含有高岭石、多水高岭石、蒙脱石等粘土矿物的软土加固效果较好,而含有伊里石、氯化物和水铝英石等矿物的粘性土以及有机质含量高、酸碱度(PH值)较低的粘性土加固效果较差。各地质层的含水量的不同,也是引起水泥和土一系列化学反应而形成强度的速度不同的原因。

施工工艺方面,水泥与土搅拌不均匀,甚至水泥与土无法混合。这与施工机械的各施工参数有关,如钻进速度、钻头转速、提升速度、喷粉压、水泥用量等有关。必须通过试验桩根据不同地质层、不同土质、不同土压力找到合适的施工参数,加以严格控制,使桩体均匀,防止缩颈、断颈等现象。

1)地质方面

在第一次试桩的一排7根桩中,靠路线前进方向右侧有4根桩沉桩。在试桩后第七天对其中两根进行抽芯检测,发现桩体上均有两段水泥明显不凝固。在试桩后第十天对发生沉桩的地质进行补勘,具体地层由上至下为:

①填砂:河砂,层厚为0.5m.

②粉质粘土:灰黄、灰褐色,可塑,稍湿~湿,随深度增加渐变为软塑状,层厚为1.2m。

③淤泥:深灰、灰黑色,软塑~流塑,饱和,粘性强,滑腻,岩性均一,底部0.5m含腐殖物,层厚为6.0m。

④淤泥质粘土:灰、青灰色,软塑,饱和,粘性较强,均匀,层厚为1.8m。

⑤淤泥夹砂:灰、青灰色,软塑,含较多中粗砂,含量在30%~50%,松散状,层厚为1.5m。

⑥砂层:浅灰色,稍密~中密,饱和,以粗砂为主,含粘性土,级配良好,层厚为1.9m。

⑦粉质粘土夹砂:灰黄、棕黄色,软塑,湿,含量在20%~50%,岩性不均,层厚为2.6m。

⑧砂层:以中粗砂为主,灰白、灰黄色,中密,饱和,含粘性土,级配良好,层厚为0.3m。

软土物理力学指标很差,淤泥平均含水量为90%,天然孔隙比2.51,直快剪C=6.79Kpa,φ=7.36。

从以上地质补勘分析,主要有以下原因:

(1)由于该段淤泥含水量为90%,而喷粉(50~60kg/m)后水泥在桩体内吸水是有限的,参照相近项目试验结果可知,短期内水泥加固土含水量减少量低于水泥掺入比,也就是该段淤泥经水泥加固土的含水量仍为75%以上,搅拌时的土和水泥还是处于流塑~软塑状,压缩模量小,抗剪强度低;喷50~60kg/m水泥9m后增加4500~5400KN自重力。处于流塑~软塑状水泥加固土压缩模量小,自身自重引起桩压缩量就大;水泥加固土抗剪强度低自身自重引起侧向挤出量大;

(2)桩身周围土受扰动土体下沉后,土对桩侧表面产生向下的负摩阻力。当土和水泥还是处于流塑~软塑状、压缩模量小、抗剪强度低时,在负摩阻力的作用下发生沉桩。

(3)该段淤泥的灵敏度大,灵敏度是原状试样的无侧限抗压强度与相同含水量重塑试样的无侧限抗压强度之比。从试桩现场,试桩桩位砂垫层表面挤压出来的`淤泥很稀,表明其重塑后强度很低,灵敏性高。

(4)喷粉在桩体内吸水,引起桩体周围土体孔隙压力消散、产生下沉,短时间增加对桩体的负摩阻力,而此时水泥加固土的强度很低且增长慢。

总的来说,是在喷粉初期,水泥加固土的强度承受不了水泥加固土的自重力和负摩阻力的作用而发生沉桩。

2)施工工艺方面

在施工工艺方面,针对沉桩问题,结合地质情况较差的实际,在施工工艺上找沉桩的原因。试桩时各施工参数(钻进速度、钻头转速、提升速度、喷粉压、水泥用量等)作了有效控制。在第二次试桩52根桩中,采用不同钻进速度、不同钻头转速、不同提升速度、不同喷粉压、不同水泥用量进行严格控制。试桩中虽然采用加大喷粉量至75kg/m,仍未解决沉桩问题。

察看试桩现场,试桩桩位砂垫层表面存在大量淤泥,据分析软塑~流塑状淤泥是在喷粉施工时风压气流的作用下,搅拌过程中因受扰动发生液化,液化的淤泥上涌至地表面,造成桩体范围内淤泥质的减少而沉桩。

增加喷粉量解决不了沉桩问题的原因在于:

(1)增加喷粉量即增加桩体自重力;

(2)增加喷粉量导致喷粉在桩体内吸水量增加,引起桩体周围土体孔隙压力消散加快、产生下沉,短时间对桩体的负摩阻力增大,因增加喷粉量水泥加固土的强度提高不显著,在喷粉初期,水泥加固土的强度仍承受不了水泥加固土的自重力和负摩阻力的作用而发生沉桩。

3、处理方法

通过以上分析,沉桩是由于在喷粉初期,土体受扰动,水泥加固土的强度承受不了水泥加固土的自重力和负摩阻力的作用而发生沉桩。改用在水泥浆液中加入适量的早强剂喷浆法施工可以解决喷粉法施工成桩初期水泥加固土的强度承受不了水泥加固土的自重力和负摩阻力发生沉桩问题。主要原因:

(1)早强剂可以使水泥加固土的强度迅速提高,而早强剂在水泥浆中搅拌可以较均匀;

(2)水泥浆液注入土体发生水泥的水解和水化反应、水泥水化物与土颗粒之间的离子交换和团粒化作用、凝硬作用、碳酸化作用等一系列化学反应而成为具有整体性、水稳定性和一定强度的水泥土桩体时,浆液本身存在足够水,不需吸收天然地基的水,并未引起桩体周围土体孔隙压力消散、产生对桩体的负摩阻力。

因此,改用喷浆法施工并在水泥浆液中加入适量的早强剂,以解决喷粉法施工成桩初期水泥加固土的强度承受不了水泥加固土的自重力和负摩阻力的作用而发生沉桩的问题。

喷浆施工参数:

成桩直径: 50㎝

钻进速度: 控制在2~3档(30~50cm/min)

电流表读数: 进入持力层I≥60A

桩底持续喷浆搅拌时间: ≥30s

提升喷浆速度: ≤30cm/min

喷浆压力: 0.6~1.0Mpa

水泥浆水灰比: 0.5

早强剂掺量(水泥掺比): 0.8%

水泥浆搅拌时间: ≥30min(每拌)

喷浆搅拌桩施工工艺按中华人民共和国交通部发布《公路软土地基路堤设计与施工技术规范》JTJ017-96关于加固土桩技术规范进行。全部穿过淤泥进入持力层50㎝。

以上施工参数进行现场试桩,试桩七天后进行桩体抽芯检测,从桩体抽芯结果来看,成桩连续性与完整性均较好,无沉桩问题。由业主组织设计单位、监理单位和施工单位召开软基处理技术专题会议,决定K9+753~K10+836桥头186m原采用喷粉法施工搅拌桩改为喷浆法施工,原合同单价不变。该段在改用喷浆法施工后,无出现沉桩问题,证明采用喷浆法施工的搅拌桩解决沉桩问题是有效的。工程造价变化不大,经济上是可行的。

三、结语

在高含水量软基中采用深层搅拌桩处理,从降低地基含水量考虑,常常选用喷粉法施工。而当采用喷粉法出现沉桩问题时,改用在水泥浆液中加入适量的早强剂喷浆法施工来解决沉桩问题。经实践证明采用喷浆法施工的搅拌桩解决沉桩问题是有效的、经济上是可行的。

276 评论

相关问答

  • 低应变基桩检测论文

    低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|p

    珊珊来了 4人参与回答 2023-12-06
  • 电能计量基础及检测技术论文

    电力营销计量改造问题及解决方法论文 1电力营销计量改造中存在的问题分析 1.1电能表的选择缺乏完善性 对电能表的及时转换与正确方法的普及是整个电力营销中最重要的

    灵虫糖宝 2人参与回答 2023-12-05
  • 基因检测技术论文1500

    这个写论文~一般是需要你自己在网上找下参考范文的吧~你应该去看下(生物过程、微生物前沿)等等这类的生物类型的期刊~自己去研究研究下吧

    zhenghan116 4人参与回答 2023-12-11
  • 桩基质量检测论文题目

    公路工程地质信息 (一)强夯法处理液化地基的施工管理 江苏北部(如徐州、宿迁等)地区广泛分布废黄河泛滥沉积物,一般以亚砂土、亚粘土—细砂为主,埋层浅,地下水位高

    魔神坛老佛爷 4人参与回答 2023-12-11
  • 地基基础检测论文

    工程地质勘查论文 工程地质勘查为调查工作,进行是为了研究影响建筑的地质因素,水文条件、一些天然的地质现象、岩土的力学性质及地质构造为地质勘查的主要因素。以下是我

    Aimy'ssmile 2人参与回答 2023-12-06