Construction Cost Audit ReportFor Pasta & Pizza Salvo Co., Ltd. Project佼佼意人食品(上海)有限公司松江区书山路55号A1厂房装修工程结算审核咨询报告To: Pasta & Pizza Salvo Co., Ltd.佼佼意人食品(上海)有限公司:Entrusted by Pasta & Pizza Salvo Co., Ltd.(The “Client” or the “Property Owner”), Beijing Zhongruiyuehua Project Cost Consulting Co.,Ltd. (The “Auditor” or “We”) has performed a construction cost audit on the completed factory decoration project of A1, Shushan Road, Songjiang District, Shanghai. During the auditing period, Shanghai Jinsha Construction & Installation Co., Ltd. (The “Contractor”) did not provide the complete information for settlement verification. Under the circumstance that we did not have the complete information, we have reviewed and verified the actual on-site work amount of the factory at A1, Shushan Road.受贵司委托对松江区书山路55号A1厂房装修工程进行已完工程结算审核咨询,在委托期间由于总包施工企业上海金厦建筑安装工程有限公司(以下简称施工方)不予以配合,未提供完整的结算审核资料。我们在施工企业提供的资料不完整的情况下,受业主委托对书山路55号A1厂房现场所发生的实际工程量予以复核。I. Auditor’s Statement一、工程审核委托说明In accordance with the construction contract, the property owner shall review and verify the proposed settlement provided by the contractor and give feedback. However, the contractor refused to provide complete information for settlement verification. The property owner has engaged us, the project cost consulting company, to audit the actual work amount and construction cost for this project on its behalf. Therefore, our calculated construction cost is based on the information provided by property owner and actual on-site measurement; and our audit result is only to provide a professional opinion to the property owner as a reference. If the contractor provided fully comprehensive information for settlement verification, we will charge the client differently in accordance with the service agreement.根据施工合同的要求,业主方应对施工方上报的结算申请予以复核,并回复意见。由于施工方拒绝提供完整的结算资料。本公司依据业主方的单方面委托,以专业身份代替业主按实审核已完工程造价,故本报告仅为本公司根据业主方提供的相关信息及现场实地丈量情况计算的工程造价,其审核结果为提供给业主方结算的参考意见,如施工方另行提供结算资料,我们将根据委托协议,进行调整。II. Construction Cost Audit Basis二、工程审核依据1. This audit report is in accordance with “Shanghai Construction and Decoration Project Budget Quota (2000)”, “Shanghai Installation Project Budget Quota (2000)”, and other related quotas, current documents, and provisions issued by Shanghai Construction .本审核咨询书依据《上海市建筑和装饰工程预算定额(2000)》、《上海市安装工程预算定额2000》等上海市建设主管部门颁发的有关工程造价的与“2000”定额相配套的其他现行文件和规定执行。2. In this audit report, the additional charge rate of 6% is in accordance with “Shanghai Construction Cost Information.”2.本审核咨询书增加项目工程造价取费费率取定根据上海市《上海市工程造价信息》所刊登之费率取定如下:装修工程综合费率按6%计取。3. In this audit report, man-hour rate and partial main materials are calculated using the average method in accordance with “Shanghai Construction Cost Information;” all other materials without market price guide are referred to current market price and the actual condition of construction. 3.本审核咨询书人工费单价及部分主要材料价格根据施工期间《上海市工程造价信息》中所刊登价格按算术平均值计算,无市场指导价的材料均按市场实价并结合本工程的实际情况进行计取。4. Construction contracts, sub contracts, and other related agreements with sub-contractors; 4.建设施工合同、分包合同、与分包单位的结算协议; documents and tender documents; 5.招标文件、投标文件; papers and deepened description, work amount, specific brand requirement, and other related specifications; 6.设计图纸及设计深化说明、工程量、指定品牌要求及其相关说明; laws and regulations; 7.有关法律、法规; provided by the client and other related verifications. 8.委托单位提供的资料及其相关依据证明。III. Construction Cost Audit Procedure三、工程审核咨询程序With the cooperation of the client, we have familiarized with the project and conducted on-site measurement, recalculation, and verification on the work amount. We have made deductions for the unperformed items on the full-responsibility non-negotiable agreement; and also made adjustment for approved additional items. In our performance of the construction cost audit, we have followed the relevant laws and regulations. Based on the information collected during the course of practice, the construction contract and quotas, we confirm that the content of the report reflects our objective and professional opinions.审核咨询方在甲方的密切配合下,熟悉相关资料,对完成的工程量进行现场丈量和计算核对,对包干闭口价施工企业漏项予以增减,对后增项目予以认可的做出调整,审核咨询人员按照合法的程序,严格依据合同和定额,客观公正予以审核咨询。IV. Construction Cost Audit Declaration 四、工程审核说明For the construction contract is a full-responsibility non-negotiable agreement, we have conducted on-site investigation and audited each item stated in the contract. We have made below deductions for the items that did not meet the contractual requirement:由于甲、乙双方签订的合同为包干闭口价,依据现场实际情况,我们对合同内的项目行逐项审核,实际现场施工方没按合同和设计要求施工的项目,我们予以扣除;For the materials with specific brand name requirement, we have made temperate price adjustment according to the market price if the contractor did not meet the requirements. For the materials without specific brand name requirement, we have treated them as disputable item.设计要求使用指定品牌及型号的材料,如果施工企业不按此规定执行的,我公司暂按市场价格予以调整,对于品牌、型号非设计招标要求的,列入有争议款项计取;The repeatedly charged items have been deducted from the final calculations (Please refer to Construction Cost Audit Declaration).重复上报的工作量予以扣除。(详见工程审核说明)V. The Purpose of Construction Cost Audit五、工程审核的目的The purpose of this report is to audit the construction and decoration work performed by the contractor for the factory of A1, No. 55 Shushan Road, Songjiang District. The audit includes review and verification the actual work amount according the construction contract; recalculate costs; disclosure and adjustment for unperformed work, repeatedly charged works, and works that did not meet contract terms or specific design requirement; and provide final conclusions.如实反映出松江区书山路55号A1厂房装修施工企业已完项目及不应计取合同范围内未施工的内容、重复上报项目、未按合同中约定及图纸设计品牌指导应扣除的造价,给予最终结论。VI. Construction Cost Audit Result六、工程审核咨询结果The project’s final settlement price reported by the contractor is 10,055, RMB. (This settlement price includes the payment of 1,309, RBM to the original contractor, Shanghai Huiling Construction and Decoration Co., Ltd.) Because of the particularity of this project, the settlement is composed by two parts. One part is the work load completed by the contractor according to the construction contract. The amount is 4,025, RMB, which has been approved by the property owner. Another part is the work that was altered from the construction contract and original design. The amount is approximately 2,000, RMB. The contractor failed to provide justification for the alteration; therefore the altered work has not been approved by the property owner. This amount is categorized as a disputable item. In summary, the disputable deduction amount for this project is 4,720, RMB; the undisputable deduction amount for this project is 2,720,206,76 RMB.本工程施工企业上报结算金额为人民币:元,大写:壹仟零伍万伍仟肆佰柒拾陆元零陆分;(含施工单位确认且已支付给原总包单位:上海汇陵建筑装饰有限公司1,309,元)对于本工程结算的特殊性,本工程结算分两部分组成,一部分为施工单位按照合同要求已完工的工程量,业主方经审价后认可的金额为:元,大写:肆佰零贰万伍仟玖佰伍拾元陆角肆分;另一部分是施工单位未按照合同和设计要求变更工作的,应业主方不予认可且施工单位也未提供变更依据的金额约为人民币:200万,故列入争议项目。因本工程的特殊性其核减金额(含有争议的款项)为人民币:元,大写:肆佰柒拾贰万零贰佰零陆元柒角陆分,不含争议款项其核减金额为人民币:2720206,76元,大写:贰佰柒拾贰万零贰佰零陆元柒角陆分。The contractor has completed the work amount of 4,025, RMB according to the contract. However, this project has not been given the final acceptance; and the property owner still has some objections regarding the quality problems. Therefore, the amount of 4,025, RMB in this audit report does not represent the quality standard accepted by the client. The client still reserves the right to request the contractor for compensation or repair work due to quality problems. (就施工单位按照合同已完成的工程量元,鉴于本工程至今未进行竣工验收,且业主方就工程质量尚存异议,故本报告审定的工程价款并不代表业主方认可相关工程质量,业主方保留进行质量索赔和要求施工单位返工返修的权利。)资料来源:华东建设造价预算网
angela颖宝贝
工程造价论文提纲范文
在日常学习和工作生活中,大家都有写论文的经历,对论文很是熟悉吧,借助论文可以达到探讨问题进行学术研究的目的。如何写一篇有思想、有文采的论文呢?以下是我精心整理的工程造价论文提纲范文,希望能够帮助到大家。
第一章绪论
研究背景
由于近几年经济发展的刺激,加上人们对房屋的需求量上升但随着国有企业股份制的改革。2010年以后国家政策的调整导致建筑市场的竞争日趋激烈。经济力量决定上层建筑,企业想要发展就必须赢得利润。因此企业在施工过程中必须科学的控制施工成本。
研究目的和意义
研究目的
研究在施工阶段的成本控制可以将资源落实到实处以减少企业施工成本。在现场施工过程中对进行的变更进行预算,以增加企业收入,提高企业竞争力。
研究意义
对施工阶段成本控制的研究是通过一系列的措施和和方法对施工过程中的成本进行控制。在保证工程项目的质量,安全和工期等合同的基础上降低成本,提高经济效率。
研究思路
本文通过研究在施工阶段中对成本的投入,科学的管理,甲方设计的变更和工程量的临时增加等成本的控制以提高经济效率。其中成本的控制包括对人工,对材料的管理和控制,机械台班费,安全文明施工费等方面。
第二章对施工阶段的研究
对企业施工阶段的研究
.工程概况和施工条件
施工方案
施工进度计划
施工平面
主要技术经济指标
.施工过程的控制建筑施工特点
施工的流动性
施工的单件性
施工周期长
境影响大
第三章对企业施工阶段成本控制的研究
对企业施工阶段成本控制的认识
企业控制施工成本的方法
施工阶段成本的节约
施工阶段成本的创益
施工阶段企业的科学管理
施工阶段成本控制的内容
材料费用的控制
人工费用的控制
管理费用的控制
安全文明施工的`投入
对传统的施工过程中成本的控制的研究。
在传统的施工过程中工程成本只是在施工前对于工程量的计算和施工后对工程进行决算,对施工中成本的控制不够到位不科学。
对安全文明施工的管理
安全文明施工决定了企业在施工过程中的成本投入。
对材料的管理
(1)材料的入库和保管
(2)材料的成本控制
(3)材料的使用
现场施工人员的管理混乱
企业施工阶段成本控制的方法
(1)安全文明施工安全文明施工是企业施工的重中之重,只有通过对施工安全的管理才能:直接或间接的获得效益。用先进的施工技术:对材料的管理对工程的合理安排:现场工作人员的要求
第四章我国工程项目施工过程中的成本控制
国内对于现代意义上成本控制理论和方法的研究始于二十世纪八十年代,是伴随我国改革开放逐渐发展起来的,施工项目成本控制理论与方法也逐渐成为理论与实务界研究的热门,许多专家学者从不同角度对这一课题进行了研究和探讨。
我国工程项目施工过程中的成本控制的主要问题
(1)组织施工计划受市场影响大
(2)施工过程中控制不严密
(3)安全管理不到位
(4)技术基础薄弱,管理水平难有保障
(5)材料管理不细致
我国工程项目施工过程中的成本控制问题的主要对策
(1)加强对市场的了解
(2)提高技术人员技术水平
(3)安全文明施工落实到位
(4)增强施工人员水平
(5)加强对材料的控制和管理
拓展资料:
写作指导
(一)主题的写法
工程论文只能有一个主题(不能是几块工作拼凑在一起),这个主题要具体到问题的基层(即此问题基本再也无法向更低的层次细分为子问题),而不是问题所属的领域,更不是问题所在的学科,换言之,研究的主题切忌过大。因为涉及的问题范围太广,很难在一本硕士学位论文中完全研究透彻。通常,硕士学位论文应针对某学科领域中的一个具体问题展开深入的研究,并得出有价值的研究结论。
工程论文论文是学术作品,因此其表述要严谨简明,重点突出,专业常识应简写或不写,做到层次分明、数据可靠、文字凝练、说明透彻、推理严谨、立论正确,避免使用文学性质的或带感情色彩的非学术性语言。论文中如出现一个非通用性的新名词、新术语或新概念,需随即解释清楚。
(二)题目的写法
工程论文题目应简明扼要地反映论文工作的主要内容,切忌笼统。由于别人要通过你论文题目中的关键词来检索你的论文,所以用语精确是非常重要的。论文题目应该是对研究对象的精确具体的描述,这种描述一般要在一定程度上体现研究结论,因此,我们的论文题目不仅应告诉读者这本论文研究了什么问题,更要告诉读者这个研究得出的结论。例如:“在事实与虚构之间:梅乐、卡彭特、沃尔夫的新闻观”就比“三个美国作家的新闻观研究”更专业更准确。
(三)摘要的写法
工程论文的摘要,是对论文研究内容的高度概括,其他人会根据摘要检索一篇硕士学位论文,因此摘要应包括:对问题及研究目的的描述、对使用的方法和研究过程进行的简要介绍、对研究结论的简要概括等内容。摘要应具有独立性、自明性,应是一篇完整的论文。
通过阅读工程论文摘要,读者应该能够对论文的研究方法及结论有一个整体性的了解,因此摘要的写法应力求精确简明。论文摘要切忌写成全文的提纲,尤其要避免“第1章……;第2章……;……”这样的或类似的陈述方式。
(四)引言的写法
一篇工程论文的引言,大致包含如下几个部分:
1.问题的提出:讲清所研究的问题“是什么”。
2.选题背景及意义:讲清为什么选择这个题目来研究,即阐述该研究对学科发展的贡献、对国计民生的理论与现实意义等。
3.文献综述:对本研究主题范围内的文献进行详尽的综合述评,“述”的同时一定要有“评”,指出现有研究成果的不足,讲出自己的改进思路。
4.研究方法:讲清论文所使用的科学研究方法。
论文结构安排:介绍本论文的写作结构安排。
5.“第2章,第3章,……,结论前的一章”的写法是论文作者的研究内容,不能将他人研究成果不加区分地掺和进来。已经在引言的文献综述部分讲过的内容,这里不需要再重复。
各章之间要存在有机联系,符合逻辑顺序。
(五)结论的写法
结论是对工程论文主要研究结果、论点的提炼与概括,应准确、简明,完整,有条理,使人看后就能全面了解论文的意义、目的和工作内容。主要阐述自己的创造性工作及所取得的研究成果在本学术领域中的地位、作用和意义。同时,要严格区分自己取得的成果与导师及他人的科研工作成果。
注意事项
1、摘要中应排除本学科领域已成为常识的内容;切忌把应在引言中出现的内容写入摘要;一般也不要对论文内容作诠释和评论(尤其是自我评价)。
2、不得简单重复题名中已有的信息。比如一篇文章的题名是《几种中国兰种子试管培养根状茎发生的研究》,摘要的开头就不要再写:“为了……,对几种中国兰种子试管培养根状茎的发生进行了研究”。
3、结构严谨,表达简明,语义确切。摘要先写什么,后写什么,要按逻辑顺序来安排。句子之间要上下连贯,互相呼应。摘要慎用长句,句型应力求简单。每句话要表意明白,无空泛、笼统、含混之词,但摘要毕竟是一篇完整的短文,电报式的写法亦不足取。摘要不分段。
4、用第三人称。建议采用“对……进行了研究”、“报告了……现状”、“进行了……调查”等记述方法标明一次文献的性质和文献主题,不必使用“本文”、“作者”等作为主语。
5、要使用规范化的名词术语,不用非公知公用的符号和术语。新术语或尚无合适汉文术语的,可用原文或译出后加括号注明原文。
6、除了实在无法变通以外,一般不用数学公式和化学结构式,不出现插图、表格。
7、不用引文,除非该文献证实或否定了他人已出版的著作。
8、缩略语、略称、代号,除了相邻专业的读者也能清楚理解的以外,在首次出现时必须加以说明。科技论文写作时应注意的其他事项,如采用法定计量单位、正确使用语言文字和标点符号等,也同样适用于摘要的编写。摘要编写中的主要问题有:要素不全,或缺目的,或缺方法;出现引文,无独立性与自明性;繁简失当。
9、论文摘要之撰写通常在整篇论文将近完稿期间开始,以期能包括所有之内容。但亦可提早写作,然后视研究之进度作适当修改。有关论文摘要写作时应注意下列事项:
10、整理你的材料使其能在最小的空间下提供最大的信息面。
11、用简单而直接的句子。避免使用成语、俗语或不必要的技术性用语。
12、请多位同僚阅读并就其简洁度与完整性提供意见。
13、删除无意义的或不必要的字眼。但亦不要矫枉过正,将应有之字眼过份删除,如在英文中不应删除必要之冠词如a''an''the等。
14、尽量少用缩写字。在英文的情况较多,量度单位则应使用标准化者。特殊缩写字使用时应另外加以定义。
15、不要将在文章中未提过的数据放在摘要中。
16、不要为扩充版面将不重要的叙述放入摘要中,即使摘要仅能以一两句话概括,就让维持这样吧,切勿画蛇添足。
17、不要将文中之所有数据大量地列于摘要中,平均值与标准差或其它统计指标仅列其最重要的一项即可。
18、不要置放图或表于摘要之中,尽量采用文字叙述。
⑴引言:引言又称前言、序言和导言,用在论文的开头。引言一般要概括地写出作者意图,说明选题的目的和意义,并指出论文写作的范围。引言要短小精悍、紧扣主题。〈2)论文
工程造价毕业设计论文摘要 写毕业设计论文的第一步就是要写好摘要,工程造价毕业设计论文摘要怎么写?下面是我为大家收集的关于工程造价毕业设计论文摘要,欢迎大家阅读!
工程项目造价管理的基本内容就是合理确定和有效的控制工程项目造价。工程项目造价有两种含义,相应的,工程项目造价管理有两种,一为工程投资管理,一为工程项目价格管理。
1影响内河航道工程造价的主要因素(1)建设年代从1992年开始,我国物价上涨较快,经过一段上涨期后,物价基本稳定。但以后波动较大,钢材、石料等原材料对水运造价产