你好,本人也是学土木的,这篇文章为原创,在百度或谷歌等网站绝对找不到,供你参考、修改,实为抛砖引玉之作,希望你能满意。 不良地基的处理与加固方法[摘 要] 论述了在建造建筑物之前,针对不良地基土及异常地基土的处理方法及加固方案。[关键词]不良地基;异常地基;地基处理;施工工艺;基础刚度Abstract:This paper the treatment schemes and reinforcing means of badness and abnormality foundation before thebuilding words:badness foundation; abnormality foundation; foundation treatment; construction technique; stiffness 在现实工程中,经常会出现不良地基及异常地基的情况,如若对其处理不当将对建筑物造成不良影响。本文将对不良地基及异常地基情况的处理做一简要介绍,以便能更好地解决工程实际中地基出现的问题。1 不良地基的处理1·1 置换法1·1·1 换填法:就是将表层不良地基土挖除,然后回填有较好压密特性的土进行压实或夯实,形成良好的持力层,从而改变地基的承载力特性,提高抗变形和稳定能力。 施工要点:将要转换的土层挖尽、注意坑边稳定;保证填料的质量;填料应分层夯实。1·1·2 振冲置换法:利用专门的振冲机具,在高压水射流下边振边冲,在地基中成孔,再在孔中分批填入碎石或卵石等粗粒料形成桩体。该桩体与原地基土组成复合地基,达到提高地基承载力减小压缩性的目的。 施工注意事项:碎石桩的承载力和沉降量很大程度取决于原地基土对其的侧向约束作用,该约束作用越弱,碎石桩的作用效果越差,因而该方法用于强度很低的软粘土地基时必须慎重行事。1·1·3 夯(挤)置换法:利用沉管或夯锤的办法将管(锤)置入土中,使土体向侧边挤开,并在管内(或夯坑)放人碎石或砂等填料。该桩体与原地基土组成复合地基,由于挤、夯使土体侧向挤压,地面隆起,土体超静孔隙水压力提高,当超静孔隙水压力消散后土体强度也有相应的提高。 施工注意事项:当填料为透水性好的砂及碎石料时,是良好的竖向排水通道。1·2 预压法1·2·1 堆载预压法:在建造建筑物之前,用临时堆载(砂石料、土料、其他建筑材料、货物等)的方法对地基施加荷载,给予一定的预压期。使地基预先压缩完成大部分沉降并使地基承载力得到提高后,卸除荷载再建造建筑物。 施工工艺与要点:①预压荷载一般宜取等于或大于设计荷载;②大面积堆载可采用自卸汽车与推土机联合作业,对超软土地基的第一级堆载用轻型机械或人工作业;③堆载的顶面宽度应小于建筑物的底面宽度,底面应适当放大;⑤作用于地基上的荷载不得超过地基的极限荷载。1·2·2 降水法:降低地下水位可减少地基的孔隙水压力增加上覆土自重应力,使有效应力增加,从而使地基得到预压。这实际上是通过降低地下水位,靠地基土自重来实现预压目的。 施工要点:一般采用轻型井点、喷射井点或深井井点;当土层为饱和粘土、粉土、淤泥和淤泥质粘性土时,此时宜辅以电极相结合。1·3 压实与夯实法以配合堆载预压用于加速饱和粘性土地基的固结1·3·1 表层压实法:采用人工夯,低能夯实机械、碾压或振动碾压机械对比较疏松的表层土进行压实。也可对分层填筑土进行压实。当表层土含水量较高时或填筑土层含水量较高时可分层铺垫石灰、水泥进行压实,使土体得到加固。1·3·2 重锤夯实法:重锤夯实就是利用重锤自由下落所产生的较大夯击能来夯实浅层地基,使其表面形成一层较为均匀的硬壳层,获得一定厚度的持力层。 施工要点:施工前应试夯,确定有关技术参数,如夯锤的重量、底面直径及落距、最后下沉量及相应的夯击遍数和总下沉量;夯实前槽、坑底面的标高应高出设计标高;夯实时地基土的含水量应控制在最优含水量范围内;大面积夯时应按顺序;基底标高不同时应先深后浅;冬季施工时,对土已冻结时,应将冻土层挖去或通过烧热法将土层融解;结束后,应及时将夯松的表土清除或将浮土在接近1m的落距夯实至设计标高。 1·3·3 强夯:强夯是强力夯实的简称。将很重的锤从高处自由下落,对地基施加很高的冲击能,反复多次夯击地面,地基土中的颗粒结构发生调整,土体变为密实,从而能较大限度提高地基强度和降低压缩性。其施工工艺流程:①平整场地;②铺级配碎石垫层;③强夯置换设置碎石墩;④平整并填级配碎石垫层;⑤满夯一遍;⑥找平,并铺土工布;⑦回填风化石渣垫层,用振动碾碾压八遍。一般在大型强夯施土前,都应选择面积不大于400m2的场地进行典型试验,以便取得数据,指导设计与施工。1·4 挤密法1·4·1 振冲密实法:利用专门的振冲器械产生的重复水平振动和侧向挤压作用,使土体的结构逐步破坏,孔隙水压力迅速增大。由于结构破坏,土粒有可能向低势能位置转移,这样土体由松变密。1·4·2 施工工艺:①平整施工场地,布置桩位。②施工车就位,振冲器对准桩位。③启动振冲器,使之徐徐沉入土层,直至加固深度以上30~50cm,记录振冲器经过各深度的电流值和时间,提升振冲器至孔口。再重复以上步骤1~2次,使孔内泥浆变稀。④向孔内倒入一批填料,将振冲器沉入填料中进行振实并扩大桩径。重复这一步骤直至该深度电流达到规定的密实电流为止,并记录填料量。⑤将振冲器提出孔口,继续施工上节桩段,一直完成整个桩体振动施工,再将振冲器及机具移至另一桩位。⑥在制桩过程中,各段桩体均应符合密实电流、填料量和留振时间等三方面的要求,基本参数应通过现场制桩试验确定。⑦施工场地应预先开设排泥水沟系,将制桩过程中产生的泥水集中引入沉淀池,池底部厚泥浆可定期挖出送至预先安排的存放地点,沉淀池上部比较清的水可重复使用。⑧最后应挖去桩顶部1m厚的桩体或用碾压、强夯等方法压实、夯实,铺设并压实垫层。1·4·3 沉管砂石桩(碎石桩、灰土桩、OG桩、低标号桩等):利用沉管制桩机械在地基中锤击、振动沉管成孔或静压沉管成孔后,在管内投料,边投料边上提(振动)沉管形成密实桩体,与原地基组成复合地基。1·4·4 夯击碎石桩(块石墩):利用重锤夯击或者强夯方法将碎石(块石)夯入地基,在夯坑里逐步填人碎石(块石)反复夯击以形成碎石桩或块石墩。2 异常情况的地基处理2·1 松土坑(填土,墓穴,淤泥等)的处理2·1·1 将坑中松软虚土挖除,使坑底及槽帮四壁均见天然老土,然后采用与坑边的天然土压缩性相近的材料回填,回填材料及做法:①当地基为砂土时,用砂或砂石回填,回填每层厚度不大于20cm并应分层洒水夯实或用平板振捣器夯实。②当地基为较密实的干硬性粘土时,可用3∶7灰土分层夯实。③当地基为中密可塑粘土时,用1∶9灰土分层夯实回填。④当虚土挖除后,如遇地下水,则水下部分采用级配砂石回填,水上部分仍可用灰土夯实回填。2·1·2 当单独柱基下有虚土坑时,可按下述情况处理①如坑深度大于槽宽,或坑面积大于槽底面积的1/3时,宜将槽底全部落到坑底。②在粘性土中,两相邻单独柱基的槽底高差不得大于相邻柱基的净距,否则应将较浅的柱基槽底相应落深,使两柱基槽底标高取平。③在砂性土中,两相邻单独柱基的槽底高差不得大于净距的1/2,否则两柱基的槽底宜取平。④如坑底过深,可考虑加大基础底面积,或与相邻柱基础连在一起做成联合基础。2·2 局部范围内有硬土或旧结构物时的处理当基底下有局部过硬的土质或旧结构物(如旧基础,老灰土,化粪池,旧砖窑,压实的路面,大树根,大块石等)时,应全部挖除,再按上述方法回填或加深基础(应指出的是,不能认为在地基处理时,只须对松软的地基做处理。对过于坚实的地基如不做处理,也会引起建筑物产生较大的不均匀沉降)。2·3 设备管道的处理当上下水等设备管道在槽底以上穿过时,应在基础墙处管道上方留出大于房屋预估沉降量的空隙,以避免建筑物产生沉降时引起管道损坏,同时,应采取防止管道漏水的措施,以避免漏水浸湿地基而引起不均匀沉降。当管道基础穿过基础时,可将基础局部落深,使管道穿过基础墙,同时,管道上方应按上述原则留足够的空隙。[参考文献][1] 董爱飞. 常用地基处理技术综述[J]. 建筑, 2008, (03) . [2] 梁亚明,刘英华. 刚性桩复合地基在软土地基处理中的应用[J]. 科学之友(B版), 2008, (03) . [3] 王剑峰,赵竹莹. 浅谈CFG桩地基处理及工程实例[J]. 林业科技情报, 2008, (01) . [4] 曹冰. 复合地基技术在北良港淤泥吹填区地基处理中的应用研究[J]. 港口科技, 2008, (03) . [5] 钟毅. 砾料石灰土结构在软土地基处理中的应用研究[J]. 北方交通, 2008, (03) . [6] 刘震,郑忠钦. CCMG地基处理在上海长江大桥桥头路基施工中的应用[J]. 上海公路, 2008, (01) . [7] 王刚,玄力,张广范,张跃宇. CFG桩在地基处理中的应用实例[J]. 西部探矿工程, 2008, (05) . [8] 吴剑,周健,崔积弘,茅永德. 上海港罗泾港区地基处理的试验研究[J]. 工业建筑, 2007, (S1) . [9] 冯国栋. 浅谈地基不均匀沉降的原因及防治[J]. 科技创新导报, 2008, (08) . [10] 苑克伟,李国,王积鑫. 粉喷桩在箱涵地基处理中的应用[J]. 北方交通, 2008, (03) .

湿陷性黄土地基处理研究

黄土湿陷性对人类工程活动危害很大,常使建筑物、渠道、库岸、道路护坡造成破坏。以下是我收集整理的湿陷性黄土地基处理研究论文,和大家一起分享。

摘要: 通过梳理湿陷性黄土成因及各地基处理方法的适用范围、优缺点,结合黄韩侯铁路房屋湿陷性黄土地基处理方案的工程实例,以技术经济分析方式,得出了湿陷性黄土地区铁路房屋地基处理的一般方法,对湿陷性黄土地区铁路房屋的修建具有很好的借鉴作用。

关键词 : 湿陷性黄土;铁路房屋;地基处理垫层法;挤密法

湿陷性黄土是一种特殊性质的土,具有在自重或外部荷重下或二者共同作用下,受水浸湿后结构迅速破坏发生突然下沉的性质.它在中国分布广泛,主要集中在山西、陕西、甘肃大部分地区以及河南西部.此外,新疆、山东、辽宁、宁夏、青海、河北及内蒙古的部分地区也有分布,但不连续.

铁路房屋是铁路生产、运营的核心,发挥着指挥、调度、监控、服务等作用,对整个铁路的安全运营起着十分重要的作用,是整体铁路系统中不可缺少的一部分.鉴于湿陷性黄土的危害性和铁路房屋的重要性,在湿陷性黄土地区的铁路站房建设,必须采取处理措施,以保证站房结构的安全.

由于国内对铁路房屋湿陷性处理措施的专项研究和实例介绍不多,本文特从理论与实践相结合的角度对此问题展开论述.

1 黄土的湿陷机理及防止措施

黄土的湿陷性机理

黄土的结构特点和胶结物质的水溶特性决定了黄土湿陷的机理[1].湿陷性黄土是一种非饱和的欠压密土,具有大孔和垂直节理,在天然湿度下,其压缩性较低,强度较高,但遇水浸湿时,土的强度显著降低,在附加压力或在附加压力与土的自重压力下引起的湿陷变形,是一种下沉量大、下沉速度快的失稳性变形.造成黄土湿陷的原因可总结为:

(1)黄土的力学性质从内部改变了黄土在浸水及外部荷载因素下,使剪应力超过抗剪强度,从而发生湿陷.

(2)黄土内部受浸水湿化作用下,使土壤自身摩擦力降低,外部扰动作用诱发湿陷.

(3)黄土内部结构发生崩解,使黄土颗粒间胶结强度弱化,颗粒间相对迁移,并伴随小颗粒进入大间隙.同时由于颗粒间胶结被水溶解,在外部扰动作用下强度已不堪平衡,造成土质结构损坏.

湿陷性黄土的防止措施

黄土湿陷性对人类工程活动危害很大,常使建筑物、渠道、库岸、道路护坡造成破坏.笔者认为,改变湿陷性黄土的结构特性是防止黄土湿陷性的核心,而防止或减小建筑物地基浸水湿陷则是防止黄土湿陷性的关键点.

防止湿陷性黄土地基湿陷的综合措施主要有地基处理、防水措施和结构措施三种.其中地基处理措施主要用于改善土的物理力学性质,减小或消除地基的湿陷变形;防水措施主要用于防止或减少地基受水浸湿;结构措施主要用于减小或调整建筑物的不均匀沉降,或使上部结构适应地基的变形[2].三种措施作用、功能、侧重点各不相同,在实践中要采取以地基处理为主的综合措施,标本兼治,突出重点,消除隐患.

防止黄土湿陷性的地基处理措施主要有以下几种:

(1)垫层法:包括土垫层和灰土垫层,是将基底以下湿陷性土层部分或者全部挖除,用2:8或3:7灰土局部或整片进行换填并分层夯实,适用于消除基底以下 1~3m的湿陷性黄土.具有施工简易、快捷、造价低的优点,但这种措施处理的黄土厚度有限,不适用于较厚的湿陷性黄土地层,还需做好防水,地面水及管道漏水仍可能渗入土层引起不均匀沉降.

(2)强夯法:是反复将夯锤(10~60t)提到一定高度(10~40m)使其自由落下,给地基以冲击和振动能量,从而提高地基承载力、降低其压缩性,改善地基性能.该法设备简单、工期短、节省劳力材料、造价低廉.处理深度一般在3~7m,对非自重湿陷性黄土效果明显.它要求场地有足够空间,对土壤含水量要求高,且施工造成的震动大,对周围建筑有影响,不适宜在城区使用,施工前试验和完工后检验时间长(30d).

(3)挤密法:是用灰土或土层夯实的桩体,形成增强体,与挤密的桩间土一起组成复合地基,共同承受基础的上部荷载.成孔挤密主要有沉管、冲击、夯扩、爆扩等方法,适用于厚度在3~15m的湿陷性黄土,由于桩体和桩间土的双效作用使得挤密法地基处理的整体效果好,不但消除或部分消除了黄土的湿陷性,还提高了地基土的承载力、增强了其水稳性.

(4)预浸水法:宜用于处理厚度大于10m,自重湿陷量的计算值不小于 500mm的场地.浸水结束后,地面6m以下湿陷性可全部消除,地面6m以内湿陷性也可大幅度减小,但该法耗时太长,往往影响工期,需水量也大,缺水地区不适用.浸水使场地周围地表下沉开裂,容易影响附近建筑物的安全,所以规定至既有建筑物的距离不小于50m,而且一般在浸水结束后,还需进行补充勘察工作,重新评定地基土的湿陷性,并采用垫层或其他方法处理上部湿陷性黄土层,无形中增加了成本、延长了工期.

当以上地基处理措施都不能满足设计要求时,可采用桩基础来消除黄土的湿陷性,此法安全可靠,但是投资费用较大.

2 工程实例

铁路车站站房综合楼

黄韩侯铁路新建白水、澄城、合阳北站站房在陕西省渭南市境内,位于陇东—陕北—晋西的湿陷性黄土带上,此地区自重性黄土分布广泛,厚度一般大于10m,地基湿陷等级一般为3~4级,湿陷性较敏感.经现场钻孔检测,三站均为4级自重性湿陷性黄土,与《湿陷性黄土地区建筑规范(GB 50025-2004)》判定一致.以澄城站站房施工场地为例,土层从上至下分布为:

(1)人工填土:厚约.

(2)黏质黄土:厚约,黄褐色,成份以黏粒为主,黏性一般,土质均匀,土体结构疏松,可见针状孔隙及虫孔,含少量钙丝及钙质结核,岩芯呈散块状及短柱状,其中:~含大量钙丝,~含大量钙质结核,具IV级自重湿陷性.fak=150kPa.(3)砂质黄土: 厚约,棕褐色,成份以黏粒为主,黏性一般,土质均匀,土体结构较紧密,可见少量针状孔隙,硬塑,岩芯呈短柱状,具IV级自重湿陷性.fak=150kPa.

经现场探孔检测,白水站和合阳北站站房与澄城站房一样,均为IV级自重湿陷性黄土,且厚度较大.站房为300人小型铁路车站站房,房屋结构采用全现浇钢筋混凝土结构,主体1层,局部2层,建筑高度12m,建筑面积2500m2,设计使用年限为50年,房屋基础采用钢筋混凝土独立基础,地基基础设计等级为丙级.

设计要求处理后复合地基承载力特征值不小于180kpa,桩间土平均挤密系数不小于.

根据现场情况、房屋结构及国家有关规范的要求综合分析测算,对三站站房地基采用灰土挤密桩的方式进行处理.灰土挤密桩材料按2:8配合比,桩径400mm,桩长度为10m,梅花状布桩,桩距900mm.施工完毕后,经检测三站站房复合地基承载力特征值为225kPa,桩间土平均挤密系数大于,地基承载力提升明显,满足设计要求。

单层小型砌体房屋

黄韩侯铁路韩城车站待检室及清扫房位于陕西省韩城市韩城火车站内,拟建房屋地质资料如下:

(1)杂填土:由粉质粘土与大量砖瓦碎片组成,结构杂乱,土质不均,厚约1m,Ⅱ级普通土.

(2)黏性黄土:分布于填土底面以下,黄褐色,硬塑—可塑,虫孔及大孔隙发育,具湿陷性,工程场地均有分布,属中等压缩性土.厚约10m,底部为棕红色古土壤层.Ⅱ级普通土.fak=120kpa,具Ⅲ级自重湿陷性.

待检室及清扫房建筑面积,层数1层,层高,结构形式为砖混,设计使用年限为50年,地基基础设计等级为丙级,基础采用柱下墙下条形基础,要求处理后的地基承载力特征值不小于180kpa.

地基处理采用基底以下换填3m厚3:7灰土垫层,每边宽出基础边不小于,垫层分层夯实,压实系数不小于.用换填法处理地基后,压实系数不小于,地基承载力特征值为195kpa,满足设计要求.

多层框架房屋

(3)黄韩侯铁路芝阳站运转综合房屋,建筑面积,二层框架结构,层高.拟建房屋地质资料为:黏性黄土:浅棕黄—黄褐色,厚度大于 20m,土质均匀,夹有钙质网膜及零星姜石,硬塑,Ⅱ普通土,fak=150kpa,属自重型湿陷性黄土,湿陷等级Ⅳ级,湿陷土层厚度约25~35m.地表水不发育.钻孔深度未见地下水,土壤冻结深度37cm,要求地基处理后复合地基承载力特征值不小于180kpa.

拟采用3:7灰土挤密桩进行地基处理,桩长6m,桩径450mm,等边三角形布桩,桩距1000mm.但由于现场施工场地不能满足灰土挤密桩处理宽度的要求,经计算,将地基处理方案修改为3:7灰土换填处理地基,处理厚度为基底下3m,宽出基础边缘各2m,灰土压实系数不小于.

现场施工完毕后,经检测,地基承载力特征值大于180kpa,满足设计要求.

工程造价分析

从上表可以看出,对铁路房屋的重要建筑如火车站站房由于其重要性宜采用灰土挤密桩进行地基处理以保证其结构的安全性,其他房屋宜采用换填灰土垫层的方法对地基进行处理,相较挤密法既能有效节省工期、又能显著降低造价,可作为铁路一般房屋处理湿陷性黄土的首选方法.

3 结语

(1)本文以陕西黄韩侯铁路房屋湿陷性黄土地基处理为例,针对房屋所处的现场情况和地质条件,论述了采取的垫层法和挤密法的房屋地基处理方案,并进行了经济技术分析,得出了铁路站房适用灰土挤密法、一般房屋适用垫层法进行湿陷性黄土地理处理结论.

(2)目前对湿陷性黄土的研究成果主要集中在地方民建方面,铁路方面主要集中在对路基的'处理方面[3,4],对铁路房屋的研究极少、类型也单一[5].由于铁路房屋的特殊性,下一步应加强湿陷性黄土地区铁路房屋地区地基处理方法的探索和研究,尤其是地方民建较少使用的其他技术(如DDC桩、钻孔灌注桩、震动碎石桩等),注意案例的收集和数据的积累,以推动湿陷性黄土地基处理技术的发展.

(3)在湿陷性黄土地基处理时,要根据《湿陷性黄土地区建筑规范》(GB50025)、《建筑地基处理技术规范》(JGJ79)的要求,结合所建建筑物的特点、地质条件、要求的地基承载力、施工难易程度、节省投资等方面,进行技术经济分析,选择最合适的房屋地基处理方案,避免资源的浪费.

(4)灰土挤密桩的施工机械属大型施工机械,由于成本原因,现在使用的机械都较为陈旧,因此要研究一套切实可行的安全控制方法和安全操作规程,确保施工安全.

(5)湿陷性黄土房屋地基经过地基处理后湿陷性消除或降低,能达到建筑物荷载的要求,但是我们在实践中还应该采取结构(如考虑框架结构,结构内外设置变形缝等)、防水(如扩大站房外散水的宽度、增加防水卷材等)等措施,继续结构、防水、维护这方面的研究和探索,在实践中不断探索防止湿陷性黄土的方法,防止地基湿陷对建筑物的危害.

参考文献:

(1)张晓宇.湿陷性黄土地区建筑的地基处理措施[J].山西建筑,2014(3):76.

(2)GB 50025-2004,湿陷性黄土地区建筑规范[S].79.

(3)摇裕春,李安洪,罗照新,孙莺.郑西客专湿陷性黄土地基处理技术研究[J].铁道工程学报,2013(9):15—19.

(4)赵如意.黄韩侯铁路湿陷性黄土地基处理措施研究与设计[J].科技创新导报,2013(5):113.

(5)袁二丽.湿陷性黄土地段房屋地基处理方案及造价分析[J].铁路工程造价管理,2013(3):8-10.

高压旋喷桩在道路软基处理中的应用摘 要:在津沽改线下穿通道的U15-U18段及搭板处,因按照原计划用于加强软土地基承载力的深层水泥搅拌桩机具过高,容易使机具与其上的高压线发生电击事故而在施工中无法得到实施,所以此段变更为高压旋喷桩。本文结合工程实例,分别从工作机理、施工流程、和质量检验三个方面对高压旋喷桩做了阐述。关键词:软土地基处理,高压旋喷桩,质量控制1、工程简介津沽该线下穿通道工程全长440米,宽为米,其中U型槽的JK3+¬— JK3+的范围内,道路中心线两侧上方有110KV高压线干扰,所以此段由原来的深层水泥搅拌桩变更为高压旋喷桩。此段旋喷桩设计桩长10—15 米,设计桩径600mm,梅花形布置,桩距米,总根数为668根,总米数为米,从2009年11月8日始到2009年11月19日止,历时12天,工后检验效果理想。2、高压旋喷桩概述.概念:高压旋喷桩是高压喷射注浆法处理地基中的一种,是利用钻孔设备,把安装在注浆管底部侧面的特殊喷嘴,置入土层预定深度后,用高压泥浆泵等装置,以20Mpa左右的压力把预先制备好的水泥、水玻璃等材料作为主固化剂的浆液从喷嘴中喷射出去冲击破坏土体,同时借助注浆管的旋转和提升运动,使浆液把从土体上崩落下来的土搅拌混合,经一定时间的凝固,便在土中形成圆柱状的具有一定强度和抗渗能力的固结体,从而使地基承载力得到加强的一种工程方法。. 加固机理:高压喷射注浆是利用工程钻机把带有喷嘴的注浆管钻进至土层的预定位置,以高压设备使浆液成为20Mpa左右的高压流从喷嘴里喷射出来,冲击破坏土体,当能量大、速度快和呈脉动状的喷射流的动压超过土体结构强度时,土料便从土体剥落下来,高压流切割搅碎的土层,呈颗粒状分散,一部分被浆液和水带出钻孔,另一部分则与浆液搅拌混合,随着浆液的凝固,组成具有一定强度和抗渗能力的固结体,当喷射流以360°旋转、自下而上喷射提升时,固结体的截面形状为圆形即称为旋喷。在钻机的钻杆最前端设置一个高压液体喷射装置,当钻机把该高压喷射装置送到土层预定深度时,通过高压泵向钻杆中心孔连续输送高压水泥浆液,高压水泥浆液即通过喷射装置中的喷嘴小孔喷入钻杆周围的砂层、土层及砂土层,与此同时钻机带动钻杆缓慢旋转并提升使喷嘴缓慢螺旋上升,从而使高压水泥浆不断切割搅拌土层,形成水泥、砂、土及速凝剂的混合搅拌浆体,通过固化剂和软土间所产生的一系列物理化学反应,生成水化物,然后水化物胶结形成凝胶体,将土颗粒凝结在一起形成具有整体性、水稳定性和较高强度的结构整体,从而提高其复合地基承载力及改变地基土物理化学性能,达到提高地基承载力、减少地基沉降、阻止水体流动、增强地基稳定性的目的。旋喷桩主要用于加固地基,提高地基的抗剪强度,改善地基土的变性性能,使其在上部结构荷载作用下,不至破坏或产生过大的变形。3、施工流程旋喷注浆施工流程可大致分为:施工准备,试桩、技术参数确定→测量放样,桩机就位,钻孔,水泥浆制备,旋喷和复搅,提管冲洗,移动设备→桩基工后检测;、 施工准备:钻机进场之前首先进行场地布置,清除施工区域的杂物,平整场地施工段落要平整密实,做好排水工作,确保在较干净的环境中进行施工,其次,准备好施工用电和施工用水;施工用电使用沿线设置的变压器并配备发电机在施工现场,架设电缆接线到施工作业区。、试桩、技术参数确定:每个工点施工前必须先打不少于3根的工艺试验桩,以检验机具性能及施工工艺中的各项技术参数,其中包括最佳的灰浆稠度、工作压力、钻进和提升速度等,还应根据被加固土的性质及单桩承载力要求,确定水泥掺入量。通过试验桩确定本工程高压旋喷桩施工技术参数为:水灰比为1:1;钻进、工作压力20~25Mpa;提升速度≤;桩顶1米范围提升速度≤;转速应控制在20~25r/min,水泥掺入量范围在180~220Kg/m之间。、测量放样:测量人员根据施工图纸提供的坐标、平面布置图,在施工段落进行布桩,桩位用小木桩红色头醒目标注,桩间距误差不大于50mm,布桩完成自检合格后报监理工程师验收,验收合格后进行下一步工序。、钻机就位:搅拌机具运至现场后进行安装调试,待转速、压力及计量设备正常后就位。钻机就位时先使钻头对准桩位标志中心,然后进行钻杆的双向调平,之后,再次调整对中,最后再精确调平。垂直度误差不超过1%,对中误差小于5cm。、钻孔:每台钻机在开钻前,技术人员对钻杆总长度进行尺量,根据桩长、设计桩顶标高、原地面标高计算下钻节数,并在最后一节钻杆上标定出下钻结束位置。钻孔的目的是为了把注浆管置入到预定深度,钻孔方法采用单管法旋转钻机。在钻杆下钻时采用小于10Mpa的水泥浆压力,一方面防止堵喷嘴,另一方面对土体进行第一次喷射,使土体成为混合液,减小喷浆时土体的阻力,以利于浆液充分搅拌,钻到设计的深度。成孔后,应校检孔位、孔深及垂直度,是否符合设计要求。、灰浆的制作:选用优质普硅水泥,根据搅拌桶的大小、水灰比、泥浆比重来标定最大水位线,按水灰比1:1添加水泥,并经充分搅拌,测定泥浆比重是否达到试配时比重,如达不到继续添加水泥直至达到试配水泥浆比重为止。搅拌时间少于4分钟的不得使用,超过初凝时间的浆液也不得使用;灰浆经过两道过滤网的过滤,以防喷嘴发生堵塞;抽入储浆桶内的灰浆要不停地搅拌。、旋喷和复搅:将注浆管下到预定深度后,调整回流阀门,使旋喷罐内的压强达到规定值,水泥浆到达喷嘴后,检验喷射方向、摆动角度,一切合格后,调整工作台和油泵阀门,使旋转速度控制在20—25 r /min和提升速度达到20-25cm /min的范围时开始提杆、旋喷,由下往上成桩,在桩头以下1米范围复喷提钻时采用最慢的1档提钻上升,并复喷一次,增加桩体的密实度,因为桩顶以下1米范围将承受较大的荷载,加强此处桩体的质量对发挥桩体的承载力起关键作用。当喷浆结束后,要对注浆孔进行二次回灌,防止旋喷桩体因水泥浆固结出现顶部凹陷而达不到设计桩顶标高。在施工过程中,旋转速度、提升速度、旋喷压力、水泥用量参数的变化将直接影响桩的均匀程度和桩径,水灰比参数的变化将会影响桩身的强度,因此必须时刻注意检查浆液初凝时间、水泥浆流量及压力、提升速度、旋摆角度、喷射方法等参数是否符合设计要求,并随时作好记录,如遇故障应及时排除。、提管冲洗:喷射作业完成后,将注浆泵的吸浆管移到水箱内,在地面上喷射,以便把泥浆泵、注浆管内的浆液全部排除,防止残存水泥浆将管路堵塞。移动设备:移动钻机至下一孔位,为确保桩与桩之间能很好咬合,宜采用打一跳一法,且间隔时间应大于36小时。4、质量检验 高压旋喷桩完成28d后方能进行质量检验。、触探及抽芯检验成桩7d内采用轻型触探进行N10检测,检测频率为工程桩数的2%。抽芯检验的总桩数不得少于工程桩数的3‰,单位工程桩数小于1000根时,至少做3根。桩芯无侧限抗压强度(28d)应满足如下要求:桩顶~2/3桩长范围:≥;2/3桩长~桩尖范围:≥。、高压旋喷桩单桩承载力要求高压旋喷桩单桩承载力表桩长(m) 单桩承载力(KN)10 30711 33712 36713 39714 42715 442质量检验标准序号 控制参数 控制标准值 备 注1 桩机安装垂直度偏差 <1% 查施工记录2 桩位偏差 ±50 mm 查施工记录3 注浆压力 ≥20Mpa 查施工记录4 水灰比 1:1 查施工记录5 水泥用量 ≥180kg/m 查施工记录6 桩径 ≥600mm 开挖抽查2%7 桩长 不小于设计值 查施工记录8 旋转速度 20~25r/min9 喷提升速度 10~25 cm/min10 桩身强度 不小于设计值 抽芯检查5、注意事项、施工时应先施工内排桩,后施工外排桩、水泥浆液应连续供应。如发生断浆现象,须复打,复打重叠长度必须大于。、浆液拌和应均匀,不得有结块;浆液不得离析或停滞时间过长,超过2小时应停止使用。、构造物基底水泥搅拌桩桩顶高程应根据构造物底高程进行计算确定,同时应考虑凿除50㎝桩头的影响。、旋喷废浆应予以充分利用,施工过长中可在相邻桩之间开挖一定深度的浆液存贮沟(沟宽~米,深~米),待浆液凝固后形成具有一定强度的桩间横系梁,以增强各桩间共同作用,提高地基承载力。施工中控制冒浆量小于注浆量的20%,超过20%或完全不冒浆应查明原因,采取措施。、成桩28d后,可开始基槽开挖,凿除50㎝软桩头,桩头凿除后桩长不得小于设计桩长。、提钻喷浆的速度控制,控制好旋喷速度,保证不大于25cm/min且稳定,灌浆管分段搭接的长度不得小于10cm。底部时应适当加大压力保证底部桩头大于设计,顶部时应重复提钻喷浆一次保证桩头的完整。、提升旋喷过程中确保压力达到设计要求,不小于20Mpa,使足够的水泥浆压入土体,钻杆旋转速度再规定范围内,20~25r/min,确保桩体的均匀性和整体性及强度。6、结语实践表明,采用高压旋喷桩技术进行软土地基加固的效果是显著的,它具有加固体强度高、加固质量均匀、施工操作简便、占地高度小等特点,可用于处理加固淤泥质土、粉土、粘土等软土地基,适用于场地狭窄、不宜进驻大型机械设备等场合,可有效地减少地基总沉降量和不均匀沉降,地基处理效果明显。参考文献:[1] 叶书麟. 地基处理工程实例应用手册[M].北京:中国建筑工业出版社,1983,3[2] 程云朋. 高压旋喷桩在地基加固中的应用探讨[J]. 山西建筑,2007[3] 李 兵. 高压旋喷桩施工技术[J]. 甘肃科技,2005

地基检测论文

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of , is also a research heat of realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering to suffer from, carrying on the evaluation to the quantity of the stake of . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

低应变反射波法Low Strain Reflection Wave Method桩身完整性检测Inspection of pile integrity桩基础|pile foundation高层建筑 High-rise buildings(分类词汇:环境资源相关 )大型桥梁super-large bridges 深水码头Deep Water Wharf海上石油平台Offshore oil platform建筑结构building structure施工construction非线性弹性材料nonlinear elastic materials桩基工程质量问题这篇虽然是科技论文,但是我觉得他翻译成“pile foundation quality question”很不妥当,我将他修改成problems of pile foundation quality,,从汉语语法之角度考虑,这里的问题两个字是多余的,去掉更好,你自己看看吧!不确定性因素Incertitude Factors基桩Foundation Pile隐蔽性(Impercephbility)axial strain轴向应变研究热点research hotspot(也有用point的)桩身缺陷位置 positions of pile defects定性估计 qualitative estimation混凝土强度等级concrete strength gradethe signal of reflected_wave curve反射波曲线信号工程隐患Project Concealed Harzard一维波动模型one-way fluctuant model控制体(control volume),本构关系 constitutive relationFORTRAN语言编制程序program written in FORTRAN language响应时程曲线波形时程曲线response time history curvePile foundation is widely used as the main basic structure of high-rise buildings,super-large bridges,deep water wharf and Offshore oil platform. During recent years,there are many bases of pile foundation quality affecting the normal working and safety of the building structures. Pile construction has high impercephbility and whose quality presents many incertitude factors,from an angel of qualitative inspection of the foundation piles, it has important significance for ensuring the quality and safety of foundation pile projects to modify the inspection methods and improving the inspection quality and the reliability of inspection & assessment results,it is also one of the research hotspots in foundation pile field. The main functions of low strain reflection wave method is to inspect the pile integrity, such as the judgment of pile defects positions, the checkout of pile lengths, and the qualitative estimation of the concrete strength grade,the judgment of the pile quality using the signal of reflected_wave curve accurately, the elimination of the project concealed harzard,and the estimation of foundation pile quality. This paper studied on the low strain reflection wave method for measuring of pile integrity made of Kelvin nonlinear elastic materials, set up a new one-way fluctuant model to treat the problems of piles made of Kelvin nonlinear elastic materials, gave out a dynamics equation of control volume,and induced the relation between pile axial forces and axial strain using the constitutive relation of one-way nonlinear elastic materials, put forward a new calculation method for the fluctuation of one-way nonlinear elastic materials, simulated the pile-top speed response time history curve (or displacement, acceleration) numerically using program written in FORTRAN language, finally the author set up a curve database of the foundation piles existing integrity problem for the integrity inspection of foundation piles in the future.

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a 基 engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of 基 examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of 基s, is also a research heat of 基 realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering 隐 to suffer from, carrying on the evaluation to the quantity of the stake of 基 . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a 维 of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a 维 not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of 基 of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。我为大家整理的建筑工程质量检测技术论文,希望你们喜欢。建筑工程质量检测技术论文篇一 浅议建筑工程质量检测 【摘要】 建筑工程质量检测工作是做好建筑工程质量管理的重要手段和技术基础。本文对检测行业的现状进行了分析,探讨了建筑工程质量检测的主要内容与检测技术,并提出了做好检测工作的策略。 【关键词】 质量检测;检测内容;策略 【中图分类号】 【文献标识码】 B 【 文章 编号】 1727-5123(2012)03-045-02 建筑工程质量不仅关系工程的适用性和建设项目的投资效果,而且关系到人民群众生命财产的安全。随着我国现代化建筑事业的蓬勃发展,建筑规模不断扩大,一旦发生工程质量问题,会直接影响公共利益和公众安全,因而,建筑工程的质量检测越来越成为人们所关注的 热点 。 1检测行业的现状 改革开放以来,建设工程质量检测行业规模由小到大,工作类型由单一到综合,检测市场化概念已经形成。但是在实际工作中仍然存在很多问题。⑴从只能检验砂石、水泥、砖瓦、钢材发展到市政工程材料、地基基础检测、建筑工程结构可靠性检测、建筑节能检测、室内环境检测等,检测的内容越来越精细,检测技术也在不断进步;⑵建筑企业试验室属于第一方试验室,即企业为了保证自身承包的工程质量而设立的试验室,由于其自身性质很大程度上限制了它们的发展,使其在经济实力、检测能力、规模和技术力量等环节处于劣势,在检测市场所占分额很小。但是这种情况正在改变,企业的试验室正在逐步分离出来, 成立具有独立法人资格的检测机构;⑶市场的竞争,使检测费用远远低于成本,导致部分试验无法正常进行;⑷检测行业目前的技术门槛过低,造成人员技术素质较低。虽然现在实行的是见证取样,施工现场的见证人员不仅没有相应的资格,甚至有一些人员连最简单的常识都不懂,样品的真实性得不到保证,所得到的数据与实际严重不符。 2建筑工程质量检测的内容 地基基础工程的质量检测。 地基。通常采用钻孔取芯试验、静载荷试验和触探试验对复合地基进行检测。检测要求有:⑴砂石桩复合地基的质量检测要求。施工后等待一段时间,抽查检测砂石桩的处理效果;可采用静力触探、标准贯入、原位测试的 方法 检测桩间土的挤密质量;⑵振冲桩复合地基的质量检测要求。施工结束后间隔一定的时间,可采用单桩载荷试验对振冲桩的质量进行检测;对于场地复杂或是重要的工程,应检测复合地基的处理效果。 桩基工程。桩基检测项目主要有:⑴单桩竖向承载力试验。在同一个条件下,试桩的数量应大于3根;应采用油压千斤顶加载;基准桩与压重平台支座、试桩之间的中心距应符合相关规定;制作的试桩应符合要求;加载方式选择慢速维持载荷法;测读桩沉降量的时间间隔应掌握好;严格按照要求确定单桩竖向极限承载力;⑵基桩高应变动力检测。检测之前需对电源、传感器、仪器、设定参数等进行检查,确保无误;锤击设备选用自由落锤时,应保证最大锤击落距小于3mm;如果只需检测桩身的结构完整性,可降低落距,减轻锤重;⑶混凝土灌注桩终孔持力层检验。人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验;可采用原位载荷试验测得的结果,并结合实践 经验 和桩基设计要求,对桩孔孔底土层的承载力进行复验。地基基础工程质量检测另外还有地下结构施工监测和建筑物的变形检测等。 钢筋混凝土结构工程质量检测。钢筋混凝土质量检测可分成三类。⑴外观检查。对于混凝土外表产生的质量问题,可用此法,如尺寸偏差、蜂窝麻面、表面损伤、缺棱掉角、裂缝、冻害等;⑵预留试块检测。这种方法有一定的误差,如预留试块的取样不当,试块与结构没有同条件养护,试块的振捣方法与结构的施工方法相差过大,则试块就没有代表性;⑶在结构本体上进行检测。这种检测内容有:混凝土的强度和缺陷、钢筋混凝土结构质量问题的常用手段,其测试结果可作为判断结构安全问题的重要依据。后者称为破损检验,是在非破损检测尚无法确定其承载能力时使用,或对新结构需要分解其受力性能时使用。常用较成熟的非破损检测方法有:回弹法(表面硬度法)、拔出法(半破损法)、超声波法(声波法)等。回弹法是一种测量混凝土表面硬度的方法,利用回弹仪冲击动能测量回弹锤撞击混凝土表面后的回弹量,确定混凝土表面硬度,用试验方法建立表面硬度与混凝土强度的关系曲线,从而推断混凝土的强度值;拔出法是直接测定混凝土的力学特性的方法,使用拔出仪拉拔埋在混凝土表面层内的锚杆,根据混凝土的拉拔强度,推算混凝土抗压强度;超声波法可以测定混凝土的强度,用超声波发射仪,从一侧发射一列超声脉冲进入混凝土中,在另一侧接收经过混凝土介质传送的超声脉冲波,同时测定其声速、振幅、频率等参数,判断混凝土的质量。 砌体结构工程检测。 砌体结构的现场检测方法。砌体结构主要指砖砌体,砌体强度是由砖块和砂浆强度或施工时制做的砌体试块强度来决定的,传统的检测方法是直接从砌体结构上截取试样,进行抗压强度试验而砌体结构的特点导致取样存在较大难度,取样时的扰动又会对试样产生较大损伤,从而影响试验结果。因此,砌体结构的现场原位非破损或半破损试验方法理所当然地受到重视,并广泛开展研究和工程实际应用。砌体强度直接测定法包括:抽样检测法、原位检测法、动测综合法、微观结构法等。 砌体强度的间接测定法。砌体强度与砂浆和砖块强度有直接关系。由砂浆和砖块强度等级可确定砌体的抗压强度,间接测定法就是使用专门的仪器和专门的测试方法,测量砂浆和砖块的某一项强度指标或与材料强度有关的某一项物理参数,并由此间接测定砌体强度。主要方法有:冲击法、回弹法、推出法,此外尚有筒压法、点荷法等通过测定砂浆的强度来测定砌体强度的方法,都已在工程中得到应用。 3做好检测工作的策略 建立检测信用档案 良好的信用是建立社会主义市场经济体制的必然要求。检测机构及检测人员信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测机构和人员的信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,建立诚信获利和失信惩戒机制,发挥信用管理调控市场的作用。通过各种 渠道 ,宣传质量检测信用好的单位,扩大其社会信誉度和知名度。 完善建筑工程质量保证体系。针对建设项目规模,建立相应等级试验检测机构和质量保证体系,对工程质量负责。试验检测机构业务范围内的有关规范、规程、标准等技术文件应齐全,试验检测应严格按有关标准、规程及规范进行。各级质量管理部门应各司其责,按质量第一的方针和全面质量管理要求,采取切实有效的 措施 ,不断提高质量管理水平。在实际工作中,应严格实行质量自检,加强质量管理和质量监督,逐步建立完善质量保证体系。还要增强建设各方面的质量意识,分工负责,责任到人,真正落实质量岗位责任制。 培养高素质的技术队伍,加大技术创新的投入。勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 坚持质量 教育 ,建立质量原理和质量责任制度。在质量管理工作中,质量意识的提高有两个途径:⑴靠坚持不懈的质量教育;⑵建立和落实质量管理和质量责任制度。因此,质量教育经常化和质量管理制度化是我们质量管理工作的重点。 严格验收工程。完成项目工程能否交付好的产品,关键在于最后验收。⑴工序验收是验收工作的基础。工序验收的过程是:先由操作者自检,再交由班组长检验。要采取必要经济制约手段,完善签字鉴证手续,严格执行每道工序,确保质量;⑵分项分部工程验收是验收工作的主要组织部分。分项分部验收要做到规范和严细:首先,保证验收工程的全面性,验收项目的品种和数量不得缺少。其次,从保证项目到允许偏差项目,验收都要严格执行国家标准,不得降低等级,严禁弄虚作假。最后,建设(监理)单位现场质量监督员应参加验收并签字鉴证;⑶竣工工程验收是工程交工的前提。工程整体验收应注意三个环节:首先,施工单位的自评;其次,建设(监理)单位的预验;最后,工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 总之,在将建筑工程质量检测行业推向市场的过程中,要加强见证取样工作的监督,无论是招标、规划、质量监督工程的各个部门在工程的每个环节都不要放松。做到每一个样品的取样合理,真实可靠。各检测单位还要提高建筑工程质量检测的质量意识和法律意识。树立服务观念,在市场经济中找准自己的位置,树立现代 企业管理 观念,借鉴和利用一切企业管理的先进手段和办法来帮助检测机构健康发展。 建筑工程质量检测技术论文篇二 刍议建筑工程质量检测 【摘要】建筑工程的数量也随着社会主义发展而不断增加,而工程检测是现代建筑必不可少的环节,这也是保证工程施工质量的有效途径。工程检测质量的好坏关系到了整个建筑质量的好坏,结合具体的工作经验,本文对建筑工程质量检测遇到的相关问题展开了简单的探讨。 【关键词】质量检测;建筑工程;问题探讨 在建筑行业不断发展的同时,我们也看到了很多潜在的安全隐患。近几年,我国建筑行业的意外事故发生率在不断增加,很多施工场地都出现了伤亡事故。这些都在警示人们,工程建筑施工必须要做好质量检查工作。检测时需要积极运用先进的技术手段,结合科学的实施程序,提高建筑工程的检测效率,尽可能避免过大的经济损失,维护建施工的安全进行。 一、建筑工程检测的主要内容与技术 1、地基基础的检测 (1)桩基工程的检测 桩基是隐蔽工程,支撑着地面上的构筑物,它是建筑物的基础,其质量优劣直接影响到这些建筑物的安全。在桩基础的施工过程中,桩基检测是一个不可缺少的环节。 a.单桩竖向承载力。在检测的同时必须要注意几个重点:在相同环境下,保证试桩的数量在3根以上;需使用油压千斤顶进行加载;对基准桩、压重平台支座、试桩三者的间隔要控制在标准范围内;设计的试桩需要满足实际工程需要;严格控制测读桩沉降量的时间长短好;根据具体标准来限制单桩竖向极限承载力。b.基桩高应变动力。在现场进行检测工作需要结合相关要求进行:在检测前期需做好相关的检查,如:电源、仪器、设定参数等,保证无误后投入使用;在锤击设备采取自由落锤时,要将最大锤击落距控制在3mm 以内;若需要对桩身的结构整体性进行检测,需要降低落距,减小锤重。c.混凝土灌注桩终孔持力层检验。检验技术要点:人工挖孔桩终孔时,应按照设计要求对孔走向、表面岩状及桩端持力层进行检验。 (2)建筑物的变形检测 a.倾斜。对建筑物倾斜情况实施检测是不可缺少的环节,其主要包括了直接测定法、间接测定等方式。直接测定法有:经纬仪投影法、垂线法、天顶天底仪观测法等;间接测定法有:对建筑物基础的相对沉降实施测定等。b.挠度与裂缝。通过运用检测仪器来做详细的观察;c.沉降。对地基的实际情况做好检查分析,避免因地基严重而影响到建筑质量。 (3)地下结构施工的监测 a.结构内力监测。钢筋混凝土的结构内力测试,主要是通过在支护结构构件主筋上布置钢筋应力计,以监控支护结构的应力变化。b.支护结构的侧向变形观测。采用测斜仪可以测量不同深度支护结构及土体的侧向变形程度。 二、对钢筋混凝土结构的质量检测 1.对混凝土内部状况的检测 由于混凝土材料的缺陷才导致的内部状况。这是因为施工大意、技术管理不到位等造成的。通过超声波可以探明缺陷具体存在的位置,并进行及时补救。直角传播法、钻孔对测法、单面平测法和直接穿透法等都是主要的检测方法。 2.对混凝土中钢筋的质量检测 对钢筋锈蚀的检测。如果钢筋发生锈蚀,则会对混凝土结构的安全性和耐久性会产生影响。通过采用半电池检测的方法,利用钢筋锈蚀程度与测量电位间建立的关系,对钢筋的锈蚀程度进行判断。对钢筋的位置进行检测。可以利用钢筋位置检测仪,这一先进的仪器设备进行测量,其能准确的测出混凝土中钢筋的位置以及保护层的厚度,确保其稳定性。 3.对混凝土强度的检测 主要是针对混凝土的内部结构而进行的非破损强度检测,主要运用回弹法等方法,对当前的建筑行业而言,这是对混凝土强度检测中比较常用的方式[2]。其重点主要在于:①在检测前需要对被检测对象的相关情况进行熟悉;②在构件上,要确定试样及分布其测区;③对回弹值、碳化深度要进行循环测试;④对试验数据要做好处理。 三、钢筋混凝土结构检测 (1)混凝土中钢筋的质量检测 a.钢筋锈蚀的检测。钢筋发生锈蚀会直接影响混凝土结构的耐久性和安全性。可采用半电池检测法,利用测量电位与钢筋锈蚀程度间建立的关系,判别钢筋的锈蚀程度。b.钢筋的位置检测。钢筋位置检测仪作为一种先进的仪器设备,可以准确的测定钢筋混凝土中钢筋的位置以及保护层厚度,保证其稳定性。 (2)混凝土强度 主要是针对混凝土结构的非破损强度进行,主要运用的方法包括了回弹法,这是当前建筑行而言比较常用的混凝土强度的方式。其重点在于:a.检测前需熟悉被检测对象情况;b.于构件上确定试样并分布测区;c.逐渐测量回弹值、碳化深度;d.对试验数据做好处理。 四、建筑材料的质量检测 建筑材种类繁多,各种材料进入施工现场后必须根据相关的规范要求进行试验检测,其检验的项目也必须符合国家、行业、地方的相关要求。常规检测项目有:主体结构(梁、板、柱) 砼标号及钢筋数量检测,竣工后房屋空气质量状况检测,钢筋抽样检测,混凝土试块检测,瓷砖性能检测,铝合金门窗三性检测等,这些项目都是强制性要求必须检测的项目。 五、建筑门窗 (1)塑料门窗 检测对象包括:a.根据断面图标准,对配合尺寸、断面尺寸的允差检查;b.低温落锤冲击试验;c.检测加热后的尺寸大小变化。 (2)铝合金门窗 包括:a.表面质量。检查门窗的装饰表面是否出现损伤,其表面的致密、配合情况是否良好。b.装配标准。检查运用的材料能否达到要求,其硬度与强度之关系是否合理。c.性能。门启闭力在50N 以下;抗风压性能要尽可能更强。 六、做好检测工作 1、建立检测信用档案 检测信用档案,包括检测机构和人员的业绩、检测市场违法违规行为及不良行为记录等。检测信用档案是对检测机构申请资质和奖惩的重要依据。完善检测信用管理,就是要建立诚信获利和失信惩戒的管理机制,发挥信用管理在市场调控中的作用。 2、完善技术管理工作制度 要认真执行工程技术标准,它是工程质量和安全的最基本保障,是工程建设领域的技术法规。要想使质量管理工作科学化、规范化、程序化、制度化,必须健全和完善建设各方主体工程质量技术保证体系,建立健全工程各方主体的质量技术管理控制机制,督促施工单位结合自身情况制定施工工艺、操作规程和内部控制标准。 3、培养高素质的技术队伍,加大技术创新的投入 勘察设计单位是技术密集型企业,对设计工作的要求很高。因此,提高设计质量的首要任务是提高人的素质,包括提高技术人员的质量意识和生产技能。同时,必须加大技术创新的投入,增加技术储备,为设计生产提供资源和技能保障。 4、严格验收工程 工程整体验收应注意三个环节:一是施工单位的自评。二是建设(监理)单位的预验。三是工程主管部门的正式验收。验收不但要现场检测,而且还要进行观感评定;不但要听取汇报,而且要严格审查一整套的工程技术档案资料。验收要明确工程遗留的质量问题,提出处理意见,确定保修条款,保证交付用户一个满意的产品。 结束语 对建筑工程实施质量检测具有十分重要的意义,对工程的质量具有决定给作用,在一定程度上可以降低工程成本的过度消耗,并对建筑物的结构安全起到了维护的作用。根据具体的需要,进而由施工单位采取相应的科学措施来进行检测。 参考文献: [1]杨莉萍,谢平.浅议工程质量检测工作的重要性及要求[J].云南建筑,2008(5) [2]王晓萍.关于混凝土构件荷载检验方法的探讨[J].河北建筑工程学院学报,2008(5) [3]周涛.浅谈工民建工程的质量检测[J].城市建设,2009(32) 看了建筑工程质量检测技术论文的人还看 1. 建筑工程技术论文范文 2. 建筑工程技术研究论文范文 3. 建筑工程技术管理毕业论文3篇 4. 建筑工程技术毕业论文范文 5. 浅谈工程技术建设论文

地基检测技术论文

桩基础 has the widespread application domain, is the high-rise construction, the large-scale bridge, the deep water wharf as well as the marine petroleum platform and so on use main foundation form. In recent years, 桩基 the project quality question influence construction structure normal use and the safe instance were very many. The pile construction has the high hiding as well as the pile construction quality has very many not definite factor, looked from 基桩 the quality examination angle, the improvement examination method and the method, improve the examination work quality and the examination evaluates the result the reliability, to guarantees 基桩 the project quality and safely has the vital significance, also is 桩基 one of domain research hot low strain reflection method main function examines the pile body structure integrity, like the pile body flaw position judgement, 施工桩 long proofreading and the concrete intensity rank qualitative estimate and so on, the use obtains the reflected wave curve signal accurately to delimit breaks the pile body quality, removes the project hidden danger, to 基桩 the quality carries on the appraisal. This article has conducted the research to the Kelvin non-linearity elastic material 料桩 body integrity examination low strain reflected wave new method. Establishes the Kelvin non- line elastic material 料桩 question the unidimensional undulation new model; Produced has controlled the body the dynamic equation, the use unidimensional non-linear elasticity this construction relations infers the pile axial force and the axial strain relations, proposed the unidimensional non-linear elastic undulation question new algorithm; Uses the FORTRAN language coding, the value simulation 基桩 桩顶 speed (or displacement, acceleration) responds the time interval curve profile; Finally 基桩 builds each kind of profile storehouse to the complete existence question, will use in 基桩 the complete examination service for later. As well as low strain reflection method; The pile body integrity examines 2 words

A foundation has the extensively applied realm, is key figures building, large bridge, deep wharf of water and sea the petroleum terrace main foundation form that etc. recent years, a 基 engineering quantity problem influence building structure of the case of the normal usage and safety is a lot construction of the stake have the concealment of the height and the construction quantity of the stakes contain a lot of indeterminations factor, seeing from the angle of a quantity of 基 examination, the method and meanses of the improvement examination, the credibility that the exaltation examination work quantity and examinations assess the result, have the important meaning towards the quantity and safeties that insure an engineering of 基s, is also a research heat of 基 realm to order it a. The low contingency reflect a function with main method is to examine a body structure integrity, if a body blemish position judgment, construction the stake grows to check to settle sex to estimate the etc. with the concrete strength grade, making use of to measure glint a curve signal rows to break a body quantity accurately, expeling the engineering 隐 to suffer from, carrying on the evaluation to the quantity of the stake of 基 . This text to the Kelvin not the glint a new method of low contingency of the flexible material a body of line complete sex examination carried on the research. Build up the new model of the Kelvin non- line flexible material an a 维 of the problem motion;Give square distance of the control dynamics of the body, make use of a 维 not the line flexibility originally 构 the relation deduce a stalk toward dint and stalks toward emergency relation, putting forward a 维 not the line flexibility undulates new calculate way of problem;Adopt the FORTRAN language establishment procedure, the number imitates a speed( or move, acceleration) to respond to a form of the timing curve;Exist an establishment of 基 of problem to rise various form database to the integrity finally, is hereafter used for a complete sex examination service. And low contingency glint a method;A body integrity examines 2 phrases

工程地质勘查论文

工程地质勘查为调查工作,进行是为了研究影响建筑的地质因素,水文条件、一些天然的地质现象、岩土的力学性质及地质构造为地质勘查的主要因素。以下是我整理的工程地质勘查论文,欢迎阅读。

1 岩土工程地质勘察技术应用现状

地质勘察的技术问题

岩土工程地质勘察工作是确保岩土工程能够实施的关键所在。

目前在地质勘察技术应用过程中还存在着一些问题。地质勘察人员在勘察过程中,需要根据岩土的各种性质来对界面进行划分,从而区别性进行对待,但在实际工作中,界面划分上缺乏针对性。在对岩土进行取样时全面性,特别是在取样时某些原状岩土样本极易被忽视,这就导致岩土室内试验缺乏全面性, 其所得出来的各项参数触及面狭窄。

部分岩土地质勘察人员由于自身勘察能力不高,这就导致野外作业和资料整理分析的能力有限, 使其无法有效的胜任勘察工作的实际需求。另外在勘察工作中,与建筑结构的结合缺乏,往往造成勘察工作存在较强的片面性。

导致地质勘察技术问题存在的原因

首先,地质勘察过程中勘察依据不足,在勘察报告中缺乏对建筑项目相关资料的分析,这就导致在勘察工作中不能有针对性的进行勘测点的布置, 从而所勘察出来的结果会无法满足建筑工程施工的要求。 而且工程所处范围内的最大限度荷载也没有进行综合考虑,这就导致勘察工作不到位情况的发生。 特别是在工程桩基施工过程中,如果某地段如果有特殊的岩土结构出来,则在桩基施工过程中需要改用水桩,这就需要对建筑物结构设计进行重新修改,导致大量的人力、物力和财力资源浪费发生。

其次,勘察工作缺乏合理性。 在勘察过程中,由于不同建筑物的在勘察工作中其勘察间距及勘察点布置都具有较大的差别性,但在勘察工作具体操作过程中,由于作业不按规范要求进行,从而导致孔深不足及勘察点超范围等现象时常发生。 在地质勘察工作中,由于对勘察等级缺乏考虑,这就导致往往按普通标准进行的地质勘察时,在测试过程中发现地基条件良好,但在后期剪切波速测试过程中往往会发现在钻孔深度内存在特殊结构的岩层。 最后,当前地质勘察水平较为落后,在碎石土层时,往往采用静力触探法进行,这就导致触控试验过程中缺乏连贯性, 在对岩层进行钻进过程中,由于对岩心采取率较为忽略,从而导致钻探效果缺乏全面性。

2 岩土工程地质勘察技术

地质勘察测绘

岩土工程地质勘测测绘,是对岩土的地貌地形、变化情况和地质条件等情况进行测绘,具体内容包括:在岩土工程勘察界限内外的一定宽度内,调查是否存在滑坡、土洞和坍塌等不良地质现象,以及岩石、软弱层地质体的出露部位、范围和分布,按照一定比例将这些调查内容标示在图纸之上;岩土所在地的气候等水文气象,以及周边生活和生产建筑物对岩土的破坏程度等的调查,并对岩石的特征、风化程度,所在位置的地貌与岩土层关系进行分析,初步划分地貌单元;调查岩土位置的地下水情况,包括地下水的类型、水位情况和流量等,并按照一定比例标示在测绘图纸上。 以上的调查内容除了标示在图纸之上,还要进行调查情况的野外照相或者素描,作为编制地质勘查报告的基本资料。

钻探技术

在岩土工程地质勘察工作中, 需要通过岩土钻探来掌握第一手资料,而且在钻探过程中对其技术性要求较高,所以在钻探过程中需要有效的掌握一些切实可行的方法,确保钻探技术水平能够更好的发挥出来。

1)钻探技术的选择。在不同的地质环境下,所选择的钻探技术也会有所不同。 当钻探在地下水以上的地层进行时,采用勺型钻锤击干法掏土钻进法为宜,这种钻探方法具有简单和便捷的特点,但利用这种方法进行钻探过程中会给土层带来较大的干扰,所以当钻探深度具有较高要求时,这种方法则不宜使用。 当针对多种岩土工程勘察的深度时,则可以利用岩芯回转泥浆护壁钻进法进行钻探。 在普通地质勘察工作中,往往会选择双管单动个别进、冲击钻探等钻进方法进行工作。

2)钻进深度的控制。在对岩土层的分层深度进行测量时,需要严格控制误差,确保其测量误差在小于 5cm. 在利用岩芯回转泥浆护壁钻进法进行钻进过程中, 为了能够更好的实现对分层精度的控制,则需要严格控制非连续取芯钻进的回次进尺,通常情况下是需要将其控制在 2m之内。

3)针对不同性质的'岩土,控制取芯率。当岩土性质不同时,则需要针对不同性质来对其取芯率进行控制。 对于土层其取芯率需要达到 100%, 在对岩石风化的残积土进行钻探时, 其取芯率则以85%为宜。而半岩半土的取芯率控制在 90%,破碎岩控制在 65%,软质岩控制在 65%,而完整岩则将其取芯率控制在 80%为最佳。

4)在钻进过程中,需要根据钻进的回次来对钻探记录进行填写,这些记录可以作为钻探技术进行应用时的必要依据。

取样和试验技术

首先,取样技术。 取样需要根据工程地基的情况进行采取,一般采集中风化和微风化岩的上部位置, 因为这些风化带具有过渡的特点,而上部位置就具有代表意义,其他位置超风化带实验值过于离散。

采集后的样本做及时蜡封处理,用胶带包括岩样,以防止其水分流失,并分类妥善保存,每种样本都要有标签清楚记录孔段的深度,然后送到土木试验地点进行土样和岩样的分析和试验。其次,原位试验,即在保证检测对象不被扰动和破坏的天然状态下,通过各种试验手法进行指标测定。 原位试验是岩土工程地质勘察的重要部分,获取岩土的设计参数,也是岩土工程施工质量检验的重要手段。 原位试验的方法很多,包括荷载、静力触探和标准贯入试验等。

试验方法具体根据工程条件和需求而定,常用的试验方法是标准贯入试验法。根据《 建筑地基基础设计规范》规定,标准贯入试验是自动落锤的试验法。该法应根据地基的条件,以 1~为一次钻进单元深度,如果地质为松土,则钻进深度应该结合实际而定, 风化残积土和全风化带钻进以 为一次钻进单元深度,强风化带以 2~为一次钻进单元深度。 最后,编写地质勘察报告。 严格按照相关规定要求进行编写,编写的前应该将各类勘察资料进行汇总整理,结合实际拟定大纲后再进行编写,内容包括勘察基本内容、地质条件、工程分析评价以及相关的结论和建议。

3 结论

岩土工程地质勘察属于综合型的工作,不仅具有复杂性,而且还具有较强的多变性特点,当前岩土工程地质勘察技术在应用过程中还存在一些不足之处, 所以需要针对产生这些问题存在的原因进行分析,从综合运用各种勘察技术来提高地质勘察的技术含量,综合、客观的对地质环境进行判断和评价,确保为建筑工程的施工提供科学的各项岩土工程地质勘察数据,确保施工的顺利进行。

参考文献

[1] 刘湛省。岩溶地区铁路工程地质勘察浅探[J].西部探矿工程,2010( 7) :15.

[2] 刘群。对堤防工程地质勘察规程中若干问题的探讨[J].人民长江,2015( 1) :14.

[3] 张淑杰。岩土工程地质勘察中控制质量的因素分析[J].黑龙江科学,2014( 10) :15.

湿陷性黄土地基处理研究

黄土湿陷性对人类工程活动危害很大,常使建筑物、渠道、库岸、道路护坡造成破坏。以下是我收集整理的湿陷性黄土地基处理研究论文,和大家一起分享。

摘要: 通过梳理湿陷性黄土成因及各地基处理方法的适用范围、优缺点,结合黄韩侯铁路房屋湿陷性黄土地基处理方案的工程实例,以技术经济分析方式,得出了湿陷性黄土地区铁路房屋地基处理的一般方法,对湿陷性黄土地区铁路房屋的修建具有很好的借鉴作用。

关键词 : 湿陷性黄土;铁路房屋;地基处理垫层法;挤密法

湿陷性黄土是一种特殊性质的土,具有在自重或外部荷重下或二者共同作用下,受水浸湿后结构迅速破坏发生突然下沉的性质.它在中国分布广泛,主要集中在山西、陕西、甘肃大部分地区以及河南西部.此外,新疆、山东、辽宁、宁夏、青海、河北及内蒙古的部分地区也有分布,但不连续.

铁路房屋是铁路生产、运营的核心,发挥着指挥、调度、监控、服务等作用,对整个铁路的安全运营起着十分重要的作用,是整体铁路系统中不可缺少的一部分.鉴于湿陷性黄土的危害性和铁路房屋的重要性,在湿陷性黄土地区的铁路站房建设,必须采取处理措施,以保证站房结构的安全.

由于国内对铁路房屋湿陷性处理措施的专项研究和实例介绍不多,本文特从理论与实践相结合的角度对此问题展开论述.

1 黄土的湿陷机理及防止措施

黄土的湿陷性机理

黄土的结构特点和胶结物质的水溶特性决定了黄土湿陷的机理[1].湿陷性黄土是一种非饱和的欠压密土,具有大孔和垂直节理,在天然湿度下,其压缩性较低,强度较高,但遇水浸湿时,土的强度显著降低,在附加压力或在附加压力与土的自重压力下引起的湿陷变形,是一种下沉量大、下沉速度快的失稳性变形.造成黄土湿陷的原因可总结为:

(1)黄土的力学性质从内部改变了黄土在浸水及外部荷载因素下,使剪应力超过抗剪强度,从而发生湿陷.

(2)黄土内部受浸水湿化作用下,使土壤自身摩擦力降低,外部扰动作用诱发湿陷.

(3)黄土内部结构发生崩解,使黄土颗粒间胶结强度弱化,颗粒间相对迁移,并伴随小颗粒进入大间隙.同时由于颗粒间胶结被水溶解,在外部扰动作用下强度已不堪平衡,造成土质结构损坏.

湿陷性黄土的防止措施

黄土湿陷性对人类工程活动危害很大,常使建筑物、渠道、库岸、道路护坡造成破坏.笔者认为,改变湿陷性黄土的结构特性是防止黄土湿陷性的核心,而防止或减小建筑物地基浸水湿陷则是防止黄土湿陷性的关键点.

防止湿陷性黄土地基湿陷的综合措施主要有地基处理、防水措施和结构措施三种.其中地基处理措施主要用于改善土的物理力学性质,减小或消除地基的湿陷变形;防水措施主要用于防止或减少地基受水浸湿;结构措施主要用于减小或调整建筑物的不均匀沉降,或使上部结构适应地基的变形[2].三种措施作用、功能、侧重点各不相同,在实践中要采取以地基处理为主的综合措施,标本兼治,突出重点,消除隐患.

防止黄土湿陷性的地基处理措施主要有以下几种:

(1)垫层法:包括土垫层和灰土垫层,是将基底以下湿陷性土层部分或者全部挖除,用2:8或3:7灰土局部或整片进行换填并分层夯实,适用于消除基底以下 1~3m的湿陷性黄土.具有施工简易、快捷、造价低的优点,但这种措施处理的黄土厚度有限,不适用于较厚的湿陷性黄土地层,还需做好防水,地面水及管道漏水仍可能渗入土层引起不均匀沉降.

(2)强夯法:是反复将夯锤(10~60t)提到一定高度(10~40m)使其自由落下,给地基以冲击和振动能量,从而提高地基承载力、降低其压缩性,改善地基性能.该法设备简单、工期短、节省劳力材料、造价低廉.处理深度一般在3~7m,对非自重湿陷性黄土效果明显.它要求场地有足够空间,对土壤含水量要求高,且施工造成的震动大,对周围建筑有影响,不适宜在城区使用,施工前试验和完工后检验时间长(30d).

(3)挤密法:是用灰土或土层夯实的桩体,形成增强体,与挤密的桩间土一起组成复合地基,共同承受基础的上部荷载.成孔挤密主要有沉管、冲击、夯扩、爆扩等方法,适用于厚度在3~15m的湿陷性黄土,由于桩体和桩间土的双效作用使得挤密法地基处理的整体效果好,不但消除或部分消除了黄土的湿陷性,还提高了地基土的承载力、增强了其水稳性.

(4)预浸水法:宜用于处理厚度大于10m,自重湿陷量的计算值不小于 500mm的场地.浸水结束后,地面6m以下湿陷性可全部消除,地面6m以内湿陷性也可大幅度减小,但该法耗时太长,往往影响工期,需水量也大,缺水地区不适用.浸水使场地周围地表下沉开裂,容易影响附近建筑物的安全,所以规定至既有建筑物的距离不小于50m,而且一般在浸水结束后,还需进行补充勘察工作,重新评定地基土的湿陷性,并采用垫层或其他方法处理上部湿陷性黄土层,无形中增加了成本、延长了工期.

当以上地基处理措施都不能满足设计要求时,可采用桩基础来消除黄土的湿陷性,此法安全可靠,但是投资费用较大.

2 工程实例

铁路车站站房综合楼

黄韩侯铁路新建白水、澄城、合阳北站站房在陕西省渭南市境内,位于陇东—陕北—晋西的湿陷性黄土带上,此地区自重性黄土分布广泛,厚度一般大于10m,地基湿陷等级一般为3~4级,湿陷性较敏感.经现场钻孔检测,三站均为4级自重性湿陷性黄土,与《湿陷性黄土地区建筑规范(GB 50025-2004)》判定一致.以澄城站站房施工场地为例,土层从上至下分布为:

(1)人工填土:厚约.

(2)黏质黄土:厚约,黄褐色,成份以黏粒为主,黏性一般,土质均匀,土体结构疏松,可见针状孔隙及虫孔,含少量钙丝及钙质结核,岩芯呈散块状及短柱状,其中:~含大量钙丝,~含大量钙质结核,具IV级自重湿陷性.fak=150kPa.(3)砂质黄土: 厚约,棕褐色,成份以黏粒为主,黏性一般,土质均匀,土体结构较紧密,可见少量针状孔隙,硬塑,岩芯呈短柱状,具IV级自重湿陷性.fak=150kPa.

经现场探孔检测,白水站和合阳北站站房与澄城站房一样,均为IV级自重湿陷性黄土,且厚度较大.站房为300人小型铁路车站站房,房屋结构采用全现浇钢筋混凝土结构,主体1层,局部2层,建筑高度12m,建筑面积2500m2,设计使用年限为50年,房屋基础采用钢筋混凝土独立基础,地基基础设计等级为丙级.

设计要求处理后复合地基承载力特征值不小于180kpa,桩间土平均挤密系数不小于.

根据现场情况、房屋结构及国家有关规范的要求综合分析测算,对三站站房地基采用灰土挤密桩的方式进行处理.灰土挤密桩材料按2:8配合比,桩径400mm,桩长度为10m,梅花状布桩,桩距900mm.施工完毕后,经检测三站站房复合地基承载力特征值为225kPa,桩间土平均挤密系数大于,地基承载力提升明显,满足设计要求。

单层小型砌体房屋

黄韩侯铁路韩城车站待检室及清扫房位于陕西省韩城市韩城火车站内,拟建房屋地质资料如下:

(1)杂填土:由粉质粘土与大量砖瓦碎片组成,结构杂乱,土质不均,厚约1m,Ⅱ级普通土.

(2)黏性黄土:分布于填土底面以下,黄褐色,硬塑—可塑,虫孔及大孔隙发育,具湿陷性,工程场地均有分布,属中等压缩性土.厚约10m,底部为棕红色古土壤层.Ⅱ级普通土.fak=120kpa,具Ⅲ级自重湿陷性.

待检室及清扫房建筑面积,层数1层,层高,结构形式为砖混,设计使用年限为50年,地基基础设计等级为丙级,基础采用柱下墙下条形基础,要求处理后的地基承载力特征值不小于180kpa.

地基处理采用基底以下换填3m厚3:7灰土垫层,每边宽出基础边不小于,垫层分层夯实,压实系数不小于.用换填法处理地基后,压实系数不小于,地基承载力特征值为195kpa,满足设计要求.

多层框架房屋

(3)黄韩侯铁路芝阳站运转综合房屋,建筑面积,二层框架结构,层高.拟建房屋地质资料为:黏性黄土:浅棕黄—黄褐色,厚度大于 20m,土质均匀,夹有钙质网膜及零星姜石,硬塑,Ⅱ普通土,fak=150kpa,属自重型湿陷性黄土,湿陷等级Ⅳ级,湿陷土层厚度约25~35m.地表水不发育.钻孔深度未见地下水,土壤冻结深度37cm,要求地基处理后复合地基承载力特征值不小于180kpa.

拟采用3:7灰土挤密桩进行地基处理,桩长6m,桩径450mm,等边三角形布桩,桩距1000mm.但由于现场施工场地不能满足灰土挤密桩处理宽度的要求,经计算,将地基处理方案修改为3:7灰土换填处理地基,处理厚度为基底下3m,宽出基础边缘各2m,灰土压实系数不小于.

现场施工完毕后,经检测,地基承载力特征值大于180kpa,满足设计要求.

工程造价分析

从上表可以看出,对铁路房屋的重要建筑如火车站站房由于其重要性宜采用灰土挤密桩进行地基处理以保证其结构的安全性,其他房屋宜采用换填灰土垫层的方法对地基进行处理,相较挤密法既能有效节省工期、又能显著降低造价,可作为铁路一般房屋处理湿陷性黄土的首选方法.

3 结语

(1)本文以陕西黄韩侯铁路房屋湿陷性黄土地基处理为例,针对房屋所处的现场情况和地质条件,论述了采取的垫层法和挤密法的房屋地基处理方案,并进行了经济技术分析,得出了铁路站房适用灰土挤密法、一般房屋适用垫层法进行湿陷性黄土地理处理结论.

(2)目前对湿陷性黄土的研究成果主要集中在地方民建方面,铁路方面主要集中在对路基的'处理方面[3,4],对铁路房屋的研究极少、类型也单一[5].由于铁路房屋的特殊性,下一步应加强湿陷性黄土地区铁路房屋地区地基处理方法的探索和研究,尤其是地方民建较少使用的其他技术(如DDC桩、钻孔灌注桩、震动碎石桩等),注意案例的收集和数据的积累,以推动湿陷性黄土地基处理技术的发展.

(3)在湿陷性黄土地基处理时,要根据《湿陷性黄土地区建筑规范》(GB50025)、《建筑地基处理技术规范》(JGJ79)的要求,结合所建建筑物的特点、地质条件、要求的地基承载力、施工难易程度、节省投资等方面,进行技术经济分析,选择最合适的房屋地基处理方案,避免资源的浪费.

(4)灰土挤密桩的施工机械属大型施工机械,由于成本原因,现在使用的机械都较为陈旧,因此要研究一套切实可行的安全控制方法和安全操作规程,确保施工安全.

(5)湿陷性黄土房屋地基经过地基处理后湿陷性消除或降低,能达到建筑物荷载的要求,但是我们在实践中还应该采取结构(如考虑框架结构,结构内外设置变形缝等)、防水(如扩大站房外散水的宽度、增加防水卷材等)等措施,继续结构、防水、维护这方面的研究和探索,在实践中不断探索防止湿陷性黄土的方法,防止地基湿陷对建筑物的危害.

参考文献:

(1)张晓宇.湿陷性黄土地区建筑的地基处理措施[J].山西建筑,2014(3):76.

(2)GB 50025-2004,湿陷性黄土地区建筑规范[S].79.

(3)摇裕春,李安洪,罗照新,孙莺.郑西客专湿陷性黄土地基处理技术研究[J].铁道工程学报,2013(9):15—19.

(4)赵如意.黄韩侯铁路湿陷性黄土地基处理措施研究与设计[J].科技创新导报,2013(5):113.

(5)袁二丽.湿陷性黄土地段房屋地基处理方案及造价分析[J].铁路工程造价管理,2013(3):8-10.

地基基础检测与加固论文

现如今,随着我国社会经济的不断发展,土 木工 程施工技术也随之不断改革、发展,为我国城市及乡镇的建设作出重大贡献。我整理了土木工程技术3000字论文,欢迎阅读!土木工程技术3000字论文篇一:《试谈土木工程建筑施工技术》 [摘要]本文介绍了土木工程建筑施工的特点及传统的施工技术,并分析了新型的土木工程施工技术,指出施工技术的未来发展趋势,尤其是新型防水施工技术、钢结构施工技术、混凝土施工技术等,为土木工程的相关工作者提供参考。 [关键词]土木工程;施工技术;创新;发展 随着我国社会经济的不断发展,土木工程施工技术也随之不断改革、发展,为我国城市及乡镇的建设作出重大贡献。现就土木工程的传统施工技术与新型施工技术进行分析、对比。 1.土木工程建筑施工特点 复杂性。由于各项土木工程建筑产品的功能性及类型不同,而且施工技术随着工程施工所在地及周边环境条件而变化,因此,土木工程建筑施工具有一定的复杂性。 流动性。由于建筑产品是固定的,出现单件组织施工的情况下,项目和地点则不断变换,因此,要求施工人员、机具、建筑材料要随建筑物建造的地点而流动。 长期性。土木工程的建筑物体积一般较为庞大、施工周期长,少则几个月,多则几年、甚至十几年才能建成。 危险性。由于建筑工程中的露天作业较多,高空作业多,极易受自然条件影响,其危险性较高。 综合性。土木工程建筑施工的协作单位较多、牵涉面广,它需要多行业、多工种的配合协作,综合性很强。 2.土木工程的传统施工技术 地基基础施工技术。地基基础施工的主要施工 方法 为桩基础施工,包括:承载能力极限状态和正常使用极限状态。一方面,按承载性状划分,基桩包括:摩擦型桩和端承型桩。摩擦型桩又分为摩擦桩和端承摩擦桩,端承桩又分为端承桩和摩擦端承桩。摩擦桩在承载能力极限状态下,桩顶竖向荷载是由桩侧摩阻承受,端阻力可以忽略。而端承摩擦桩在极限状态下,桩顶竖向荷载则是由桩侧阻力承受主要部分。端承桩在极限状态下,桩顶竖向荷载由桩端阻力承受,桩侧阻力可以忽略。而摩擦端承桩则是由桩端阻力承受大部分的竖向荷载。另一方面,按照成桩方法划分,包括:非挤土桩、挤土桩和部分挤土桩,制作基桩的材料也主要分为木桩、混凝土桩、钢桩等,不同类型和不同材料桩的施工方案和适宜的基础亦有所不同。在桩基础施工中,通过结合主要单根桩的施工质量来确定桩型,并进行综合考虑,尤其是群桩基础,尽量避免发生不均匀沉降。其中,桩基础施工中钻孔灌注桩的主要步骤是:桩定位放线、钻机就位并校正垂直度、钻孔清土、灌注并搅拌混凝土、制作安放钢筋笼、成桩验收并进行质量检验。 钢结构施工技术。钢结构施工主要是吊装构件,首先,在施工前应当事先做好准备工作,包括场地清理、道路修筑、基础准备、构件运输、检查装备等。其次,钢构件运送先后顺序要按照施工顺序进行,构件运到现场后,应尽量存放在起吊位置,并用足够支承面的木枕垫底。在吊装前应该核准构件标号、位置,并清除表面,摩擦面要保持干燥清洁。最后,应当准备灭火器谨防发生火灾,这主要是由于钢结构工程的特殊性,可能会在施工过程中用到氧气、乙炔类焊接工具,容易引发火灾。 混凝土结构施工技术。按照施工中浇制混凝土的地点主要包括:预制法和现浇法。其中,预制法是在别处而非施工现场浇筑混凝土,预制混凝土以其低廉的成本、出色的性能,成为建筑业的新宠。在使用预制法施工时,应当确保预制模的尺寸准确,并严格按照施工顺序进行。另外,现浇法则是在施工现场支模浇筑混凝土,是大多数建筑物采用的方式,其应用更为广泛。 3.土木工程施工新技术 防水施工新技术 冷作业防水施工。当前,我国防水施工技术不断发展,正朝冷作业方向发展,其中,各种防水材料也有很大发展。我国生产的聚氯乙烯防水卷材、SBS改性沥青防水卷材、APP改性沥青防水卷材、聚氨酯涂料及603卷材等,其中部分材料性能已达到或接近国际先进水平。 防水混凝土结构。防水混凝土结构,主要通过混凝土本身的自密实性,实现其防水性能,例如地下室、水池、水泵房等。防水混凝土结构不仅具有承重、围护、抗渗和抗裂等多重作用,而且其耐侵蚀度和耐冻融度较高。 大跨度的钢结构施工新技术 大跨度的钢结构施工技术主要包括:高强厚钢板工地焊接技术、大型网壳钢结构安装技术、大跨度空间钢结构临时支撑卸载技术、大跨度钢结构计算机控制液压提升安装技术、大跨度柱面网壳折叠展开提升安装技术、钢结构整体平移安装技术、旋转开启式钢屋盖安装技术、拱形多轨道开启式钢屋盖安装技术、桅杆钢结构提升安装技术、预应力钢结构施工技术、索膜结构施工技术、爬升塔式起重机悬置布置及使用技术、重型塔式起重机置于永久结构上的使用技术、重型履带起重机置于永久结构上的使用技术、大型旋转式龙门起重机的应用技术以及大型桁式龙门起重机的应用技术等。 混凝土施工新技术 清水混凝土施工技术。清水混凝土技术,以原始的浇筑混凝土面直接作为装饰性表面,属于现浇钢筋混凝土技术。清水混凝土施工操作简便,成本也较低,大大提高了土木工程建筑的牢固程度。它不仅满足了高层建筑对工艺的高要求,而且属于一次浇筑成型的施工技术,仅在表面涂一层或两层透明的保护剂,该施工技术环保性急天然性较高,而且施工质量较高,外形美观。如中国首例现浇清水混凝土风格美术馆――辽河美术馆,具有朴实无华、自然沉稳的外观韵味。 钢纤维混凝土施工新材料。在确保建筑产品实用性的前提下,为了迎合人类对土木建筑愈来愈高的审美要求,也为了展现建筑的艺术美感,我国行业专家已研究出了在普通的混凝土中掺入适量的钢纤维,再经均匀拌合而成的钢纤维混凝土。这一突破性的新材料,不仅弥补了施工中建筑材料抗拉能力不足的问题,而且还能够增强混凝土构件的抗剪性、抗裂性和耐久性。另外,钢纤维混凝土还具有优良的抗冲击能力,对于提高建筑施工质量具有重要意义。 土木工程技术3000字论文篇二:《试谈土木工程技术创新阐述》 摘要 :土木工程施工在我国的建筑类施工中起着重要的作用,在施工中的地位也越来越重,土木工程关系到我国城市建设发展水平和建筑业的发展,铁路建设是土木工程施工的重要内容,只有加强土木工程技术的创新才能推动我国铁路建设不断发展。本文着重对土木工程施工的创新手段进行了深入阐述,表现了加强土木工程技术创新对土木工程施工发展起到的重要作用。 关键词 :土木工程 施工技术 前言 土木工程的英文是Civil Engineering ,直译是民用工程,它是建造各种工程的统称。它既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材料设备和进行的勘测,设计施工,保养,维修等专业技术。 一、土木工程施工技术的特点 随着经济和科学技术的发展,新材料、新结构不断出现,大规模、技术复杂的土木工程结构也越来越多,施工技术也相应随之不断发展。我国正处在经济高速发展时期,工程建设数量多,规模大,促进了我国施工技术的发展。由于土木工程的特点,决定了其生产组织与一般的工厂生产组织不同,每项工程都需要根据工程性质和特点,单独进行施工组织,施工组织是否科学合理直接影响到工程项目的成败,一般来说,土木工程施工具有如下特点:固定性和流动性:流动性包括施工队伍的流动和在同一工程上工人在作业空间上的流动;多样性和单件性:工程各不相同,完全一样的工程几乎没有庞大性和协作性、综合性:需要建设、设计、施工、监理、材料供应商等多家不同单位配合协作完成;复杂性和易受干扰性:技术、管理复杂,易受气候、周围环境等外界因素干扰;投资大、生产周期长。(一)桩基施工技术。土木工程中的桩基施工要求施工人员要合理的选择适合桩型进行施工,还要充分的考虑好单桩和群装的选择,以达到单桩基施工质量的标准,如果施工用的是群桩,就要想到地基会不会出现不均匀沉降问题;在进行预制的桩基吊运时,要充分的考虑因吊运对桩基产生的强烈冲击感和振动感;施工人员还要有效的进行对桩基钻孔和混凝土的灌注工作,对桩基完成了定位放线和校正以及钻机的垂直效果、钻土和清土、混凝土的灌注搅拌、制作安放钢筋笼、校验等一些工作后,就要对施工的质量进行检验,查看是否达到施工的规范和标准。 (二)混凝土构造技术施工也是常见的铁路施工方法。施工中的预制方法和现行浇灌是混凝土的施工机构中比较常见的施工方法。预制混凝土方法是混凝土在逐渐的施工管理中被广泛认可的应用,预制的方法具有成本低廉、性价比高等优点,在使用预制混凝土构造技术时要首先考虑预制工具的大小尺寸并且要严格按照施工的规范操作进行。现浇的施工方法比预制的施工方法应用时间更早,这种方法在施工的现场通过支模对其浇筑。 二、工程中的建筑结构 建筑工程就是兴建房屋规划,勘测,设计,施工的总称。 房屋建筑一般包括十个部分:(1)埋在地下的基础和地下室(2)承载外力并把力传到基础的柱子,楼板,梁,框架墙,屋盖及支撑体系(3)四周的饿维护结构和中间的隔墙(4)房屋内外的装饰(5)控制环境的供暖,通风,空气调节,照明,防火隔声等系统(6)楼梯间,电梯或自动扶梯等垂直传输系统(7)闭路电视,电话,计算机网络等通讯体系(8)电力系统(9)卫生设备和给水排水系统(10)垃圾处理系统。 Pier Luigi Nervy说过:建筑结构说穿了,不过就是受力体的反力与内部应力如何与外力达到平衡。建筑首先要解决,也是必须要解决的问题就是受力的问题。我们把解决这个问题的学科称为建筑力学。建筑力学有可以分为:静力学,材料力学和结构力学三大力学体系。建筑力学是讨论和研究建筑结构及构件在荷载和其他因素影响的工作状况,也就是建筑的强度,刚度,稳定性。在载荷作用下,承受载荷和传递载荷的建筑结构和构件会引起周围的物体对它们的作用,同时物件本身受载荷作用而产生变形,并且存在着破坏的可能性,但是结构本身就具有一定的抵抗变形和破坏的能力,而结构的承载能力的大小是与构件的材料,截面的几何尺寸,受力性质,工作条件和构造情况有关。而这些关系都可以由力学关系式通过计算而得以解决。 三、土木工程施工技术研究 1.软土地基施工与石方爆破施工 软土地基施工特点:往往不能满足承载力和变形能力的要求,施工时如果采取 措施 不当,往往会发生路基或建筑物地基失稳或严重下沉,造成建筑物破坏或不能正常使用,需要进行加固,加固方法:换土垫层法、强夯法、振冲法、砂桩挤密法、深层搅拌法、堆载预压法、化学法等;土石方爆破施工:适用环境:开挖时遇到岩石,施工现场地下障碍物的清除、旧建筑物和构筑物的拆除,施工的工序:打孔放药、引爆、排渣;特点:施工费用低、效率高、有震动和粉尘危害,对旧建筑物、构筑物的拆除,还可以采用静力破碎等配合施工工艺,是拆除在低震动、低粉尘、无公害的情况下进行。 2.灌注桩施工与墩式基础施工 (1)灌注桩施工是在施工现场的桩位处用机械或人工成孔,然后在孔内放入钢筋笼、浇筑混凝土(或者直接浇筑混凝土)而成的一种施工方法。成孔工艺:干作业成孔、泥浆护壁成孔、套管成孔、人工成孔、爆扩成孔等。其特点:能适应地层的变化、施工时振动小、噪声低、工艺要求较高、施工后混凝土需要养护且不能立即承受荷载。 (2)墩式基础是在人工或机械成孔的大直径孔中浇筑混凝土(或者放钢筋笼、浇筑混凝土)而成的大直径基础。目前,我国多用人工挖孔,故又称为大直径人工挖孔桩。墩式基础特点:端部直接支撑在岩石或坚硬土层上,桩的强度和刚度都很大,有较大的承载能力。 3.沉井基础施工 沉井是由刃脚、井筒、内隔墙等组成的呈圆形或矩形的筒状钢筋混凝土结构,多用于重型设备基础、桥墩、水泵站、取水结构、超高层建筑物的基础等,施工过程:施工时首先制作井筒,然后在井筒内挖土,使井筒靠其自重沉入土中。井筒的最下端为刃脚,形状如刀刃,在沉井下沉过程中使沉井切入土中。沉井的外壁为井筒,在下沉过程中起挡土作用,同时靠其自重可以克服筒壁与土之间的摩阻力和刃脚底部的土阻力,使沉井能在自重作用下逐步下沉。 4.预应力混凝土工程施工 预应力混凝土结构的截面小、刚度大、抗裂性和耐久性好,能充分发挥钢材和混凝土各自的性能,在土木工程中得到了广泛的应用。其施工具体方法主要分为以下三种: (1)先张法施工:先张拉预应力钢筋,然后再浇筑混凝土构件的一种施工方法主要施工过程是在浇筑混凝土构件之前,张拉预应力钢筋并将其临时锚固在台座或钢模上,然后浇筑混凝土构件,待混凝土到达一定强度、混凝土与钢筋之间有足够的粘结力后,放松预应力钢筋,借助混凝土与预应力钢筋之间的粘结,使混凝土产生预压应力。 (2)后张法施工:是先制作混凝土构件后张拉预应力钢筋的一种施工方法,要施工过程:先制作混凝土构件并预留孔道,待混凝土达到一定强度后,将预应力钢筋传入孔道,利用张拉机具张拉预应力钢筋,然后用锚具将预应力钢筋锚固在构件端部,最后进行孔道灌浆。 (3)粘结预应力施工:是在后张法基础上发展起来,要施工过程:采用表面有涂料、外面包有塑料套管的预应力筋,铺设在模板内,然后浇筑混凝土,待混凝土到达设计要求的强度后,再进行预应力筋的张拉、锚固。 四、结束语 总之,土木工程施工技术在近几十年虽然有了飞速发展,但是土木工程施工至今仍以手工操作、半机械作业为主,劳动效率大大低于其他产业部门,还属于劳动力密集型的产业,现代土木工程施工技术的发展方向,除了要有满足当前土木工程建设需要而与之配套的施工技术,还要向高效率、无公害、高质量、机械化、智能化、高技术含量、信息化的方向发展。 参考文献: [1]段树金主编.土木工程概论.北京:中国铁道出版社,2005. [2]关于土木工程施工的探讨. 土木工程技术3000字论文篇三:《试谈高层建筑施工土木工程问题》 一、高层土木建筑简介 当今,为了能适应社会发展需求,高层建筑的结构越来越大,这就需要土木工程技术的支持,所以,这两者之间的关系不可分割,高层建筑的可靠性、安全性、依旧依赖于土木施工质量的保障,只有找出阻碍各方面原因,才能解决土木行业还没有解决的问题,才能给高层建筑做道路铺垫,才能有效提升行业的发展速度。 二、施工特点分析 高层建筑施工具有很多特点,包括以下几点; 1.我们都知道,高层建筑的工序不仅繁多,而且不劳动量大作业工序还复杂,施工管理与协调工作相当难做; 2.鉴于高层项目占地与体积都很大,施工前期需要准备很多的建筑材料与机械设备,庞大的规模的建设,需要2年到3年时间才能竣工,甚至更长时间。长时间的建设周期,有可能会错过新技术与新型材料的到来;存在着错过新技能的风险; 3.高层建筑项目都很危险,所谓高层建筑一般都是30层左右的高度,在如此高度的环境下作业容易造成安全事故的发生,所以,在高层项目中需要有组织有计划的安排布局,把施工质量安排稳妥,事故防范于未然。 三、施工质量的控制分析 (一)裂缝的产生 裂缝的产生对于施工质量来说是一个非常严峻的问题,也是在高层建筑工程里面比较普遍的一种疾病。导致裂缝形成的原因诸多,有动态与静态的,甚至还有稳定的和闭合的。所以,想要保住整个建筑质量,就需要把裂缝问题这一环节处理妥当。要整治工程的裂缝问题,首先要发现裂缝开裂的原因,分析其裂缝对建筑整体的影响,分析其原因所在后,在对其进行处理。在施工的设计阶段,就需要采取有效的预防措施分别有:将荷载的作用降低、释放作用效应。 (二)解析混凝土浇筑强度控制 在整个项目建设阶段中,混凝土浇筑环节最为重要。首先,在浇筑作业时要采取先进的技术和方法,一旦浇筑面积扩大,需要停止作业。要对浇筑层做冷却处理,保证混凝土与水的恒温在25°的范围内。完毕浇筑后,要注意温度是否有变化,要对数据进行记录整理,为2次浇筑做准备。当在进行2次浇筑时,需要把控好时间。需要在第一层混凝土呈半凝结状态下进行,与此同时,将捣振器的使用范围与力度调整好,这样有助于效避免了裂缝的产生。其次,要科学合理浇筑,盲目的不按照施工程序操作会导致严重的质量问题。在整个浇筑阶段中,现场的监理人员要严格检测结点这个位置,因为,结点是整个浇筑物的关键部位,其质量的优劣直接影响着整个工程的质量。 四、各方面影响工程质量的因素与措施 (一)影响施工质量的因素 在当前形势下,对项目建设施工提出了很大的要求,但是,在以往传统的组织里,组织者的思想还是陈旧,创新意识不全,这就导致工程质量不达标,经济下滑。 (二)重建不重管 建设高层建筑时,会使用到各式各样的设备,施工进度的快慢取决于施工期的设备选择,所以在选择设备的时候要考虑设备的参数和性能,做好“用前检查,用后保养”的习惯。如果检查工作遗漏或是觉得检查多此一举,这将会导致安全隐患的产生,后果不可想象。譬如:施工中一台三脚架的质量出现了质量问题,是因为前后期的检查工作有遗漏做不到位,那么在施工阶段中可能会出现坍塌的现象,更为严重的会导致人员的死亡。为此,相关管理员要把设备机械管理好,避免因为机械引发的安全事故;在项目里,假设管理员和施工员都不按照正常的 规章制度 办事,不重视操作规程,这将会严重影响工作质量,给实际工作带来安全隐患。 (三)质量监督不到位存在漏洞 进行项目时有时会有塌方的现象出现,会给施工造成严重的影响,导致这些问题是没有重视某处周围的环境因素。致使工程质量监督中通常会出现建筑周边环境的监控不到位。 由于周围的环境因素没有考虑周全,在实际工作中会受到外界的影响,地下水的结构遭到破坏,这就导致土质变软,然后承载能力就会有所下降。因此,在建设项目之前需要对周围的环境进行了解,综合考虑会影响到施工质量的因素,做好应对措施,记录工作 日记 ,杜绝事故的再次发生。 五、提升高层建筑施工质量的控制措施 (一)增强监管力度 面对管理的缺陷,在这一问题上就要采取逐个解决的措施。首先,对于设备的管理,需要匹配相关的专业人士管理。工程开工前期,需要将设备全面检查,从而保证设备的正常使用,施工过程中也要定期对设备检查防止其损坏。竣工后,要及时清洗养护设备,将养护工作做好,保证设备使用后完整。其次,加强规范建筑业规章制度,严格遵循各方面制度,完善协作机制,相互监督帮助。在次,加强 安全 教育 的学习,增长安全意识,建立创新性的安全监管手段,把 安全生产 做到位。 综上,增强监管力度是保证建筑工程有条不紊的进行的重要基础。 (二)纳入科技技术及优秀人才 建筑行业的专向发展,缺少不了先进的科学技术以及优秀的人才配合。管理人员的专业素养对高层建筑施工管理质量起着至关重要的作用,相对于当前 文化 过低的的操作员来说,理论和实践会受到外界的约束,这将严重的影响着工程的建设。可见,人才的储蓄尤为重要,除此之外,还要在技术上面将技术更新,借鉴国外先进技术和先进设备,在当前形势下,落后将会被淘汰,技术的与时俱进是保证工程质量的重要前提。 六、结语

浅谈关于高层建筑的地基基础施工设计研究

论文关键词:高层建筑 施工设计 工程施工

论文摘要: 高层建筑工程施工中,地基基础施工是整个建筑的重要组成部分,其施工质量直接影响到整个工程的质量。文章依据本人今年来的工作经验提出了高层建筑地基基础设计与选型的条件,并进一步探讨了高层建筑地基基础施工质量的提升建议,以期对广大工程设计与施工同仁提供参考。 0.引言 高层建筑的建造过程中,其建筑负荷全都由地层来承担,影响建筑物负荷的那部分地层被称之为地基,向地基传递负荷的下部结构被称为基础。近年来,在高层建筑工程的施工中因基础问题影响到施工质量的情况时有发生,在工程的整体设计上,一般认为施工难度较大的部分,在于建筑的上层结构,其实这是一种错误的认识,高层建筑地基基础才是施工中的重点。地基基础是工程基础建设质量的重要保障。为了确保地基基础的安全性,就必须对它加以研究,并在工程施工中对施工方法和施工手段进行分析,论证、监督。以下文章主要对高层建筑的地基基础的施工进行系统的分析和论述。 1.高层建筑基础设计与选型条件 选型条件 现阶段,我国的建筑行业随着经济的进步而快速发展,给建筑工程地基提出了更高的要求。在建筑工程的整体设计中,经常有地基强度不足,抗压抗震性不强的,沉降不均匀的情况发生,这就要求设计部门根据实际情况设计地基基础。地基的处理方法有很多,每种方法都有其适应的环境和范围,在施工中要注意施工方法的局限性和优缺点,每个工程都要从地基的实际情况、处理要求、技术难度,工程费用等方面综合考虑,以确保用合理的方法来进行地基的处理。 地基基础的设计应满足以下几个基本条件。首先,地基的负荷不应超出地基本身的承载能力,避免地基土剪切和稳定性的失衡。其次,在控制好翻地的变形量,把变形量控制在地基可允许的范围内,控制好因地基引起的上部结构损坏,或因此影响建筑物功能上的使用。最后,要对地基基础做强度和耐久性、刚度的进行充分的数据分析,确保地基能适应高层建筑的结构。 基础设计 地基的设计应由设计单位提出具体要求,并经过勘察单位进行现场的水文地质勘察,提供施工现场范围内的地质报告,并对土层和地质构造进行分析论证。不能以相邻建筑物的勘察资料做了待开工建筑的勘察据依。对于土质较软的地基,应进行地基加固处理,防止地基因土质问题而变形。且不能依靠大型基础断面来承担地基上部结构的荷载,因为基础再大,相对于上部结构还是较柔的。所以地基处理要与基础选型结合起来进行设计。在地基选型上要充分考虑到建筑整体的布局、结构荷载、抗震性,和现场的实际情况。要将地基与建筑结构作为一个整体来进行设计。基础设计形式要与上部结构相适应、相吻合、相协调,每个部分既是独立的,又是相互作用的,使得每个部分都能发挥出应用的作用又能发挥共同作用。在地基的设计过程中要参考邻近建筑物的资料,根据邻近建筑物的勘察资料,分析对待建建筑物的干扰,主要是指新建筑建成后,邻近建筑物对地基产生的影响和后果,既是否影响新建建筑物的地基变形,是否影响新建建筑物功能上的使用,是否影响新建建筑的整体布局和施工进度。在设计过程中要结合实际情况进行周密的论证分析,确保建筑物设计的合理性,和地基的完整性,合理的对地基进行选型,确保工程的顺利展开。施工队伍的施工经验和技术水平也决定着地基基础建设的好与坏,考虑好这些客观条件,提出符合实际情况的设计方案可以快速、有效、安全的进行地基施工。 2.高层建筑地基施工的质量控制 高层建筑地基的测量放线 高层建筑的测量放线工作是建筑地基施工中的基础性工作,精确、详细、周密的测量能确保地基工程顺利安全的施工,并为上部结构的安全性提供有效的技术保障。高层建筑的测量放线对工程质量有着决定性的影响,在工程质量管理中也起到了非常重要的作用。放线过程中要充分的利用好手中的科学仪器,提升施工质量。地基施工中利用新仪器和新的技术手段可以提高工作效率,这就要求工程测量人员要不断的掌握和学习新的知识和新的仪器,为建筑地基基础工程提供更为精确和周密的数据而服务。 高层建筑地基的施工材料控制 高层建筑地基的施工材料控制是确保地基安全性的重要组成部份。地基材料的质量决定着整体工程的质量,在施工中要确保原材料的达标性,既原材料一定是出厂合格产品并符合工程本身的技术质量要求。在地基施工的每个阶段都要严把质量关,控制好原材料的质量,以此提高地基工程的施工质量。在原材料的把关上,要对材料的供应商进行资质审核,有必要的进行调研的,可以去原材料生产单位进行调查研究,确保原材料的真实性。施工中进场的原材料必需由建设单位和监理单位进行统一严格的检查与审验,生产厂商对于每批的进场材料都要出具质量检验报告和合格证,有必要的`还需进行化学试验,确保原材料的生产质量。 高层建筑地基水泥灌桩的质量控制 高层建筑地基多采用水泥灌桩技术进行地基基础的加固施工,钻孔灌桩技术中每个施工步骤都对地基的施工质量有着决定性的影响。钻孔和水泥灌桩是工程质量的关键。施工前对钻孔机器进行周密的检查,确保底座和顶端的平稳,避免施工过程中因底座的移位和下陷影响了灌桩的质量。当钻机达到设计高度后,需对孔径的大小,钻孔的深度和垂直度进行详细的检查,达到设计标准后请监理工程师对钻孔进行合格性检验,并填写钻孔检验记录,完成钻孔工作。灌桩进时所采用的原材料主要以混凝土为主,目前较多的施工单位都采用成品泥浆进行钻孔灌桩,这就要求施工单位和监理单位要对进场的泥浆进行严格的质量检验,在施工单位质量检验人员的检验的同时认真审核确保使用材料符合要求。 管理体系和人员管理 高层建筑的地基施工中,要完善施工企业的质量管理,促进质量控制的实施,建立健全的质量控制体系是保障高层建筑施工质量的关键。高层建筑地基基础施工质量控制得益于企业完善的质量保障体系。通过全员、全过程的质量监控及施工过程记录、监理等有效保障高层建筑地基基础施工的质量,为工程质量打好坚实的基础。 3.结语

各类工程的勘察基本要求 房屋建筑和构筑物 房屋建筑和构筑物(以下简称建筑物)的岩土工程勘察,应在搜集建筑物上部荷载、功能特点、结构类型、基础形式、埋置深度和变形限制等方面资料的基础上进行。其主要工作内容应符合下列规定: 1 查明场地和地基的稳定性、地层结构、持力层和下卧层的工程特性、土的应力历史和地下水条件以及不良地质作用等; 2 提供满足设计、施工所需的岩土参数,确定地基承载力,预测地基变形性状; 3 提出地基基础、基坑支护、工程降水和地基处理设计与施工方案的建议; 4 提出对建筑物有影响的不良地质作用的防治方案建议; 5 对于抗震设防烈度等于或大于6 度的场地,进行场地与地基的地震效应评价。 建筑物的岩土工程勘察宜分阶段进行,可行性研究勘察应符合选择场址方案的要求;初步勘察应符合初步设计的要求;详细勘察应符合施工图设计的要求;场地条件复杂或有特殊要求的工程,宜进行施工勘察。 场地较小且无特殊要求的工程可合并勘察阶段。当建筑物平面布置已经确定,且场地或其附近已有岩土工程资料时,可根据实际情况,直接进行详细勘察。 可行性研究勘察,应对拟建场地的稳定性和适宜性做出评价,并应符合下列要求: 1 搜集区域地质、地形地貌、地震、矿产、当地的工程地质、岩土工程和建筑经验等资料; 2 在充分搜集和分析已有资料的基础上,通过踏勘了解场地的地层、构造、岩性、不良地质作用和地下水等工程地质条件; 3 当拟建场地工程地质条件复杂,已有资料不能满足要求时,应根据具体情况进行工程地质测绘和必要的勘探工作; 4 当有两个或两个以上拟选场地时,应进行比选分析。 初步勘察应对场地内拟建建筑地段的稳定性做出评价,并进行下列主要工作: 1 搜集拟建工程的有关文件、工程地质和岩土工程资料以及工程场地范围的地形图; 2 初步查明地质构造、地层结构、岩土工程特性、地下水埋藏条件; 3 查明场地不良地质作用的成因、分布、规模、发展趋势,并对场地的稳定性做出评价; 4 对抗震设防烈度等于或大于6 度的场地,应对场地和地基的地震效应做出初步评价; 5 季节性冻土地区,应调查场地土的标准冻结深度; 6 初步判定水和土对建筑材料的腐蚀性; 7 高层建筑初步勘察时,应对可能采取的地基基础类型、基坑开挖与支护、工程降水方案进行初步分析评价。 初步勘察的勘探工作应符合下列要求: 1 勘探线应垂直地貌单元、地质构造和地层界线布置; 2 每个地貌单元均应布置勘探点,在地貌单元交接部位和地层变化较大的地段,勘探点应予加密; 3 在地形平坦地区,可按网格布置勘探点; 4 对岩质地基,勘探线和勘探点的布置,勘探孔的深度,应根据地质构造、岩体特性、风化情况等,按地方标准或当地经验确定;对土质地基,应符合本节第条~第 条的规定。 初步勘察勘探线、勘探点间距可按表 确定,局部异常地段应予加密。 初步勘察勘探孔的深度可按表 确定。 当遇下列情形之一时,应适当增减勘探孔深度: 1 当勘探孔的地面标高与预计整平地面标高相差较大时,应按其差值调整勘探孔深度; 2 在预定深度内遇基岩时,除控制性勘探孔仍应钻入基岩适当深度外,其他勘探孔达到确认的基岩后即可终止钻进; 3 在预定深度内有厚度较大,且分布均匀的坚实土层(如碎石土、密实砂、老沉积土等)时,除控制性勘探孔应达到规定深度外,一般性勘探孔的深度可适当减小; 4 当预定深度内有软弱土层时,勘探孔深度应适当增加,部分控制性勘探孔应穿透软弱土层或达到预计控制深度; 5 对重型工业建筑应根据结构特点和荷载条件适当增加勘探孔深度。 初步勘察采取土试样和进行原位测试应符合下列要求: 1 采取土试样和进行原位测试的勘探点应结合地貌单元、地层结构和土的工程性质布置,其数量可占勘探点总数的1/4~1/2; 2 采取土试样的数量和孔内原位测试的竖向间距,应按地层特点和土的均匀程度确定;每层土均应采取土试样或进行原位测试,其数量不宜少于6 个。 初步勘察应进行下列水文地质工作: 1 调查含水层的埋藏条件,地下水类型、补给排泄条件,各层地下水位,调查其变化幅度,必要时应设置长期观测孔,监测水位变化; 2 当需绘制地下水等水位线图时,应根据地下水的埋藏条件和层位,统一量测地下水位; 3 当地下水可能浸湿基础时,应采取水试样进行腐蚀性评价。 详细勘察应按单体建筑物或建筑群提出详细的岩土工程资料和设计、施工所需的岩土参数;对建筑地基做出岩土工程评价,并对地基类型、基础形式、地基处理、基坑支护、工程降水和不良地质作用的防治等提出建议。主要应进行下列工作: 1 搜集附有坐标和地形的建筑总平面图,场区的地面整平标高,建筑物的性质、规模、荷载、结构特点、基础形式、埋置深度、地基允许变形等资料; 2 查明不良地质作用的类型、成因、分布范围、发展趋势和危害程度,提出整治方案的建议; 3 查明建筑范围内岩土层的类型、深度、分布、工程特性、分析和评价地基的稳定性、均匀性和承载力; 4 对需进行沉降计算的建筑物,提供地基变形计算参数,预测建筑物的变形特征; 5 查明埋藏的河道、沟浜、墓穴、防空洞、孤石等对工程不利的埋藏物; 6 查明地下水的埋藏条件,提供地下水位及其变化幅度; 7 在季节性冻土地区,提供场地土的标准冻结深度; 8 判定水和土对建筑材料的腐蚀性。 对抗震设防烈度等于或大于6 度的场地,勘察工作应按本规范第 节执行;当建筑物采用桩基础时,应按本规范第 节执行;当需进行基坑开挖、支护和降水设计时,应按本规范第 节执行。 工程需要时,详细勘察应论证地基土和地下水在建筑施工和使用期间可能产生的变化及其对工程和环境的影响,提出防治方案、防水设计水位和抗浮设计水位的建议。 详细勘察勘探点布置和勘探孔深度,应根据建筑物特性和岩土工程条件确定。对岩质地基,应根据地质构造、岩体特性、风化情况等,结合建筑物对地基的要求,按地方标准或当地经验确定;对土质地基,应符合本节第 条~第条的规定。 详细勘察勘探点的间距可按表 确定。 详细勘察的勘探点布置,应符合下列规定: 1 勘探点宜按建筑物周边线和角点布置,对无特殊要求的其他建筑物可按建筑物或建筑群的范围布置; 2 同一建筑范围内的主要受力层或有影响的下卧层起伏较大时,应加密勘探点,查明其变化; 3 重大设备基础应单独布置勘探点,重大的动力机器基础和高耸构筑物,勘探点不宜少于3 个; 4 勘探手段宜采用钻探与触探相配合,在复杂地质条件、湿陷性土、膨胀岩土、风化岩和残积土地区、宜布置适量探井。 详细勘察的单栋高层建筑勘探点的布置,应满足对地基均匀性评价的要求,且不应少于4 个;对密集的高层建筑群,勘探点可适当减少,但每栋建筑物至少应有1 个控制性勘探点。 详细勘察的勘探深度自基础底面算起,应符合下列规定: 1 勘探孔深度应能控制地基主要受力层,当基础底面宽度不大于5m 时,勘探孔的深度对条形基础不应小于基础底面宽度的3 倍,对单独柱基不应小于 倍,且不应小于5m;2 对高层建筑和需作变形计算的地基,控制性勘探孔的深度应超过地基变形计算深度;高层建筑的一般性勘探孔应达到基底下~ 倍的基础宽度,并深入稳定分布的地层; 3 对仅有地下室的建筑或高层建筑的裙房,当不能满足抗浮设计要求,需设置抗浮桩或锚杆时,勘探孔深度应满足抗拔承载力评价的要求; 4 当有大面积地面堆载或软弱下卧层时,应适当加深控制性勘探孔的深度; 5 在上述规定深度内当遇基岩或厚层碎石土等稳定地层时,勘探孔深度应根据情况进行调整。 详细勘察的勘探孔深度,除应符合 条的要求外,尚应符合下列规定: 1 地基变形计算深度,对中、低压缩性土可取附加压力等于上覆土层有效自重压力20%的深度;对于高压缩性土层可取附加压力等于上覆土层有效自重压力10%的深度; 2 建筑总平面内的裙房或仅有地下室部分(或当基底附加压力p0≤0 时)的控制性勘探孔的深度可适当减小,但应深入稳定分布地层,且根据荷载和土质条件不宜少于基底下~ 倍基础宽度; 3 当需进行地基整体稳定性验算时,控制性勘探孔深度应根据具体条件满足验算要求; 4 当需确定场地抗震类别而邻近无可靠的覆盖层厚度资料时,应布置波速测试孔,其深度应满足确定覆盖层厚度的要求; 5 大型设备基础勘探孔深度不宜小于基础底面宽度的2 倍; 6 当需进行地基处理时,勘探孔的深度应满足地基处理设计与施工要求;当采用桩基时,勘探孔的深度应满足本规范第 节的要求。 详细勘察采取土试样和进行原位测试应符合下列要求: 1 采取土试样和进行原位测试的勘探点数量,应根据地层结构、地基土的均匀性和设计要求确定,对地基基础设计等级为甲级的建筑物每栋不应少于3 个; 2 每个场地每一主要土层的原状土试样或原位测试数据不应少于6 件(组); 3 在地基主要受力层内,对厚度大于 的夹层或透镜体,应采取土试样或进行原位测试; 4 当土层性质不均匀时,应增加取土数量或原位测试工作量。 基坑或基槽开挖后,岩土条件与勘察资料不符或发现必须查明的异常情况时,应进行施工勘察;在工程施工或使用期间,当地基土、边坡体、地下水等发生未曾估计到的变化时,应进行监测,并对工程和环境的影响进行分析评价。 室内土工试验应符合本规范第11 章的规定,为基坑工程设计进行的土的抗剪强度试验,应满足本规范第 条的规定。 地基变形计算应按现行国家标准《建筑地基基础设计规范》(GB50007)或其他有关标准的规定执行。 地基承载力应结合地区经验按有关标准综合确定。有不良地质作用的场地,建在坡上或坡顶的建筑物,以及基础侧旁开挖的建筑物,应评价其稳定性。

地基基础检测与加固论文题目

房屋建筑工程施工是我们最常见的建设项目之一,在写作房屋建筑学论文时,我们要重视论文的题目,千万不能忽视论文的题目的重要性。。下面是我带来的关于房屋建筑学论文题目的内容,欢迎阅读参考!房屋建筑学论文题目(一) 1. 山区乡村建筑洪水冲击作用可视化研究 2. 房屋质量 保险 制度下质量检查机构运行机制研究 3. 山区乡村建筑洪水作用荷载试验研究 4. 木构架砖围护墙房屋的拟静力试验研究 5. 基于玻化微珠保温混凝土既有砌体房屋抗震加固与节能改造一体化研究 6. 夯土房屋纵横墙交接处裂缝成因及其预控 措施 研究 7. 既有建筑顶部钢结构加层的结构设计与抗震性能分析 8. 广东沿海典型低矮建筑调研与风荷载特性的试验研究 9. 基于建筑和结构安全统一的废旧集装箱改造房构造的研究 10. 从建筑到村落形态 11. 城市房屋拆迁补偿制度研究 12. 关于《危险房屋鉴定标准》的应用研究 13. 现有小高层钢筋混凝土房屋的抗震鉴定与加固 14. 现代木结构建筑之墙体构造研究 15. 云南传统民居建筑抗震加固 方法 的研究 房屋建筑学论文题目(二) 1. 澜沧江中下游流域传统聚落研究初探 2. 村落人居环境与建筑朝向生态的可持续发展 3. 沈阳周边村镇砌体结构学校建筑抗震性能研究 4. 湖南省村镇砖砌体房屋抗震施工方法及质量控制研究 5. 多层砌体房屋的抗震鉴定研究 6. 低层建筑表面风荷载数值模拟研究 7. 大庆地区房屋结露发霉治理技术研究 8. 汶川地震中村镇建筑的震害分析及抗震减灾措施研究 9. 夯土墙承重房屋的局部受压性能研究 10. 太阳能技术在建筑上的应用研究 11. 汶川地震房屋震害分析及抗震鉴定方法的研究 12. 西安老城区宗教建筑修复与保护研究 13. 抗震设防建筑的易损性及震害指数研究 14. 砌块建筑裂缝成因及处理技术研究 15. 混凝土砌块建筑裂缝及渗漏处理技术研究 16. 低层砌体住宅房屋简化设计及施工质量控制 17. 国内外房屋建筑物管理制度的比较和借鉴 房屋建筑学论文题目(三) 1. 高速公路服务区建筑设计研究 2. 多层砌体结构房屋震后鉴定及加固研究 3. 传统木结构建筑抗震性能试验研究 4. 多层砖混结构房屋抗震构造措施研究 5. TTU标模及平顶罩棚类低矮建筑的风洞试验研究 6. 摩擦滑移减震技术在村镇砌体房屋结构中的应用 7. 可行性研究及减震效果分析 8. 建筑外墙饰面检测维修优化分析 9. 山区乡村建筑洪水冲击破坏数值模拟研究 10. 住宅建筑计量供热自力式差压控制阀及热计费问题的研究 11. 云南农村民居新建房屋夯土墙竹筋加固的试验研究 12. 美日德建筑节能立法及其启示研究 13. 轻钢龙骨体系多层房屋力学性能比较分析 14. 现代木结构建筑之屋顶构造系统的研究 15. 武汉地区办公建筑节能设计研究 16. 砖砌体结构房屋震害分析及设计建议 17. 喇嘛甸油田建筑节能措施研究 猜你喜欢: 1. 房屋建筑学的论文 2. 房屋建筑学论文 3. 房屋建筑学毕业论文 4. 房屋建筑学设计论文 5. 房屋建筑学小论文

道路桥梁,一般由路基、路面、桥梁、隧道工程和交通工程设施等几大部分组成。下面是我精心推荐的一些道路桥梁工程技术论文题目,希望你能有所感触! 道路桥梁工程技术论文题目篇一 1、论石灰土稳定天然砂砾路面基层的应用 2、二灰碎石基层的施工及质量控制 3、公路路堑边坡防护技术研究 4、强法处理湿陷性黄土路基工艺 5、浅谈高等级公路沥青砼路面机械化施工的几个方面 6、沥青混凝土混合料的组成设计 7、沥青混凝土场拌质量控制 8、石灰稳定的施工与病害防治 9、冲击压实技术在路基工程中的应用 10、浅析场拌二灰砂砾参破碎砾石质量控制 11、骨架密实型二灰碎石基层修筑技术研究 12、水泥稳定碎石基层收缩裂缝防治 13、解决高速公路桥头跳车的理论与施工 14、公路桥面铺装早期破坏原因及治理方法 15、市政工程现场施工与质量管理 16、关于风积沙路基施工的论述 17、论改性沥青路面施工技术 18、石质路堑路床整修带来的思考 19、二灰土底基层的施工 20、二灰碎石基层的施工 21、市政道路工程质量通病及防治 22、土工合成材料的应用 23、土方量计算方法 24、高填方路基沉降变形规律研究 25、公路路基压实质量控制 26、公路路基沉陷的处理技术 27、软土地基的加固措施 28、浅谈填石路堤的施工技术 29、路拌法水泥石灰综合稳定土的施工质量控制 30、SMA混合料的施工质量控制 31、粉喷桩在高填方软土地基中的应用 32、公路边坡植被防护技术 33、浅析滑坡形成机理及防治措施 34、大孔隙沥青混凝土路面 35、农村公路薄层水泥混凝土路面探析 36、喷播边坡防护技术初探 道路桥梁工程技术论文题目篇二 道路桥梁工程检测技术 摘要:道路桥梁工程检测技术的应用和探索,不仅能够起到保证桥梁运行安全、延长桥梁使用寿命的作用,还能通过对桥梁病害的及早发现,规避因整顿大修、关闭交通所带来的重大损失。介绍道路桥梁外观病害分析方法,总结几种道路桥梁的检测技术,可为相关检测工作提供参考。 关键词:道路桥梁 检测技术 外观检测 0、引言 近几年来,受车祸、超载和养护不当等人为因素,以及地震、洪水等自然因素的影响,道路桥梁出现了各种各样的关于其结构损伤、病害的问题,缩短了其使用寿命,为保证道路桥梁的运营安全,需要对其进行检测。道路桥梁检测技术应运而生,并快速发展起来。 1、当前道路桥梁在使用中常出现的问题 道路桥梁在使用过程中会出现各种问题, 导致道路桥梁的安全性遭到破坏。 当前, 道路桥梁病害原因大致分为以下几类: a) 缺乏科学合理的设计方案, 导致不明确的工程施工规划; b)在道路桥梁试运行期间或者试运行以后, 道路桥梁出现比较严重的病害, 从而在很大程度上影响道路桥梁的承载能力; c)道路桥梁在施工过程中 ,没有按照规范进行, 导致施工质量较差, 使工程完工时没有达到工程预先的设计要求; d)有些桥梁在施工建设时的施工质量比较好, 在试运行期间也达到了良好的状态要求, 但是在运行一段时间以后桥梁的承载能力达不到要求; e)对于大跨度桥梁的检测工作可能会存在检测不到位现象, 导致桥梁出现安全隐患, 这类桥梁需要更加高深的检测技术, 而现阶段我国的检测方式还不能达到要求。 2、道路桥梁外观病害分析法 根据部位逐一进行检测 道路桥梁的结构组成可以分为上部、 下部以及其余附属结构。 鉴于不同的结构部位有不同的受力特征, 不同部位也会发生具有一些共性的病害, 对于出现的非常规病害, 检测人员要仔细 研究其病害发生原因, 同时按照不同部位发生的病害程度进行相应的质量评估, 然后更换损坏部件以维持正常运行。 根据受力特征确定检测重点 通常情况下, 可以根据桥梁的类型确定检测重点, 这些重点主要集中在跨中区域的裂缝、 剪力缝、 挠度、 桥梁主梁连接部位的安全情况以及道路桥梁的外观质量等。 对材料特性进行检测调查 随着新技术、 新产品的不断发展和桥梁结构日益多样化, 越来越多的材料和设计应用到桥梁的结构建设中来, 其中使用最广的仍然是钢筋和混凝土结构。 其中钢筋的强度常常是以设计施工中的相关资料为依据的, 检测人员如果发现钢筋质量出现问题或者资料不明确, 在施工前要采取一定的措施进行相关问题的材料试验。 内部缺陷检测 在道路桥梁的混凝土构架中, 常常出现碎裂、 蜂窝、 分层、环境侵蚀以及钢筋锈蚀等缺陷, 如果单单靠外观检测不能及时发现这些缺陷, 因此要借助于其他的检测技术进行相关检测。 当前常用的桥梁检测方法有雷达检测技术、 声波检测法以及超声波探伤法。 结构性能检测 在完成道路桥梁进行整体评价以后, 要根据相关的技术规范进行相应的验算工作, 在验算过程中的相关技术参数要以实际桥梁为准。 验算完成后, 对于未达到规范要求的桥梁可以考虑重建, 对于相对可以利用的可以进行更深一步的鉴定检测。 桥梁钢筋锈蚀测评 由于混凝土的密实度、 碳化深度、 含水量以及保护层厚度不足或者开裂损伤等原因而导致钢筋锈蚀的, 可以通过外观检测、敲击检查等简单易行的操作对钢筋锈蚀程度进行检测。 3、道路桥梁检测技术 超声波检测技术 超声法检测道路桥梁缺陷的基本原理是利用超声波检测仪以及声波换能器, 测量并分析超声脉冲在道路桥梁中的传播速度、波幅、 主频率等参数, 然后以这些参数以及相应的变化为依据,判断道路桥梁出现的缺陷。 地质雷达检测技术 地质雷达技术又称探测雷达技术, 是一种高精度、 无损检测、 直观、 经济快速的高科技检测技术。 该技术主要通过地质雷达向物体内部发射高频电磁波,然后接受由物体产生的相应反射来判断物体内部的情况。 地质雷达技术是一项精度较高的物理探测技术, 主要应用于工程地质、地基工程、 文物考古、 道路桥梁以及混凝土结构探伤等检测领域。 利用地质雷达仪器进行检测的主要流程为: a)检测人员利用笔记本电脑对控制单元发出指令信息; b) 控制单元在接受指令以后, 向发射天线和接收天线发射出信号; c)当发射触发信号以后, 向地面发射高频电磁波; d)当探测位置为不均匀介质时, 电磁波就会遇到不同电性的目标和界面, 导致部分电磁波被反射回地面, 然后接收天线接收信号, 并以数据的形式传到控制单元, 返回到笔记本中, 以图像的形式显现出来; e) 通过对图像进行分析处理, 就可以检测出被检测物的内部情况。 声发射法检测技术 由于材料内部结构不均匀或者存在不同性质的缺陷, 局部应力的集中会导致不稳定的应力分布, 材料在产生裂缝、 发生塑性变形以及断裂过程中, 会释放出部分应力, 使之以应力波的形式向四周扩散, 即为声发射。 道路桥梁中的混凝土结构在荷载作用下发生变形, 当变形超出设计要求时, 就会出现裂纹,以波的形式释放能量。 运用声发射法对道路桥梁进行检测时, 将声发射器放置在需要检测的部位, 通过检测不同位置收到的声波时间差, 就可以明确缺陷的发生位置。 运用声波发射法进行检测可以详细、 准确、 快速地了解桥梁内部结构的变化。 在分析研究缺陷位置以后, 裂纹的种类、大小、 开裂速度等都可以比较详细地分析出来。 由于此种检测方法容易受到周围噪声的影响, 会导致检测精度的下降; 另一方面, 此种方法是利用道路桥梁内部缺陷,因此可以进行连续的动态检测。 冲击回波法检测技术 冲击回波法检测技术是检测仪器通过机械冲击器向被检测物体表面发送应力脉冲波, 当压缩波在物体内传播遇到内部缺陷时, 冲击波就不能穿透而发生反射, 当波速固定且选择正确的冲击器时, 就可以通过测试准确地测得缺陷位置, 即便没有缺陷也可以测得物体的厚度。 冲击回波法检测技术常为单面反射测试技术, 在检测完一点以后就可以判断出此处是否有损伤, 因此该方法具有方便、 快捷, 测试结果比较直观的优点。此方法广泛应用于道路桥梁混凝土或者混凝土结构内部裂纹等缺陷的测定。 另一方面, 此种方法虽然检测简单, 但属于单点测量, 其检测的结果存在不全面的缺点, 实际应用也比较少。 红外热像检测技术 红外线热像检测技术就是运用红外线热像探测仪器检测物体各部分发出的红外线能量, 然后根据物体表面温度场分布情况,直观地显示物体材料及结构上存在的不连续缺陷。 红外热像检测技术是非接触性无损检测技术。 红外热像检测技术具有以下优点: a)红外热像检测技术的探测焦距可以从20cm到无穷远, 因此更加适合具有非接触性及大范围性无损检测; b)红外热像探测仪只对红外线产生反应, 因此只要道路桥梁的温度高于零度, 就可以用红外热像检测技术进行检测; c)由于红外热像检测仪可以取得很高的检测精度, 其温度分辨率可以达到℃; d)检测模式更加灵活, 其摄像速度从1~30帧/s之间变化, 既适合静态检测又适合动态检测。 4、结语 对于道路桥梁进行相关内容的检测已经成为了目前道路桥梁日常维护管理过程中重要的组成部分之一。所以必须建立一套适用于道路桥梁试验相关的检测系统,并且实现对道路桥梁使用安全有效的保障,并且还需要具有一定的系统性以及智能化,这样就要求了相关的工作人员本身必须拥有较为丰富的实践经验,与此同时还必须对相关的理论知识有一个详细的了解,积极有效地将理论实际进行有效的集合,并且对每一项具体的检测数据进行有效地获取、分析,并且对整个道路桥梁进行准确细致的评估,同时及时有效地将安全隐患进行消除。 看了“道路桥梁工程技术论文题目”的人还看: 1. 道路桥梁工程技术论文 2. 道路桥梁工程论文 3. 道路桥梁施工技术论文 4. 道路桥梁工程检测技术论文 5. 道路桥梁论文范文

建筑工程作为与人们生产生活息息相关的工程,与整个国家经济的发展、人民生活的改善有着密切的关系。下面是我带来的关于建筑工程技术 毕业 论文题目的内容,欢迎阅读参考!建筑工程技术毕业论文题目(一) 1、软土地基上基础的处理 措施 2、拟建建筑物地质差异较大时的地基处理措施 3、结构设计中梁柱的交接处理 方法 4、结构设计中基础梁的设计处理方法 5、砌体结构房屋产生裂缝的处理措施 6、重力式挡土墙安全问题的研究 7、防止高层建筑基础不均匀沉降的措施 8、工程项目施工的组织研究 9、软弱地基的处理方法 10、地形地貌对建筑体型和层高的影响研究 11、建筑物三缝合一的处理方法研究 12、解决屋面渗漏问题的方法 13、论建筑与人 文化 的协调统一 14、论建筑设计与结构设计的协调统一 15、底层商场的设计处理方法 16、电梯轿箱基础与框架独立柱基的设计处理方法研究 17、深基础支护结构的设计与施工方法 18、框架结构中楼梯与框架梁柱的连接方法研究 19、提高普通建筑物的保温隔热措施 20、保证工程预算准确性的措施 建筑工程技术毕业论文题目(二) 1 浅谈企业从事工程总承包面临的问题 2 试述工程建设项目施工索赔的艺术 3 关于房地产开发成本管理的初探 4 浅谈施工方案与工程项目施工质量的关系 5 试论建筑工程监理应如何确保施工安全 6 论述工程量清单计价模式下的造价控制与管理 7 浅析如何搞好工程建设监理工作 8 试述施工现场基础工程质量控制 9 浅谈工程项目主要成本管理与控制 10 试述工程管理项目中的成本控制和品质管理 11 关于做好项目工程造价全过程的控制 12 浅谈网络计划技术在项目管理中的应用 13 浅谈建设工程项目的造价管理 14 论述工程成本的影响因素及控制对策 15 论述工程建设项目投资中的造价控制 16 论述可行性研究在建设中的作用 17 浅析工程项目投资管理 18 试论建设工程项目质量管理与控制 19 浅谈房地产开发中的工程成本控制 20 浅谈工程建设项目的技术变更管理 建筑工程技术毕业论文题目(三) 1. 浅谈如何做好工程项目的施工质量管理 2. 发包人如何做好工程合同管理 3. 建筑工程项目施工风险防范分析 4. 我国工程监理业存在的问题及对策讨论 5. 关于施工企业实施低成本的战略讨论 6. 浅谈大型工程项目的信息化管理 7. 双代号时标网络计划在建筑施工进度控制中的应用 8. 施工企业如何应对清单环境下的成本管理 9. 浅论如何加强施工项目的成本管理 10. 信息管理在施工管理中的应用 11. 关于工程项目成本管理的预测与控制 12. 浅谈工程索赔对减少工程经营风险的作用 13. 浅谈如何有效的进行工程造价管理 14. 浅谈施工阶段工程项目成本的有效控制 15. PDCA循环管理在建设工程管理中的应用 猜你喜欢: 1. 2017年工程管理毕业论文题目 2. 大专建筑工程技术论文题目 3. 建筑工程技术毕业论文范文 4. 建筑工程技术论文参考文献 5. 建筑工程技术管理毕业论文