首页 > 学术发表知识库 > 暖通空调节能毕业论文英文

暖通空调节能毕业论文英文

发布时间:

暖通空调节能毕业论文英文

毕业论文”的英文:Graduation Dissertation

Dissertation 读法 英 [,dɪsə'teɪʃ(ə)n]  美 ['dɪsɚ'teʃən]

n. 论文,专题;学术演讲

短语:

1、academic dissertation 学位论文 ; 学术论文

2、Graduation Dissertation 毕业论文

3、Doctorate dissertation 博士论文

4、Dissertation Committee 论文委员会

5、dissertation topics 毕业论文题目

词义辨析:

article, paper,dissertation, essay, prose, thesis这组词都有“文章”的意思,其区别是:

1、article 多指在报刊、杂志上发表的非文艺性的文章,包括新闻报导、学术论文等。

2、paper 正式用词,多指在学术刊物上发表或在学术会议上宣读的专题论文,也指高等学校的学期论文,或学校里的作文练习。

3、dissertation 书面语用词,指独立研究后所写的较为详细的专题文章;也可指学位论文。

4、essay 指任何一种非小说性的,篇幅不长、结构简练的文章,如论说文、报道、评论、讽刺性杂文等。

5、prose 专指散文。

6、thesis 既可指毕业论文、学位论文,又可指一般的为阐述学术观点而写的论文。

例句:

1、Exploring "Trinity Working Mode" of Integrating Graduation Field Work, Graduation Dissertation and Employment on Graduation.

毕业实习、毕业论文与学生就业三位一体工作模式探索。

2、On Problems in Writing Graduation Dissertation

关于撰写毕业论文应该注意的问题。

testing of an air-cycle refrigeration system for road transportAbstractThe environmental attractions of air-cycle refrigeration are considerable. Following a thermodynamic design analysis, an air-cycle demonstrator plant was constructed within the restricted physical envelope of an existing Thermo King SL200 trailer refrigeration unit. This unique plant operated satisfactorily, delivering sustainable cooling for refrigerated trailers using a completely natural and safe working fluid. The full load capacity of the air-cycle unit at −20 °C was 7,8 kW, 8% greater than the equivalent vapour-cycle unit, but the fuel consumption of the air-cycle plant was excessively high. However, at part load operation the disparity in fuel consumption dropped from approximately 200% to around 80%. The components used in the air-cycle demonstrator were not optimised and considerable potential exists for efficiency improvements, possibly to the point where the air-cycle system could rival the efficiency of the standard vapour-cycle system at part-load operation, which represents the biggest proportion of operating time for most units.Keywords: Air conditioner; Refrigerated transport; Thermodynamic cycle; Air; Centrifuge compressor; Turbine expander COP, NomenclaturePRCompressor or turbine pressure ratioTAHeat exchanger side A temperature (K)TBHeat exchanger side B temperature (K)TinletInlet temperature (K)ToutletOutlet temperature (K)ηcompCompressor isentropic efficiencyηturbTurbine isentropic efficiencyηheat exchangerHeat exchanger effectiveness1. IntroductionThe current legislative pressure on conventional refrigerants is well known. The reason why vapour-cycle refrigeration is preferred over air-cycle refrigeration is simply that in the great majority of cases vapour-cycle is the most energy efficient option. Consequently, as soon as alternative systems, such as non-HFC refrigerants or air-cycle systems are considered, the issue of increased energy consumption arises immediately.Concerns over legislation affecting HFC refrigerants and the desire to improve long-term system reliability led to the examination of the feasibility of an air-cycle system for refrigerated transport. With the support of Enterprise Ireland and Thermo King (Ireland), the authors undertook the design and construction of an air-cycle refrigeration demonstrator plant at LYIT and QUB. This was not the first time in recent years that air-cycle systems had been employed in transport. NormalAir Garrett developed and commercialised an air-cycle air conditioning pack that was fitted to high speed trains in Germany in the 90s. As part of an European funded programme, a range of applications for air-cycle refrigeration were investigated and several demonstrator plants were constructed. However, the authors are unaware of any other case where a self-contained air-cycle unit has been developed for the challenging application of trailer refrigeration.Thermo King decided that the demonstrator should be a trailer refrigeration unit, since those were the units with the largest refrigeration capacity but presented the greatest challenges with regard to physical packaging. Consequently, the main objective was to demonstrate that an air-cycle system could fit within the existing physical envelop and develop an equivalent level of cooling power to the existing vapour-cycle unit, but using only air as the working fluid. The salient performance specifications for the existing Thermo King SL200 vapour-cycle trailer refrigeration unit are listed .It was not the objective of the exercise to complete the design and development of a new refrigeration product that would be ready for manufacture. To limit the level of resources necessary, existing hardware was to be used where possible with the recognition that the efficiencies achieved would not be optimal. In practical terms, this meant using the chassis and panels for an existing SL200 unit along with the standard diesel engine and circulation fans. The turbomachinery used for compression and expansion was adapted from commercial turbochargers.2. Thermodynamic modelling and design of the demonstrator plantThe thermodynamics of the air-cycle (or the reverse ‘Joule cycle’) are adequately presented in most thermodynamic textbooks and will not be repeated here. For anything other than the smallest flow rates, the most efficient machines available for the necessary compression and expansion processes are turbomachines. Considerations for the selection of turbomachinery for air-cycle refrigeration systems have been presented and discussed by Spence et al. [3]. a typical configuration of an air-cycle system, which is sometimes called the ‘boot-strap’ configuration. For mechanical convenience the compression process is divided into two stages, meaning that the turbine is not constrained to operate at the same speed as the primary compressor. Instead, the work recovered by the turbine during expansion is utilised in the secondary compressor. The two-stage compression also permits intercooling, which enhances the overall efficiency of the compression process. An ‘open system’ where the cold air is ejected directly into the cold space, removing the need for a heat exchanger in the cold space. In the interests of efficiency, the return air from the cold space is used to pre-cool the compressed air entering the turbine by means of a heat exchanger known as the ‘regenerator’ or the ‘recuperato ’. To support the design of the air-cycle demonstrator plant, and the selection of suitable components, a simple thermodynamic model of the air-cycle configuration shown in was developed. The compression and expansion processes were modelled using appropriate values of isentropic efficiency, as defined in Eqs.The heat exchange processes were modelled using values of heat exchanger effectiveness as defined in The model also made allowance for heat exchanger pressure drop. The system COP was determined from the ratio of the cooling power delivered to the power input to the primary compressor, as defined in illustrate air-cycle performance characteristics as determined from the thermodynamic model:illustrates the variation in air-cycle COP and expander outlet temperature over a range of cycle pressure ratios for a plant operating between −20 °C and +30 °C. The cycle pressure ratio is defined as the ratio of the maximum cycle pressure at secondary compressor outlet to the pressure at turbine outlet. For the ideal air-cycle, with no losses, the cycle COP increases with decreasing cycle pressure ratio and tends to infinity as the pressure ratio approaches unity. However, the introduction of real component efficiencies means that there is a definite peak value of COP that occurs at a certain pressure ratio for a particular cycle. However,illustrates, there is a broad range of pressure ratio and duty over which the system can be operated with only moderate variation of COP.The class of turbomachinery suitable for the demonstrator plant required speeds of around 50 000 rev/min. To simplify the mechanical arrangement and avoid the need for a high-speed electric motor, the two-stage compression system shown was adopted. The existing Thermo King SL200 chassis incorporated a substantial system of belts and pulleys to power circulation fans, which severely restricted the useful space available for mounting heat exchangers. A simple thermodynamic model was used to assess the influence of heat exchanger performance on the efficiency of the plant so that the best compromise could be developed show the impact of intercooler and aftercooler effectiveness and pressure loss on the COP of the proposed plant.The two-stage system in incorporated an intercooler between the two compression stages. By dispensing with the intercooler and its associated duct work a larger aftercooler could be accommodated with improved effectiveness and reduced pressure loss. Analysis suggested that the improved performance from a larger aftercooler could compensate for the loss of the intercooler.shows the impact of the recuperator effectiveness on the COP of the plant, which is clearly more significant than that of the other heat exchangers. As well as boosting cycle efficiency, increased recuperator effectiveness also moves the peak COP to a lower overall system pressure ratio. The impact of pressure loss in the recuperator is the same as for the intercooler and aftercooler shown in. The model did not distinguish between pressure losses in different locations; it was only the sum of the pressure losses that was significant. Any pressure loss in connecting duct work and headers was also lumped together with the heat exchanger pressure loss and analysed as a block pressure loss.The specific cooling capacity of the air-cycle increases with system pressure ratio. Consequently, if a higher system pressure ratio was used the required cooling duty could be achieved with a smaller flow rate of air. shows the mass flow rate of air required to deliver 7,5 kW of cooling power for varying system pressure ratios.Since the demonstrator system was to be based on commercially available turbomachinery, it became important to choose a pressure ratio and flow rate that could be accommodated efficiently by some existing compressor and turbine rotors. and were based on efficiencies of 81 and 85% for compression and expansion, respectively. While such efficiencies are attainable with optimised designs, they would not be realised using compromised turbocharger components. For the design of the demonstrator plant efficiencies of 78 and 80% were assumed to be realistically attainable for compression and expansion.Lower turbomachinery efficiencies corresponded to higher cycle pressure ratios and flow rates in order to achieve the target cooling duty. The cycle design point was also compromised to help heat exchanger performance. The pressure losses in duct work and heat exchangers increased in proportion with the square of flow velocity. Selecting a higher cycle pressure ratio corresponded to a lower mass flow rate and also increased density at inlet to the aftercooler heat exchanger. The combined effect was a decrease in the mean velocity in the heat exchanger, a decrease in the expected pressure losses in the heat exchanger and duct work, and an increase in the effectiveness of the heat exchanger. Consequently, a system pressure ratio higher than the value corresponding to peak COP was chosen in order to achieve acceptable heat exchanger performance within the available physical space. The below optimum performance of turbomachinery and heat exchanger components, coupled with excessive bearing losses, meant that the predicted COP of the overall system dropped to around 0,41. The system pressure ratio at the design point was 2,14 and the corresponding mass flow rate of air was 0,278 kg/s.By moving the design point beyond the pressure ratio for peak COP, it was anticipated that the demonstrator plant would yield good part-load performance since the COP would not fall as the pressure ratio was reduced. Also, operating at part-load corresponded to lower flow velocities and anticipated improvements in heat exchanger performance. Part-load operation was achieved by reducing the speed of the primary compressor, resulting in a decrease in both pressure and mass flow rate throughout the cycle.3. Prime mover and primary compressorThe existing diesel engine was judged adequate to power the demonstrator plant. The standard engine was a four cylinder, water cooled diesel engine fitted with a centrifugal clutch and all necessary ancillaries and was controlled by a microprocessor controller.From the thermodynamic model, the pressure ratio for the primary compressor was 1,70. The centrifugal compressor required a shaft speed of around 55 000 rev/min. Other alternatives were evaluated for primary compression with the aim of obtaining a suitable device that operated at a lower speed. Other commercially available devices such as Roots blowers and rotary piston blowers were all excluded on the basis of poor efficiency.A one-off gearbox was designed and manufactured as part of the project to step-up the engine shaft speed to around 55 000 rev/min. The gearbox was a two stage, three shaft unit which mounted directly on the end of the diesel engine and was driven through the existing centrifugal clutch.4. Cold air unitThe secondary compressor and the expansion turbine were mounted on the same shaft in a free rotating unit. The combination of the secondary compressor and the turbine was designated as the ‘Cold Air Unit’ (CAU). While the CAU was mechanically equivalent to a turbocharger, a standard turbocharger would not satisfy the aerodynamic requirements efficiently since the pressure ratios and inlet densities for both the compressor and the turbine were significantly different from any turbocharger installation. Consequently, both the secondary compressor and the turbine stage were specially chosen and developed to deliver suitable performance.Most turbochargers use plain oil fed journal bearings, which are low-cost, reliable and provide effective damping of shaft vibrations. However, plain bearings dissipate a substantial amount of shaft power through viscous losses in the oil films. A plain bearing arrangement for the CAU was expected to absorb 2–3 kW of mechanical power, which represented around 25% of the anticipated turbine power. Also, the clearances in plain bearings require larger blade tip clearances for both the compressor and the turbine with a consequential efficiency penalty. Given the pressurised inlet to the secondary compressor, the limited thrust capacity of the plain bearing arrangement was also a concern. A CAU utilising high-speed ball bearings, or air bearings, was identified as a preferable arrangement to plain bearings. Benefits would include greatly reduced bearing power losses, reduced turbomachinery tip clearance losses and increased thrust load capacity. However, adequate resources were not available to design a special one-off high speed ball bearing system. Consequently, a standard turbocharger plain bearing system was used.The secondary compressor stage was a standard turbocharger compressor selected for a pressure ratio of 1,264. Secondary compressor and turbine selection were linked because of the requirement to balance power and match the speed. Since most commercial turbines are sized for high temperature (and consequently low density) air at inlet, a special turbine stage was developed for the application. Cost considerations precluded the manufacture of a custom turbine rotor, so a commercially available rotor was used. The standard turbine rotor blade profile was substantially modified and vaned nozzles for turbine inlet were designed to match the modified rotor, in line with previous turbine investigations at QUB (Spence and Artt,). An exhaust diffuser was also incorporated into the turbine stage in order to improve turbine efficiency and to moderate the exhaust noise levels through reduced air velocity. The exhaust diffuser exited into a specially designed exhaust silencer.The performance of the turbine stage was measured before the unit was incorporated into the complete demonstrator plant. The peak efficiency of the turbine was established at 81%.5. Heat exchangersDue to packaging constraints, the heat exchangers had to be specially designed with careful consideration being given to heat exchanger position and header geometry in an attempt to achieve the best performance from the heat exchangers. Tube and fin aluminium heat exchangers, similar to those used in automotive intercooler applications, were chosen primarily because they could be produced on a ‘one-off’ basis at a reasonable cost. There were other heat exchanger technologies available that would have yielded better performance from the available volume, but high one-off production costs precluded their use in the demonstrator plant.Several different tube and fin heat exchangers were tested and used to validate a computational model. Once validated, the model was used to assess a wide range of possible heat exchanger configurations that could fit within the Thermo King SL200 chassis. Fitting the proposed heat exchangers within the existing chassis and around the mechanical drive system for the circulation fans, but while still achieving the necessary heat exchanger performance was very challenging. It was clear that potential heat exchanger performance was being sacrificed through the choice of tube and fin construction and by the constraints of the layout of the existing SL200 chassis. The final selection comprised two separate aftercooler units, while the single recuperator was a large, triple pass unit. Based on laboratory tests and the heat exchanger model, the anticipated effectiveness of both the recuperator and aftercooler units was 80%.6. InstrumentationA range of conventional pressure and temperature instrumentation was installed on the air-cycle demonstrator plant. Air temperature and pressure was logged at inlet and outlet from each heat exchanger, compressor and the turbine. The speed of the primary compressor was determined from the speed measurement on the diesel engine control unit, while the cold air unit was equipped with a magnetic speed counter. No air flow measurement was included on the demonstrator plant. Instead, the air flow rate was deduced from the previously obtained turbine performance map using the measurements of turbine pressure ratio and rotational speed.7. System testingDuring some preliminary tests a heat load was applied and the functionality of the demonstrator plant was established. Having assessed that it was capable of delivering approximately the required performance, the plant was transported to a Thermo King calorimeter test facility specifically for measuring the performance of transport refrigeration units. The calorimeter was ideally suited for accurately measuring the refrigeration capacity of the air-cycle demonstrator plant. The calorimeter was operated according to standard ARI 1100-2001; the absolute accuracy was better than 200W and all auxiliary instrumentation was calibrated against appropriate standards.The performance capacity of transport refrigeration units is generally rated at two operating conditions; 0 and −20 °C, and both at an ambient temperature of +30 °C. Along with the specified operating conditions of 0 and −20 °C, a further part-load condition at −20 °C was assessed. Considering that the air-cycle plant was only intended to demonstrate a concept and that there were concerns about the reliability of the gearbox and the cold air unit thrust bearing, it was decided to operate the plant only as long as was necessary to obtain stabilised measurements at each operating point. The demonstrator plant operated satisfactorily, allowing sufficient measurements to be obtained at each of the three operating conditions. The recorded performance is summarised .In total, the unit operated for approximately 3 h during the course of the various tests. While the demonstrator plant operated adequately to allow measurements, some smoke from the oil system breather suggested that the thrust bearing of the CAU was heavily overloaded and would fail, as had been anticipated at the design stage. Testing was concluded in case the bearing failed completely causing the destruction of the entire CAU. There was no evidence of any gearbox deterioration during testing.8. Discussion of measured performanceFrom the calorimeter performance measurements, the primary objective of the project had been achieved. A unique air-cycle refrigeration system had been developed within the same physical envelope as the existing Thermo King SL200 refrigeration unit, w

毕业论文是Graduation thesis 若要在论文里指论文就可以直接说thesis或者paper

暖通空调就很好了

暖通空调专业毕业论文

建筑空调制冷系统施工中的管理摘要:如何就对随着科技的进步和人民生活水平的提高,人们对生活和生产环境的不断提高的同时,提高制冷系统的性能稳定,笔者就此提出了在施工阶段应注意的一些事项。关键词:空调制冷系统,施工,注意事项,管理要点制冷工程的施工质量好坏对制冷系统调试的成功与否关系极大。施工时支立管,干管甩口不准,支架托架失效,形成倒坡,导致窝风,影响水流循环,从而使水系统内部某些位置水温升高,甚至死水不畅,有时还产生水击声响,造成这些人为的施工缺陷后,调试时费时费力,甚至无法弥补,而改造不仅更麻烦,还会造成新的浪费。其次,在南方热带地区,空调系统的保温工艺问题是许多单位常年来十分头痛的问题,也是影响业主形象的大事。随着科技的进步和人民生活水平的提高,人们对生活和生产环境的要求也不断提高。空调系统作为智能建筑的重要组成部分,是楼宇自动化系统的主要监控对象,也是建筑智能化系统主要的管理内容之一。一、系统设计及其对调试效果的影响制冷工程的设计质量和施工质量对制冷效果影响极大,设计考虑不周,系统型式选择不当,设备部件本身的缺陷以及施工工序和施工质量的差异,施工材质和施工队伍的把关等都会给制冷系统初调和运行管理带来麻烦。制冷系统目前基本上都采用机械循环系统。这种系统的环路,支立管形成闭合的冷水循环管网。设计者应充分认识这一水力系统的特点,进行精心设计,应正确选择管网型式和系统划分,同时还必须把冷水流量按计算负载分到各用户,或各末端设备中去,这一点最为重要。设计时处理得好,系统运行时就容易调试;处理得不好,将成为系统水力平衡的先天性缺陷。与此同时,设计中还必须采取有效措施排除系统内的空气,否则也会造成冷热不均的现象。二、空调制冷系统在结构施工过程中应注意哪些2.1空调专业负责现场施工的技术人员;要同空调专业设计,结构专业设计一起,根据设备生产厂家提供的技术资料,确定各种设备如制冷机组、各种水泵、冷却塔、膨胀水箱以及其他设备的基础处理方案,向工地的土建专业提供设备基础图,冷却塔要提供预埋件布置图,争取设备基础处理和土建结构同步施工。2.2因制冷机组属大型设备,所以要根据土建专业的建筑和结构图纸,结合结构预留的设备吊装孔洞的位置,确定合理的大型没备运输通道的走向。以书面文字形式通知土建专业,在运输通道所经过路段的隔墙暂时不要砌筑。在垂直吊装子L洞上方的结构梁内。预留一个或几个能满足垂直运输大型设备的吊钩(要画图,并提出具体要求)。2.3根据设备生产厂家和专业设计人员提供的资料,计算出大型设备在运输时,包括设备本身及垫木、滚杆需要占用的空间高度、宽度和长度。然后通知工地总包,由总包出面组织各安装专业的协调会。在运输通道内,凡是设备运输时所占用空间高度范围内的所有管道,包括给排水干管、电气专业的电缆桥架,采暖系统的干管,通风专业的各种风管、空调专业的干管以及其他专业的管道,都要做梯形翻弯处理,无压力的排水管道,要适当调整走向。躲开设备运输所占用的高度,所有管路的调整由土建总包确定方案,经过建设单位、工程监理和设计人员认可以后。各专业在管道安装时必须严格执行。需要说明的是管路的翻弯调整必须在施工前期处理好。如果要等到工程后朗,各专业管道通水或穿完电线以后再改动,困难很大。如果前朗不安装。等设备运输完成以后,再安装管道,就等于封堵了运输通道,这一方案也不可取,要考虑到日后设备的更换,设备通道的重复利用。2.4结构施工期间,空调专业施工人员要按照专业施工图纸预留空调管道的楼板洞和过墙洞,一次结构施工完成以后,空调专业开始安装主立管和水平干管;如果条件具备,可分层分段分系统进行打压试水和保温,在立管井和吊顶内安装手动或电控阀门时,要考虑阀门的位置,手动开启的方向。要有一定的安装操作空间,要方便口后的维修和操作。三、项目经理如何重点把握管理工作要点3.1了解设计意图、设计内容、建筑构造特点、设备技术性能、工艺流程及建设方的要求等。首先粗审图纸,搞清分部分项工程的数量和大致内容,诸如:风系统、水系统的工艺布局,建筑工程的形式、层数、楼梯和电梯的位置、数量、平面布局状况以及各层的层高,装修工程中墙、顶、地、门窗、击水排水的基本要求,防水工程情况等。3.2细审图纸,掌握设计要求的尺寸。诸如风管各部断面尺寸及长度,水管管径及长度,制冷主机及制冷机房其他设备的相关尺寸;空调末端设备的规格、数量、安装部位及空调机房、新风机房的平面尺寸与高度等;还应了解各方面的技术要求、消防与电的具体布置及与土建工程的关系等;同时核对各专业图纸中所述相同部位、相同内容的统一性,掌握其是否存在矛盾和误差。3.3结合设计情况、学习相应的标准图集、施工验收规范、质量验评标准和有关技术规定,在此基础上,形成项目经理自己对工程施工的总体印象和施工组织设想。这部分工作是创造性的,其中心是要考虑设计和规范要求是否可以得到施工方面的满足;自有的施工力量、施工队伍和技术、装备水平,是否及如何达到要求;设计要求与施工现实差距较大或施工操作困难的,在满足设计意图和质量要求的前提下,可否做出一向有利于施工组织、加快进度的变更;根据上述各项,施:正中应考虑采取哪些主要的技术、组织、供应、质量和安全措施。3.4综合以上工作,对审查出的问题、不明的疑问及施工的合理化建议做出归纳总结,提交技术部门向业主和设计人员反映,尽量把问题解决在开工之前,为工程的施工组织提供尽可能准确、完整的依据。四、多于施工班组及相关人员交底及管理原则项目经理向施工班组及相关人员进行施工组织设计、计划和技术交底,目的是把拟建工程的设计内容、施工计划、进度、技术与质量标准、安全和消防要求等事项详尽地向施工人员说明,以保证严格地按照设计图纸、施工组织设计、安全操作规程和施工验收规范顺利进行施工。4.1交底的主要内容有:计划交底,技术质量交底,定额交底,安全生产交底和各项管理制度交底。技术交底是指工程开工前,由各级技术负责人将有关工程施工的各项技术要求逐级向下贯彻,直到基层。其目的是使参与施工任务的技术人员和工人明确所担负工程任务的特点、技术要求、施工工艺等,做到心中有数,保证施工顺利进行。因此,技术交底是施工技术准备的必要环节。4.2技术交底的注意事项:技术交底必须在该交底对应项目施工前进行,并应为施工留出足够的准备时间。技术交底不得后补;技术交底应以书面形式进行,并辅以口头讲解。交底人和被交底人应履行交接签字手续。技术交底及时归档;技术交底应根据施工过程的变化,及时补充新内容。施工方案、方法改变时也要及时进行重新交底;分包单位应负责其分包范围内技术交底资料的收集整理,并应在规定时间内向总包单位移交。总包单位负责对各分包单位技术交底工作进行监督检查。总结:在施工管理中要加强对施工单位的严格科学监理,认真控制每一工序,努力减少或消除施工缺陷。参考文献:[1]陈天豪.探讨空调制冷系统安装施工技术[J].城市建设与商业网站,2009,(27)[2]邵宗义.空调系统设计与施工解析[J].中国建设信息供热制冷,2008(04)[3]陈金鹏.空调制冷系统的施工及注意事项[J].制冷空调与电力机械,2009(03)[4]王淑敏.空调制冷系统设计与施工[J].暖通空调,2006(05)[5]周成愚.空调系统设计和施工中的几个问题[J].空调制冷系统设计与施工,2003(05)

暖通空调ei期刊

暖通空调就很好啊,他的增刊很好,制冷与空调也行,得看自己侧重的行业

暖通专业的论文,最好是发国家级或者核心期刊了,不过审核也相当严的,

暖通空调 就是一个杂志啊或者其他自然学科的杂志

暖通空调论文3500字

随着经济的迅速发展,能源和环境问题日益尖锐。在特别炎热的夏天,我们都切身地体会到了电力的紧张。可以预见,这种状况在今后还会出现,并且会日趋严重。一、暖通空调领域节能的重要性和可行性随着社会的发展,建筑能耗在总能耗中所占的比例越来越大,在发达国家已达到40%,据统计在湖南省也达到27.8%。在城市远高于这个比例。而在建筑能耗里,用于暖通空调的能耗又占建筑能耗的30%-50%,且在逐年上升。随着人均建筑面积的不断增大,暖通空调系统的广泛应用,用于暖通空调系统的能耗将进一步增大。这势必会使能源供求矛盾的进一步激化。另一方面,现有的暖通空调系统所使用的能源基本上是高品位的不可再生能源,其中电能占了绝对比例。对这些能源的大量使用,使得地球资源日益匮乏,同时也带来严重的环境问题,如在我国的一些地区酸雨、飘尘问题呈日益严重之势,对生态环境和可持续发展带来了很大影响。以湖南长沙地区为例,2003年夏季电力系统最大负荷大约为160万千瓦,据有关部门推算,其中空调系统的负荷就占了约60万千瓦。在最热的夏天,如果对暖通空调系统采取节能措施,不仅可以大大缓解电力紧张状况,同时对于降低不可再生能源的消耗、保护生态环境、维持可持续发展、振兴湖南经济等都有着重要的意义。根据暖通空调行业的研究成果,现有空调系统的能耗是惊人的,如果采用节能技术,现有空调系统节能20%-50%完全可能。显然,如果对长沙地区的空调系统和建筑系统采用节能措施,那么即使遇到今夏那样的炎热天气,长沙也不会超过现有电力系统峰值而停电了。二、暖通空调领域节能的途径与方法科学技术的不断进步,使暖通空调领域新的技术不断出现,我们可以通过多种方法实现暖通空调系统的节能。1、精心设计暖通空调系统,使其在高效经济的状况下运行暖通空调系统特别是中央空调系统是一个庞大复杂的系统,系统设计的优劣直接影响到系统的使用性能。例如系统往往都是按最大负荷设计的,而实际运行基本上是在部分负荷下运行,如果系统各部分的设计不能满足部分负荷运行的要求,那系统的能耗是很大的。又如新风系统的设计,系统应该能随着室外气象参数的变化改变新风量,以最大限度地缩短主机的开启时间。可以说空调系统的设计对系统的节能起着重要的作用。2、改善建筑维护结构的保温性能,减少冷热损失我们知道对于暖通空调系统而言,通过维护结构的空调负荷占有很大比例,而维护结构的保温性能决定维护结构综合传热系数的大小,亦即决定通过维护结构的空调负荷的大小。所以在国家出台的建筑节能设计规范和标准中,首先要求的就是提高维护结构的保温隔热性能。3、提高系统控制水平,调整室内热湿环境参数,尽可能降低空调系统能耗空调系统特别是舒适性空调系统对人体的作用是通过空气温度、湿度、风速、环境平均辐射温度进行的,人体对环境的冷热感觉是这些环境因素综合作用的结果。以往的空调控制方式仅仅是测控空气的温度湿度,甚至仅空气温度。显然是不全面的,势必带来许多问题,如空调系统对人体的作用不直接、当环境变化时对环境的调控不迅速、人体感到不舒适、空调系统的这种调控方式不节能。热湿环境研究成果的应用,为我们采用新的控制方式方法提供了理论基础。如果采用舒适性评价指标即体感指标作为空调系统的调控参数,如采用PMV或SET*指标对空调系统进行调控,不仅可以解决传统控制方法存在的弊病,而且可以实现大幅度的节能,据我们的初步研究表明,采用这种控制方法可使空调系统在人体舒适的条件下节能30%左右。4、采用新型节能舒适健康的空调方式如上所述,影响人体热舒适性的环境参数众多,不同的环境参数组合可以得到相同的热舒适性效果,但不同的热湿环境参数组合空调系统的能耗是不相同 的。例如在冬季,如果我们采用传统的空调方式,把整个室内的空气加热,通过空气实现人体与环境的热湿交换,就需要较高的空气温度,此时通过维护结构的热损失和加热新风的热损失都比较大。如果我们根据热湿环境的研究成果,改变传统的空调方式,增加辐射热(如低温地板辐射采暖),此时所需要的空气温度降显著下降,一般可达到12~14度,而传统方式一般在18~20度,显然后者比前者具有显著的节能效果。在夏季也有类似的结果。5、推广应用使用可再生能源或低品位能源的空调系统随着空调系统的广泛应用,空调对不可再生能源的消耗将大幅度上升,同时对生态环境的破坏也在日趋加剧。如何利用可再生能源及低品位能源已经成了该领域重要的研究课题。地源热泵空调系统就是在这种形势下发展起来的,它利源地下恒温层土壤热显著提高空调系统的COP值,使得同等制热(或制冷)量下的系统能耗大幅度下降。另外,利用太阳能供热或制冷技术也在开发研究着。6、开展冷热回收利用的研究运用工作,实现能源的最大限度利用目前许多空调系统冷热回收利用研究也在蓬勃开展,如空调系统排风的全热回收器,夏季利用冷凝热的卫生热水供应等,都是对系统冷热的回收利用,显著提高了空调系统能源利用率。三、存在的问题与对策要实现空调系统的节能降耗,已经具备了许多成熟的条件,但同时也存在许多问题有待于解决:1、暖通空调系统的设计管理问题如前所述,空调系统的设计对空调系统的节能性有着重要的影响。然而在实际中往往得不到一些设计部门和设计人员的足够重视,使得设计建造的系统不仅初投资大,运行能耗也相当惊人,大大超过了国家标准。据实测,有的公共建筑的空调能耗占建筑总能耗的60%。为此, 我们有必要建议政府有关职能部门加强对暖通空调设计项目的管理,可以委托相关技术部门如学会等对设计图纸文件进行严格审查,对未达到国家有关节能标准的设计严禁施工建造。2、暖通空调系统的运行管理问题除设计外,我们发现运行管理也起着重要的作用。有些单位的空调系统,一年四季只有开机关机和冬夏季转换操作,显然系统达不到相应的节能效果。为此 要求运行管理人员不仅要有强烈的责任心,上岗前还必须要进行系统的培训和考核,对没有达到要求的,应重新培训,考核合格后才能上岗。在调查中我们发现,同样一套系统,管理人员不同,系统的能耗大不相同,有的甚至相差50%以上。3、新型空调方式、控制方法及新的节能技术的开发应用问题如前所述,采用新型空调方式、新的控制方法,不仅能显著提高热舒适性而且可以使系统大幅度节能。在我省对新型空调方式和控制方法的研究可以说在全国都是比较早的,并且已经取得了一些可喜的成果,只要政府部门略加扶持这些成果将很快能得到适用,并形成产业化,对这些项目的实施,将对我省的能源、环境和经济都将起到巨大的推动作用。4、公众对空调系统作用的理解观念问题对于舒适性空调系统,从本专业的角度来讲就是使人体有好的热舒适性。而在社会上我们常常发现一种这样的观念:认为空调在夏季是越冷冬季越热效果越好。这显然与舒适性空调的出发点相违背的。事实上,这样不仅大大增大了空调系统的能耗,同时由于室内外温差的增大,也使人体对不同环境的适应性下降,身体免疫力降低。这些可以通过宣传改变人们的观念。5、使用可再生能源空调系统的开发推广应用问题利用可再生能源的暖通空调系统,如地源热泵空调系统、太阳能制冷、供热系统,不仅有着显著的环境和社会效益,有的还有着显著的经济效益(如地源热泵空调系统),应大力开发推广。当然,和其他任何新技术一样,这些技术也存在着一些问题(如地源热泵系统的地源热提取问题等),也需要进一步研究完善,也需要政府部门的重视和支持。综上所述,暖通空调系统在建筑节能中占据重要的位置,起着重要的作用,节能技术的研究开发和运用是暖通空调系统、建筑系统节能的基础,政府职能部门的重视和支持,则是实现大幅度节能、产生显著的环境和社会效益、推动经济发展的保证。

暖通专业在计算 方法 、程序编制和工程应用几方面都取得了显著成绩。下面是由我整理的暖通专业技术论文,谢谢你的阅读。

暖通空调技术与节能

摘要:随着人们生活水平的日益提高,人们生活的节奏逐渐加快及心理压力的不断增大,使得人们的工作生活环境应该予以重视。而在人们的工作生活环境中倡导环保和节能的生活方式越来越重要。本文主要是对暖通空调技术与节能进行分析。

关键词:暖通空调 技术 节能

2009年9月22日,国家主席胡锦涛在联合国气候变化峰会开幕式上发表题为《携手应对气候变化挑战――在联合国气候变化峰会开幕式上的讲话》的重要讲话,郑重承诺今后中国将进一步把应对气候变化纳入经济社会发展规划,并继续采取强有力的 措施 :一是加强节能、提高能效工作;二是大力发展可再生能源和核能;三是大力增加森林碳汇;四是大力发展绿色经济,积极发展低碳经济和循环经济,研发和推广气候友好技术。明确提出了建设生态文明的重大战略任务,强调要坚持节约资源和保护环境的基本国策,坚持走可持续发展道路,在加快建设资源节约型国家。可见节能对于一个国家乃至世界时是多么的重要。本文主要从节能方面浅谈暖通空调技术。

1.室内设计参数

常规情况下,在冬季供暖时,室内计算温度每降低1℃,能耗将减少约5%~10%;在夏季供冷时,室内计算温度每升高1℃,能耗将减少约8%~10%。室内设计参数必须在规定的参数范围内取值。近几年,低温地板辐射采暖系统已经取代散热器采暖,之所以采用这种方式,主要是因为这种方式具有能耗小、舒适性高、容易分户计量、不占用房间使用面积等优点。

2.采暖设计

采暖空调热负荷为12650KW,热指标为。热源由城市热网供给,一次水供回水温度为95/70℃,经热交换后,高温二次水供回水温度为85/60℃,供采暖系统及空气、新风处理机组使用。各类机房、自行车库等设5-8℃的值班采暖,人防掩蔽体采暖设计温度为18℃,厕所为16℃;低温二次水供回水温度为60/50℃,供风机盘管和汽车坡道化雪系统使用,或者化雪系统由于什么原因没有使用。为保证一层室内良好的温度环境,抵挡大门的冷风侵入,在各大门入口处均设置了热空气幕。

以空气为热泵的热源在寒冷地区进行采暖是当前研究的 热点 。因为它和以往的燃煤、燃油、直接用电等取暖方式比较的话,在环保、节能、安全使用,甚至经济等方面有突出的优点,其可推广性也超过了水源、地源热泵。

2.1地板采暖的空气热泵机组容量的选择

机组容量(W)=当地建筑采暖设计负荷()×用户采暖的建筑面积()÷(1-)×0.85-0.9

2.2室外机最好安装在冬季主导风的背风面,应该设置遮雪蓬,机组如果安装在平台上,则底面应抬高至少20cm,以免化霜结冻,机组吸风口距障碍物至少25cm,双机之间距离至少20cm。

2.3地板下埋管的设计

空气热泵作为热源时,供水温度或供回水平均温度应尽可能设计得低些,以使机组效率尽可能高,又由于工程实践证明本机组的供回水温差较少仅2℃-3℃,所以,选择地下埋管时可参照“低温热水地板辐射供暖应用技术规程”( DBJ/T01-49-2000)附录 E-1至 E-3中平均水温35℃一栏,按照地板所需散热量选择间距,然后,将管道直径放大到Φ20/16成间距缩小一档即可。

3.风系统设计

3.1集中空调系统的排风热回收

一直以来,业内人士只是从经济方面的角度来衡量热回收装置的利弊,而环保与节能则被忽视。当今,业内人士考虑的角度有所转变,现在从环保和节能这个角度来衡量热回收装置的利弊。

空调区域排风中的热能量是非常多的,如果把这些热能量加以回收利用,那么环保和节能定会实现。如果新风和排风采用专门独立的管道输送,那么有利于集中热回收装置的设置。新风和排风采用热回收装置进行湿热或者全热交换,节能效果非常明显的表现出来。

3.2空调风系统

(1)有资料显示,以我国南方地区为例,夏季室内设计温度如果每降低1℃或冬季设计温度每升高1℃,其工程投资将增加6%,能耗将增加8%。该数据很明显地说明,适当提高夏季以及降低冬季的室内空气温度,都将起到显著的节能效果。与此同时,为保证室内空气质量以及人们对新鲜空气的需要,现行《采暖通风与空气调节设计规范》对最小新风量作出明确规定,要求建筑满足国家现行有关卫生标准。研究表明,加大新风量能够在一定程度上解决室内空气质量问题,但增加了空调能耗。新风定值必须按照规范来确定,因为新风量对于能耗和人体健康有着非常重要的作用,如果人员密度较大时,新风的供应按人员的密度来进行的话是非常不经济的。我国建筑采用了新风需求控制(检测室内CO2浓度),值得注意的是:新风量变化,排风量随着也发生变化,否则造成负压,可能会适得其反。

(2)暖通设计师对于规范中新风量的规定表示赞同。暖通设计师认为,在目前中央空调清洗不够规范的背景下,加大新风量是必要的。不过,对于室内设计温度的要求,他们却持保留态度。业内人士有这样的一个说法:“如果说节能像一棵树,有很多枝杈可以作为思路,那么,业主方的意见更像那个根。他们的态度,将成为决定暖通专业乃至建筑节能的根本性因素。”业内人士表示,建设方的意见非常重要。

要想增加新风量或者增强风机盘管处理室内回风的能力,风机盘管加新风的新风口应单独或布置在盘管出风口的旁边,而不应该布置在盘管回风吸入口。

(3)房间面积或空间较大、人员较多或有必要集中进行温度控制的空气调节区,其空气调节风系统宜采用全空气空调系统,不宜采用风机盘管系统,以利于集中处理、调节,发挥有利因素,弥补之前产生的问题。

(4)建筑空间高度大于或等于10m、且体积大于时,宜采用分层空调系统。与全室性空调方式比,分层空调系统夏季可以节能30%左右,但是冬季并不节能。通常设计时,夏季的气流组织为喷口侧送,下回风,高大空间上部排风;而冬季一般在底层设置地板辐射或地板送风供暖系统,也可将上部过热的空气通过风道送至房间下部。

(5)多个空气调节区合用1个空气调节风系统,各区负荷变化较大、低负荷运行时间较长,且需要分别调节室内温度,在经济条件允许时,宜采用全空气变风量空气调节系统。设计时应注意:要求采用风机调速改变系统风量,而不能采用恒速风机而改变系统阻力调节;其次,应采取保证最小新风量的措施,避免因送风量减少,造成新风量减少而不满足卫生要求的后果;再者,调节末端送风口风量时,推荐采用串联式风机驱动型末端装置以保证室内的气流分布。

(6)在某些情况下,像屋顶传热量较大、吊顶内发热量较大、吊顶空间较大(此时的吊顶至楼板底的高度超过1.0m),如果采用吊顶内回风,导致空调区域增大、空调耗能上升,这样非常不利于节能。所以对于建筑顶层或者吊顶上部有较大热量、吊顶空间较高时,直接从吊顶回风是不合理的。

4.围护结构

北京市建筑设计研究院原院长、北京市建筑设计研究院顾问总工程师吴德绳认为,暖通专业既然是建筑节能的支柱力量,因此,目光不仅要盯住如何优化暖通空调系统设计,更应该有所转移,在围护结构设计方面重点考虑。

围护结构在节能工作中,扮演着愈来愈重要的角色。所谓围护结构节能,通常是指通过改善建筑物围护结构的热工性能,使得建筑在夏季隔绝室外热量进入室内,冬季防止室内热量泄出室外,以保持室内尽可能接近舒适温度,减少通过辅助设备来达到合理舒适室温的负荷,并最终达到节能的目的,如通过采暖、制冷设备达到节能。

传统住宅建筑的围护结构是普通黏土砖,简单架空屋面和单层玻璃钢窗,它们的传热系数分别为1.96、1.66和6.4。而“节能住宅”的围护结构中外墙和屋面采取了保温措施,外窗采用中空塑钢窗或断热中空铝合金窗,它们的传热系数分别为 1.5、1.0和3.0,使围护结构的节能贡献约占25%。采用能效比高的采暖、空调设备(按照国家标准,房间空调器的能效比:制冷>2.3,采暖>1.9),使采暖、空调设备的节能贡献约占25%,两者相加总体达到节能50%的目标。

据介绍,围护结构的节能设计应该从墙体、窗户、屋面等三个方面考虑。对于设计人员而言,如何处理建筑玻璃幕墙的问题,在业内一直存在很大争议。普通玻璃幕墙是建筑节能不能实现的因素之一。统计数据表明,夏季通过玻璃窗的日照热可占制冷机最大负荷的30%,冬季单层玻璃的热损失约可占锅炉负荷的20%。窗体节能技术主要从减少渗透量、减少传热量、减少太阳辐射能三个方面考虑。另外,在保证室内采光良好的前提下,合理确定窗墙比十分重要。当窗墙面积比超过50%时,负荷将明显增加。不仅是外围护结构,内围护结构在设计中同样重要。暖通设计师要比普通建筑师更懂得建筑节能的途径,所以暖通设计师和普通建筑师多进行沟通效果才会更好。

5.实现节能

暖通空调的设计师在方案设计时,首先应深入了解业主的能源状况以及对空调的使用状况和是否有余热、废气等条件,然后对各种能源方案进行合理综合的对比。设计师在设计时应考虑的重点是:如何利用可再生能源和低品位能源。

暖通设计师在设计阶段完成基础工作之后,最关键的就是环保和节能的实现,而环保和节能的实现是通过综合利用各种先进技术、利用各种可再生资源来实现的。

利用自然条件来满足人们对于室内温度的需求,这是最理想的方式。现在通过各种设备实现对温度的调节,只不过是对人们的过错进行补救。冷热源是设计师最关注的一点,因为其能耗往往能占空调系统总能耗的50%左右。

地源热泵系统就是在这种形势下快速发展起来的,它利用地下恒温层土壤热显著提高空调系统效率。同时,采用新能源利用的供给方式,实现冷、热、电三联供;利用燃气、汽、电力能量转换的原理联合循环使用,将工业流程最尾端的余热收集起来,用于供冷系统空调冷冻水和供热系统的生活热水,这样,能源的利用率可提高至70%~80%左右。这些都给暖通空调设计师提供了广泛的节能设计思路。

6. 总结

随着全球逐渐变暖这种现象的出现,空调现在已经是人们生活中不可或缺的一部分,它使人们工作生活更加舒适,人们对于空调也有了一定的依赖性。然而,环保和节能是当今非常重要的问题,因此,在暖通空调设计方面,暖通空调的环保和节能是目前空调技术方面发展的方向,也就是说,城市供热环保和节能是目前亟须加强和可持续发展的问题。

参考文献:

[1] 赵君利. 暖通空调节能从设计开始.中国建设报,2010,(03).

[2] 胡锦涛活动报道集,2009,(09)

[3] 刘金瑶,李婉茹,刘鹏华. 浅谈暖通空调的节能.暖通空调,2008,(04).

[4] 张莉,李尧,朱玉明.暖通空调节能设计分析.山西建筑,2010,(09).

[5]__荣.建筑工程的暖通空调设计.施工技术与设计,2008,(07).

[6] 万蓉. 基于气候的采暖空调耗能及室外计算参数研究.西安建筑科技大学, 2009,(08).

点击下页还有更多>>>暖通专业技术论文

先被空调吹一天,明天在告诉你。

暖通空调论文3000字

随着改革开放逐步深化、国民经济的快速发展、人民对生活品质要求的提高,空调在现代建设中被广泛的应用。下面是我为大家精心推荐的空调节能技术论文,希望能够对您有所帮助。

空调节能技术浅谈

摘要:随着近年来社会经济的不断发展,人们生活品质的逐步提高,对于物质生活和环境舒适性的需求也更加苛刻,空调系统显然已经成为现代建筑行业中一个不可忽视的部分。但是,近年来能源危机突出和环境破坏对人类的影响逐步加深,已经让人类清晰的认识环境保护和能源节约的重要,国家也制定了一系列的法律法规和行业标准。因此,能源的有效节约、提高能源有效利用的方法和技术的研究成为了当今一项重要课题。本研究从影响空调系统的能耗的关键因素出发,提出了几项空调节能的可行性方案,最后探讨了空调节能的未来发展趋势。

关键词:空调系统;节能技术;措施建议

中图分类号:TU831.3+5文献标识码: A

前言:

随着人们经济水平的不断提高,生活品质的提升,无论是生活环境还是工作环境,空调系统在现代建筑中的应用也越来越广泛。根据统计表明,在我国空调耗能占建筑物总能源消耗的60%~70%,因此,采取有效的节能措施,解决高层建筑节能问题符合我国经济的可持续发展的要求,对节能减排和建设环境友好型社会有着至关重要的意义。

空调能耗的现状以及节能的重要性

随着改革开放逐步深化、国民经济的快速发展、人民对生活品质要求的提高,空调在现代建设中被广泛的应用。而在建筑能耗里,空调能耗已经占到建筑能耗的60%~70%左右,而且比重还在逐年上升。因此空调节能技术的发展对提高能源利用率、环境可持续发展有重要影响。

在我国现阶段中央空调系统的应用中,通常认为空调系统的温湿度控制以及空气品质的控制是最为重要的,进而忽略了空调系统的能源消耗情况。在我国,影响中央空调系统能源不能得到有效利用的主要因素有三方面,首先,在设计过程中重视投资成本,而忽略了能耗指标计算,在整个系统方案中,缺乏节能引导中央空调系统的经济性分析。导致在工程建筑方案的运行过程中,使用投资低、耗能大、运行费用高的空调系统。其次,对于中央空调而言,整个的系统工程相对复杂,所以对于中央空调能源有效利用的评价,要从整个系统全面来看,而不能单纯地停留在对机器设备本身的评价上,真正意义上的节能是与各个系统设计理念、施工优劣情况以及运行管理水平和建筑物热特性等因素息息相关,而不是只看重设备本身。最后,还有一个主要的因素,就是缺乏高素质运行管理人员和节能监控,致使空调系统在运行和管理的过程中没有得到很好地控制和监管,合格的管理人才可以大大改善运行不合理的地方,有利于节能。

建筑节能技术

空调系统的节能技术首先可以从建筑物本身入手,结合建筑、结构等相关知识,使建筑物在形状、色彩、方位及材料等方面为空调节能创造最基础的条件。对于空调位置的安排要进行合理布局,合理设计相关比例与系数,选择保温隔热性能良好的材料作为墙体和屋面,并提高改善建筑围护结构的性能等,都是建筑节能的可行性措施。

2.1选择合理的室内设计参数

在整个建筑物中,主要的热损失来自于围护结构和门窗缝隙空气渗透。因此, 在建筑物进行建筑节能中,注重室内设计中加强围护结构,使用环保、节能型建筑材料, 可有效地减少通过围护结构的传热这一主要的空调负荷, 从而各主要设备的容量达到显著的节能效果。通过这种方法进行保温隔热,同时加强门窗的气密性。另外,在夏季空调供冷时,室内外侧玻璃受阳光照射,是空调冷负荷的主要部分,应采取必要的遮阳措施。而在冬季空调供热时,则要求改善窗户的保温效果,可以采用光热性能好的玻璃;为了减少窗的冷(热)桥传热,可以采用钢塑窗代替铝合金窗;同时还可以采用双层玻璃窗提高窗的保温性。在窗户的设计位置上要减小窗洞口与墙的面积比值减少空调房间两侧温差大的外墙面积及其薄弱环节窗的面积,利于空调建筑节能。

2.2合理设计建筑结构

合理的设计建筑结构也是进行空调节能的一个有效途径之一。可以通过改善建筑的保温隔热性能,使房间内冷热量的损失通过房间的墙壁和门窗传递出去,这样可以有效地减少建筑物的冷热负荷。建筑物的朝向对空调冷负荷有很大的影响,根据我国的地理位置来分析确定良好的建筑朝向,一般建筑物为南朝向是我国建筑节能的必要条件,可以通过保持合理的建筑间距以及建筑群的错落布局,使建筑物接受适当的太阳辐射,同时有利于获得自然通风气流。

空调设计方面节能

在面积较大的空调房内,在空调房内区的负荷与周边区的相比较差距较大,如果两个区域选择使用一个空调系统进行制冷,两个空调房区域的房间的将会产生较大的温差,尤其是在冬季及过渡季节,所以同时处于两个不同区域的工作人员对环境空间的温度反映冷热温差较大,,根据我国在2001年版的《采暖通风与空气调节设计规范》新增5.3.2条之规定,建筑物内负荷特性相差较大的内区与周边区,以及同一时间内必须分别进行加热与冷却的房间,宜分别设置空气调节系统.。内区系统主要处理室内负荷,与外区负荷相比,内区负荷则相对稳定,内区往往需要全年供冷,去除室内余热。外区系统主要处理外部得热,外区负荷波动大,外区新风来源一般是内区空调系统,与外区回风混合经风机盘管处理后达到送风点,外区冬季供暖,夏季供冷,从而满足舒适性要求。

空调系统中的节能技术

空调系统如何适应在低负荷下高效节能运行及在系统设计中对设备进行节能选配就成为空调节能的关键。

4. 1 加强中央空调的运行管理和控制设备的调节控制

提高空调能源的有效利用,需提高操控人员的职业素质,避免由于管理不善而引起的空调耗能。操控人员要做好设备运行记录,分析机组各种压力表、温度计、流量计的读数是否正常准确,并根据空调负荷的变化调节机组,确保机组运行在节能状态,而且定期保养检查,及时更换磨损的零件。

4. 2 设备及管道的保温及水质处理

要实现降低能量的过多耗费这一目标,就要做好设备及管道的保温。保温的目的是为了阻绝内外温度传递,如果室外的温度小于空调排水的温度加保温是为了防止空调水管结冰冻裂水管,如果环境温度大于空调排水温度加保温是为了防止有冷凝水造成漏水。空调设备和管道的保温,对于节省能量消耗、降低运行费用也是相当重要的。空调能耗高还有一个重要的原因,就是空调系统中水管中水质的污染。

5、建筑空调系统设备的节能运行技术

设备的节能运行技术在建筑空调系统综合节能技术中, 其也至关重要。主要技术包括: 蓄能空调技术、热回收技术、变频技术等。

5.1蓄能空调技术

蓄能系统就是储蓄在不需要的冷/热量或需要的冷/热量减少的时间的过程中,制冷/热设备将蓄冷/热介质中所移出的热量,并在空调处于用冷/热或工艺性的用能高峰时,启动此能量。这样既减少了能源的流失,又可以有效地利用能源,既有经济效益又有社会效益, 是一项双赢的节能举措。

5.2 热回收技术

热回收技术包括排风余热回收和制冷机组的冷凝热回收。排风余热回收充分利用排风的能量, 对其进行回收,从而对新风进行预冷或预热,减小新风负荷是暖通空调节能的重要途径。制冷机组的冷凝热回收系统既可以避免冷凝热排放到大气中造成热污染, 又可以节省为提供热水而设的锅炉及其附属设备, 避免了由于燃料的燃烧向大气排放的有害物, 应该说是一种效果明显, 又有环保作用的节能技术。

5.3变频技术

随着电力电子技术和计算机控制技术的不断发展,在空调控制系统中变频器也得到了广泛的应用,它的应用主要是针对空调控制系统的特点而进行控制。不同类型的冷水机组都有较完善的自动控制调节装置, 能随负荷变化自动调节运行状况, 保持高效率运行,从而实现了一种既能达到控制要求又能节约能源的方法。

5.4太阳能空调技术

太阳能是绿色能源中最重要的能源, 太阳能的热利用是目前建筑中利用太阳能的主要利用形式。它包括被动式和主动式两种形式。被动式太阳能房的结构相对简单、造价低、不需要任何辅助能源, 通过建筑方位合理布置和建筑构件的恰当处理, 以自然热交换方式来利用太阳能。主动式太阳房结构较为复杂,造价较高,需要用电作为辅助能源。采暖降温系统由太阳集热器、风机、泵、散热器及储热器等组成。在建筑外围护结构中还可采用太阳能集热墙, 利用太阳能采暖。

6、结束语

能源问题是我国实现经济发展的重点问题之一,建筑空调节能技术是节约能源、改善环境、促进经济可持续发展的有效措施。空调系统在高负荷下高效节能运行以及在系统设计中选配节能设备是建筑空调节能的关键因素, 这对于节约能源、降低运行费用、促进国民经济发展具有十分重要的意义。在未来的建筑物中,在空调系统设计方面,要在节约能源以及有效利用能源这两方面引起高度重视。只要各方共同努力,空调系统的节能降耗问题的解决指日可待。

参考文献:

[1] 农孙仁. 中央空调系统节能改造探析[J]. 企业科技与发展. 2012(18)

[2] 叶宁. 中央空调系统的节能运行[J]. 科技资讯. 2012(03)

[3] 李令言. 中央空调节能控制系统的研究与开发[D]. 中国科学技术大学 2011

点击下页还有更多>>>空调节能技术论文

空调系统方案设计论文

1、运行控制设计

1.1夏季除湿工况新风阀开度确定

夏季除湿工况,从节能角度,在保持最低换风次数要求的前提下,使新风阀处于最小开度。根据我国暖通空调规范规定:对于室温允许±1.0℃波动范围的空调区域,换气次数应大于或等于5次/时(最小送风量)。保证最低换气次数,回风阀最小开度计算:为获取新风量数值,在新风直管段设置风速检测口,日常运行时封堵,检测时插入风速仪测量新风风速。参数定义:空调控制区域容积-VN空调新风量-Qx新风管截面积-Sx新风管测得风速-则新风量Qx=SxVx,欲使室内换风次数每小时达到5次,须满足:Vx=。通过调整新风阀开度,使风速vx满足上式要求,确认并记录该风速下的新风阀开度。为满足空调节能运行要求,夏季除湿阶段,新风阀可保持这一开度值,定期测试风速,实施新风阀开度值修正。

1.2温、湿度分控模式

在夏季降温除湿工况时,将原有温、湿度联合控制程序调整为温、湿度独立分控程序,即根据室内回风含湿量(通过回风温湿度计算转化得出)与室内设定工况含湿量之间的差值,或根据新风湿度的变化跟踪室内设定工况湿度通过PI调节,来控制主表冷器(除湿通道)的.阀门开度;根据室内回风温度与室内设定温度之间的差值,来控制副表冷器(降温通道)的阀门开度。过渡季,仍按原变新风比或全新风运行,只是需要增加旁通新风阀的开关控制,具体逻辑是当室外工况进入过渡季、新风除湿电动冷水阀关闭,旁通新风阀应同时打开。当室外处于夏季除湿工况时、新风除湿电动冷水阀开度不为零,旁通新风阀应处于关闭状态。过渡季对新风量的调节仍由原新风、回风调节阀负责。

2、常规控制与双通道温湿度独立控制热力工况对比分析

2.1参数定义

G1-新风量N-室内设定点G2-回风量W-夏季室外状态点G-总风量(G1+G2)C-混风状态点i-焓值L-机器露点Q-冷量消耗O-夏季送风状态点

2.2常规空调系统在夏季除湿工况下的再热分析

2.2.1常规夏季除湿空气热湿处理过程卷烟厂空调系统为卷烟生产工艺提供高精度的室内温湿度环境,系统一般都配有表冷、加热、加湿等多种热湿处理手段。常规空调系统夏季热湿处理过程为:新回风混合后,经表冷器降温除湿,再经加热器再热,达到送风状态点后向室内送风。其对应的空气处理过程焓湿图表述常规空调系统在夏季除湿工况下的空气处理过程焓湿图。

2.2.2常规表冷处理冷量消耗计算1)混风状态点(C)焓值计算:根据:,得出:iC=iN+(iW-iN)2)冷量(Q)消耗计算:Q=(G1+G2)(iC-iL)=(G1+G2)(iN-iO)室内负荷+(G1+G2)(iO-iL)再热负荷+G1(iW-iN)新风负荷。

2.3双通道温湿度独立处理方案的节能分析

2.3.1双通道除湿工况空气热湿处理过程根据上文所述,空调系统双通道温湿度独立处理过程概括为:新风(或与部分回风混合)经主表冷器降温除湿,回风经副表冷器干冷却后,新回风进一步混合,达到送风状态点后向室内送风。

2.3.2温湿度分控冷量消耗:1)混风状态点(C)焓值计算根据:=得出:iC=iN-(iN-iL)2)冷量(Q)消耗计算:Q=G1(iW-iL)+(G1+G2)(iC-iO)=(G1+G2)(iN-iO)室内负荷+G1(iW-iN)新风负荷温湿度分控冷量消耗与常规处理冷量消耗比较,常规夏季除湿空气热湿处理过程中(G1+G2)(iO-iL)再热负荷部分已消除。

3、结论

两种空气处理方式的节能点在于:温湿度分控方案节省了再热部分能耗;对于单一冷冻水管网系统,不会额外增加制冷机组的运行能耗,相反会减少因常规降温除湿过程的过冷负荷调节,降低制冷机组能耗。此方案可彻底解决夏季冷热相抵的不合理现象,大量节省夏季再热量和制冷量,可迅速收回初投资,节能效率十分明显。同时不影响过渡季变新风或全新风运行,空调机组硬件设备改动幅度小、改造难度不大。

  • 索引序列
  • 暖通空调节能毕业论文英文
  • 暖通空调专业毕业论文
  • 暖通空调ei期刊
  • 暖通空调论文3500字
  • 暖通空调论文3000字
  • 返回顶部