甜甜的今天
桥梁与隧道工程论文参考文献
参考义献 这是论文中很重要、也是存在问题较多的一部分。那么,桥梁与隧道工程论文参考文献有哪些呢?下面我为大家收集一些优秀的范例,大家不妨多加参考!
桥梁与隧道工程论文参考文献一
[1] Measor E.O.,New, D.R The design and construction of the Royal Festival Hall, South Bank[J] Journal Instn Civ. Engrs, 1951,36241-318.
[2]曹艳梅,夏禾,王鲲鹏.紧邻既有铁路桥基础施工对行车影响的预评估.铁道学报.2013.35(3):95-101.
[3]饶明贵,既有线旁钻孔灌注桩施工方法[J].铁道工程学报.2003,(1):145-149.
[4]罗鹏,邻近既有线路桥梁挖孔桩基础施工安全性分析[J].施工技术与测技术.2008,28 249-252.
[5]吴庆润,邻近既有铁路的.大直径超深钻孔桩施工关键技术[J].地基基础.2012,34 (3):176-179.
[6]朱建才,许明来,朱剑锋,徐日庆,周群建,钻孔桩施工对既有桥桥墩安全性影响试验研究[J].工程勘察.2012,(3): 27-32.
[7] Gunn M J,Yan,R W M. Stress transfer and deformation.mechanisms around a di^)hragm wallpanel [J]. Proc.ASCE,Journal of Geotechnical and Geoenvironmental &igineering, 1998,124(7):638-648.
[8] F.C.Schroeder, D.M.Potts, T.LAddenbrooke. The Influence Of Pile Group Loading On ExistingTunnels [J], Geotechniqe, 2004,54(6)351 -362.
[9]陈隆,叶涛,群桩施工全过程模拟,工业建筑,2010. (40): 1011-1017.
[10]李智彦,丁振明,钻孔灌注桩施工对邻近桥桩基影响的数值模拟.公路交通科技.2013.(4):70-76.
[11]高晓燕,钻孔灌注桩施工对既有并行高铁线桥梁的影响.山西建筑.2015,(3):163-164.
[12] Ming-Fang, Chang, P.E., Hong Zhu. Construction effect on toad transfer along bored piles [J].Journal of Geotechnical and Geoenvironmental Engineering, 2004,130(4):426-437.
[13] Burland, LB. Shaft friction of piles in clay-a simple fundamental approach! J]. GroundEngineering. 1973, 6(3): 30-42.
[14] Skempton, A.W. Cast in-situ bored piles in London Clay [J] . Geotechnique, 1959,9(4):153-173.
桥梁与隧道工程论文参考文献二
[15] Meyerhof,GG,Murdock, L.J. An investigation of the bearing capacity of some bored and drivenpiles in London Clay [J].Geotechnique, 1953,3(7)267-282.
[16] Clayton, C. R. I,Milititsky, J. Installation effects and the performance of bored piles in stiffClay[J]. Ground Engineering, 1983,16(2): 17-22.
[17] Clear.C.A. Ffcrrison.T.A, Concrete pressures on formwork. CIRIA association. Report 108,1985.
[18] Lings,M.L., Ng, CW.W^Nash, DJ.T. The lateral pressure of wet concrete in diaphragm wallpanels cast und^ bentonite [C]. Proc.Instn Civ. Engrs Geotech. Engng, 1994,107:163-172.
[19] Symons, I.F, Carder, D. R. Stress changes in stiff clay caused by the installation of embeddedretaining walls [M]. Retaining structures. Thomas Telford, London, UK, 1993,227-236.
[20] DeBeer E E & WaOays M. Forces induced in piles by unsymmetrical surcharges on the soilaround the pfles[A]. Proc 5thECSM FE[C].Madrid :1972,325-332.
[21] Leussink, K And Wenz, K.P., 1969,Storage Yard Foundatio on Soft Coheesive Soils.Proceedings, Seventh international Conference on Sofl Mechanics,\bL9,1972,149-155.
[22] tfcyman L,Boersm a F. Bending moments in piles due to lateral earth pressure[A].Proc 5ThICSMFE[C], Paris:1961:425-429.
[23] Wenz K P. Large scale tests for determination of lateral loads on piles in soft cohesive soils[A].Proc 8thICSMFE[C]. Moscow:19732-5.
[24]梁发云,于峰.土体水平位移对邻近既有桩基承载性状影响分析.岩土力学,2010,32:449—454.
[25]杨敏,朱碧堂,陈福全.堆载引起某厂房坍塌事故的初步分析[J].岩土工程学报,2002^24(4): 446-450.
[26]张陈蓉,黄茂松,李早.被动群桩的分析方法与验证[C].中国土木工程学会第十届土力学及岩土工程学术会议论文集.重庆:重庆大学出版社,2007.
[27] Matsui hong W P& I to T. Earth pressure on piles in a row due to lateral soil movements [ J]. Soiland Foundations. 1982,22( 2):71-81.
[28] Poulos H G, Chen L T& Hull T S. Model tests on single piles subjected to lateral soilmovement[ J]. Soil and Foundations. 1995,35(4) :85-92.
就是隧道工程啊
8000—10000 字。本科毕业生的本科毕业论文字数要求每篇本科毕业论文最低要 8000—10000 字 。当代,论文常用来指进行各个学术领域的研究和描述学术
[1] 关宝树.隧道工程施工要点集[M].北京:人民交通出版社,2003.[2] 孔德岩.隧道浅埋段开挖及支护施工技术[J].浙江建筑,2006, 23(4).
第一部分 隧道与地下工程第一节 概述隧道和地下工程随着我国经济和人民生活水平的提高而进一步发展和推广。隧道和地下工程已经是解决我国交通和工业的和很有前景的一门科
道路桥梁施工中存在的问题及对策论文 摘要:在道路桥梁建设大军的长时间共同努力下,我国道路桥梁建设取得了飞速发展的局面,形成了对交通发展和经济建设的有效支持。研究