In the 20th century, bridge construction technology evolved and was fueled by the Industrial Revolution. At the turn of the century, steel bridges were riveted together, not bolted; concrete bridges were cast in place, not precast; and large bridge members were built from lacing bars and smaller sections, not rolled in one piece. Plastic had not yet been invented. Construction techniques such as post-tensioning, slurry walls, soil freezing, and reinforced earth walls had not yet been conceived. Surveying was performed mechanically since infrared, optical technology was still 75 years away. Bridge construction is changing as the new millennium begins. New construction techniques and new materials are emerging. There are also new issues facing the bridge building industry relative to the research needs associated with these new techniques and materials. LONG-SPAN BRIDGES Suspension Bridges While suspension bridge building was conducted at a modest pace throughout the 20th century, an unprecedented number of spans of remarkable record lengths were built in the Far East and Denmark. Both the Akashi Kaikyo Bridge in Japan and the Great Belt Bridge in Denmark were completed in 1998. The Akashi Kaikyo Bridge is the largest suspension bridge in the world, with a span of 1991 m, and the Great Belt Bridge is the second largest, with a span of 1624 m. While spans lengths have increased nearly fivefold during the course of this century, they may have reached their physical limits with today’s materials. Research will be necessary to develop the new, ultra-high-strength steel wire or carbon fiber wire required to build the longer main suspension cables that will make it possible to increase span lengths to beyond 2000 m. As we enter the new millennium, rehabilitation and ongoing maintenance of the existing suspension bridges must continue as well. Recent rehabilitation measures for the main cables and suspension systems of these bridges have uncovered degradation through corrosion and hydrogen embrittlement. Research is needed to determine the remaining useful service life of suspension bridge cables and what measures can be taken to slow or halt the degradation process. Transportation in the New Millennium 2 Other components of long-span bridges, existing and new, are being revolutionized as technology moves forward. Advances in deck technology are producing stronger, lighter decks. Orthotropic and exodermic decks are becoming increasingly popular on long-span structures as a means of reducing dead load. Bearings, joint systems, and seismic retrofitting components are becoming increasingly efficient as more large-scale testing facilities are built.在20世纪,桥梁施工技术,是由进化而来的 工业革命。随着新世纪的到来,钢桥受到铆接在一起,而不是 螺栓、混凝土桥梁被扔在的地方,不是预制、大型桥梁成员 从系酒吧和小的部分,不卷在一块。塑料尚未 发明了。制作等施工工艺、浆墙、土壤冻结, 加筋土墙尚未怀了孕。测量进行机械 自从红外、光学技术仍然是75年。 大桥建设是新千年开始转变。新建筑 技术和新材料正在浮出水面。也有新的解决面临的桥 建筑行业的相关研究的需要,这些新技术 材料。 大跨度桥梁 悬挂的桥梁 虽然悬索桥建设进行了整个20速度不快 世纪,前所未有的跨越了卓越的长度是建在记录 远东和丹麦。双方在日本明石海峡大桥正式通车,伟大的带桥 在丹麦是在一九九八年完成。这个明石海峡大桥正式通车是世界上最大的悬架 在这个世界上,与桥梁的m,1991年是中国的第二大带桥, 用一段1624)。 虽然已经增加了近5倍长度的跨世纪的过程中, 他们已经达到了他们的物理极限与今天的材料。研究将 必须发展新的、ultra-high-strength钢丝、碳纤维丝要求 建立了悬索,将不再主要可能增加到跨度的长度 超出2000米。 当我们进入新千年、康复和持续的维护现有的 悬索桥必须继续。最近的戒毒措施为主要 电缆悬架系统与这些桥梁发现退化 氢脆腐蚀,。研究还剩下的 寿命悬索桥电缆和什么措施可以减缓或 停止退化的过程。 在新千年的运输 其他组件的大跨度桥梁,现有的和新的,正在发生了革命性的变化 技术的进步。提出了在甲板上技术生产强的,更轻的 甲板。正交各向异性和exodermic牌是大跨度越来越受欢迎 作为一种手段,降低结构自重荷载。轴承、联合系统和抗震能力 越来越多的有效成分是更大规模的测试设备 建造。 50分!!~~谢谢 参考资料:我的大脑
最爱的mango
桥梁工程学的发展主要取决于交通运输对它的需要。古代桥梁以通行人、畜为主,载重不大,桥面纵坡可以较陡,甚至可以铺设台阶。在有重载马车之后,载重量逐步加大,桥面纵坡也必须使之平缓。这时的桥梁材料仍以木、石为主,铸铁和锻铁很少使用。 从桥梁的原始雏形——堤梁(及在浅滩溪涧中筑起一个个石堤,堤间流水,人从石堤上跨越)、独木桥、浮桥(架设在船只上的桥)和石拱到现在超千米跨度的悬索桥,桥梁工程在几千年的时间里发展可谓翻天覆地。然而桥梁工程能拥有这翻天覆地的发展取决于工程材料和工程技术迅猛发展的有力推动。在原始社会里,懵然无知的古人类还只是追求有一个起身的洞穴和能填饱肚子的食物,还不会想到桥。然而随着社会的发展,人类文明的进步,交通的不断发展,人们开始创造了桥。然而那时工程材料的使用仅限于天然的木和石块,且工程技术非常落后,所以人们只能建造简单的桥——堤梁、独木桥和简单的石拱。世界上现存最古老的石桥在希腊的伯罗奔尼撒半岛,是一座用石块干垒的单孔石拱桥,距今3500年左右建成。我国古代桥梁工程技术的发展在当时处于世界领先地位。公元590——608年建造在河北省赵县(叫)河上留存至今的隋代敞肩式单孔圆弧弓形石拱桥,即赵州桥。该桥全长50.82m,桥面宽约10m,采用28条并列的石条砌成拱券形成。拱券矢高7.23m。拱上设有4个小拱,既能减轻桥身自重,又便于排洪,且更显美观。该桥无论在材料使用、结构受力、艺术造型和经济上都达到极高成就,是世界上最早的敞肩式拱桥,早于欧洲同类桥约1000年。近代土木工程的时间跨度为从17世纪中叶至20世纪中叶的300年间。这个时期内土木工程的主要特征有:——有力学和结构理论作为指导;——砖、瓦、木、石等结构建筑材料得到日益广泛的使用;混凝土、钢材、钢筋混凝土及早期的预应力混凝土得到发展;——施工技术进步很大,建造规模日益扩大,建造速度大大加快。在这个时期内,以下几件大事对桥梁工程的影响巨大: (1)意大利学者伽利略在1638年出版的著作《关于两门新科学的谈话和数学证明》中论述了建筑材料的力学性质和梁的强度,首次用公式表达了梁的设计理论。 (2)英国科学家牛顿在1687年总结了力学三大定律它们是土木工程设计理论的基础。 (3)瑞士数学家欧拉1744年出版《曲线的变分法》建立了柱的压屈理论,得到计算柱的临界受压力的公式,为分析土木工程结构物的稳定问题奠定了基础。 (4)1824年英国人阿斯普.丁取得了波特兰水泥的专利权,1850年开始生产。这是形成混凝土的主要材料,使得混凝土在土木工程中得到广泛应用。后来,在20世纪初,有人发表了水灰比等学说,才初步奠定了混凝土强度的理论基础。 (5)1859年发明了贝塞麦转炉炼钢法,似的钢材得以大量生产,并愈来愈多地应用于土木工程。 (6)1867年法国人莫尼埃用铁丝加固混凝土制成花盆,并把这种方法应用到工程中,建造了一座蓄水池,这是应用钢筋混凝土的开端。1875年他主持建造了第一座长16m的钢筋混凝土桥。 (8)1779年英国用铸铁建成跨度为30.5m的拱桥;1826年英国用锻铁建成跨度为177m的悬索桥;1883年美国建成世界上第一座大跨钢悬索桥——布鲁克林桥;1890年英国又建成两孔主跨达521m的悬臂式刚架桥,这样,现代桥梁3种基本形式(梁桥、拱桥、悬索桥)相继出现。 自从有了铁路以后,桥梁所承受的载重逐倍增加,线路的坡度和曲线标准要求又高,且需要建成铁路网以增大经济效益,因此,为要跨越更大更深的江河、峡谷,迫使桥梁向大跨度发展。石材、木材、铸铁、锻铁等桥梁材料,显然不合要求,而钢材的大量生产正好满足这一要求。 在技术方面,只是凭经验修桥,曾使19世纪80~90年代的许多铁路桥发生重大事故;从这时起,正在发展中的结构力学理论得到了重视,而在它的静力分析理论完全确立并广泛普及之后,桥梁因强度不足而造成的事故显然大为减少。 二十世纪以来,公路交通有很大发展。在内陆,需要在更多的河流、峡谷之上建桥。在城市中,以及在各种交通线路相交处,需要建造立交桥。在沿海,既需在大船通航的河口、海湾、海峡修建特大跨度桥梁,又需在某些海岛与大陆之间修建长桥。 由于更多新技术新材料的出现,现代桥梁工程的发展尤其迅速,世界各国相继建造出超千米的桥梁。世界上跨径最大的预应力混凝土斜拉桥——西班牙的卢纳巴里奥斯桥,跨径达440m,采用了双面辐射形密索布置. 世界第一的悬索桥——日本明石海峡桥,横跨日本内海,使日本神户与淡路岛紧紧相连.这座大桥全长3190M,中央跨度1990m于1998年竣工.它可以承受里氏8.5级地震.目前中国在建的一批公路桥梁,无论是桥梁的数量还是工程规模、技术难度、科技含量,都代表着当今世界的先进水平,创造了中国建桥史之最。据悉,这些桥梁主要有:阳逻长江大桥,主跨1280米的悬索桥;南京长江三桥,主跨648米的斜拉桥;润扬长江公路大桥,跨江连岛的主跨1490米悬索桥和406米斜拉桥组合;深圳湾跨海大桥,主跨180米独塔单索面斜拉桥;苏通长江公路大桥,主跨1088米的斜拉桥,居世界第一;杭州湾跨海大桥,按双向六车道高速公路标准建设,全长36公里,是世上在建最长的公路跨海大桥。一个国家同时在建这么多世界级桥梁,在世界上不多见。 桥梁需要大量修建,而人力、物力、财力有限;于是,不断提高技术水平,引用新材料、新工艺、新桥式,对结构行为进行更精确的数值分析,采用更精确的结构试验进行验证,以使桥梁建设的经济效益不断提高,已成为时代的要求。 桥梁工程学主要研究桥渡设计,包括选择桥址,决定桥梁孔径,考虑通航和线路要求以确定桥面高程,考虑基底不受冲刷或冻胀以确定基础埋置深度,设计导流建筑物等;桥式方案设计;桥梁结构设计;桥梁施工;桥梁检定;桥梁试验;桥梁养护等方面。 在建桥材料方面,以高强、轻质、低成本为选择的主要依据,近期仍以发展传统的钢材和混凝土为主,提高其强度和耐久性。对于建筑钢材的脆断机理、初始几何缺陷等,以及混凝土材料的非弹性问题(收缩徐变以及疲劳等),将继续作充分的研究,使能正确控制结构的受力和变形。至于碳纤维塑料等在桥梁上的广泛应用,还必须在降低成本以后才有可能。 在桥梁勘察设计方面,随着交通事业的迅速发展,大跨度或复杂的桥型将不断涌现。高速公路的发展,对桥梁设计亦将提出新的要求。在桥式方案设计中,将有可能利用结构优化设计理论,借助电子计算机选出最佳方案。 在结构设计计算中,采用空间理论来分析桥梁整体受力已成为可能;以概率统计理论为基础的极限状态设计理论,将进一步反映在桥涵设计规范中,使桥梁设计的安全度得到科学合理的保证。桥梁美学作为时代、民族的文化在某些方面的反映,将愈来愈受到人们的重视:桥梁的面貌将蔚为大观。 在桥梁施工方面,对施工组织将充分利用电子计算机进行经济有效的管理。在施工技术中,将不断引用新技术和高效率、高功能的机具设备,借以提高质量、缩短工期、降低造价。如采用激光测量控制结构的精确定位;引用自升式水上平台克服深水基础的困难;利用遥控设备在沉井、沉箱中挖基,以减少劳动强度并避免人身危险;利用高质量的焊接技术,借能推广工地焊接等,此外,装配式桥梁也将有所发展,以使结构和构件标准化,生产工业化。 在桥梁养护维修方面,要求对既有桥梁建立完善的技术档案管理制度。在桥梁维修检查中,引用新型精密的测量仪表,如用声测法对结构材料的缺陷以及弹性模量进行测定;用手携式金相摄影仪检查钢材的晶体结构俾能及早进行加固防患于末然,以便延长桥梁的使用寿命。 桥梁工程始终是在生产发展与各类科学技术进步的综合影响下,遵循适用、安全、经济与美观的原则,不断的向前发展。人们除了要求桥的功能完善,还讲求桥的外形美观、有艺术性 ,桥梁地建造将更加复杂化,更加艺术化,桥梁的未来将更加多元化,是现代桥梁更现代,还是旧式桥梁的复兴,值得期待! 中国桥梁的历史可以上溯到6000年前的氏族公社时代,到了1000多年前的隋、唐、宋三代,古代桥梁发展到了巅峰时期。公元35年东汉光武帝时,在今宜昌和宜都之间,出现了架 设在长江上的第一座浮桥。 在秦汉时期,我国已广泛修建石粱桥。世界上现在是保 存着的最长、工程最艰巨的石粱桥,就是我国于1053一1059年 在福建泉州建造的万安桥,也称洛阳桥,此桥长达800米,共47 孔,位于“波涛汹涌,水深不可址”的海口江面上。此桥以 磐石铺遍桥位底,是近代筏形基础的开端,并且独具匠心地用养殖海生牡蛎的方法胶固桥基使成整体,此也是世界上 绝无仅有的造桥方法,近千年前就能在这种艰难复杂的水文 条件下建成如此的长桥,实是中华桥梁史上一次勇敢的突破。 我国古代石拱桥的杰出代表是举世闻名的河北省赵 县的赵州桥(又称安济桥),该桥在隋大业初年(公元605年左 右)为李春所创建,是一座空腹式的圆弧形石拱桥,净跨37m, 宽9m,拱失高度7.23m,在拱圈两肩各设有二个跨度不等的腹 拱,这样既能减轻桥身自重,节省材料,又便于排洪、增加美 观,赵州桥的设计构思和工艺的精巧,不仅在我国古桥是首屈一指,据世界桥梁的考证,像这样的敞肩拱桥,欧洲到19世纪中叶才出现,比我国晚了一千二百多年,赵州桥的雕 刻艺术,包括栏板、望柱和锁口石等,其上狮象龙兽形态逼 真,琢工的精致秀丽,不愧为文物宝库中的艺术珍品,我国 石拱桥的建造技术在明朝时曾流传到日本等国,促进了与世 界各国人民的文化交流并增进了友谊。 1240年建造的福建潭州虎渡桥,也是最令人惊奇的一 座粱式大桥,此桥总长约335m,某些石粱长达23.7m,沿宽度 用三根石粱组成,每根宽1.7m,高1.9m,重达200多吨,该桥一直 保存至今”历史记载,这些巨大石梁桥是利用潮水涨落浮运建 设的,足见我国古代加工和安装桥梁的技术何等高超。 广东潮安县横跨韩江的湘子桥(又名广济桥)此桥始 建于公元1169年,全桥长517.95m,总共20墩19孔,上部结构有 石拱、木梁、石梁等多种型式,还有用18条活船组成的长达 97.30m的开合式浮桥,设置浮桥的目的,一方面适应大型商 船和上游木排的通过,并且也避免了过多的桥墩阻塞河道, 以致加剧桥基冲刷而造成水害,这座世界上最早的开合式 桥,柱石桥之长、石墩之大、桥梁之多以及施工条件之困难 工程历时之久,都是古代建桥史上所罕见的。。 1957年,第一座长江大桥——武汉长江大桥的胜利建 成,结束了我国万里长江无桥的状况,从此“一桥飞架南北,天堑变通途”,桥的正桥为三联3X128m的连续钢桁粱,双 线铁路上层公路桥面宽18m,两侧各设2.25m人行道,包括引 桥在内全桥总长1670.4物,大型钢梁的制造和架设、深水管柱基础的施工等,对发展我国现代桥染技术开创了新路。 1969年胜利建成了举世瞩目的南京长江大桥,这是我国自行设计、制造、施工,并使用国产高强钢材的现代大型桥梁,正桥除北岸第一孔为128m简支钢桁粱外,其余为9 孔3联,每联为3x l60m的连续钢桁粱。上层是公路桥面,下层 为双线铁路,包括引桥在内,铁路部分全长6772m,公路部 分为4589m,桥址处水深流急,河床地,质极为复杂桥墩基础 的施工非常困难。南京长江大桥的建成显示出我国的建桥事 业已达到了世界先进水平,也是我国桥梁史又一个重要标 志。 在最近的1000年中,中国的桥梁技术全面落后于世界的脚步,中国第一座现代化桥梁的出现距今仅100多年历史,而且是由外国人建造的。从钱塘江大桥算起,中国人自己设计现代桥梁的历史还不足70年;从南京长江大桥算起,中国人自行设计建造大型桥梁的历史仅34年。而九十年代以来,中国桥梁的成就才使我们重新无愧于祖先地站到了世界前列,这是中国桥梁建设的伟大复兴时代。改革开放以来的20多年中,中国的桥梁建造技术取得了举世瞩目的成就,前十年为此做了经济上、技术上和人才上的准备,九十年代迎来了跨越式的发展。展望未来,随着中国经济的发展,一批更大的越江跨海工程的建设,中国桥梁将会创造更辉煌的成就。中华民族的伟大复兴,必将造就一代巨人去引领世界桥梁的未来。 1990年四川省在宜宾市建成的小南门桥,跨径达到240米,已是当时世界上中承式拱桥中跨径最大的一座。2001年11月7日,小南门大桥因吊杆锈蚀造成部分桥面跨塌,在修复过程中,技术人员对全桥进行了检测,大桥整体结构依然完好。小南门大桥所付出的代价是创新的代价,没有创新我们就不可能一睹1400年前的赵州桥。 1991年,四川省苍溪县建成了中国第一座钢管混凝土拱桥——旺苍大桥,跨径115米。在此之后的几年中,各地虽然兴建了不少钢管混凝土拱桥,但跨径始终在200米以下徘徊,直到1998年,广西壮族自治区建成了三岸邕江大桥,一举将此类桥梁的跨径提高到270米;1999年又建成了跨径220米的六景大桥。此后,在湖北、浙江和贵州等省,跨径在250米左右的钢管混凝土公路、铁路拱桥开始增多。 1995年贵州省瓮安县建成江界河大桥,首次突破了中国混凝土拱桥跨径 300米大关,达到330米,一举成为世界最大的桁式组合拱桥。不仅如此,其拱顶桥面至水面高度达263米,居中国各类桥梁之首。大桥一跨飞跃乌江天险,主孔分108个桁片预制,运用桁架伸臂法悬拼架设,两岸引孔为桁式刚构,全桥轻盈简洁,凌空飞渡,气势不凡。 1997年重庆万县长江大桥建成。大桥位于万州区(原万县市)黄牛孔处,是上海至成都高速公路跨越峡江天险的特大型拱桥。大桥一跨飞渡长江,全长 856.12米,主拱圈为钢管混凝土劲性骨架箱型混凝土结构,主跨420米,桥面宽24米,为双向四车道,是1995年贵州省瓮安县建成江界河大桥,首次突破了中国混凝土拱桥跨径 300米大关,达到330米,一举成为世界最大的桁式组合拱桥。不仅如此,其拱顶桥面至水面高度达263米,居中国各类桥梁之首。大桥一跨飞跃乌江天险,主孔分108个桁片预制,运用桁架伸臂法悬拼架设,两岸引孔为桁式刚构,全桥轻盈简洁,凌空飞渡,气势不凡。 华夏第一桥——江阴长江公路大桥,是我国“八五”规划的“两纵两横”国道主干线中沿海主骨架的跨江工程,是目前 中国第一、世界第四大跨径钢悬索桥。大桥由桥塔、主缆、锚旋和钢箱梁等主要部件组成。大桥全长3071 米,主跨1385米;桥面宽33.8米,双向六车道,设计车速100公里/小时;通航净空为50米,可通行五万 吨级巴拿马型散货轮。江阴长江公路大桥的两根主索,各长2400多米,直径近1米,每根重1.4万 多吨,主索用127根直径5.3毫米的钢丝搅成索,再由169股钢索组成主索。主桥每边有85个吊杆,每个吊杆2根,用以连结主索和桥面。 两岸索塔标高为196.236米,相当于65层搂高。北塔基长43.5米,宽73.5米,下有123根近90米长的基础桩。北锚的混凝土陈井平面长69米,宽51米(面积相当于一片足球场大)。沉入地面58米,被称为世界第一大沉井。江阴长江大桥于1994年11月22日正式开工,1999年10月1日胜利通车,名列“中国第一,世界第四”。 改革开放以来的20多年中,中国的桥梁建造技术取得了举世瞩目的成就,前十年为此做了经济上、技术上和人才上的准备,九十年代迎来了跨越式的发展。展望未来,随着中国经济的发展,一批更大的越江跨海工程的建设,中国桥梁将会创造更辉煌的成就。中华民族的伟大复兴,必将造就一代巨人去引领世界桥梁的未来。
湛蓝世纪
沥青玛蹄脂碎石混合料是一种由沥青、纤维稳定剂、矿粉及少量的细集料组成的沥青玛蹄脂,填充间断级配的粗集料骨架间隙而形成的眼挤型密实结构混合料。SMA改性沥青及SMA路面是一种新型的路面结构,改性沥青及SMA混合料冷却后非常坚硬,强度高。本文结合上海城市外环线(浦东段)环南一大道工程的施工,谈谈如何对改性沥青及SMA路面的施工进行控制。一、工程综述本工程北起张扬路立交东至环东一大道,路幅红线宽度100米,为城市Ⅰ级主干道,双向8车道,总长2387米。车行道结构形式为沥青柔性路面,结构层组成为路基+15厘米砂砾垫层+40厘米二灰碎石基层+15厘米三层式沥青混凝土面层。面层组合如下:表面层为改性沥青玛蹄脂碎石混合料(SMA-16)4厘米;中面层为中粒式改性沥青砼(LH-25)6厘米;底面层为粗粒式改性沥青砼(CLH-35)6厘米;下封层1厘米。二、改性沥青施工质量控制的难点1.改性沥青混合料粘度较高,各工序的施工温度均比普通沥青混合料的施工温度要求高,贮存、运输期间的降温不应超过10℃,生产厂至施工现场的距离较长,上海交通繁忙,气候变化大,混合料贮藏温度控制难。2.沥青路面施工质量与摊铺机械的性能密切相关,沥青摊铺机械型号多种,性能不一。如何选择性能良好的施工机械,是工程质量控制的重点。3.沥青摊铺时,必须均匀、连续,工人素质必须高,要能正确判断摊铺界面。三、SMA沥青的拌合及施工1.沥青混合料拌合。由于SMA与普通密级配沥青砼最大不同之处是SMA为间断级配,粗集料粒径单一、量多、细集料很少,矿粉用量多。细集料包括石屑和砂一共只需15%左右,给混合料的供料拌和带来不少困难。为此,料斗、料仓要重新安排,增加粒径为5~10毫米的骨料仓,以保证冷料数量,而细集料用量很少,冷料仓门开启很少,供料过程中要保持细集料干燥,以保证细集料顺利供料。主皮带把粗配料送入滚洞,通过燃烧器对骨料加热,有热电偶检测料温,自动调节燃烧器的风油比,使骨料温度达到190℃~200℃。热料经提升机进入振动筛,把热料按目标配合比的规格要求分筛到不同的热料仓(筛网尺寸可根据要求更换),有计算机控制各热料仓拉门,按输入的生产配合比自动配料、计量,由于SMA粗料粒径单一,细料很少,热料可能会发生粗集料仓经常不足(亏料),而细集料仓经常溢仓的不正常情况,控制室的操作人员不可调整放料的数量,使SMA的配合比不准。然后将木质素纤维加入到搅拌锅与骨料共同进行干拌,再添加经计算机控配比控制计量的石粉及沥青,拌和后,完成成品料的生产。SMA的干拌时间为4秒~5秒,湿拌30秒~45秒。各种材料加热温度控制:沥青加热温度160℃~165℃,现场制作温度165℃~170℃,加工最高温度175℃,集料加热温度190℃~200℃,混合料出场温度175℃~185℃,混合料最高温度(废弃温度)195℃,摊铺温度不低于160℃,初始开始温度不低于150℃,复压最低温度不低于130℃,碾压终了温度不低于130℃,开放交通温度不高于60℃。2.运输。由于SMA沥青混合料的沥青玛蹄脂的粘性较大,运输车的车厢底部要涂较多的油水混合物,而且为了防止运输车表面混合料结成硬壳,运输车运输过程中必须加盖油布,同时车量要适当增加。3.摊铺。沥青必须缓慢、均匀连续不间断地摊铺。摊铺过程中,不得随意变换速度或中途停顿,摊铺速度应根据拌和机产量,施工机械配套情况及摊铺层厚度、宽度确定。摊铺速度为3.5米/分钟。4.碾压。碾压过程是面层施工中的重要环节,碾压SMA的八字方针为“紧跟、碾压、高频、低幅”,并合理地选择压路机组合方式及碾压步骤。5.接缝。(1)纵缝:根据本工程特点,我单位在沥青混合料摊铺过程中采用一台德国产ABG423摊铺机并排摊铺,采用此方式可以一次整幅摊铺,纵缝热接提高了路面的平整度,美化了路面的视觉效果。(2)横缝:SMA路面的接缝处理要比普通混合料困难一些,因此,摊铺时在边部设置挡板,也可以在沥青SMA层每天施工完工后,在其尚未冷却之前,即切割好,并利用水将接缝冲洗干净。第二天涂刷粘层油,即进行摊铺新混合料。6.SMA沥青混合料施工中容易产生的问题:(1)过碾压:由于SMA路面的集料嵌挤作用,压实程度不大,压实度较易达到,但是随着碾压遍数的增加,集料不断地往下走,玛蹄脂一点点地向上浮,造成构造深度减小。在碾压过程中,特别注意表面构造保持在1~1.5毫米,以便有适宜的构造深度。(2)出现油斑:SMA路面通车后出现油斑也是常见的一种病害,这是由于SMA的纤维拌合不均匀造成的。因此在拌合时,要严格控制纤维的投放数量和投放时间,并延长干拌时间,确保纤维拌合均匀。还要注意储藏期间纤维干燥,防止纤维受潮成团。(3)碾压成型温度不够高是常见的毛病。SMA在130℃碾压的效果就很差了。在低温时碾压,容易出现不平整。在行车过程中出现车辙,是因为碾压不足造成的。Asphalt of Stone Mastic is a mixture of asphalt from the fiber stabilizing agent, slag and a small amount of the fine aggregate composed of lipid Mastic Asphalt, filled with intermittent level of coarse aggregate skeleton space formed by squeezing eye-density Structure mixture. SMA modified asphalt road and SMA is a new type of pavement, and SMA modified asphalt mixture cooled very hard, high strength. Based in Shanghai, Link (Pudong), a South Central Avenue construction project, talk about how the modified asphalt road construction and SMA control.I. Review of projectsThe project has publicized the North Road interchange east to Central Avenue East a road width of 100 meters pieces of red, as cities Ⅰ-level main road, two-way lane 8, the chief of 2,387 meters. Carriageway of the form of flexible asphalt pavement, structural layer of gravel for the roadbed +15 cm layer of grey rubble +40 cm grassroots +15 cm three asphalt concrete surface. Surface composition is as follows: for the modified asphalt surface layer of Stone Mastic mixture (SMA-16) 4 centimeters of the surface of tablets for-modified asphalt concrete (LH-25) 6 centimeters for the bottom layer Coarse-modified asphalt concrete (CLH-35) 6 centimeters under the closure of one centimeter.Second, the modified asphalt construction quality control difficult1. Modified asphalt mixture viscosity higher, the process of construction than the general temperature of the asphalt mixture of high-temperature requirements, storage, transportation during the cooling should not exceed 10 ℃, manufacturing plant to the construction site of the long distance Shanghai heavy traffic, climate change, mixture storage temperature control difficult.2. Asphalt road paving machinery and construction quality is closely related to the performance, a variety of types of asphalt paving machinery, mixed performance. How to choose the good performance of construction machinery, is the focus of project quality control.3. Asphalt paving, it must uniform, continuous, workers must be of high quality, must be able to correct judgement paving interface.3, SMA asphalt mixing and Construction1. Asphalt mixture mixing. As with the SMA Miji with ordinary asphalt concrete is the biggest difference between the SMA for intermittent graded, coarse aggregate single particle size, quantity, fine aggregate small amount of slag and more. Stone Chip fine aggregate and sand, including a total of only around 15 percent, to the mixture of materials for mixing brought about many difficulties. To this end, the hopper, silo to re-arrangements, to increase the diameter of 5 to 10 mm aggregate positions, to ensure that the expected number of cold, fine aggregate amount of very few, very few cold silo door open for materials to maintain the course of Fine Aggregate drying, to ensure smooth for fine aggregate materials. The main ingredients into the thick belt of the roll-through on aggregate heating burner, a thermocouple detection feed temperature and automatically adjust the oil burner than the wind so that the aggregate temperature reaches 190 ℃ ~ 200 ℃. Heat expected to enter the elevator shaker, thermal materials on target to meet the specifications than the sub-screen to a different thermal bin (screen size can be replaced upon request), a computer control of the Silo flamenco, according to enter the Auto production mix ingredients, measuring, as a single SMA rough material particle size, small little material, thermal materials may be rough sets in less than regular hopper (deficit expected), while small-hopper often overflow warehouse is not the normal situation, control Room operators can not adjust the amount of discharge, the SMA not allowed to mix. Lignin fiber and then added to stir the pot with the aggregate common dry mix, then add the computer-control measures the ratio of powder and asphalt, mixing, the expected completion of the finished product. SMA mix the dry time of four seconds to five seconds, 30 seconds wet mix to 45 seconds.Heating temperature control of various materials: asphalt temperature 160 ℃ ~ 165 ℃, the temperature at the scene produced 165 ℃ ~ 170 ℃, the highest temperature of processing 175 ℃, aggregate heating temperature 190 ℃ ~ 200 ℃, the temperature mixture out 175 ℃ ~ 185 ℃ , The highest temperature mixture (abandoned temperature) 195 ℃, paving the temperature of not less than 160 ℃, the initial starting temperature of not less than 150 ℃, repressing the lowest temperature of not less than 130 ℃, RCC ended temperature of not less than 130 ℃ Open transport temperature no higher than 60 ℃.2. Transportation. As SMA asphalt mixture of asphalt Mastic more viscous resin, the carrier at the bottom of the compartment to the oil-water mixture Tu more, and in order to prevent the carrier surface mixture form a hard shell, the carrier during transport to be decked Tarpaulin, it is necessary to appropriately increase the volume of cars.3. Paver. Asphalt must be slow, even for uninterrupted paver. Paving process, not free to transform the speed or stop half-way, paving the speed of production should be based on mixing, matching and construction machinery paving thickness, width identified. Paving a speed of 3.5 m / min.4. RCC. RCC is the process of construction of an important link in the RCC SMA eight-character principle for the "keeping up, rolling, high-frequency, low-rate" and a reasonable choice roller composition and RCC steps.5. Joints.(1) longitudinal seam: According to the engineering features, I unit in the asphalt paving mixture used in the course of a Germany-ABG423 paver paving side-by-side, this method can be a whole paver, longitudinal seam to increase the heat The smoothness of the road and beautify the road of visual effects.(2) Joints: SMA road handling the joints than ordinary mixture difficult, therefore, paving set at the edge of the baffle, can also SMA layer of asphalt a day after the completion of construction, not yet in its cooling, That is, cutting good, and joint use of water will be clean. The next day Tushua viscosity of the oil, that is paving the new mixture.6.SMA asphalt mixture construction of the easy questions:(1) the RCC: As the road aggregate SMA embedded crowded, not degree of compaction, the degree of compaction easier to achieve, but with the RCC to increase the number of times, the aggregate continue to go down, Mastic A little bit of fat to the floating, resulting in reduced structural depth. RCC in the process, with particular attention to the surface structure remained at 1 to 1.5 millimeters in order to have appropriate structural depth.(2) in the oil spot: SMA opening of the road after the oil spot is a common disease, which is due to the SMA fiber caused by uneven mixing. Therefore, in mixing, it is necessary to strictly control the number of fibers running and running time and extended dry mix, to ensure uniform mixing fibers. We must pay attention to storage during the dry fiber to prevent the fibers exposed to moisture into college.(3) RCC forming a high enough temperature is a common illnesses. SMA in the 130 ℃ RCC effect on the poor. In the low temperature at RCC, is not prone to the formation. In the lane in the process of rutting, is inadequate because of the RCC.你可以试下这个《road and bridge》——美刊可以看一些行内的核心期刊,比如《中国公路学报》《力学》等,也可以看看各个学校的学报,比如《同济大学学报》《哈工大学报》《长安大学学报》等,或者有些教材也可以作为参考文献。
In the 20th century, bridge construction technology evolved and was fueled by th
桥梁工程概论论文 桥梁工程指桥梁勘测、设计、施工、养护和检定等的工作过程,以及研究这一过程的科学和工程技术,它是土木工程中属于结构工程的一个分支。下面是我整理的
桥梁工程学的发展主要取决于交通运输对它的需要。古代桥梁以通行人、畜为主,载重不大,桥面纵坡可以较陡,甚至可以铺设台阶。在有重载马车之后,载重量逐步加大,桥面纵坡
桥梁工程学的发展主要取决于交通运输对它的需要。古代桥梁以通行人、畜为主,载重不大,桥面纵坡可以较陡,甚至可以铺设台阶。在有重载马车之后,载重量逐步加大,桥面纵坡
路基施工要点关键词:30cm混渣+20cm碎石+4层20cm灰土本人有幸于三月中旬到六月上旬间在天津市塘沽区的天津大道项目实习,以实习期间对天津大道项目路基工程