• 回答数

    2

  • 浏览数

    325

小夕玲儿
首页 > 学术期刊 > 和工程造价有关的英文论文题目

2个回答 默认排序
  • 默认排序
  • 按时间排序

PolarBella

已采纳

学术堂整理了十五个关于工程造价的论文题目,供大家参考:1、浅谈定额计价与清单计价的异同2、探讨低价中标在建筑工程中的合理应用3、如何编制一份高质量的工程量清单4、浅谈建设项目施工招投标5、建设工程项目信息管理研究6、浅谈工程项目风险管理7、浅谈建筑工程合同价款的确定与调整8、建设工程违约责任分析9、工程量清单计价与传统报价模式比较研究10、浅谈投标报价策略及报价技巧11、建筑施工企业如何加强工程造价管理12.工程设计对工程造价的影响13、注重工程结算提高索赔意识14、编制预结算过程中几个疑难问题之我见15、运用预算电算化软件的一些体会

246 评论

阿哥丶WLy

一看就是毕业论文~!!!!Engineering cost management Project cost control emphasis should be transferred to the project construction early days, is transferred to the project decision and design stage. Project cost control in construction projects throughout the entire process, the key lies in the pre construction investment decision-making with design phase, whereas in the investment decision is made, the key lies in designing. According to expert analysis: architectural design, in the preliminary design stage, design stage, construction design stage to the engineering effect were 75% ~ 95%, 35% ~ 75%, 5% ~ 35%; while in the construction phase, through the optimization of construction organization design, construction cost saving the possibility of only 5% to 10%. We should put the focus shifted to the design stage, in order to get twice the result with half the effort. Pay attention to the technical and economic optimization combination. The combination of technology with economy is most effective way to control engineering cost. China engineering fields for a long time did not do this. The lack of technical personnel economy idea, design thought is conservative, the design of the outcome of the economy are not fully reflect. Therefore, we should solve the problem is to improve economic efficiency as the goal, in the construction process, organization, technology and economy organic ground union rises. Through the economic analysis, comparative study and effect evaluation, correct processing of advanced technology and reasonable in economy between the relation of unity of opposites, strive to advanced technology under the conditions of economic rational, reasonable in economy based on advanced technology. Carry out "limitation is designed" method. To be consciously put the application of value engineering to the specific design, actively promote quota design in engineering design contract, by way of bidding. This has been proven in practice is an effective way, it is not only an economic problem, more precisely a technical and economic problems. This "limitation is designed" to effectively control the project cost. In order to make the "limitation is designed" to achieve the desired objectives, should be involved in the design personnel must be experienced skilled economic designer. Their design results must be practical, advanced and reasonable cost. Control of engineering cost on the other hand is the need for comparison, because the outcome is a process of gradual improvement, and not to decide, so the comparison is a measure of its practical, advanced and economical means. Do good project cost control in the process. ( 1) compilation of economic and feasible construction scheme. Before construction, construction enterprises should be combined with the construction drawings and the actual situation at the scene, their mechanical equipment, construction experience, the management level and technical specification acceptance criteria, a set of practical and feasible construction scheme. The construction scheme is engineering implementation of the programme of action. ( 2) to technical personnel, materials, machinery and personnel staff communication and coordination. In the process of construction, construction technology, materials and mechanical personnel should cooperate closely, understand each other, to management as the core, to reduce costs for the purpose of. ( 3) to the project completion settlement. Strict supervision system. Control project cost effectively, in the early phase of the project shall be subject to supervision (including cost management ) system. Through analyzing the design process of supervision, make the design more reasonable, cost control to limit the scope of, accomplish truly with the smallest investment maximize output. Strict supervision system. Control project cost effectively, in the early phase of the project shall be subject to supervision (including cost management ) system. Through analyzing the design process of supervision, make the design more reasonable, cost control to limit the scope of, accomplish truly with the smallest investment maximize output. To establish and perfect the independent project cost advisory body, cultivate a Zhi De have both engineering team. To establish a real sense of independent engineering cost consulting agencies. Through improving the laws and regulations, normative behavior, separate government functions from enterprise management, the establishment of independent business partnership, share-holding system, the limited responsibility system and other forms of organization, an industry-based, diversified services integrated project consulting company, build and development and reform the engineering cost intermediary service institutions, make construction project management of a gradual transition by an independent specialized agency in charge of project cost whole process tracking management, truly between owner and contractor plays an intermediary role. To strengthen engineering cost consulting industry association construction, establish project cost consulting industry self-discipline mechanism, and constantly improve the Engineering Cost Association in engineering cost consulting industry status, to be truly representative of the interests of the majority of the industry practitioners, government and enterprises to become connection link and the bridge. At the same time to strengthen the project cost specialty in higher education and in service education. As a result of project cost management in construction projects and various economic interests are closely related, and the whole social economic activities play a very important role, it requires the cost engineering technical personnel should have different levels of knowledge, in addition to their professional knowledge and have a deep understanding, also deal with the design content, design process, construction technology, project management, economic laws and regulations have a comprehensive understanding of. Therefore, the project cost management, project cost per unit of society groups, has already obtained a cost engineer qualification personnel, in order to carry out plan, has the goal, multiple levels of continuing education and training, to understand and master Chinese bilateral agreements with countries project cost technology, regulations, management system and its development trend, to expand domestic and foreign exchanges, and actively participate in international or regional engineering activities, improve their professional quality, so that the current practitioners in intelligent structure, theory and working experience three aspects can meet the needs of engineering cost management. Cost engineering professionals need to strengthen their own learning, in addition to the professional knowledge to upgrade, should also work in combination with a broad understanding and master the relevant engineering and technical expertise, educational organizations and industry regulatory bodies constitute a complete education system, so as to the field of engineering senior talent development to create good conditions.

351 评论

相关问答

  • 工程造价论文题目有哪些

    建议你工程设计类。这个是最能检验你学识程度的。

    优雅的猫214 2人参与回答 2023-12-09
  • 工程造价方向的论文题目

    论工程造价与现场管理的关系,论工程索赔的管理。论造价成本分析的作用。

    妮裳风云 3人参与回答 2023-12-10
  • 有关工程造价信息论文题目

    学术堂精选了十个好写的工程造价毕业论文题目供大家进行参考:1.浅谈工程项目内部成本控制及措施2.对施工企业加强工程项目管理的几点思考3.建筑工程项目承包管理方式

    散光女王 3人参与回答 2023-12-10
  • 工程造价的理解论文题目

    题目1.国内外工程造价构成研究 2.浅谈定额计价与清单计价的异同3.探讨低价中标在建筑工程中的合理应用 4.如何编制一份高质量的工程量清单5.项目决策阶段影响工

    dongdong88z 3人参与回答 2023-12-09
  • 审计与工程造价相关论文题目

    额,说到论文这个问题,首先你要把你的题目定好,题目不能太广了,譬如:轮中国地产开发成本管控;也不能出现负面的:谈当今社会工程造价灰色收入。要向写好你的论文.这个

    蔻蔻妖妖柒 5人参与回答 2023-12-08