孔雀凉凉
MECHANICAL PRELIMINARY DESIGN REPORT STADIUM 1.给排水设计 饮用水和污水 Design Water and sewage water .设计基础 - 甲方提供的设计任务书和市政管网综合图 - 建筑专业提供的条件图 - 国家现行的设计规范及有关规定设计简章 .Design bases Design Brief and Municipal integrated network drawing offered by the client. Condition drawings from architectural discipline. Current national design codes and related stipulations 2. 给水系统 通过一根DN200的进水管将水引入.水表安装在进水管上,离红线1米处.供水管在红线内连成环路管网,并接到供应楼的消防水池和给排水水池.由环路管网向必需的室外消火栓和绿化带的喷淋器供水. 2. Water supply system For water supply of this project, DN200 water intake pipes are led in. Water meters are installed on the intake pipes m away from the red line. The water supply pipes are connected into loop networks in the red line and then led to the fire pool and sanitary water pool in the supply buildings respectively. Necessary number of outdoor hydrants and sprinklers for green area will be provided on the loop networks. 设计范围 包括红线内的饮用水,污水,雨水,建筑消防. Design scope Design scope of this project includes water, sewage water, rainwater, fire-protection in the building, and water and sewage water within the red line. 给排水水池与消防水池分开,容量为100m3 .体操馆供水管埋地敷设. Sanitary water pool is separated from fire water pool, volume of sanitary water pool is 100m3. Water supply pipes for the stadium will be laid in the earth. 3.用水量标准 - 体育馆: 15升/顾客·日 K= - 宾馆: 150升/人·日 K= - 餐厅: 50升/顾客·日 K= - 工作人员: 25升/人·日 K= - 地面冲洗用水: 3升/m2日 - 冷却塔补水量:按用水量的2%计 - 未预见水量: 按日用水量20%计 - 消防用水: 消火栓:室内40升/秒,室外30升/秒,火灾延续时间为3小时; 自动喷洒按22升/秒,火灾延续时间为1小时 卷帘水幕用水升/秒·米,火灾延续时间为3小时; Water consumption standard - Stadium: 15L/visitor·day K= - Hotel: 150L/visitor·day K= - Restaurant: 50L/customer·day K= - Staff 25L/person·day K= - Floor cleaning: 3L/m2·day Make-up water for cooling tower: 2% of the actual cold water consumption. Unforeseen water consumption: 20% of the daily water consumption. Water for fire protection Hydrant: 40L/s indoor, 30L/s outdoor, fire duration time is 3h; Sprinkler: 22L/s, fire duration time is 1h; Drencher for rolling shutter: ·m, fire duration time is 3h; 在适当的位置设置饮用水机,在主进口为残障人设置两个饮用水机.为此饮用水系统安装循环泵.机房 设在地下室的水除了机房.当饮用水机不被使用时,应排空,以免水质腐败. 在客房和餐厅内设置电热水器,同时亦为热水供应设置循环泵. 在更衣间旁设置电热水器,为淋浴和洗盥供应热水. 为楼板清洁安装一定数量的水龙头. Some suitable places are supplied with portable water drinking units, two drinking units for disable people are provided at main entrances, for this portable water system, circulating pumps are adopted, the equipment room is located in water treatment center in the basement. When there is no use, portable water will be drained completely to avoid deterioration. Electric water heaters are installed in guest rooms and restaurant, also hot water circulating pumps will be provided for supplying hot water. Electric water heaters are installed near the changing and clothing rooms for supplying hot water for shower and washing. Certain number of water taps are installed for floor-cleaning. 4.用水量 最大日用水量:日 最大时用水量:220m3/时 Water consumption demand Maximum daily water consumption: Maximum hourly water consumption: 220m3/hour 却循环系统 冷却水循环系统采用机械循环系统.总冷却水用量为460m3/h.在供应楼顶设置三台超低噪音冷却塔(230 m3/h, 2x 115 m3/h).进水温度37Co,出水温度32Co .补充水量 9,6 m3/h.补充水由市政供水网直接提供. Cooling water circulation system There are cooling water circulation system in this project, cooling water for the refrigerators adopts mechanical circulation system. Total water consumption of cooling towers is 460m3/h. On roof of the supply building there are 3 ultra-low noise cooling towers (230 m3/h, 2x 115 m3/h), inlet temperature of 37Co, outlet temperature of 32Co, with make-up water of 9,6 m3/h. Make-up water of the cooling towers will be supplied directly by the municipal network. 在消防泵房内有消火栓泵(一个运行,一个备用),喷淋泵(一个运行,一个备用),卷帘雨淋泵(一个运行,一个备用).用于地下车库的泡沫喷淋设备,如报警阀,泡沫压缩罐,化学药剂泵安装在消防设备中心. 消防水箱和消防稳压装置分别安装在车库的四面墙. In the fire water pump room, there are hydrant pumps (one operation, one standby), sprinkler pumps (one operation, one standby) and rolling shutter drencher pumps (one operation, one standby). Fire equipment, which are used for the foam sprinkler system in underground garage, such as fire alarm valves, foam concentrated tank and chemical dosing pump, etc. are provided in fire equipment centers. Four fire water tanks and fire protection stabilized pressure devices are respectively located at four sides next to the garages. 消防用水 消火栓:室内按40升/秒,室外按30升/秒,火灾延续时间按3个小时计 自动喷洒按22升/秒,火灾延续时间按1小时计 卷帘水幕用水量 升/秒·米,火灾延续时间按3个小时计 消火栓:室内,室外用水量皆为756m3; 自动喷洒用水量为 m3; 卷帘水幕用水量为 270m3; 一次火灾用水量为; Water for fire protection Water consumption standard for fire protection Hydrant: 40L/s indoor, 30L/s outdoor, fire duration is 3h Sprinkler: 22L/s, fire duration is 1h Drencher for rolling shutter: ·m, fire duration is 3h Water consumption for fire protection Hydrant: indoor and outdoor water consumptions are 756m3 respectively Sprinkler: m3 Drencher for rolling shutter: 270m3 Water consumption for one fire: m3 消火栓的布置 在整个建筑物内沿墙,沿柱,沿走廊,风塔上及楼梯附近设有必要数量的室内消火栓,消火栓间距小于30米.消火栓管网水平,竖向皆成环状布置,消火栓箱内配有DN65消火栓一支,25米衬胶水龙带一条,φ19毫米喷咀水枪一支,并配消防卷盘(DN25消火栓一支,30米胶管,φ9毫米喷咀水枪一支)且设有可直接启动消火栓泵的按钮;在室内消火栓箱下设有磷酸铵盐手提式灭火器箱.室内消火栓系统在室外设有三组水泵接合器. Hydrant arrangement Necessary number of hydrants are installed indoors along the wall, columns, corridors, and staircases, at intervals of less than 30m. Hydrant networks are connected as a loop both horizontally and vertically. Inside each hydrant box, a DN65 hydrant, a 25m long rubber lined hose, a water nozzle of φ19mm, hose reel (a DN25 hydrant, a 30m long rubber lined hose and a water nozzle ofφ9mm), and a direct starting button for the hydrant pump are provided. Under each indoor hydrant box, a portable ammonium phosphate powder extinguisher box is installed. There are three sets of pump adopters being installed outdoors for the indoor hydrant system. 消防系统 防水泵房及消防水池 供水管DN200在红线内连成环路管网,管网上安装 一定数量的消火栓.两根DN200供水管分别引入供应楼内两个消防泵房内的消防水池.消防水池总容量不应小于4000m3, 每个为. Fire protection system Water pump room and water pool for fire protection The lead-in pipes (DN200) are connected as a loop inside the red line, on the loop, certain number of hydrants are water supply pipes (DN200) are led into the fire water pools at each fire water pump room in supplybuilding. In consideration of the importance of the project, the volume of the fire water pools should be not less than 4000m3, each is . 自动喷淋系统 自动喷淋系统安装在全建筑范围,除了室外和高于10 米的房间.喷淋泵安装在地下的消防泵房内.报警阀设置在地下的消防泵房内和中间的消防设备中心内,水流显示器设在每个防火分区内. Sprinkler system Sprinkler systems will be provided inside the whole building except outside areas and roomshigher than 10m, with sprinkler pumps installed in the underground fire water pump rooms. Alarming valves installed in underground fire water pump rooms and four fire equipment centers in the middle, water flow indicators are installed by fire compartments. 除了安装一个封闭喷淋系统,将为地下车库设置一个泡沫喷淋系统.餐厅内安装93oC启动的自动喷淋头,但在其它房间,仅安装93oC启动的普通和快速反应自动喷淋头.三组泵接合器安装在室外. Besides an enclosed sprinkler system, a foam sprinkler system composed of a proportioning mixer and a foam concentrated tank is provided for the underground garage. Sprinkler actuated at 93oC are provided in the restaurants, but in other rooms, only ordinary sprinklers and fast response sprinklers actuated at 68oC are provided. Three sets of pump adaptors for this system will be installed outdoors. 排水系统 为排水系统设置污水主立管和特别垂直排气管.排气管与污水管在每层连接,污水排出体操馆.餐厅的污水首先在油脂分离池中处理,然后排入室外排水网.给排水污水将被在化粪池收集和处理,然后排入市政排水管网.化粪池在输送区旁.最大天排水量为870m3/天. 9. Drainage system Main vertical sewage pipes and special vertical vent pipes are provided for the drainage system. The vent pipes are connected with sewage pipe at each floor; sewage water is drained out of stadium. Sewage water in the restaurants and garage are treated in the grease and oil separation tank, and then discharged into the outdoor drainage networks. Sanitary sewage water is collected and treated in the septic tank, then drained into the municipal drainage. The septic tanks are located besides the deliverycircle. Maximum daily drainage amount is 870m3/day. 卷帘水幕系统 地下车库设置有卷帘水幕系统.水幕泵安装在消防水泵房内,采用开式雨淋头,电动或手动控制.十组泵接合器安装在室外 Drencher system for rolling shutters Rolling shutter protected by drenchers are provided for the underground garage, the drencher pumps are installed in the fire water pump rooms, open drencher heads are selected, and are controlled both by electrically and manually. Ten pump adapters will be installed outdoors for this system. 地下室内污水设有污水坑,废水设有废水坑,生活污水,废水经潜污泵提升排至室外排水管网,潜污泵的启停皆由磁性浮球控制器的控制. 地下汽车库废水设有废水坑,废水经潜污泵提升排至室外,经隔油池处理后排入室外雨水管网. There are cesspits for sewage water and wastewater pits for wastewater in the basement, the sewage and wastewater is sucked up and drained to the outdoor drainage networks by submerged sewage pumps. Operation of the pumps is controlled by the magnetic floating ball controllers. Wastewater pits are provided for the underground garage, wastewater is sucked up and drained to outdoor oil separation tank by submerged sewage pumps, after treated, wastewater is drained to the outdoors rainwater networks. 在柴油发电机房,变配电房和通讯设备机房设低压二氧化碳气体灭火系统. Low pressure CO2 extinguisher systems are provided in diesel generator rooms, transformer substations and telecommunication equipment rooms. 在本建筑内按"建筑灭火器配置设计规范"在每个消火栓箱下设手提式灭火器箱,箱内设有必要数量的磷酸铵盐手提式灭火器. According to the Code for Design of Extinguisher Disposition in Buildings, portable fire extinguisher box, in which there are necessary number of portable ammonium phosphate powder extinguishers, will be installed under every hydrant box. 在每个消防电梯井底旁设有消防排水坑,废水经潜污泵提升排至室外. Fire water drain pit is provided at side of bottom of each fire elevator well, waste water will be sucked up and drained out by the pumps. 雨水系统 雨水排水屋顶采用压力流排水. 雨水设计重现期按P=10年计算,降雨历时为5分钟,暴雨强度公式按Q=(1+)/(t+)计算. 沿柱在屋面设置雨水沟.雨水通过雨水沟收集,然后进入雨水头和下排管,然后到室外雨水观察井. 10. Rainwater system Pressurized drainage system is adopted for roof rainwater drainage system. Here, return period P=10 years, rainfall duration is 5 minutes, stormwater amount is calculated by the following formula: Q=(1+)/(t+) Rainwater gutters are provided on roof along columns, skylight. Rainwater is collected in the gutter, then to rainwater heads and downpipes, and to the outdoors rainwater inspection wells. 11.管材 - 生活给水管,冷却塔补水管采用铜管,氩弧焊接. - 直饮水管采用不锈管. - 消火栓管,冷却循环管,水幕管,水泵吸水管采用焊接钢管,焊接. - 自动喷洒水管,雨淋水管采用热镀锌钢管,丝扣连接或卡压连接. -二氧化碳管采用无缝钢管焊接. - 地下车库泡沫喷淋水管采用不锈钢管,卡压连接. Pipe material Copper pipes connected by argon arc welding are adopted for the sanitary water pipes, make-up water pipes for cooling towers. Stainless stell pipes are adopted for portable water pipes. Welded steel pipes connected by welding are selected for hydrant pipes, cooling circulating pipes, drencher pipes, pump suction pipes. Hot-galvanized steel pipes connected by threads or compression-seizing are selected for sprinkler and deluge sprinler pipes. Seamless steel pipes connected by welding are selected for CO2 pipes. Stainless steel pipes connected by pressed clamp is selected for the pipes of foam sprinklers in the underground garage. 当雨水两超出雨水沟设计量时,雨水可沿屋檐自由排放.雨水被收集,然后排入市政集水池. When the amount of rainwater is more than the design value of the gutters, water is discharged naturally along the eaves. Rainwater is collected, and then drained to the municipal catch basins. 围绕体育馆的循环池将用于喷洒运动场和作为室外绿化带的储水池. 此池将作为一个循环过滤设施,可容水约 m . 喷洒压力设备和其它必须的过滤设备安装在供应楼里. The circular senic pool surround stadium will be used for spraying sportsfield and as reservoir for outdoor greening. The pool will be used as a circular filtering facility and will be adopted with a water volume of about m . The spray water pressurizing equipment as well as further necessary filtering equipment will be adopted in the supply building. 制冷 Cooling 冷源: 空调冷负荷(估算): 本工程建筑面积共平方米,包括观众区,休息室,更衣室,小会议室,餐厅,办公室和其它附属房.空调设计日峰值冷负荷为,设计日总冷负荷为3 kW. Refrigerating source Cooling load of air conditioning system Total floor area for this building is 50,000sqm, which includes spectator areas, lounges, Clothing and changing rooms small meeting rooms, restaurant, office and other auxiliary rooms. Designed dayly peak cooling load is 2,4MW, designed total dayly cooling load is 3kW. 每台1200kW制冷机配一台 流量为206m3/h离心泵.各配一台备用泵 一次泵采用压差旁路控制. 通过埋地敷管,向游泳体操馆供应冷冻水. A centrifugal pump with a flow rate of 103m3/h is provided for each 1200kW chiller. One operation pump with a standby corresponds to one chiller. Pressure difference branch control is adopted for primary pump Via earth laid pipes from supply building to gymnasium chilled water supply will be deliverded. 冷源的选择: 根据建筑的实际情况,3台制冷机将安装在供应楼内的冷冻机房.设计容量为4800kW. 为了实现能量的效率化使用,设计方案为,1台制冷机的出力为总设计容量的50%.而另2 台.每台出力为总设计容量的25%. 冷冻水系统的主要设备包括3台电动制冷机,一级冷冻泵,二级冷冻泵,自动控制阀等等.冷冻水的供/回水温度为-7/ 12°C. Selection of refrigerating source According to the real condition of the building, 3 chillers are located in the refrigerating plant rooms in the supply building, designed capacity is 2400kW. For actuing in an energy efficient way one chiller about 50% of total capacity ( kW) and two chillers with 25% of total (600 kW each)capacity each are adopted. Main equipment of chilled water system includes 3 electrical chiller, primary cool water pump, secondary chilled water pump and automatic controlled valve, etc. supply/return temperature of the chiller is-7/ 12°C. 二次泵系统:根据使用功能,各制冷机房又分成不同的循环支路. 二次泵采用变频调速控制.根据负荷侧供回水管的压差,控制水泵的转速. 二次泵循环支路的管道采用异程式. Secondary pump system: Each refrigerating plant room is subdivided into different circulation branch loops according to use functions. Variable-frequency speed-regulating control is adopted for secondary pumps. The rotating speed of a water pump is controlled according to the pressure difference between water supply and return pipes. Direct return system is adopted for the pipes of circulating branch of secondary pumps 空调冷冻水系统 由于本工程占地面积大,功能复杂,有连续使用,也有间歇使用,为了达到运行灵活,节能的目的,空调冷冻水系统采用两管制二次泵系统. Chilled water system Due to the large occupied area of this project, the complicated functions and the combination of continuous utilization and intermittent utilization, in order to accomplish the purpose of flexible operation and energy saving, the chilled water system is of two-pipe secondary pump system. 管材: 水管采用焊接钢管及无缝钢管. 本工程的风管除土建风道外,均采用镀锌铁皮咬口制作.每节风管之间用法兰连接. Pipe and duct materials The water pipes adopt welded steel pipes and seamless steel pipes. Air ducts for this project are made of galvanized sheet steel by seaming except ducts by civil construction. Air ducts are connected together by flanges. 一次泵系统: 供应楼冷冻机房 2400kW制冷机配一台离心泵, 流量为412m3/h.配一台备用泵. Primary pump system: Chiller room supply building A centrifugal pump with a flow rate of 412m3/h is provided for 1200kW chiller. One operation pump with a standby corresponds to one chiller. 保温材料: 空调供,回水管,冷凝水管采用酚醛管壳保温. 空调送,回风管以及处理后的新风管采用外贴铝箔的离心玻璃棉板保温. - 管道穿防火墙的空隙处采用岩棉材料等非燃材料填充. Thermal materials phenolic pipes are adopted for thermal insulation of water supply and return pipes for air conditioning, as well as air-conditioning condensate pipes. Aluminum foil faced glass fiber boards are adopted for thermal insulation of air-conditioning air supply and return ducts as well as fresh air ducts after chillers. Non-flammable material will be selected to fill the interspace in the fire protection wall where the ducts go through. 消声与隔振: 冷水机组,水泵等设备采用减振台座,弹簧减振器或橡胶减振垫减振降噪. 在空调机组,新风机组,通风机的进出口采用涂胶帆布软管连接. - 水泵进出水管上采用可曲挠橡胶接头,使设备振动与配管隔离. Noise reduction and vibration isolation Shock absorption bases, spring shock absorbers on rubber shock absorption pads are adopted for equipment, such as water chiller units, pumps, etc to reduce vibration and lower noise. Flexible rubber-coated canvas hoses are adopted far connections of inlets and outlets of air-conditioning units, fresh air handling units and ventilators. Flexible rubber couplings are adopted for the water intake and delivery pipes of the pumps to isolate equipment vibration from their pipes. 空调和通风系统 Air Conditioning and Ventilation Systems 方案设计范围 Scope of schematic design 空调设计 Air Conditioning Design 在体育馆内,一些区域设置空调系统.这些区域划分为: 西侧地下二层的贵宾休息室 东侧地下二层酒店门廊 地下一层的输送区,技术机房,运动员更衣间,医务服务,热身区,裁判区,健身中心,酒店大堂,会议室,厨房,特许区和贵宾大堂混合区. 首层的酒店大堂,酒店区,贵宾门廊,急救 In the stadium, in some ranges air conditioning systems are used. These ranges subdivide themselves as follows: VIP – Lobby in West of levelel -2 Hotel lobby in the east of level –2 Delivary Circle, technical Plantrooms, Changingrooms for the athletes, Medical Service and warm up area, Judges Area, Fitness Center, Hotel Lobby, Conferenz, Kitchen and Concession, Vip lobby- Mixed Zone in level -1 Hotel lobby, Hotel area, Vip lobby, Vip Area, First aid in 0
古董的杂货铺
随着我国现代建筑技术的不断发展,人们对于建筑给排水工程方面也提出了越来越高的的要求。下文是我为大家整理的关于建筑给排水工程论文的范文,欢迎大家阅读参考!
浅谈高层建筑给排水工程设计
摘要:对高层建筑给水系统设计,排水系统设计、室内消防和热水系统设计进行了详细介绍,总结出目前高层建筑给排水存在的问题,并探讨了给排水节水措施,以确保水资源的合理利用。
关键词:建筑给排水;高层建筑;设计;节水措施
1、高层建筑给排水工程设计方法
高层建筑给水排水工程与一般多层建筑和低层建筑给水排水工程相比,基本的理论和计算方法是一致的,但因高层建筑层数多,高度大,结构复杂。近年来建筑给水工程设计方法得到改进。
例:给一个高层建筑为15层的楼房设计给排水:
住宅楼为框架结构,共15层,层高,室外给水管网位于建筑物的北侧,距离外墙为10m,接管点埋深,管径400mm,管材为球墨给水铸铁管,常年提供的水头;室内粪便污水需要经过化粪池处理方可排入市政管网,室外排水管网位于建筑物的南侧,埋深2m,管径600mm,管材为聚乙烯双壁波纹排水塑料管。
设计参数
生活用水定额:qd=150L/(人.d);最大小时生活用水量:Qh=;最高日用水量:Qd=;小时变化系数:kh=;每户人口:m=人;共90户;室内消防用水量:10L/s;消防水箱水量为火灾前10min的水量6m?;贮水池内的消防水量:按火灾延续2h的水量计;雨水重现期:2年。
设计内容
给水系统设计
管道采用钢塑复合管(内衬塑外镀锌)螺纹连接,进行干管安装、立管安装、支管安装,管道安装完毕需进行水压试验,压力设在,并对安装好的管道做好防腐和保温工作,冲洗管道对其进行管道通水试验。
根据《建筑给排水设计手册》上卫生器具的最大静水压力不得超过,因此高层建筑给水系统必须分区。设计任务书给定了市政给水管网提供常年的水压为。根据给水最小所需压力估算方法:第1层,第2层,2层以上增加1层,压力需增加。得的压力能直接供到第6层还多。所以1层~6层为一个区,上面7层~15层为一个区,总共就两个区。1层~6层用市政管网直接供水,其中底层和2层~6层单独设立管。
考虑到此设计对象是15层的高层建筑。市政管网提供的压力不能全部直接供水,所以必须对生活用水进行提升或加压。高层建筑设计一般都使用高位水箱供水,供水压力比较稳定,此设计也使用高位水箱;又因此设计面向高层民用住宅楼,通过查看平面图纸,根据建筑物的布置情况和楼层的承载力情况及水箱本身占用大量的建筑面积,即在楼层中间没有建筑面积可允许安置水箱,串联供水不可实现,因此高区的供水应在地面用泵抽升到高区水箱。
方案(一)与方案(二)相比管材使用量、工程投资相对较少,但它对减压阀的质量要求相对较高,一旦减压阀受损或使用性能降低,低区的静水压力会迅速增加,影响卫生器具的使用。方案(二)采用低区市政管网直接供水,消除了通过依赖减压阀降低静水压力来减少低区供水的现象。基于工程质量和供水水质及水压的可靠性,最终选择方案(二)
排水系统设计
室内排水系统为污水、废水合流系统,地上部分直接排出室外,地下部分分段设置集水坑把地下室污水、废水汇集于坑内,利用潜水泵由集水坑自动控制将其提升至室外。为了保护存水弯水封性能,保持排水系统内的空气压力与大气压取得平衡,使排水管内排水畅通,向排水管内通入新鲜的空气,保持管内的换气,防范因室外管道系统积聚起来的有害气体而伤害到养护人员、引发火灾和腐蚀管道等隐患,还应减少排水系统的噪声,在排水系统中设置通气管。
室内消防工程
室内消火栓给水系统有:分区、不分区两种方式。消火栓的静水压力超过时就需要分区供水,而本设计是15层的小高层,高度不超过50m,静水压力小于,可以不分区。同时本设计的建筑是15层小高层民用住宅楼,造成火灾的隐患少,人员疏散也快,扑救难度不大,高压消防给水无须设置常年的。设置专用的消防泵,从贮水池内抽取消防水,可用生活给水箱在火灾发生初期10min提前给水,并设置止回阀,既消除了消防水箱对楼层负荷,又可减少工程投资。此设计是15层小高层,层高,总楼高不超过45m,根据建筑给排水设计手册!规定消防栓的最大静水压力不超过,此设计无须分区消防供水,可利用消防泵直接供水满足条件。
室内热水工程
应根据建筑物的用途、热源的供给情况、热水用量和卫生器具的布置情况进行技术和经济比较来确定何种热水供应方式。热水供水方式有如下几类。按供应范围不同有:集中供热、局部供热、区域供热。
2、目前建筑给排水存在的问题
控制超压出流产生的水量浪费
生活给水系统按规定竖向分区后仍然存在着部分卫生器具配水点水压偏大的问题,而这是常常被忽视的。卫生器具的额定流量少于单位时间内的出水量,影响给水系统正常分配水的流量。如不采取减压节流措施,将造成水资源浪费、水压过高、漏水量增加等弊病,同时易产生水击、噪声和振动,致使管件损坏和破裂。这些水量的浪费不容忽视。
管道和阀门的损坏
我们可看到的路边给水管道在管子接缝处及法兰、阀门连接处向外冒水,而我们看不见的地下更不知有多少漏水处。管道受损及腐蚀,阀门不严等问题导致大量水流失。
热水系统浪费水量巨大
建筑热水供应已成为建筑给水的重要部分,由于设计不当,其浪费已非常严重,造成一定损失。所以给水系统供水应保证冷热水压力均衡,采用循环系统以确保每户开龙头就有热水,降低水量浪费。
3、我国建筑给排水节水措施
提高用水效率
1)严格执行生活用水量定额标准,饮用水、生活用水、景观用水、绿化用水按各个水质要求分别供给。
2)采用节水系统,如节水的卫生器具,利用限制卫生器具的流出水头、红外线感应龙头和便器等。
3)选择一个可再生能源,如风能、太阳能、水能、海洋能、地热能、生物能等非化石能源用于建筑的热水供应。对于不同的场合采用不同的热源形式。
雨水的利用
利用雨水收集系统再循环得到符合标准的水质进行绿化浇灌,处理后的雨水还可用于冲洗厕所,这不仅可减少用水量还可减轻污染。提高地基的保水能力,合理规划雨水流经途径,引入雨水沉淀池再利用。
污水排放和二次利用
建筑中水系统是典型的资源可持续利用装置,将建筑物产生的污水、废水加以收集并对其处理,在节省资源和保护环境的基础上对生活污水和废水的重复利用。
节水指标
节水指标有三类:
1)雨洪水利用率:常年降雨量除以使用或收集量;
2)水使用率:正常使用量除以使用量;
3)循环量:一次性用量乘以循环次数。
4、结语
在给排水设计时,我们应正确合理的选择系统和方案,以达到节水节能的目的,确保水资源的合理利用。
参考文献:
[1]孙志魁.我国绿色建筑给排水节能新技术的应用新探.中国新技术新产品,2012(1):45.
[2]杨天峰,张旺.低碳经济下建筑给排水的节能问题研究.科技创业月刊,2010,23(9):161-162.
[3]赵培林.浅议绿色建筑住宅的节水设计.机电产品开发与创新,2009,22(3):40-41.
[4]李倩.绿色建筑给排水设计的节水途径探析.企业导报,2012(1):273.
浅析建筑工程给排水施工技术
摘要:本文作者结合实际工作经验,对建筑工程的给排水施工技术进行了分析,提出了自己的见解。
关键词:建筑工程;给排水;施工技术
随着我国现代建筑技术的不断发展,人们对于建筑给排水工程方面也提出了越来越高的的要求。在设计和施工时要不断积累经验,深入分析各种常见问题,促进给排水施工技术的发展。
1 建筑给水方面的管道施工
给水管道材料的种类和选用
现在在新型建筑中用的较多的给水管材主要包括:聚丙烯类、聚乙烯类、聚丁烯类、工程塑料类,以及还有一些复合管类,例如:钢塑管、铝塑管、铜塑复合管等。虽然可供选择的材料有许多种,但在每一个具体施工工程中也必须根据实际情况进行选择。而且在管材的选用上还受到许多因素的影响,必须对国家政策、施工标准、地区特点、工程性质以及施工标准等因素进行综合考虑,选择最优管材。其中还要特别注意的是,管道的使用位置以及其使用方法是在管材选用时需要着重考虑的,还有就是管件与连接也是选取管材时容易忽视的一个关键的问题。
给水管道的施工
在对给水管做热熔连接时,必须要掌握好加热的时间和连接将要插入的深度。如果加热时间过长就使水管融化,如果加热时间过短也不能更好连接;如果插的过深,就会造成管道断面减少;如果插的过浅也会使降低接口处强度。所以,加热时的温度、加热时间和接缝压力是影响热熔连接质量的三个关键因素。
2 建筑排水管道常见问题的原因分析
排水管道方面经常出现的问题是漏水、堵塞问题。出现这些问题的原因也比较多,第一,就是施工中出现的问题,大多是施工单位没有选择合格的管材,为了一时经济利益以次充好,或者是在安装前没有进行漏水实验,也或是一些不合格的材料运用到工程中导致漏水现象的发生;比如说管道穿墙(楼板)设置套管的缺陷与不足较为普遍。有的虽然加了套管,穿越楼板与楼板面齐平或嵌入楼板有的穿越墙面,比饰面多出20-50mm,有的没有设套管或预埋套管偏位,于脆用水泥圈(楼面)塑料圈(墙面)护(粘)住,掩人耳目,有的套管比管道只大一个规格,有的大三至五个规格,套管与管道间隙有的用泡沫、油麻堵塞等等套管的设置应按(GB50242-2002)规范第规定.“安装在楼板内的套管,其顶部应高出装饰地面20mm,安装在卫生间及厨房内的套管,其顶部应高出装饰地面50mm,底部应与楼板底面相平,安装在墙壁内的套管其两端与饰面相平。穿过楼板的套管与管道之间缝隙应用阻燃密实材料和防水油膏填实。端面光滑。穿墙套管与管道之间缝隙宜用阻燃密实材料填实,且端面应光滑。管道的接口不得设在套管内”。第二,就是设计方面出现了问题,导致管道安装好以后容易堵塞;第三,就是住户使用时出现了问题。
3 建筑给排水施工的特点
管道安装具有的特点
在这几年里,给水管道的材料大多使用的是PP-R管和UPVC管。因为这两种管道具有轻便、耐高压、抗腐蚀、质量安全、使用卫生、通水阻力小、使用寿命较长的特性,所以安装中最明显的特点就是便于安装。对于PP-R管的安装来说,连接前要清除管道上附着的灰尘后,在按照严格的施工流程来进行安装,但是其中需要注意的是在在对管道进行热熔是一定不能旋转,以免加热过度,而且在管道连通后还要采取一定措施对其进行冷却。对于UPVC管的安装来说,安装时一定要使用排水胶粘结。在涂完胶以后还要注意的就是胶干时间,具体的时间应依据当地气候和温度的变化来进行调节,还要注意不能沾水。如果是在环境温差较大的地方安装,必须使用管道伸缩节。
给排水管道的试压
当所有管道安装完成之后,还要对所有部位进行全面的检测,主要包括检测已安装的管道和阀门等设备是否符合设计和技术要求规定,如果有问题应立即拆除予以更换或是维修。检测的具体方法是用临时的短管来替代安装的管道,把所有的开口处封闭,从管道最低处开始灌水,在最高处进行放气。如果出现异样,要及时停止检测,并立即排水。在试压完成后,还对所有管道要进行吹洗。
4 提高建筑的给排水施工技术的具体措施
随着建筑技术的发展,生产工艺的不断改进和提高,对给排水工程的设计、施工、维修和运行管理的要求也就越来越高。要想使管网达到优质、高效、低能耗运行的目的,除要有合理的设计方案外,给排水系统安装质量的优劣将会对日后的使用产生极大的影响。
管道施工的措施
对于管道的施工来说主要是注意加热时间、加热温度、接缝压力这三个方面的问题,施工中运用最多的是钢塑复合管,在对其施工中应采用螺纹连接的方法,插入管道的长度应严格按照标准旋转深度进行控制;在对管端和管螺纹进行加工后,还要进行密封处理,这时需要使用聚四氟乙烯生料带来进行缠绕螺纹;施工中需要选用厌氧密封胶密封过的管道接头,必须在养护24h之后再进行试压。施工中要用专门的施工机具,不能随便更该。
W型铸铁管的施工方法
有关W型铸铁管的具体施工措施,第一步就是下料,在切割管材时要选用专门的切割工具,主要是保证管口的平直。第二步是连接,进行连接时先要松开卡箍,再取出内衬中的橡胶圈,把箍套和橡胶圈放在入管口的一侧,使管口对齐后,随后把橡胶圈放在接口上,最后锁紧了箍套紧固了螺丝就算完成了管道连接。第三步低支架的设置,对于一般的管材安装来说,如果每隔3m设置一个支架其实是可以的,但是对于W型无承口机制排水铸铁管接口来说就不行了,因为其属于柔性接口,当支架放在管道中间时,理论上可以将管道保持平衡,可是在实际工作中,找到重心点是很难的,所以经常无法保证管道接口的平滑,如果采用每隔设置一个支架的方法来进行布置,这样就可以很好地解决管道外观和管道坡度的问题。
建筑给排水施工的监管
给排水管道的设计与施工是一项很复杂的措施,其中关于管道的铺设和管道的安装都容易出现问题,所以有关管道施工的监督也是一项非常重要的方面。因为管道施工工期较长设计建筑工程的的许多阶段,所以监管也可以分为多个阶段来进行。
首先,在工程施工前期阶段的监管,在施工前就应该仔细阅读施工图纸,充分了解设计者的设计意图和目的,这样才能保证施工过程中不偏离设计图纸的要求,也不能在施工中随意变更设计方案。
其次,是在基础主体结构施工阶段的监管,在基础主体施工中,要注意排水系统的排水管和给水管的引入管在穿越建筑物或地下构筑物外墙处时,是否按设计要求预留好了足够的孔洞以及设置好的套管。
再次,就是装修阶段的监管,在装修施工阶段主要是对给排水管道系统安装阶段,主要是注意装修工程不能破坏原有的管道路线的设置或是预留管道的破坏,必须在明确所有管道布置之后再结合装修方案进行施工。
5 结束语
随着我国建筑技术的不断发展,对给排水工程的设计、施工和运行管理等方面的要求也越来越高。优质的安装施工质量和科学的管理是保障管网系统高效安全运行的必要条件。为了满足给排水建筑施工技术要求,提高施工质量,需要施工人员不断学习,提高自身的技术素质,只有这样,才能保证安装工程的质量,立足于建筑安装工程的基本建设。
参考文献:
[1] 王胜飞;民用建筑给排水工程施工质量常见问题及预防措施[J].中小企业管理与科技(下旬刊),2010,(08).
[2] 金生;建筑工程给排水施工常见问题解决措施探讨[J].现代商贸工业,2011,(09).
[3] 刘康;建筑工程给排水施工常见问题及解决措施研究[J].科技致富向导,2011,(01).
[4] 何新辉,魏晓斌.高层建筑给排水设计分析研究[J].中国房地产业,2011,(04).
[5] 李霞,高层建筑给水排水工程课程教学实践与探讨[J].山西建筑,2011,(01).
《工业水处理》和《给水排水》是两款很权威的可以在下载《工业水处理》杂志下载地:《工业水处理》(月刊)创刊于1981年,由天津化工研究设计院主办、国家工业水处理工
MECHANICAL PRELIMINARY DESIGN REPORT STADIUM 1.给排水设计 饮用水和污水 1.Sanitary Design Wa
《工业用水与废水》是原化学工业部主管的国家级刊物。化学工业部撤消后由东华工程科技股份有限公司(原化学工业部第三设计院)主管、主办。《工业用水与废水》是国内创刊最
《中国给水排水》最权威,评职称的论文可以算作国家级。《给水排水》比较好采用。《城镇供水》的面比较窄。
当工作进行到一定阶段或告一段落时,需要我们来对前段时期所做的工作认真地分析研究一下,肯定成绩,找出问题,归纳出 经验 教训,以便于更好的做好下一步工作。下面