• 回答数

    5

  • 浏览数

    360

傻喵喵123
首页 > 职称论文 > 重力坝毕业论文模板

5个回答 默认排序
  • 默认排序
  • 按时间排序

美丽的大蒜君

已采纳

Spring river 蕴藏 abundant water power resources, among them piece the main purpose for valley segment suitable forly fixing set upping the water conservancy vital point, water conservancy vital point is a flood control to generate electricity. This text combination piece valley geography geology characteristics, hydrology characteristic, as to it's the water conservancy vital point proceeds first step design, vital point of basic data, main building that main contents include the vital point of a valley water conservancy arranges the project, foundation to handle and start construction the 导s to cut the 流 etc. the contents. Under the consideration the every kind of factor, choice B - B conduct and actions this vital point the engineering's 坝 stalk line, on the choice of the 坝 type, the right every kind of 坝 type proceeds 优 weakness the comparison is after, and join together this engineering of when ground characteristics, chose the concrete entity gravity the 坝 to be used as this water conservancy the vital point's 坝 调洪 calculates the adoption the method of widespread half illustrated manual table, at the project that compare three 调洪s the project after make sured a fit, get its design flood is rices, 校核 flood rice, certain 坝 crest high 程 is main building of this vital point be leak watered by 挡 water building, building, generate electricity the building, put the 空 building to machine-readable( gravity 坝 stability with should dint calculation procedure) with should dint and stability than the 核 is after, and have to out not 溢流 the 坝 's breadth of economic section, 坝 crest rice, high rice;Leak water practical WES curve, 消 of curve adoption of the 流 's way, 坝 crest of watch bore 溢 of building adoption can the way adopt the 挑流消 can;Factory premises 坝 the segment include the segment of three machine sets with the segment of a gearing field, factory premises adoption after the 坝 type;The deep bore conduct and actions of adoption puts the 空 building, bore figure to choose to use to have no to press the 坝 inside to start construction the 导流 choose to use the 导流 of two two pieceses the method, be designed spring river piece valley water conservancy vital point gave out aly completely by tie the narrow river bed 泄 the 流 , second periods are from the 导流 bottom bore 泄流 , project.有不能翻译的自己找找资料吧!

330 评论

nellie0223

Spring the river is containing the rich hydro-electric resources, valley section suits in the construction hydro-junction, the hydro-junction main goal is prevents floods the electricity generation. This article unifies opens the valley terrain geology characteristic, the hydrology characteristic, has carried on the preliminary design to its hydro-junction. The main content opens the valley hydro-junction including the spring river the basic document, the main building design, the key position scheme of arrangement, ground processing as well as the construction leads dams the current and so on the content. In had considered under each kind of factor, the choice second grade - second grade took this key project the dam spool thread, in the dam choice, carries on the good and bad points comparison after each kind of dam, unifies this project the local characteristic, chose the concrete entity gravity dam to take this hydro-junction the dam. Adjusts Hong to calculate uses the quite universal semigraphical method, after has compared three accents Hong plan had determined an appropriate plan, its design flood level is meters, the examination flood level meters, the definite top of dam elevation is meters. This key position main building by keeps off the water building, the drainage building, the electricity generation building, blows off the building to be composed. Passes the charging after to calculate (gravity dam is stable and stress computational procedure) and the stress and stably compares the nucleus, obtains the non- overfall dam the economical section plane, the top of dam width meters, the height meters; The drainage building uses the table hole overflow the way, the top of dam curve uses the practical WES curve, disappears can the way adopt selects class disappearing energy; The workshop dam section including three flow conditions and installment field sections, after the workshop uses the dam the type; Uses the deep hole achievement to blow off the building, the hole figure selects does not have presses in the dam the sluiceway. Finally constructs the conduction current to select two issues of two section of conduction current methods, an issue by ties the narrow river bed to release the class, two issues release the class by the conduction current bottom hole, opened the valley hydro-junction to the spring river to produce a quite complete design proposal.

283 评论

角落小泰迪

哥们,这个成果还在没,急求啊!要什么换都没问题

199 评论

真南真北

水利工程水利工程毕业设计论文[博士]城市区域水土作用分析与土的结构 [博士]中小城市水利可持续发展研究 [博士]中小城市水利可持续发展研究 河口冲刷的理论与数值模拟 [硕士] 吉林西部生态环境需水量与水资源承载力研究 [硕士]航道整治河段流动特性的三维数值模拟 新疆某水电站毕业设计 某混凝土实体重力坝枢纽及发电引水管道设计 [博士]裂隙岩体可灌性及灌浆数值模拟研究 天津市城市水源合理配置研究[硕士] 【学士】某江水利枢纽坝工设计 [学士]水电站毕业设计 【学士】某江水利枢纽重力坝毕业设计 [学士]重力式沉箱码头毕业设计 [硕士]太原城区段汾河蓄水工程对地下水渗流特征影响的研究 [硕士]入库洪水资源化问题的研究与应用 [硕士]波流共同作用下水流垂直结构及污染物 [硕士]从长江三峡库尾(重庆段)淤砂中提钪试验研究 [硕士]洪水资源化利用模式及风险分析 [硕士]河道人工建筑物对复氧及溶解氧扩散影响的研究 [硕士] 市区性河流的水质数学模拟 [硕士] 湿地治污系统在洞庭湖区的应用研究 [硕士]大连市周水子地区海水入侵问题研究 [硕士] 基于模糊数学方法的洞庭湖区水安全评价 [硕士]从长江三峡库尾(重庆段)淤砂中提钪试验研究 [硕士] 长春市主要河流环境容量及其总量控制研究 [硕士]乌梁素海农田面源入湖量的核算研究 [硕士]云南糯扎渡水库水质预测研究 汉河水系上一中型水闸的毕业设计 某泵站的毕业设计 发电机继电保护的研究 毕业设计-某一级水利枢纽工程规划设计书 [硕士]大体积混凝土温度应力分析与反分析 某供水工程毕业设计报告 矩形渡槽设计[本科] 护岸工程课程设计书 某厂净水厂设计[学士] 水工钢筋混凝土课程设计 拱式渡槽设计资料 广西郁江洪水预报与调度系统研究 水利工程水情自动测报系统设计研究 重力式码头施工组织设计课程设计 云南省景洪水电站施工组织设计 拱坝计算书 松涛水利枢纽工程施工(课程、毕业设计) 土石坝毕业设计 某水利工程土石坝枢纽设计说明书 [学士]水利枢纽工程初步设计 [学士]拦河闸设计 [学士]黑河水利枢纽布置及面板堆石坝设计 [学士]土石坝施工组织设计 [学士]函江水利枢纽工程毕业设计 [学士]函江水利枢纽工程毕业设计 [博士]大坝安全管理关键技术研究 [学士]水利灌渠改建工程毕业设计 某闸工程设计图 某排水泵站的初步设计

250 评论

2014兔兔

写山峡吧,我是宜昌的,山峡很有发展前途,你写山峡的战略意义,防震防摧毁等等,从大坝建设基础上找原因,相关资料我没空帮你找,自已到网上搜

123 评论

相关问答

  • 土石坝溃坝问题研究毕业论文

    变形它往下走,为了防止变形可以用水泥。把缝隙沟抹,或用修成梯形。

    飘渺于浮尘中 5人参与回答 2023-12-12
  • 关于重力坝的毕业论文

    水利工程水利工程毕业设计论文[博士]城市区域水土作用分析与土的结构 [博士]中小城市水利可持续发展研究 [博士]中小城市水利可持续发展研究 河口冲刷的理论与数值

    喵小萌103 3人参与回答 2023-12-10
  • 某混凝土重力坝设计毕业论文

    Spring river 蕴藏 abundant water power resources, among them piece the main purpos

    夏日风清凉 5人参与回答 2023-12-09
  • 关于重力坝论文范文资料

    一、三峡大坝的建筑结构: 三峡大坝工程包括主体建筑物工程及导流工程两部分。大坝为混凝土重力坝,坝顶总长3035米,坝顶高程185米,正常蓄水位175米,总库容3

    王颖880804 4人参与回答 2023-12-06
  • 大坝水库毕业论文

    补的钱太少了``都被上面的人贪了

    liuruojing 2人参与回答 2023-12-07