首页 > 学术论文知识库 > 土木工程的毕业论文中英翻译

土木工程的毕业论文中英翻译

发布时间:

土木工程的毕业论文中英翻译

有一篇施工监控的论文,你查收一下吧,希望对你有用!

土木工程的key哀,速度,

The urban river embankment discuss the ecological constructionAnonymous XXXXXXXXAbstract: the urban river embankment construction as the object, discuss the current social background, analyses and compares the river embankment design of traditional methods and characteristics of ecological methods, and puts forward three modes of ecological design and their advantages and disadvantages, and expounds the present situation of the ecological construction in domestic bank and future : the bank; Ecology; Design way; Domestic situationText:A, backgroundRiver Banks part is the amphibious interlaced transition belt, has the remarkable edge effect. Here are active substances, nutrient and energy flow, offer a habitat for a variety of creatures. Natural state Banks often species richness, productivity traditional embankment design often single ?一、背景河流的堤岸部分是水陆交错的过渡地带,具有显著的边缘效应。这里有活跃的物质、养分和能量的流动,为多种生物提供了栖息地。自然状态下的堤岸往往物种丰富、生产力高。传统的堤岸设计往往会单纯从防洪角度出发,采用土堤或者土石混合堆砌起来高高的堤岸。它的优点在于高度的可靠性,结构设计后加起防护堤岸抗流水冲刷能力显著增强。对于洪水暴发频繁、侵蚀严重的区段,这样的设计无可厚非,而对于一般河流堤岸的修建,这样的设计则显得缺乏环境的美化和绿化,同时也破坏许多对生态起重要作用的自然因素,如破坏植被与河床间的联系,造成冲刷侵蚀转移等。另外,河流作为城市风貌不可多得的珍惜资源,也是城市风貌的特色要素,它的景观塑造显得十分必要。同时,堤岸景观建设必然使滨河地区土地价值提升,滨水开发的高投资回报的特点更增强了对城市堤岸景观建设的需求。二、需求——堤岸的生态化建设河流堤岸作为城市中最邻近河流的区域,是城市与河流的衔接线,它的景观规划是提高城市生活品质的需要,也是丰富城市景观的需要。生态化建设,它的根本思路是运用自然本身抗干扰和自我修复的能力来处理人与自然的关系。生态设计方法不同于传统用人工的结构和形式来取代自然的方法,而是用自然的结构和形式来顺应自然的进程。将河岸与河道在生态上联系起来,也就实现了物质、养分、能量的交流:对于生物,它提供了合适的栖息地;植物根系可固着土壤,枝叶可截留雨水,过滤地表迳流,抵抗流水冲刷,从而起到保护堤岸、增加堤岸结构的稳定性、净化水质、涵养水源的作用,而且随着时间的推移,这些作用被不断加强。同时,生态化建设以自然的外貌出现,容易与环境取得协调,造价也较低,不需要长期的维护管理。三、河流堤岸生态化设计方式河流堤岸生态化设计,要遵守生态设计的原则,注重地方性、保护与节约自然资本、让自然做功、显露自然,主要体现在对地域气候环境、河流地质地貌、水文变化的适应,对河流生态环境的考虑,对堤岸地形的处理和对筑堤材料的选择和构造方式方面。1) 人工类:传统方法是采用块石或混凝土块砖等堆砌。可在此基础上加以改进以适应河流景观设计的需求。a) 块石或混凝土块砖干砌,不用砂浆。这样在砌块之间就留有空隙,为后期滨河植物的生长提供了空间。随着时间的推移,堤岸会逐渐呈现出自然的风貌。b) 堤岸采用台阶式分级,台阶面上的空间加以利用,种植植物。当然这两种改进方法对于河岸处现有植被仍存在一定的不良影响,人工痕迹也过于明显。2) 自然类:充分利用堤岸植被原型,可直接将适用于滨河地带生长的植被种植于堤岸上,利用植物的根、茎、叶来稳固堤岸,防止侵蚀、控制沉积的同时也为生物提供了栖息地。3) 人工自然相结合综合了以上两种方法的优点,具有人工结构的稳定性和自然的外貌,见效快、生态效益好,以下为常见的两种类型:a) 种植植物的堆石将由大小不同的石块组成的堆石置于与水接触的土壤表面,再把活体切枝插入石堆中使斜坡更加稳定。根系可提高强度,植被可遮盖石块,使堤岸外貌更加自然。b) 与植物结合使用的插孔式混凝土块将预制的混凝土块以连锁的形式置于岸底的浅渠中,再将植物切枝或植株扦插于混凝土块之间和堤岸上部,其上覆土压实,再播种草本植物。堤岸生态化建设也存在一定的局限性。如:选用的材料及建造方法不同,堤岸的防护能力相差很大,需要运用多学科知识认真分析,这就为设计人员提出了更大的挑战;建造初期若受到强烈干扰,则会影响到以后防护作用的发挥等。这也就对河流堤岸的生态化设计提出了更高的要求。四、国内现状1)省会城市在我国省会城市及计划单列市中有近80%进行了堤岸景观规划。(参考文献[3])城 市 项目名称 城 市 项目名称北 京 长河城市水系统综合治理 南 宁 堤岸园工程长 沙 湘江风光带 宁 波 滨江大道沿江景观工程成 都 府南河绿化工程 上 海 外滩、陆家嘴滨江大道福 州 闵江江滨公园 沈 阳 浑河观光旅游带广 州 珠江二沙段堤岸景观、芳村长堤建设 太 原 汾河公园贵 阳 南明河景观绿化工程 天 津 海河堤岸改造工程哈尔滨 松花江南岸沿江风景长廊 武 汉 汉口江滩一二期工程昆 明 盘龙江中段滨水生态景观建设 西 安 灞河大水大绿工程兰 州 黄河风情线 重 庆 南滨路滨江旅游观光大道从规划后建成情况看,这些城市河流堤岸景观项目都得到了当地政府与市民的肯定。在这些项目中,堤岸既可成为当地最具吸引力的城市公园,如太原的汾河公园和福州的江滨公园;堤岸也可成为市民日常休闲活动的热点地段,如南宁的堤路园和武汉的汉口江滩工程;堤岸还可成为城市最具特色的地段,如重庆的南滨路滨江旅游观光大道;堤岸更可成为城市旅游的热点,如上海的外滩和陆家嘴滨江大道。总之,经过景观规划的堤岸已成为当地最具特色的地区。从建设效果看,相对堤岸的原来面貌而言,统计资料中的这些景观工程都是较成功的,都成为当地城市关注的热点,成为当地政府的政绩工程,成为当地的民心工程。城市河流堤岸通过景观规划,有效地改善了滨河地段的环境,并带动滨河地段的开发。但必须清醒地认识到,这些城市堤岸景观项目规划并非尽善尽美,也存在这样或那样的问题,仍有待完善。2)中小城市城市经济实力的强大决定了其城市建设水平的高标准和高水平。中小城市河流堤岸景观与统计资料中的城市存在较大的差距,存在更多的问题。特别是由于资金问题,堤岸景观是,纯人工,状态的钢筋混凝土防洪堤,或保持自然防洪状态的土石堤,没有经过景观规划,易造成城市资源的极大浪费。五、前景目前,河流景观建设,特别是城市河流景观建设,在中国正方兴未艾;在发达国家中也是一个久盛不衰的话题。 回顾发达国家河流景观建设的历史,自20世纪70年代以来,随着人们环境意识的普遍增强,重视河流景观的生态功能已成为一个时代的呼唤,河流景观建设的生态设计方法也已得到了空前的重视和发展。他山之石可以攻玉,借鉴发达国家已经形成的成熟的理念和做法,可以使我们少走弯路,搭上隆隆前进的生态建设之车。

这个要靠你自己找了,你可以上万方网找,还有那也可以找的.但你们学校必须买那样的数据库.

土木工程毕业论文外文翻译

土木工程的英文是Civil Engineering ,直译是民用工程,它是建造各种工程的统称。它既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材料设备和进行的勘测,设计施工,保养,维修等专业技术。土木工程随着人类社会的进步而发展,至今已经演变成为大型综合性的学科,它已经出许多分支,如:建筑工程,铁路工程,道路工程,桥梁工程,特种工程结构,给水排水工程,港口工程,水利工程,环境工程等学科。土木工程共有六个专业:建筑学,城市规划,土木工程,建筑环境与设备工程,给水排水工程和道路桥梁工程。土木工程作为一个重要的基础学科,有其重要的属性:综合性,社会性,实践性,统一性。土木工程为国民经济的发展和人民生活的改善提供了重要的物质技术基础,对众多产业的振兴发挥了促进作用,工程建设是形成固定资产的基本生产过程,因此,建筑业和房地产成为许多国家和地区的经济支柱之一。.古代的土木工程有很长的时间跨度,大致从公元前500年新石器时代出现原始的土木工程活动到16世纪末意大利的文艺复兴,导致土木工程走上迅速发展的道路为止,前后经历了两千多年。在这段时间内,由于科学理论发展及其缓慢,土木工程也没有突破习惯的发展。从17世纪中页开始到20 世纪40年代第二次世界大战结束为止的300年间,国外的建筑取得了长足的进步。土木工程进入了定量分析阶段。一些理论的发展,新材料的出现,新工具的发明,都使土木工程科学日渐完善和成熟。到了近代,二战结束之后,许多国家经济起飞,现代科学日益进步,从而为进一步发展提供了强大的动力和物质基础。人们生活水平的不断提高,必然要求越来越舒适的居住环境,在这种情况下,建筑的发展直接推动了土木工程的发展。总的来说土木工程是一门古老的学科,它已经取得了巨大的成就,未来的土木工程将在人们的生活中占据更重要的地位。地球环境的日益恶化,人口的不断增加,人们为了争取生存,为了争取更舒适的生存环境,必将更加重视土木工程。在不久的将来,一些重大项目将会陆续兴建,插入云霄的摩天大楼,横跨大样的桥梁,更加方便的交通将不是梦想。科技的发展,以及地球不断恶化的环境必将促使土木工程向太空和海洋发展,为人类提供更广阔的生存空间。近年来,工程材料主要是钢筋,混凝土,木材和砖材,在未来,传统材料将得到改观,一些全新的更加适合建筑的材料将问世,尤其是化学合成材料将推动建筑走向更高点。同时,设计方法的精确化,设计工作的自动化,信息和智能话技术的全面引入,将会是人们有一个更加舒适的居住环境。一句话,理论的发展,新材料的出现,计算机的应用,高新技术的引入等都将使土木工程有一个新的飞跃.English is the Civil Engineering Civil Engineering, civil engineering is literally, it is the construction of the project collectively. It means building objects that the construction on the ground, underground, water works facilities, equipment and materials to use in surveying, design construction, maintenance, repair and other professional skills. Civil Engineering with the progress of the human society, has been transformed into large integrated disciplines, it has a number of branches, such as : construction, rail projects, road projects, bridge projects, special project structure, water drainage works, the port project, water, environmental engineering disciplines. A total of six professional Civil Engineering : architecture, urban planning, civil engineering, construction and environmental engineering equipment, water drainage works and road bridge Engineering as an important foundation subjects, its important attribute : an integrated, social, practicality, uniformity. Civil Engineering for the development of the national economy and improve the living standards of the people provided important material and technological foundation for the revitalization of many industries played a catalytic role in the construction of fixed assets is a basic production process, the construction and real estate in many countries and regions become a pillar of the economyAncient Civil Engineering has a long time span, roughly 500 years before Christ from the original date in civil engineering activities to the 16 century Italian Renaissance, resulting in the rapid development of the Civil Engineering on the road today, and has experienced more than 2,000 years. During this period, due to the development of scientific theories and slow, there is no breakthrough in civil engineering from 17 pages to 40 years in the 20th century end of the Second World War 300 years, foreign construction made great strides. Civil Engineering has entered a phase of quantitative analysis. Some theoretical development, the emergence of new materials, new tools of invention, the Civil Engineering Science is perfection and maturity. In modern times, after the end of World War II, many countries economic takeoff, the increasing advances of modern science, so as to provide a powerful impetus to further development and material basis. People's living conditions continue to improve, more and more comfortable living environment for the inevitable in the circumstances, the construction of development directly to the Civil Engineering development.

问题一:毕业论文外文翻译是什么意思?有什么要求? 外文翻译要求:(1)选定外文文献后先给指导老师看,得到老师的确认通过后方可翻译。(2)选择外文翻译时一定选择外国作者写的文章,可从学校中知网或者外文数据库下载。(3)外文翻译字数要求3000字以上,从外文互章起始处开始翻译,不允许从文章中间部分开始翻译,翻译必须结束于文章的一个大段落。 问题二:毕业论文的外文文献是什么意思?是说找一篇外文文献,然后把它翻译成中文吗? 5分 是在知网上(应该是Ebhos罚差不多是这个,具体记不清了)找到一篇与你论文主旨相关的英文文章,然后可以从头翻译或者从当中开始翻译。 问题三:外文翻译是什么 5分 呵呵 就是找一篇和自己的论文相关的外文,翻译成中文即可! 呵呵 问题四:毕业论文中的外文翻译可以在什么网站找到? 先到百度文库,找一篇此类文档中文的,然后用有道翻译,或是谷歌在线翻译翻成英 文,然后把英文放上面,中文放下面。希望可以帮到你。如果要找标准的PDF格式外文文 献,可以在谷歌,用英文文献名+空格+PDF 这样比较容易找到。 第一是Google搜索,主要是英文,尤其是其学术搜索,意义大。 第二,通过各大学图书馆系统,进入几个主流的出版发行集团。 第三,利用网络免费储存、电子书系统。尤其是国外多。 1、论文题目:要求准确、简练、醒目、新颖。 2、目录:目录是论文中主要段落的简表。(短篇论文不必列目录) 3、提要:是文章主要内容的摘录,要求短、精、完整。字数少可几十字,多不超过三百字为宜。 4、关键词或主题词:关键词是从论文的题名、提要和正文中选取出来的,是对表述论文的中心内容有实质意义的词汇。关键词是用作机系统标引论文内容特征的词语,便于信息系统汇集,以供读者检索。每篇论文一般选取3-8个词汇作为关键词,另起一行,排在“提要”的左下方。主题词是经过规范化的词,在确定主题词时,要对论文进行主题,依照标引和组配规则转换成主题词表中的规范词语。 5、论文正文:(1)引言:引言又称前言、序言和导言,用在论文的开头。 引言一般要概括地写出作者意图,说明选题的目的和意义, 并指出论文写作的范围。引言要短小精悍、紧扣主题。〈2)论文正文:正文是论文的主体,正文应包括论点、论据、论证过程和结论。主体部分包括以下内容:a.提出-论点;b.分析问题-论据和论证;c.解决问题-论证与步骤;d.结论。 6、一篇论文的参考文献是将论文在和写作中可参考或引证的主要文献资料,列于论文的末尾。参考文献应另起一页,标注方式按《GB7714-87文后参考文献著录规则》进行。中文:标题--作者--出版物信息(版地、版者、版期):作者--标题--出版物信息所列参考文献的要求是:(1)所列参考文献应是正式出版物,以便读者考证。(2)所列举的参考文献要标明序号、著作或文章的标题、作者、出版物信息。 一,选题要新颖。 这次我的论文的成功,和高分,得到导师的赞许,都是因为我论文的选题新颖所给我带来的好处。最好涉及护理新领域,以及新进展,这样会给人耳目一新的感觉。 二,大量文献做基础 仔细查阅和你论文题目和研究范围相关的文献,大量的文献查阅会你的论文写作铺垫,借鉴别人的思路,和好的语言。而且在写作过程不会觉得语言平乏,当然也要自己一定的语言功底做基矗 三,一气呵成 做好充分的准备,不要每天写一些,每天改一些,这样会打断自己的思路,影响文章的连贯。 四,尽量采用多的专业术语 可能口语化的表达会给人带来亲切感,但论文是比较专业的形式,是有可能做为文献来查阅和检索的,所以论文语言的专业化,术语化会提升自己论文的水平。 五,用正规格式书写 参考正规的论文文献,论文格式。不要因为格式问题,而影响到你论文的质量。 六,最好在计算机上完成写作过程 如果有条件最好利用电脑来完成写作过程,好处以下几点:1,节省时间,无论打字的速度慢到什么程度,肯定要比手写的快。2,方便,大量的文献放在手边,一个一个查阅是很不方便的,文献都是用数据库编辑,所以都是在电脑上完成。提前先在电脑上摘要出重点,写出提纲,随时翻阅,方便写作。3,修改编辑,在电脑随时对文章进行修改编辑都是非常的方便。4,随时存档,写一段,存一段,防止突然停电,或者电脑当机。本人就是吃了这个大亏,一个晚上的劳动......>> 问题五:外文参考文献怎么找 在中国期刊网ki/里找,有那种英文的文献,之后翻译过来。万方、维普都可以。或者直接到外人数据库找。 APS美国物理学会电子出版物 AIP美国物理研究所电子出版物 ASME美国机械工程师学会电子期刊 ASCE美国土木工程协会电子期刊 ACS美国化学学会数据库 IOP英国皇家物理学会期刊 RSC英国皇家化学学会期刊 AIAA美国航空航天学会 John Wiley电子期刊 Kluwer电子期刊 Springer LINK 电子期刊 EBSCO学术、商业信息数据库 Elsevier Science IEEE/IEE Electronic Library ACM Digital Library 但估计你们学校没有数据库。 如果找不到干脆找个中文的自己翻译过来算了。 问题六:外文文献引证号是什么 我看到有些只写一个数字,期刊号是不是第几期?如[2]何龄修.读顾城《南明史》[J].中国史研究学刊,1998,(3):167-173这里面的(3)就是期刊号,这个是不是这个学术期刊的第3期 问题七:毕业论文中的外文翻译可以在什么网站找到?非常感谢! 学校的数据库,中国知网应该都有,根据专业也可以选择国外比较有名的数据库,推荐几个我用过的吧 ABI,ACM,ASTP,American Chemical Society ,Blackwell Science-Blackwell synergy EBSCO综合类,强烈推荐,Engineering Index 工科是离不开EI的,IEEE 电子类必备,HighWire Press,ISI学术权威 ,National Technical Information Service 个人比较喜欢的,推荐 问题八:论文的外文翻译是什么意思 需要帮忙可以找我 外文翻译就是一篇跟你题目相关的文章然后翻译出来 问题九:毕设外文文献翻译和毕设是个什么关系?我怎么觉得外文翻译和我的毕设 文献翻译应该是毕业设计的前期准备工作吧,毕竟你需要知道你所选取的课题在国内外的研究现状才能确定研究方向啊 问题十:外文翻译是翻译什么 楼主您好:你只要用一种非中国语言的外语翻译一篇你的毕业论文即可!谢谢采纳!如果您满意的话就给五星评价吧!如有疑问请追问!

刚好我也在做毕业设计 把我的给你用吧! Traditional Construction ProceduresAs mentioned before, construction under the traditional construction procedure is performed by contractors. While they would like to satisfy the owner and the building designers, contractors have the main objective of making a profit. Hence, their initial task is to prepare a bid price based on an accurate estimate of construction costs. This requires development of a concept for performance of the work and a construction time schedule. After a contract has been awarded, contractors must furnish and pay for all materials, equipment, power, labor, and supervision required for construction. The owner compensates the contractors for construction costs and general contractor assumes overall responsibility for construction of a building. The contractor engages subcontractors who take responsibility for the work of the various trades required for construction. For example, a plumbing contractor installs the plumbing, an electrical contractor installs the electrical system, and an elevator contractor installs elevators. Their contracts are with the general contractor, and they are paid by the general , in addition to a general contractor, the owner contracts separately with specialty contractors, such as electrical and mechanical contractors, who perform a substantial amount of the work require for a building. Such contractors are called prime contractors. Their work is scheduled and coordinated by the general contractor, but they are paid directly by the also, the owner may use the design-build method and award a contract to an organization for both the design and construction of a building. Such organizations are called design-build contractors. One variation of this type of contract is employed by developers of groups of one-family homes or low-rise apartment buildings. The homebuilder designs and constructs the dwellings, but the design is substantially completed before owners purchase the of the construction procedure often is difficult. Consequently, some owners seek assistance from an expert, called a professional construction manager, with extensive construction experience, who receives a fee. The construction manager negotiates with general contractors and helps select one to construct the building. Managers usually also supervise selection of subcontractors. During construction, they help control costs, expedite equipment and material deliveries, and keep the work on schedule. In some cases, instead, the owner may prefer o engage a construction program manager, to assist in administrating both design and contractors employ labor that may or may not be unionized. Unionized craftspeople are members of unions that are organized by construction trades, such as carpenter, plumber, and electrician unions, Union members will perform only the work assigned to their construction, all work should be inspected. For this purpose, the owner, often through the architect and consultants, engages inspectors. The field inspectors may be placed under the control of an owner’s representative, who may be titled clerk of the works, architect’s superintendent, engineer’s superintendent, or resident engineer. The inspectors have the responsibility of ensuring that construction meets the requirements of the contract documents and is performed under safe conditions. Such inspections may be made at frequent addition, inspections also are made by representatives of one or more governmental agencies. They have the responsibility of ensuring that construction meets legal requirements and have little or no concern with detailed conformance with the contract documents. Such legal inspections are made periodically or at the end of certain stages of construction. One agency that will make frequent inspections is the local or state building department, whichever has jurisdiction. The purpose of these inspections is to ensure conformance with the local or state building is a description of the basic traditional construction procedure for a multistory the award of a construction contract to a general contractor, the owner may ask the contractor to start a portion of the work before signing of the contract by giving the contractor a letter of intent or after signing of the contract by issuing a written notice to proceed. The contractor then obtains construction permits, as required, form governmental agencies, such as the local building, water, sewer, and highway general contractor plans and schedules construction operations in detail and mobilizes equipment and personnel for the project. Subcontractors are notified of the contract award and issued letters of intent or awarded subcontracts, then are given, at appropriate times, notices to construction starts, the general contractor orders a survey to be made of adjacent structures and terrain, both for the record and to become knowledgeable of local conditions. A survey is then made to lay out offices for the contractor are erected on or near the site. If desirable for safety reasons to protect passersby, the required to be removed from the site are demolished and the debris is carted , the site is prepared to receive the building. This work may involve grading the top surface to bring it to the proper elevations, excavating to required depths for basement and foundations, and shifting of utility piping. For deep excavations, earth sides are braced and the bottom is construction starts with the placement of foundations, on which the building rests. This is followed by the erection of load-bearing walls and structural framing. Depending on the height of the building, ladders, stairs, or elevators may be installed to enable construction personnel to travel from floor to floor eventually to the roof. Also, hoists may be installed to lift materials to upper levels. If needed, temporary flooring may be placed for use of the building rises, pipes, ducts, and electric conduit and wiring are installed. Then, permanent floors, exterior walls, and windows are constructed. At the appropriate time, permanent elevators are installed. If required, fireproofing is placed for steel framing. Next, fixed partitions are built and the roof and its covering are put is place,Finishing operations follow. There include installation of the following: ceilings; tile; wallboard; wall paneling; plumbing fixtures; heating furnaces; air-conditioning equipment; heating and cooling devices for rooms; escalators; floor coverings; window glass; movable partitions; doors; finishing hardware; electrical equipment and apparatus, including lighting fixtures, switches, transformers, and controls; and other items called for in the drawings and specifications. Field offices, fences, bridges, and other temporary construction must be removed from the site. Utilities, such as gas, electricity, and water, are hooked up to the building. The sit is landscaped and paved. Finally, the building interior is painted and owner’s representatives then give the building a final inspection. If they find that the structure conforms with the contract documents, the owner accepts the project and gives the general contractor final payment on issuance by the building department of a certificate of occupancy, which indicates that the completed building meets building-code requirements.传统的施工程序众所周知,在传统的施工程序中进行施工的承包商。尽管他们想满足业主和建筑设计师的要求,但是最终还是以赚取利润为主要目标的。因此,他们最初的任务是对编写投标价格的建筑成本进行准确的估计。这就需要进行前期调查的工作并且做出施工时间表。等合约批出后,施工方必须提供所有材料并支付其费用,设备,电力,劳动力。业主此时需要进行必要的监督。一个总承包商承担一个建筑整体的责任。从事分包的承建商则需承担建造工程所需的各个工作。例如,管道承包商安装水管,电业承办商安装电气系统,电梯则由电梯承包商安装。他们与总承包商签订合同,费用由总承包商支付。有时候,除了一个总承包商,还有各种专业承包商,如电气和机械承包商,执行工作时需要与业主签订合同。这种承包商被称为间接承包商。他们的工作,由总承包商协调,但它们都是由业主直接联系。还有些时候,业主可以使用设计建造方法同时兼有设计和建筑施工单位的职能。这些单位被称为设计建造承包商。这方面的一个类型的合同聘用的变化是由一户住宅或低层住宅建筑群的开发。在房屋建筑设计和建造的住房,但设计之前需要由购买房屋的业主完成。施工过程管理往往是困难的。因此,一些业主会去寻求专家的协助,这些专家被称为专业施工经理,他们具有丰富的施工经验。施工经理与总承包商进行谈判,并选择其中一个项目。施工经理通常还监督分包商。在施工期间,它们有助于控制成本,加快运送设备和材料,并保持工作的进度。在依法行政,协助设计和建设的情况下,业主可以选择从事建筑项目经理。建筑承包商雇用的劳动力,一般有大工和小工。大工再建筑工程中从事技术活,如木工,管道工,工会成员和电工工会,小工则执行了分配给他们的工作。在施工期间,一切工作都要验收。因此,业主通过建筑师和监理经常进行督查。可能是名为工程员,建筑师或驻地工程师。作为业主的代表实地视察。核查人员必须确保工程符合合同文件的要求,并在安全的条件下进行的责任。这种检查可作出重复。此外,验收还是需要一个或多个政府机构的代表。他们必须确保工程符合法律要求,并负责检查与合同文件是否一致。这种视察一般定期或在某些阶段施工结束以后进行。地方或国家建设部门具有管辖权。这些检查的目的是确保符合当地或国家的建筑规范。以下是传统多层建筑施工的基本程序。建造开始后合同授予开发商,业主可要求开发商开始施工之前签约给或之后签约发出书面通知的同时另一部分工作继续进行。紧接着施工方根据需要获取建筑许可证,例如当地的建设,供水,污水处理,政府机构和公路部门。总承包商的计划和进度详细施工作业以及动员项目设备和人员。分包商得到通知后,做出签订合同的意向或授予分包合同书,然后给出在适当的时候进行通知。在施工前启动,总承包商要进行的一项调查就是邻近结构和地形,这些都要记录在案,并要熟悉当地情况。这项调查结束以后,随即进行布局建设。承建商的现场办事处都建在施工现场或附近。为了安全起见,必须从脚手架上移除的东西,产生的碎片都要运走。下一步,该网架是为建设工程准备的。这项工作为地下室开挖和基础开挖的深度,以及公用事业管道转移找到正确的标高。深挖掘,土方支撑,底部排出。建筑开始于基础上,然后是承重墙和结构框架的施工。梯子,楼梯,或电梯的安装,可让施工人员往返于各个楼层。此外,可安装卷扬机来运送材料。由于建筑高度的上升,管道,电力管道和线路安装以及永久地板,外墙,窗户和构造的影响。在适当的时候,永久的电梯安装。再需要的情况下可以安装防火卷帘。其次,屋顶等地方也需要安装。精加工工序安装有包括以下内容:天花板,瓷砖,墙板,墙壁镶板,水管装置,加热炉,空气调节设备,加热和冷却室装置;自动扶梯;地板,窗户玻璃;活动板,门;电气设备和仪器,包括照明灯具,开关,变压器,控制器,遵照项目的图纸和规格。外地办事处,围栏,桥梁和其他临时建筑,公共设备,如天然气,电力管道,水管,都连接到建筑上。最后,是建筑物内部的打扫和清洗。业主的代表,会给建设工程作最后检查。如果他们满意并认为符合合同文件,那么业主接受该项目,并交给总承包商的一个占用证书,这表明,总承包商已完成建设,建设部门再根据建筑规范的要求发放最后付款。

有一篇施工监控的论文,你查收一下吧,希望对你有用!

土木工程专业毕业论文外文翻译

这是一小段,看看行吧,行我就全传给你Organization of this textCivil engineering,the oldest of the engineering specialties,is the planning,design,construction, and management of the built environment.This environment includes all structures built according to scientific principles,from irrigation and drainage systems to rocket-launching facilities.土木工程,最老的工程专业,是建筑环境的规划、设计、施工和管理。这个环境包括从灌溉和排水系统到火箭发射设施的所有根据科学原理建造的结构物。Civil engineers build roads,bridges,tunnels,dams,harbors,power plants,water and sewage systems,hospitals,schools,mass transit,and other public facilities essential to modern society and large population concentrations.土木工程师修建道路、桥梁、隧道、大坝、港口、发电站、水系统和污水系统,医院、学校、公共交通系统,以及现代化社会和大量人口集中的地方所必需的其他公共设施。Civil engineering and civil engineersThey also build privately owned facilities such as airports, railroads,pipelines, skyscrapers, and other large structures designed for industrial,commercial, or residential use.他们也修建私人拥有的设施,如机场、铁路、水渠、高楼大厦,和为工业、商业、民用设计的其他大型建筑。

你是哪个省的啊 看看如果可以的话 可以给你一份全面的

The urban river embankment discuss the ecological constructionAnonymous XXXXXXXXAbstract: the urban river embankment construction as the object, discuss the current social background, analyses and compares the river embankment design of traditional methods and characteristics of ecological methods, and puts forward three modes of ecological design and their advantages and disadvantages, and expounds the present situation of the ecological construction in domestic bank and future : the bank; Ecology; Design way; Domestic situationText:A, backgroundRiver Banks part is the amphibious interlaced transition belt, has the remarkable edge effect. Here are active substances, nutrient and energy flow, offer a habitat for a variety of creatures. Natural state Banks often species richness, productivity traditional embankment design often single ?一、背景河流的堤岸部分是水陆交错的过渡地带,具有显著的边缘效应。这里有活跃的物质、养分和能量的流动,为多种生物提供了栖息地。自然状态下的堤岸往往物种丰富、生产力高。传统的堤岸设计往往会单纯从防洪角度出发,采用土堤或者土石混合堆砌起来高高的堤岸。它的优点在于高度的可靠性,结构设计后加起防护堤岸抗流水冲刷能力显著增强。对于洪水暴发频繁、侵蚀严重的区段,这样的设计无可厚非,而对于一般河流堤岸的修建,这样的设计则显得缺乏环境的美化和绿化,同时也破坏许多对生态起重要作用的自然因素,如破坏植被与河床间的联系,造成冲刷侵蚀转移等。另外,河流作为城市风貌不可多得的珍惜资源,也是城市风貌的特色要素,它的景观塑造显得十分必要。同时,堤岸景观建设必然使滨河地区土地价值提升,滨水开发的高投资回报的特点更增强了对城市堤岸景观建设的需求。二、需求——堤岸的生态化建设河流堤岸作为城市中最邻近河流的区域,是城市与河流的衔接线,它的景观规划是提高城市生活品质的需要,也是丰富城市景观的需要。生态化建设,它的根本思路是运用自然本身抗干扰和自我修复的能力来处理人与自然的关系。生态设计方法不同于传统用人工的结构和形式来取代自然的方法,而是用自然的结构和形式来顺应自然的进程。将河岸与河道在生态上联系起来,也就实现了物质、养分、能量的交流:对于生物,它提供了合适的栖息地;植物根系可固着土壤,枝叶可截留雨水,过滤地表迳流,抵抗流水冲刷,从而起到保护堤岸、增加堤岸结构的稳定性、净化水质、涵养水源的作用,而且随着时间的推移,这些作用被不断加强。同时,生态化建设以自然的外貌出现,容易与环境取得协调,造价也较低,不需要长期的维护管理。三、河流堤岸生态化设计方式河流堤岸生态化设计,要遵守生态设计的原则,注重地方性、保护与节约自然资本、让自然做功、显露自然,主要体现在对地域气候环境、河流地质地貌、水文变化的适应,对河流生态环境的考虑,对堤岸地形的处理和对筑堤材料的选择和构造方式方面。1) 人工类:传统方法是采用块石或混凝土块砖等堆砌。可在此基础上加以改进以适应河流景观设计的需求。a) 块石或混凝土块砖干砌,不用砂浆。这样在砌块之间就留有空隙,为后期滨河植物的生长提供了空间。随着时间的推移,堤岸会逐渐呈现出自然的风貌。b) 堤岸采用台阶式分级,台阶面上的空间加以利用,种植植物。当然这两种改进方法对于河岸处现有植被仍存在一定的不良影响,人工痕迹也过于明显。2) 自然类:充分利用堤岸植被原型,可直接将适用于滨河地带生长的植被种植于堤岸上,利用植物的根、茎、叶来稳固堤岸,防止侵蚀、控制沉积的同时也为生物提供了栖息地。3) 人工自然相结合综合了以上两种方法的优点,具有人工结构的稳定性和自然的外貌,见效快、生态效益好,以下为常见的两种类型:a) 种植植物的堆石将由大小不同的石块组成的堆石置于与水接触的土壤表面,再把活体切枝插入石堆中使斜坡更加稳定。根系可提高强度,植被可遮盖石块,使堤岸外貌更加自然。b) 与植物结合使用的插孔式混凝土块将预制的混凝土块以连锁的形式置于岸底的浅渠中,再将植物切枝或植株扦插于混凝土块之间和堤岸上部,其上覆土压实,再播种草本植物。堤岸生态化建设也存在一定的局限性。如:选用的材料及建造方法不同,堤岸的防护能力相差很大,需要运用多学科知识认真分析,这就为设计人员提出了更大的挑战;建造初期若受到强烈干扰,则会影响到以后防护作用的发挥等。这也就对河流堤岸的生态化设计提出了更高的要求。四、国内现状1)省会城市在我国省会城市及计划单列市中有近80%进行了堤岸景观规划。(参考文献[3])城 市 项目名称 城 市 项目名称北 京 长河城市水系统综合治理 南 宁 堤岸园工程长 沙 湘江风光带 宁 波 滨江大道沿江景观工程成 都 府南河绿化工程 上 海 外滩、陆家嘴滨江大道福 州 闵江江滨公园 沈 阳 浑河观光旅游带广 州 珠江二沙段堤岸景观、芳村长堤建设 太 原 汾河公园贵 阳 南明河景观绿化工程 天 津 海河堤岸改造工程哈尔滨 松花江南岸沿江风景长廊 武 汉 汉口江滩一二期工程昆 明 盘龙江中段滨水生态景观建设 西 安 灞河大水大绿工程兰 州 黄河风情线 重 庆 南滨路滨江旅游观光大道从规划后建成情况看,这些城市河流堤岸景观项目都得到了当地政府与市民的肯定。在这些项目中,堤岸既可成为当地最具吸引力的城市公园,如太原的汾河公园和福州的江滨公园;堤岸也可成为市民日常休闲活动的热点地段,如南宁的堤路园和武汉的汉口江滩工程;堤岸还可成为城市最具特色的地段,如重庆的南滨路滨江旅游观光大道;堤岸更可成为城市旅游的热点,如上海的外滩和陆家嘴滨江大道。总之,经过景观规划的堤岸已成为当地最具特色的地区。从建设效果看,相对堤岸的原来面貌而言,统计资料中的这些景观工程都是较成功的,都成为当地城市关注的热点,成为当地政府的政绩工程,成为当地的民心工程。城市河流堤岸通过景观规划,有效地改善了滨河地段的环境,并带动滨河地段的开发。但必须清醒地认识到,这些城市堤岸景观项目规划并非尽善尽美,也存在这样或那样的问题,仍有待完善。2)中小城市城市经济实力的强大决定了其城市建设水平的高标准和高水平。中小城市河流堤岸景观与统计资料中的城市存在较大的差距,存在更多的问题。特别是由于资金问题,堤岸景观是,纯人工,状态的钢筋混凝土防洪堤,或保持自然防洪状态的土石堤,没有经过景观规划,易造成城市资源的极大浪费。五、前景目前,河流景观建设,特别是城市河流景观建设,在中国正方兴未艾;在发达国家中也是一个久盛不衰的话题。 回顾发达国家河流景观建设的历史,自20世纪70年代以来,随着人们环境意识的普遍增强,重视河流景观的生态功能已成为一个时代的呼唤,河流景观建设的生态设计方法也已得到了空前的重视和发展。他山之石可以攻玉,借鉴发达国家已经形成的成熟的理念和做法,可以使我们少走弯路,搭上隆隆前进的生态建设之车。

土木工程的key哀,速度,

土木毕业论文文献翻译

几年级的啊?

你是哪个省的啊 看看如果可以的话 可以给你一份全面的

有一篇施工监控的论文,你查收一下吧,希望对你有用!

外表上被限制的混凝土压缩行为 综合夹克。 部分A : 实验性研究 . Berthet, E. Ferrier *, P. Hamelin 部分内容:摘要本文提出一次实验性调查的结果关于碳和E玻璃FRP夹克外表上限制的具体短的专栏压缩行为的。 不同的参量的影响例如禁闭水平、夹克的机械性能和具体核心的耐压强度被学习了。 结果表示,外在禁闭可能极大改进标本的强度极限和延展性。 局限的混凝土应力反应双线: 在第一个线性区域,平原行为和被限制的具体标本是相似的,而在第二个类塑料分支,局限的混凝土行为取决于主要夹克mechanicals物产。 测试结果显示出, ···

毕业论文土木工程

土木工程大学本科毕业论文篇2 浅析土木工程施工质量管理 摘要:土木工程项目实施过程中重点加强对于施工质量的管控是必不可少的,尤其是随着当前土木工程项目实施构建中复杂性越来越突出的发展趋势,这种质量方面的影响因素同样也越来越多,进而也就更加需要从质量管理方面入手进行严格把关和控制。本文就重点针对土木工程项目施工质量管理工作的落实,从现阶段存在的各类问题以及相应的解决优化措施入手进行了简要的分析和论述。 关键词:土木工程施工项目;质量管理;影响因素;对策 1引言 在当前我国现阶段社会发展过程中,相应的土木工程项目越来越多,这些土木工程项目的具体施工建设确实也在较大程度上有效促进了我国社会的快速发展,并且在很多方面都发挥出了较为理想的积极作用价值,需要引起高度重视。当然,相应土木工程项目作用效果的呈现还需要以其具备较高的质量为基本前提,这也就需要在土木工程项目施工过程中,切实做好对于质量方面的管控,促使其能够形成较为理想的施工质量效果,有效规避以往施工操作过程中可能最为常见的一些缺陷影响。 2土木工程施工项目质量影响因素分析 结合现阶段土木工程项目施工建设工作的实施操作过程来看,为了较好提升其质量管理效果,尽可能确保相应土木工程项目施工建设能够具备理想的质量水平,必须要促使相应质量管理工作具备理想的方向性,这种方向性方面的明确也就需要针对相应的各个影响因素进行分析,当前比较突出的土木工程施工质量影响因素有以下几点: (1)设计方面的影响。 对于土木工程项目实施操作工作的具体落实而言,其施工操作的执行主要就是参考设计方案进行处理,由此可见,如果设计方案中存在着较为明显的缺陷问题的话,势必会影响到最终土木工程项目的施工效果,产生一些质量问题,这一方面的影响是比较常见的。围绕着设计方面存在的问题和影响因素来看,其一方面和设计单位存在着密切的联系,如果设计单位的能力不理想,导致其设计方案中存在着较多的缺陷问题,错漏百出,最终也就必然会带来施工质量方面的不利干扰;另外一方面,施工人员对于设计方案的了解不准确同样也是比较重要的一个影响问题表现,尤其是不注意设计图纸中的相应标注内容,仅仅依据自身的经验进行施工处理,进而也就容易产生理解偏差。 (2)施工材料方面的影响。 从土木工程项目施工质量的影响因素方面进行分析,其施工材料方面的干扰和影响同样也是必不可少的一个突出问题,尤其是随着当前土木工程项目对于施工质量要求的不断提升,相应的施工材料方面需求也正在不断加强,如果随意选择和应用施工材料的话,很可能会导致其施工质量受损。另外,从当前我国施工材料市场的发展中来看,随着相应施工材料种类的不断增加,以及施工材料售卖方的增加,其中必然也会导致其充斥着较多的劣质产品,这些劣质产品的存在也就很可能会导致其在施工过程中表现出一定的质量问题,施工效果不佳。 (3)施工现场方面的影响。 对于土木工程项目施工质量问题的产生来看,其在施工现场方面同样也存在着较多的影响因素和问题,并且该方面的表现同样也是比较复杂的,土木工程项目自身规模的提升,更是会导致其相应的施工现场环境方面出现较多的隐患问题,对于最终施工质量产生较大影响。结合这种施工现场存在的影响因素来看,其主要表现在施工现场内以及外界环境两个方面,施工现场内部的影响主要就是指其在施工材料的堆放以及施工技术的操作落实中存在着一些不合理之处,进而带来较为直接的施工质量问题;而对于施工现场外界环境因素的干扰和影响来看,其则主要就是指一些天气变化或者是不可抗力的产生而对于土木工程项目施工质量产生较大干扰。 (4)施工管理方面的影响。 对于土木工程项目施工过程中质量问题的产生和遗漏来看,其必然也会和管理不全面和不严格存在较为直接的联系,这种施工管理方面的影响在当前同样也存在着较为突出的表现。从现阶段土木工程项目施工管理的执行中来看,其虽然可供选择和应用的管理手段越来越先进,但是其落实效果却并不是特别理想,依然存在着较多的不恰当之处。这种施工管理方面的问题主要表现在施工质量管理制度不完善以及施工质量管理人员能力不佳,施工质量管理制度的不完善也就很可能导致一些施工对象得不到有效监管,最终形成质量缺陷问题,而施工质量管理人员自身的能力和素质不佳,则会导致其相应的管理任务落实不理想,最终同样也会形成一定的干扰和影响。 3土木工程施工项目质量管理对策 围绕着上述土木工程项目在施工建设过程中能够影响其质量效果的各个因素来看,为了较好提升其施工质量水平,必须要从管理方面予以控制,其中比较有效地管理对策可以从以下几个方面入手: (1)加强设计方案的审查分析。 为了确保后续土木工程项目在实施过程中具备较为理想的操作效果,降低因为施工操作偏差而带来的一些质量问题,必须要首先明确如何进行施工处理,尤其是对于施工操作过程中如何落实相应的施工技术手段进行分析,这也就需要从设计方案入手进行审查,促使施工人员能够按照设计图纸的具体指导和约束进行落实。这种设计方案方面的审查工作需要协同设计人员进行共同处理,如此才能够保障相应设计方案能够在实际的施工操作中得到有效应用。 (2)加强对于施工材料的严格管理。 为了较好规避施工材料方面带来的不良威胁和影响,还需要在整个土木工程项目施工过程中加强对于施工材料的严格管理和控制。这种施工材料的管理需要首先把好源头关,尤其是要重点针对施工材料的采购进行严格审查,对于所采购施工材料的质量进行抽查和试验检测,进而也就能够规避可能出现的一些劣质材料以次充好问题;此外,还需要在各类施工材料的实际应用过程中进行全方位管控,确保其在类型以及数量方面均能够具备理想的作用效果,避免使用出现偏差的问题。 (3)加强对于施工现场的全面管控。 土木工程项目施工现场的严格把关和控制同样也是较好提升其施工质量效果的重要前提条件,这种施工现场的管控同样也需要从施工操作基本环境以及外界环境两个方面进行分析控制。首先从施工现场入手进行规范,促使其材料的摆放、施工现场电力线路的铺设、机械设备的运行以及施工人员的操作平台,都能够得到较好的设置,如此也就能够保障施工现场各项操作有序开展的前提下,确保施工质量效果;而对于外界环境方面存在的威胁和影响而言,则需要重点加强全面监控,相应的监控操作也就可以为具体的预防提供较强参考价值,降低其不利威胁和影响。 (4)提升自身管理水平。 从土木工程项目施工质量管理水平提升方面进行优化也是比较重要的一个方面,这种自身管理水平的提升优化需要首先把握好对于施工质量管理制度的完善和健全,尤其是对于土木工程项目施工操作过程中涉及到的各个管理任务,必须要进行细化,将细化后的施工质量管理任务进行有效分配,构建较为合理的施工质量管理责任制度,进而也就能够依托这一责任制度进行有序管控,提升质量管理的实效性;另外,为了较好提升其施工质量管理水平,还需要重点从施工质量管理人员入手进行培训和教育,促使其能够具备较为理想的施工质量管理意识,并且能够学会如何运用各类先进的管理技术手段进行现场操作管控,将各个方面的质量干扰和影响降到最低。 4结束语 综上所述,对于土木工程施工项目的施工质量管理工作而言,其必要性是比较突出的,并且随着当前土木工程项目的发展,其复杂性也正在不断提升,需要具体施工质量管理人员不断提升自身管理能力和综合素质,在此基础上,针对整个土木工程项目全过程进行有效管控和约束,尽可能降低质量问题出现几率。 参考文献: [1]许长江.谈土木工程施工项目质量管理的加强[J].四川水泥,2016(7):218+57. [2]徐明晶.提升土木工程施工项目质量管理的对策[J].住宅与房地产,2016(6):142. [3]廖翔.如何加强土木工程的施工项目质量管理[J].科技经济导刊,2016(5):198. [4]张晓玲.加强土木工程施工项目质量管理的措施[J].企业科技与发展,2015(17):97~98. [5]胡春锦.论加强土木工程施工项目质量管理的对策[J].赤峰学院学报(自然科学版),2015(4):24~26. [6]王明,邓冬冬.探讨提升土木工程施工项目质量管理的对策[J].门窗,2013(1):227+229. 猜你喜欢: 1. 土木工程本科毕业论文 2. 土木工程毕业论文范文 3. 土木工程毕业论文范本 4. 浅谈土木工程毕业论文 5. 关于土木工程毕业论文范文

土木工程毕业论文参考文献

导语:随着科学技术的进步和工程实践的发展,土木工程这个学科也已发展成为内涵广泛、门类众多、结构复杂的综合体系。对我们的生活产生深远的影响。下面是我分享的土木工程毕业论文的参考文献,欢迎阅读!

土木工程毕业论文参考文献 篇1

1.《建筑结构制图标准》GB/T50105-2001

2.《建筑结构荷载规范》GB5009-2001(2006版)

3.《混凝土结构设计规范》GB50010-2002

4.《建筑地基基础设计规范》GB5007-2002

5.《砌体结构设计规范》GB5003-2001

6.《建筑抗震设计规范》GB5011-2001

7.《钢结构设计规范》GB50017-2003

8.《建筑结构构造资料》(合订本),中国建筑工业出版社,1998年。

9.《混凝土结构构造手册》,中国建筑工业出版社,2002年。

10.《地基基础设计手册》,上海科技出版社,1998年。

11.《混凝土结构设计手册》,中国建筑工业出版社,2002年。

12.《建筑结构静力计算手册》,中国建筑工业出版社,1999年

13.《建筑结构强制性国家标准》(简装本),中国建筑工业出版社,2001年9月

14. 任全宏、常建军.钢筋混凝土多层框架结构房屋结构设计中应注意的几个问题。陕西建筑2007,145(7).

15. 范俊梅. 钢筋混凝土多层框架结构设计问题分析. 科技资讯2008,3.

16. Basic Principles for Reinforced Concrete Structure Design

17.建筑、结构设计有关图集资料以及专业课程教材等。

土木工程毕业论文参考文献 篇2

[1] 齐骥, 徐波. 建筑工程管理学[M]. 陕西科学技术出版社.2003

[2] 刘正周. 管理激励. 上海财经大学出版社.1999 年 1 月

[3] 刘志远, 林云. 现代企业激励机制.上海人民出版社.1997 年,第 6 页

[4] 李旭伟. 总承包体制下项目质量管理研究[J]. 科技管理研究.2006(04)

[5] 侯光明. 管理激励与约束.北京理工大学出版社.1999 年,第 80 页

[6] 杨红军. 非正式制度与企业文化研究.吉林大学 2004 年硕士论文

[7] 姜敢闯. 现代企业激励问题研究.中南大学 2002 年硕士论文

[8] 张婷. 中西方管理特点比较分析. 山东大学 2009 年硕士论文

[9] 张曼玲. 企业内部会计控制研究.首都经济贸易大学 2004 年 3 月.

[10] 陈郁.所有权、控制权与激励. 上海三联书店、上海人民出版社.1998 年

[11] 齐骥, 徐波. 香港的建筑管理制度[J]. 建筑,2002(2):50-52.

[12] 戚安邦. 现代项目管理[M]. 北京:对外经济贸易大学出版社,2001 年.

[13] 王宗昌. 建筑工程质量控制实例[M]. 科学出版社.2004

[14] 王宗昌, 高振东. 建筑工程质量百问[M]. 北京:中国建筑工业出版社.1999

[5] 朱宏亮. 项目进度管理[M]. 北京:清华大学出版社,2002 年.

[16] 刘迎心, 李清立. 中国建筑工程质量现状剖析、国际借鉴、未来对策[M]. 中国建筑工业出版社.2007

土木工程毕业论文参考文献 篇3

[1] 张飞涟,周继祖.铁路建设项目后评价理论体系的研究[J].综合运输,2010(12) :25-28

[2] 黄 恺.积极开展商业房地产项目后评价[J].城市开发.2011(10): 76

[3] 汪红霞,商业地产项目引入后评价的探讨[J].重庆教育学院学报,(6):93-95

[4] 曲琳莉.正确进行商业房地产项目后评价研究[J].特区经济.2011(10), 299

[5] 曾珍香.可持续发展协调性分析[J].系统工程观论与文践,2011(3): 18-21

[6] 倪枫杰,黄金枝.工秤项目后评价研究综述[J].建筑技术开发,2009,31(11):103-106

[7] 许晓峰,肖 翔.建设项目后评价[M].中华工商联合出版社,2000

[8] 吕军印.浅谈环境经济评价的类别划分[J].中国环境保护.

[9] 张三力.项目后评价[M].清华大学出版社,2003

[10] 王 超.项目决策与管理[M].中国对外经济贸易出版社.2005

[11] 曹炳元.应用模糊数学与系统[M].中国:科学出版社,2005

[12] 戚成邦.项目评估学[M].大津:南开大学出版社.2006

[13] 徐 强.技术经济学原理与方法[M].北京:北京科学技术出版社.1993

土木工程毕业论文致谢

首先要向恩师表示衷心的感谢和深深的敬意。在两年半的研究生生活中,于老师无论是在学习上、工作上还是生活上都给了我极大的帮助,在为人处事上给予了我很大的启发。尤其是在本论文的创作过程中,从论文的选题、材料的`准备、开题、一直到论文撰写的整个过程,于老师都给予了我认真的检查和悉心的指导,于老师的这种严谨认真的治学态度,对我论文创作的整个过程都起到了巨大的推动作用。她严谨的治学精神、勤奋的工作态度和谦虚的处事风格无不时刻激励着我、启发着我,在今后的工作、生活和学习中我要更加勤奋努力、锐意进取。

其次,我要由衷的感谢许骏老师对我论文前期准备工作的指导以及在深入企业调研和实施过程中,我的校外导师及中国建筑工程第八工程局有限公司的领导和同事们给我的帮助以及给我提供的宝贵资料。同时,我还要感谢我的家人、朋友和同学们对我论文写作提供的支持和帮助。

最后,我要向在百忙之中抽出时间对本文进行评审和参加我答辩并提出宝贵意见的各位老师和专家表示衷心的感谢!

我国社会经济不断快速发展,特别是近些年来,土木工程的建设发展十分迅速。下文是我为大家搜集整理的关于土木工程大学本科毕业论文的内容,欢迎大家阅读参考!

浅析土木工程施工中混凝土技术的运用

摘要:混凝土技术是目前国内、外建筑领域工程项目施工建设过程中常用的一种技术手段,同时也是建筑行业快速发展的技术保障。实践中可以看到,混凝土是确保土木工程项目整体施工质量的重要影响因素,混凝土技术水平在很大程度上关系着整个工程项目施工建设质量和应用安全可靠性。因此,在当前的形势下,加强对混凝土技术及其在土木施工过程中的应用问题研究,具有非常重大的现实意义。本文将对土木工程施工建设过程中用到的几种混凝土技术进行分析,并在此基础上提出一些建设性建议,以供参考。

关键词:土木工程施工建设混凝土技术

1土木施工中的混凝土浇筑技术

土木工程项目施工建设过程中,对混凝土质量有标准和要求,土木工程施工建设中用到的混凝土,其强度一般在C20至C40之间,该范围内的土木工程项目施工建设用料(混凝土)选择过程中,还应当根据建筑构造要求、性能等,对混凝土进行合理的配筋作业;比如,针对土木工程项目中的大体积混凝土浇筑比例方法,对钢筋数量适当增加,而且钢筋可承受混凝土浇筑时中的温度应力,可以有效对混凝土裂缝等病害进行控制。土木工程项目施工建设过程中,尤其是混凝土浇筑前,应当对混凝土温度、产生的温度应力等进行全面预算,并且合理确定土木工程施工过程中的温度指标、混凝土温度变化情况。

在此基础上,还要制定温度变化管控措施,并且对土木工程项目施工建设过程中的各种混凝土裂缝病害问题进行预防,以此来确保土木工程项目整体施工质量。土木工程施工过程中,混凝土浇筑施工是一项比较难操作的的工程,主要是因为混凝土的成分是水、砂石,并且还有加入适量的外加剂。在混凝土施工过程在,通常因上述组成材料的比例控制不好,而容易出现施工质量问题。比如,因混凝土灌水量不足,而形成收缩性裂缝,该种情况容易发生在混凝土施工时地基受到限制的情况下。在具体的土木工程施工建设过程中,因内部拉应力比混凝土抗拉强度大,所以可能会产生内部裂缝病害。之所以会出现拉应力超标现象,主要原因在于水分、温度等参数不合理。

比如,温度性病害,主要是因为热胀冷缩,混凝土膨胀、收缩过程中,形成挤压应力、拉伸应力,进而导致混凝土结构内部产生裂缝。基于以上分析可知,混凝土施工过程中,应当把握好混凝土浇筑技术,具体分析如下:第一,全面分层技术。在土木工程施工过程中,混凝土结构施工时常用分层技术进行浇筑,首层浇筑后、初凝前,对第二层进行浇筑,然后以此类推,逐层进行浇筑施工操作,直到最终完成施工任务。同时,利用该技术手段,可以有效确保施工质量,而且建筑结构平面一定要避免过大,施工时从短边依次向长边进行施工操作。第二,分段分层技术。土木工程施工过程中,采用分层技术手段进行浇筑,其强度一般都非常的大,若现场施工机械难以有效满足施工质量要求,则建议采用分段分层技术进行浇筑施工作业。具体操作过程中,应当从底层开始,完成一段距离后,再对第二层进行浇筑,如此往复至浇筑完毕为止。第三,斜面分层技术。土木工程施工过程中,该技术适用于结构相对较长,超过厚度本身大约3倍的工况,将混凝土一次性浇筑到顶,混凝土可形成自然斜面坡1∶3,振捣时应当确保从浇筑层最底端开始施工,然后逐层上移。

2土木施工中的混凝土振捣技术

土木工程施工过程中,振捣是一个非常重要的环节,混凝土自吊斗口下落过程中,自由降落的有效高度应当控制在2米范围之内。实践中,若浇筑高度在3米以上,则需采取有效的保护措施,比如利用溜管、入串桶等。混凝土浇筑过程中,应当本着分段分层、不间断的原则进行施工作业,根据建筑结构的特点、钢筋材料的疏密程度等,合理确定浇筑层的有效高度。通常情况下,浇筑层有效高度为振捣器作用范围的倍时,最大高度也不能超过50厘米。实际振捣施工过程中,若所选用的是插入式振捣器设备,则应当保持快插、慢播。其中,插点的排列一定要均匀,而且依点移动,严格按照设计要求和顺序进行施工作业,不可出现遗漏,确保振实均匀性。在振捣过程中,对移动间距也提出了更高的要求,比如移动间距不能超过振捣半径的倍,一般在30至40厘米之间。在上层振捣过程中,建议插入下层大约5厘米位置,以此来有效避免两层间产生接缝问题。在布设表面振动器移动间距时,每一次移动间距均需确保底板完全覆盖已振捣的区域边缘,在结构衔接位置的混凝土可达到标准密实度要求。

3土木工程施工中的箍筋施工技术

土木工程混凝土施工过程中,各个梁柱节点位置的箍筋施工非常重要,箍筋施工时,钢筋分布比较密集,操作人员需高空作业,尤其是纵横交错处,箍筋绑扎操作难度比较大。在此过程中,若采用的是整体沉梁施工方式,则节点位置的下部箍筋绑扎难度非常的大,甚至会导致梁柱节点位置无法准确放置柱箍筋,产生安全隐患。在具体施工过程中,建议采用两个开口箍筋拼台方式,即在节点位置采用开口箍筋施工技术手段,通过规范箍筋封闭、箍筋末端弯钩构造,可确保箍筋对混凝土核心的有效约束作用。

然而,分层下箍施工方法的实际应用难度非常的大,建议拆除节点处的模板,只有这样才能保证节点箍筋间距、绑扎安全可靠性。梁板模板施工安装完毕后,方可对梁板钢筋进行安装,进而对整体沉梁进行施工作业。从施工效果来看,该种施工方法,钢筋堆放、运输以及绑扎,整体施工非常的安全,交叉工序也比较多。在施工过程中,应当避免支模与绑钢筋不发生冲突,施工效率高。在此过程中,针对节点箍筋少放、难以确保箍筋间距等问题,笔者建议采用以下技术措施进行处理。首先,下料施工时,每个节点位置均应当适当增加纵向短筋;其次,柱节点位置箍筋焊接过程中,在纵向短筋上构建骨架;同时,还要将整体骨架套入柱纵筋,并且将其布设在楼板模板面之上,用穿粱钢筋对其进行牢固绑扎。

4土木工程施工中的混凝土养护技术

混凝土施工技术在国内建筑行业发展过程中的应用非常的广泛,实际操作过程中多采用的是泵送混凝土施工模式。采用泵送混凝土施工技术,可有效缩短施工工期,改善混凝土性能。在土木工程项目施工建设过程中,应当做好原材料购置、配比以及振捣等环节的质量管控,以免混凝土强度不达标。土木工程施工中的混凝土养护过程中,主要的养护技术手段包括以下几个方面的内容。第一,墙板混凝土完成浇筑振捣以后,需带模养护7天以上。拆模以后,挂上两层麻袋将其严密的覆盖好,继续对其进行保温。在此过程中,需洒水养护到两周的时间;第二,顶板混凝土浇捣施工完成、终凝以后,6小时内不能浇水,以免出现起灰、起皮等问题;8至12小时内,用薄膜可将其严密覆盖,而且面层加盖两层麻袋进行保温和养护,确保7天内混凝土足够的湿润。3~4天以后,确认混凝土核心温度高峰期过去,再正常洒水养护至14d(满足UEA防水混凝土养护要求)。

5结语

土木工程施工过程中的混凝土施工技术应用非常的广泛,而且涉及到诸多方面的影响因素,因此实践中应当加强重视和技术创新,只有这样才能确保我国建筑行业的可持续发展。

参考文献:

[1]杨毅,马士良,王涛,等.混凝土温升抑制抗裂技术在镇江西津湾地下停车场工程中的应用[J].混凝土,2015(8):143-145.

[2]张永存,李青宁.薄壁混凝土渡槽结构施工过程中的温度应力分析[J].混凝土与水泥制品,2015(10).

[3]胡伟华,彭刚,黄仕超,等.基于声发射技术的混凝土动态损伤特性研究[J].长江科学院院报,2015(02):123-127.

>>>下页带来更多的土木工程大学本科毕业论文

  • 索引序列
  • 土木工程的毕业论文中英翻译
  • 土木工程毕业论文外文翻译
  • 土木工程专业毕业论文外文翻译
  • 土木毕业论文文献翻译
  • 毕业论文土木工程
  • 返回顶部