• 回答数

    5

  • 浏览数

    125

牙牙的美食美刻
首页 > 学术论文 > 土木工程专业毕业论文外文翻译

5个回答 默认排序
  • 默认排序
  • 按时间排序

吃那么一天

已采纳

这是一小段,看看行吧,行我就全传给你Organization of this textCivil engineering,the oldest of the engineering specialties,is the planning,design,construction, and management of the built environment.This environment includes all structures built according to scientific principles,from irrigation and drainage systems to rocket-launching facilities.土木工程,最老的工程专业,是建筑环境的规划、设计、施工和管理。这个环境包括从灌溉和排水系统到火箭发射设施的所有根据科学原理建造的结构物。Civil engineers build roads,bridges,tunnels,dams,harbors,power plants,water and sewage systems,hospitals,schools,mass transit,and other public facilities essential to modern society and large population concentrations.土木工程师修建道路、桥梁、隧道、大坝、港口、发电站、水系统和污水系统,医院、学校、公共交通系统,以及现代化社会和大量人口集中的地方所必需的其他公共设施。Civil engineering and civil engineersThey also build privately owned facilities such as airports, railroads,pipelines, skyscrapers, and other large structures designed for industrial,commercial, or residential use.他们也修建私人拥有的设施,如机场、铁路、水渠、高楼大厦,和为工业、商业、民用设计的其他大型建筑。

179 评论

雪莉小姐的

你是哪个省的啊 看看如果可以的话 可以给你一份全面的

185 评论

浮云秋叶

The urban river embankment discuss the ecological constructionAnonymous XXXXXXXXAbstract: the urban river embankment construction as the object, discuss the current social background, analyses and compares the river embankment design of traditional methods and characteristics of ecological methods, and puts forward three modes of ecological design and their advantages and disadvantages, and expounds the present situation of the ecological construction in domestic bank and future : the bank; Ecology; Design way; Domestic situationText:A, backgroundRiver Banks part is the amphibious interlaced transition belt, has the remarkable edge effect. Here are active substances, nutrient and energy flow, offer a habitat for a variety of creatures. Natural state Banks often species richness, productivity traditional embankment design often single ?一、背景河流的堤岸部分是水陆交错的过渡地带,具有显著的边缘效应。这里有活跃的物质、养分和能量的流动,为多种生物提供了栖息地。自然状态下的堤岸往往物种丰富、生产力高。传统的堤岸设计往往会单纯从防洪角度出发,采用土堤或者土石混合堆砌起来高高的堤岸。它的优点在于高度的可靠性,结构设计后加起防护堤岸抗流水冲刷能力显著增强。对于洪水暴发频繁、侵蚀严重的区段,这样的设计无可厚非,而对于一般河流堤岸的修建,这样的设计则显得缺乏环境的美化和绿化,同时也破坏许多对生态起重要作用的自然因素,如破坏植被与河床间的联系,造成冲刷侵蚀转移等。另外,河流作为城市风貌不可多得的珍惜资源,也是城市风貌的特色要素,它的景观塑造显得十分必要。同时,堤岸景观建设必然使滨河地区土地价值提升,滨水开发的高投资回报的特点更增强了对城市堤岸景观建设的需求。二、需求——堤岸的生态化建设河流堤岸作为城市中最邻近河流的区域,是城市与河流的衔接线,它的景观规划是提高城市生活品质的需要,也是丰富城市景观的需要。生态化建设,它的根本思路是运用自然本身抗干扰和自我修复的能力来处理人与自然的关系。生态设计方法不同于传统用人工的结构和形式来取代自然的方法,而是用自然的结构和形式来顺应自然的进程。将河岸与河道在生态上联系起来,也就实现了物质、养分、能量的交流:对于生物,它提供了合适的栖息地;植物根系可固着土壤,枝叶可截留雨水,过滤地表迳流,抵抗流水冲刷,从而起到保护堤岸、增加堤岸结构的稳定性、净化水质、涵养水源的作用,而且随着时间的推移,这些作用被不断加强。同时,生态化建设以自然的外貌出现,容易与环境取得协调,造价也较低,不需要长期的维护管理。三、河流堤岸生态化设计方式河流堤岸生态化设计,要遵守生态设计的原则,注重地方性、保护与节约自然资本、让自然做功、显露自然,主要体现在对地域气候环境、河流地质地貌、水文变化的适应,对河流生态环境的考虑,对堤岸地形的处理和对筑堤材料的选择和构造方式方面。1) 人工类:传统方法是采用块石或混凝土块砖等堆砌。可在此基础上加以改进以适应河流景观设计的需求。a) 块石或混凝土块砖干砌,不用砂浆。这样在砌块之间就留有空隙,为后期滨河植物的生长提供了空间。随着时间的推移,堤岸会逐渐呈现出自然的风貌。b) 堤岸采用台阶式分级,台阶面上的空间加以利用,种植植物。当然这两种改进方法对于河岸处现有植被仍存在一定的不良影响,人工痕迹也过于明显。2) 自然类:充分利用堤岸植被原型,可直接将适用于滨河地带生长的植被种植于堤岸上,利用植物的根、茎、叶来稳固堤岸,防止侵蚀、控制沉积的同时也为生物提供了栖息地。3) 人工自然相结合综合了以上两种方法的优点,具有人工结构的稳定性和自然的外貌,见效快、生态效益好,以下为常见的两种类型:a) 种植植物的堆石将由大小不同的石块组成的堆石置于与水接触的土壤表面,再把活体切枝插入石堆中使斜坡更加稳定。根系可提高强度,植被可遮盖石块,使堤岸外貌更加自然。b) 与植物结合使用的插孔式混凝土块将预制的混凝土块以连锁的形式置于岸底的浅渠中,再将植物切枝或植株扦插于混凝土块之间和堤岸上部,其上覆土压实,再播种草本植物。堤岸生态化建设也存在一定的局限性。如:选用的材料及建造方法不同,堤岸的防护能力相差很大,需要运用多学科知识认真分析,这就为设计人员提出了更大的挑战;建造初期若受到强烈干扰,则会影响到以后防护作用的发挥等。这也就对河流堤岸的生态化设计提出了更高的要求。四、国内现状1)省会城市在我国省会城市及计划单列市中有近80%进行了堤岸景观规划。(参考文献[3])城 市 项目名称 城 市 项目名称北 京 长河城市水系统综合治理 南 宁 堤岸园工程长 沙 湘江风光带 宁 波 滨江大道沿江景观工程成 都 府南河绿化工程 上 海 外滩、陆家嘴滨江大道福 州 闵江江滨公园 沈 阳 浑河观光旅游带广 州 珠江二沙段堤岸景观、芳村长堤建设 太 原 汾河公园贵 阳 南明河景观绿化工程 天 津 海河堤岸改造工程哈尔滨 松花江南岸沿江风景长廊 武 汉 汉口江滩一二期工程昆 明 盘龙江中段滨水生态景观建设 西 安 灞河大水大绿工程兰 州 黄河风情线 重 庆 南滨路滨江旅游观光大道从规划后建成情况看,这些城市河流堤岸景观项目都得到了当地政府与市民的肯定。在这些项目中,堤岸既可成为当地最具吸引力的城市公园,如太原的汾河公园和福州的江滨公园;堤岸也可成为市民日常休闲活动的热点地段,如南宁的堤路园和武汉的汉口江滩工程;堤岸还可成为城市最具特色的地段,如重庆的南滨路滨江旅游观光大道;堤岸更可成为城市旅游的热点,如上海的外滩和陆家嘴滨江大道。总之,经过景观规划的堤岸已成为当地最具特色的地区。从建设效果看,相对堤岸的原来面貌而言,统计资料中的这些景观工程都是较成功的,都成为当地城市关注的热点,成为当地政府的政绩工程,成为当地的民心工程。城市河流堤岸通过景观规划,有效地改善了滨河地段的环境,并带动滨河地段的开发。但必须清醒地认识到,这些城市堤岸景观项目规划并非尽善尽美,也存在这样或那样的问题,仍有待完善。2)中小城市城市经济实力的强大决定了其城市建设水平的高标准和高水平。中小城市河流堤岸景观与统计资料中的城市存在较大的差距,存在更多的问题。特别是由于资金问题,堤岸景观是,纯人工,状态的钢筋混凝土防洪堤,或保持自然防洪状态的土石堤,没有经过景观规划,易造成城市资源的极大浪费。五、前景目前,河流景观建设,特别是城市河流景观建设,在中国正方兴未艾;在发达国家中也是一个久盛不衰的话题。 回顾发达国家河流景观建设的历史,自20世纪70年代以来,随着人们环境意识的普遍增强,重视河流景观的生态功能已成为一个时代的呼唤,河流景观建设的生态设计方法也已得到了空前的重视和发展。他山之石可以攻玉,借鉴发达国家已经形成的成熟的理念和做法,可以使我们少走弯路,搭上隆隆前进的生态建设之车。

158 评论

爱心小猪

土木工程的key哀,速度,

155 评论

华尔街学徒工

刚好我也在做毕业设计 把我的给你用吧! Traditional Construction ProceduresAs mentioned before, construction under the traditional construction procedure is performed by contractors. While they would like to satisfy the owner and the building designers, contractors have the main objective of making a profit. Hence, their initial task is to prepare a bid price based on an accurate estimate of construction costs. This requires development of a concept for performance of the work and a construction time schedule. After a contract has been awarded, contractors must furnish and pay for all materials, equipment, power, labor, and supervision required for construction. The owner compensates the contractors for construction costs and general contractor assumes overall responsibility for construction of a building. The contractor engages subcontractors who take responsibility for the work of the various trades required for construction. For example, a plumbing contractor installs the plumbing, an electrical contractor installs the electrical system, and an elevator contractor installs elevators. Their contracts are with the general contractor, and they are paid by the general , in addition to a general contractor, the owner contracts separately with specialty contractors, such as electrical and mechanical contractors, who perform a substantial amount of the work require for a building. Such contractors are called prime contractors. Their work is scheduled and coordinated by the general contractor, but they are paid directly by the also, the owner may use the design-build method and award a contract to an organization for both the design and construction of a building. Such organizations are called design-build contractors. One variation of this type of contract is employed by developers of groups of one-family homes or low-rise apartment buildings. The homebuilder designs and constructs the dwellings, but the design is substantially completed before owners purchase the of the construction procedure often is difficult. Consequently, some owners seek assistance from an expert, called a professional construction manager, with extensive construction experience, who receives a fee. The construction manager negotiates with general contractors and helps select one to construct the building. Managers usually also supervise selection of subcontractors. During construction, they help control costs, expedite equipment and material deliveries, and keep the work on schedule. In some cases, instead, the owner may prefer o engage a construction program manager, to assist in administrating both design and contractors employ labor that may or may not be unionized. Unionized craftspeople are members of unions that are organized by construction trades, such as carpenter, plumber, and electrician unions, Union members will perform only the work assigned to their construction, all work should be inspected. For this purpose, the owner, often through the architect and consultants, engages inspectors. The field inspectors may be placed under the control of an owner’s representative, who may be titled clerk of the works, architect’s superintendent, engineer’s superintendent, or resident engineer. The inspectors have the responsibility of ensuring that construction meets the requirements of the contract documents and is performed under safe conditions. Such inspections may be made at frequent addition, inspections also are made by representatives of one or more governmental agencies. They have the responsibility of ensuring that construction meets legal requirements and have little or no concern with detailed conformance with the contract documents. Such legal inspections are made periodically or at the end of certain stages of construction. One agency that will make frequent inspections is the local or state building department, whichever has jurisdiction. The purpose of these inspections is to ensure conformance with the local or state building is a description of the basic traditional construction procedure for a multistory the award of a construction contract to a general contractor, the owner may ask the contractor to start a portion of the work before signing of the contract by giving the contractor a letter of intent or after signing of the contract by issuing a written notice to proceed. The contractor then obtains construction permits, as required, form governmental agencies, such as the local building, water, sewer, and highway general contractor plans and schedules construction operations in detail and mobilizes equipment and personnel for the project. Subcontractors are notified of the contract award and issued letters of intent or awarded subcontracts, then are given, at appropriate times, notices to construction starts, the general contractor orders a survey to be made of adjacent structures and terrain, both for the record and to become knowledgeable of local conditions. A survey is then made to lay out offices for the contractor are erected on or near the site. If desirable for safety reasons to protect passersby, the required to be removed from the site are demolished and the debris is carted , the site is prepared to receive the building. This work may involve grading the top surface to bring it to the proper elevations, excavating to required depths for basement and foundations, and shifting of utility piping. For deep excavations, earth sides are braced and the bottom is construction starts with the placement of foundations, on which the building rests. This is followed by the erection of load-bearing walls and structural framing. Depending on the height of the building, ladders, stairs, or elevators may be installed to enable construction personnel to travel from floor to floor eventually to the roof. Also, hoists may be installed to lift materials to upper levels. If needed, temporary flooring may be placed for use of the building rises, pipes, ducts, and electric conduit and wiring are installed. Then, permanent floors, exterior walls, and windows are constructed. At the appropriate time, permanent elevators are installed. If required, fireproofing is placed for steel framing. Next, fixed partitions are built and the roof and its covering are put is place,Finishing operations follow. There include installation of the following: ceilings; tile; wallboard; wall paneling; plumbing fixtures; heating furnaces; air-conditioning equipment; heating and cooling devices for rooms; escalators; floor coverings; window glass; movable partitions; doors; finishing hardware; electrical equipment and apparatus, including lighting fixtures, switches, transformers, and controls; and other items called for in the drawings and specifications. Field offices, fences, bridges, and other temporary construction must be removed from the site. Utilities, such as gas, electricity, and water, are hooked up to the building. The sit is landscaped and paved. Finally, the building interior is painted and owner’s representatives then give the building a final inspection. If they find that the structure conforms with the contract documents, the owner accepts the project and gives the general contractor final payment on issuance by the building department of a certificate of occupancy, which indicates that the completed building meets building-code requirements.传统的施工程序众所周知,在传统的施工程序中进行施工的承包商。尽管他们想满足业主和建筑设计师的要求,但是最终还是以赚取利润为主要目标的。因此,他们最初的任务是对编写投标价格的建筑成本进行准确的估计。这就需要进行前期调查的工作并且做出施工时间表。等合约批出后,施工方必须提供所有材料并支付其费用,设备,电力,劳动力。业主此时需要进行必要的监督。一个总承包商承担一个建筑整体的责任。从事分包的承建商则需承担建造工程所需的各个工作。例如,管道承包商安装水管,电业承办商安装电气系统,电梯则由电梯承包商安装。他们与总承包商签订合同,费用由总承包商支付。有时候,除了一个总承包商,还有各种专业承包商,如电气和机械承包商,执行工作时需要与业主签订合同。这种承包商被称为间接承包商。他们的工作,由总承包商协调,但它们都是由业主直接联系。还有些时候,业主可以使用设计建造方法同时兼有设计和建筑施工单位的职能。这些单位被称为设计建造承包商。这方面的一个类型的合同聘用的变化是由一户住宅或低层住宅建筑群的开发。在房屋建筑设计和建造的住房,但设计之前需要由购买房屋的业主完成。施工过程管理往往是困难的。因此,一些业主会去寻求专家的协助,这些专家被称为专业施工经理,他们具有丰富的施工经验。施工经理与总承包商进行谈判,并选择其中一个项目。施工经理通常还监督分包商。在施工期间,它们有助于控制成本,加快运送设备和材料,并保持工作的进度。在依法行政,协助设计和建设的情况下,业主可以选择从事建筑项目经理。建筑承包商雇用的劳动力,一般有大工和小工。大工再建筑工程中从事技术活,如木工,管道工,工会成员和电工工会,小工则执行了分配给他们的工作。在施工期间,一切工作都要验收。因此,业主通过建筑师和监理经常进行督查。可能是名为工程员,建筑师或驻地工程师。作为业主的代表实地视察。核查人员必须确保工程符合合同文件的要求,并在安全的条件下进行的责任。这种检查可作出重复。此外,验收还是需要一个或多个政府机构的代表。他们必须确保工程符合法律要求,并负责检查与合同文件是否一致。这种视察一般定期或在某些阶段施工结束以后进行。地方或国家建设部门具有管辖权。这些检查的目的是确保符合当地或国家的建筑规范。以下是传统多层建筑施工的基本程序。建造开始后合同授予开发商,业主可要求开发商开始施工之前签约给或之后签约发出书面通知的同时另一部分工作继续进行。紧接着施工方根据需要获取建筑许可证,例如当地的建设,供水,污水处理,政府机构和公路部门。总承包商的计划和进度详细施工作业以及动员项目设备和人员。分包商得到通知后,做出签订合同的意向或授予分包合同书,然后给出在适当的时候进行通知。在施工前启动,总承包商要进行的一项调查就是邻近结构和地形,这些都要记录在案,并要熟悉当地情况。这项调查结束以后,随即进行布局建设。承建商的现场办事处都建在施工现场或附近。为了安全起见,必须从脚手架上移除的东西,产生的碎片都要运走。下一步,该网架是为建设工程准备的。这项工作为地下室开挖和基础开挖的深度,以及公用事业管道转移找到正确的标高。深挖掘,土方支撑,底部排出。建筑开始于基础上,然后是承重墙和结构框架的施工。梯子,楼梯,或电梯的安装,可让施工人员往返于各个楼层。此外,可安装卷扬机来运送材料。由于建筑高度的上升,管道,电力管道和线路安装以及永久地板,外墙,窗户和构造的影响。在适当的时候,永久的电梯安装。再需要的情况下可以安装防火卷帘。其次,屋顶等地方也需要安装。精加工工序安装有包括以下内容:天花板,瓷砖,墙板,墙壁镶板,水管装置,加热炉,空气调节设备,加热和冷却室装置;自动扶梯;地板,窗户玻璃;活动板,门;电气设备和仪器,包括照明灯具,开关,变压器,控制器,遵照项目的图纸和规格。外地办事处,围栏,桥梁和其他临时建筑,公共设备,如天然气,电力管道,水管,都连接到建筑上。最后,是建筑物内部的打扫和清洗。业主的代表,会给建设工程作最后检查。如果他们满意并认为符合合同文件,那么业主接受该项目,并交给总承包商的一个占用证书,这表明,总承包商已完成建设,建设部门再根据建筑规范的要求发放最后付款。

310 评论

相关问答

  • 土木工程检测专业毕业论文

    土木工程大学本科毕业论文篇2 浅析土木工程施工质量管理 摘要:土木工程项目实施过程中重点加强对于施工质量的管控是必不可少的,尤其是随着当

    星无畏惧 3人参与回答 2023-12-07
  • 土木工程专业毕业论文框架

    毕业设计(论文)是学生毕业前最后一个重要学习环节,是学习深化与升华的重要过程。它既是学生学习、研究与实践成果的全面总结,又是对学生素质与能力的一次全面检验,而且

    gaooooo汪汪 4人参与回答 2023-12-10
  • 土木工程毕业论文外文翻译

    土木工程的英文是Civil Engineering ,直译是民用工程,它是建造各种工程的统称。它既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材

    同济装潢设计 4人参与回答 2023-12-11
  • 土木工程专业毕业论文答辩

    论文陈述可以很好地组织和发展论点,并为读者提供关于论点的“指南”。 论文陈述包含以下内容: 1、陈述你对这个主题的主要观点 陈述观点时一定要表达一个主要思想,并

    女儿我爱你 3人参与回答 2023-12-10
  • 本科毕业论文土木工程专业

    题目是一篇论文的“眼睛”,是读者关注的首个要点,特别是对于土木工程专业论文而已,题目的好坏会直接影响到导师的评审结果,那么 土木工程本科论文题目如何拟定比较好呢

    dreamydream 3人参与回答 2023-12-09